Oracle  Primavera  Successfully  Manage  Cost  and  Schedule  with  Primavera  Unifier  and  Primavera  P6

Ray  McEnteeDirector,  Product  Strategy

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Safe  Harbor  StatementThe  following  is  intended  to  outline  our  general  product  direction.  It  is  intended  for  information  purposes  only,  and  may  not  be  incorporated  into  any  contract.  It  is  not  a  commitment  to  deliver  any  material,  code,  or  functionality,  and  should  not  be  relied  upon  in  making  purchasing  decisions.  The  development,  release,  and  timing  of  any  features  or  functionality  described  for  Oracle’s  products  remains  at  the  sole  discretion  of  Oracle.

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Why• Integrate  cost  and  schedule  across  Unifier  and  P6.• Need  to  be  able  to  compare  forecasted  schedule  and  costs  from  baselines  to  the  current  project  in  terms  of  cash  flow  and  summarized  by  CBS.• Be  able  to  cost  a  resource-­‐loaded  P6  Project.

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Benefits• Ability  to  compare  top  down  estimates/budgets  within  Unifier  with  bottom-­‐up  developed  costs  from  P6.• Ability  to  cost,  resource  loaded  schedules  within  Unifier.• Compare  Forecasts  from  Unifier  Business  Processes  and  P6  Baselines  and  Current  Project  with  the  Unifier  Cost  Sheet  and  Cash  Flow.• Use  P6  data  as  sources  of  input  to  EV.

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Primavera  P6

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Supported  Use  Cases• Duration  Based  Schedule–Only  Dates  sent  to  Unifier

• Resource-­‐Based  Schedule– Dates  and  Resource  Unit  Spreads  sent  to  Unifier.  Costs  can  be  calculated  in  Unifier

• Cost-­‐Loaded  Schedules– Dates,  Resource  Unit  and  Cost  Spreads  sent  to  Unifier

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Schedule  Type

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Summarization  Level• Data  summarized  by  CBS  to  predefined  WBS  levels– Complete  – all  WBS  Codes– Levels  – to  a  user  defined  level  of  WBS– Partial  – user  selects  which  WBS  level  on  any  branch  in  the  hierarchy

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Summarization  Level

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

CBS  Codes  now  at  Assignments/Expenses

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Send  Data  to  Unifier

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Send  WBS  Hierarchy  to  Unifier  Cost  Sheet

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Unifier  Cost  Codes  created  in  the  Cost  Sheet

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Send  Summary  Data  to  Unifier

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Can  send  the  current  Project  and  include  Baselines

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Baseline  Selected

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

• Planned  – Start  &  Finish  Dates– Resource  Unit  Spreads  (Only  

Resource  &  Cost  Type  projects)

– Cost  Spreads  (Only   Cost   Type  projects)• Actual  – Start  &  Finish  Dates– Resource  Unit  Spreads  (Only  

Resource  &  Cost  Type  projects)

– Cost  Spreads  (Only  Cost  Type  projects)

• Remaining  – Start  &  Finish  Dates– Resource  Unit  Spreads  (Only  Resource  

&  Cost  Type   projects)– Cost  Spreads  (Only  Cost  Type  projects)

• At  Completion  – Start  &  Finish  Dates– Resource  Unit  Spreads  (Only  

Resource  &  Cost  Type  projects)

– Cost  Spreads  (Only   Cost   Type  projects)

Data  being  sent  to  Unifier,  summarized  by  CBS  Code  at  the  defined  WBS  Level

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Unifier  10.1

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Resource  &  Cost  Loaded  Schedules• P6  Resource  assigned  to  the  Project  are  automatically  created  as  Roles  in  Unifier.  (Roles   in  Unifier  provide  the  rates  and  assigned  currency)• P6  Resource  Based  projects  will  be  costed within  Unifier  as  they  are  integrated.   If  a  rates  do  not  exist  for  a  role  then  they  can  be  added  and  the  P6  Summary  Sheet  can  be  re-­‐costed.

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Project  Detail  Form  updated  with  Schedule  Type  from  P6

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Role  created  within  Unifier

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Role  currency  and  rates

The  currency   for  the  role  can  be  defined  and  Unifier  will  convert  the  rate  to  the  project  currency.  Escalating  Rates  can  be  defined.

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Define  P6  Data  Sources

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

P6  Summary  Sheets

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

P6  Summary  Sheet  – Overall  Summary

Sheet  shows    summary   by  Unifier  WBS  and  Role.  All  Dates  and  available  Costs  and  Units  are  displayed.  Clicking  on  the  links  will  display   the  detail.

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

P6  Summary  Sheet  – By  Month

Drill  down  to  the  detail  by  Week,  Month,   Quarter  or  Year.  Clicking  on   the  links  will  display  more  detail.

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

P6  Summary  Sheet  – By  Month

Drill  down  to  the  detail  by  Week,  Month,   Quarter  or  Year.  Clicking  on   the  links  will  display  more  detail.

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

P6  Summary  Sheet  – By  Day

The  lowest  level  of  detail  will  shows  costs  and  units  

by  day.

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Unifier  Cash  Flow

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Create  new  Cash  Flow  by  WBS

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Cash  Flow  – Baseline  Curve

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Cash  Flow  – Actual  Curve

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Cash  Flow  – Forecast  Curve

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Cash  Flow  Graph

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Unifier  Cost  Sheet

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Define  the  Cost  Sheet  Columns  -­‐ BaselineThe  P6  Summary  Sheets  become  

Datasources for  the  Cost  Sheet

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Define  the  Cost  Sheet  Columns  -­‐ Actuals

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Cost  Sheet

Values  from  the  Project  Baseline

Values  from  the  Current  Project

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Unifier  Earned  Value

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Create  a  new  Earned  Value  Sheet

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Planned  Value

PV  is  based  on  our  Project  

Baseline  Planned  Cost

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

EV  is  based  on  the  Progress   that  

has  been  captured   in  P6

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

EAC  is  based  on  the  AT  

Completion  Costs  of  the  

Current  Project  

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

EV  Work  Sheet.

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

EV  Graph

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Capturing  Progress

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Capturing  Progress  in  P6  and  sending  to  Unifier

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

P6  Summary  Sheets  show  ActualsWe  can  drill  down  into  the  details  as  we  saw  earlier.

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

P6  Summary  Sheets  show  At  Completion

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

This  data  then  updates  the  Cash  Flow

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

It  updates  the  Cost  Sheet

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

And  finally  the  EV  can  be  updated

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

In  Summary• This  new  integration  provides  a  means  of  comparing  top-­‐down  budgets  with  bottom-­‐up  costs  defined  within  the  schedule.• It  also  allows  us  to  compare  the  various  baselines  to  review  the  performance  of  the  project.

Copyright  ©  2014  Oracle  and/or  its  affiliates.  All  rights  reserved.    |

Safe  Harbor  StatementThe  preceding  is  intended  to  outline  our  general  product  direction.  It  is  intended  for  information  purposes  only,  and  may  not  be  incorporated  into  any  contract.  It  is  not  a  commitment  to  deliver  any  material,  code,  or  functionality,  and  should  not  be  relied  upon  in  making  purchasing  decisions.  The  development,  release,  and  timing  of  any  features  or  functionality  described  for  Oracle’s  products  remains  at  the  sole  discretion  of  Oracle.