summary bid tab - cfpua
TRANSCRIPT
SUMMARY BID TABNORTHERN WATER MAINS PROJECT
CAPE FEAR PUBLIC UTILITY AUTHORITYWilmington, North Carolina
HIGHFILL Project No.: CFA1801HIGHFILL INFRASTRUCTURE ENGINEERING, P.C
7/16/2019
Pay Item No.
Item Description Est. Qty. Unit UNIT PRICE EXTENDED TOTAL UNIT PRICE
EXTENDED TOTAL UNIT PRICE
EXTENDED TOTAL UNIT PRICE
EXTENDED TOTAL
1 Mobilization (max. 3% of total) 1 LS $100,000.00 100,000.00$ $169,465.00 169,465.00$ 155,000.00$ 155,000.00$ 96,825.00$ 96,825.00$
2 Horizontal Directional Drilling, 18‐inch DIPS DR11 HDPE (200 PSI)a STA. 54+12 to STA. 58+07 (SR 1358) 1 LS $100,000.00 100,000.00$ $100,000.00 100,000.00$ 130,000.00$ 130,000.00$ 85,374.00$ 85,374.00$ b STA. 66+77 to STA. 70+62 (SR 1358) 1 LS $100,000.00 100,000.00$ $100,000.00 100,000.00$ 140,000.00$ 140,000.00$ 84,480.00$ 84,480.00$ c STA. 80+59 to STA. 84+44 (NC 133) 1 LS $100,000.00 100,000.00$ $100,000.00 100,000.00$ 120,000.00$ 120,000.00$ 84,480.00$ 84,480.00$ d STA. 103+63 to STA. 106+99 (NC 133) 1 LS $90,000.00 90,000.00$ $90,000.00 90,000.00$ 114,000.00$ 114,000.00$ 73,200.00$ 73,200.00$ e STA. 113+49 to STA. 118+82 (NC 133) 1 LS $132,500.00 132,500.00$ $135,000.00 135,000.00$ 160,000.00$ 160,000.00$ 109,740.00$ 109,740.00$ f STA. 123+80 to STA. 126+65 (NC 133) 1 LS $80,000.00 80,000.00$ $75,000.00 75,000.00$ 10,000.00$ 10,000.00$ 70,698.00$ 70,698.00$ g STA. 214+59 to STA. 217+99 (SR 2158) 1 LS $90,000.00 90,000.00$ $90,000.00 90,000.00$ 114,000.00$ 114,000.00$ 77,652.00$ 77,652.00$ h STA. 219+83 to STA. 223+23 (SR 2158) 1 LS $90,000.00 90,000.00$ $90,000.00 90,000.00$ 110,000.00$ 110,000.00$ 77,652.00$ 77,652.00$
3Boring and Jacking, 24‐inch Diameter Casing (0.375" Steel), Roadways Excluding I‐140, as shown on plans (Includes 16‐inch DI Carrier Pipe) 540 LF $540.00 291,600.00$ $700.00 378,000.00$ 700.00$ 378,000.00$ 405.00$ 218,700.00$
4Boring and Jacking, 24‐inch Diameter Casing (0.375" Steel), I‐140, as shown on plans (Includes 16‐inch DI Carrier Pipe) 390 LF $400.00 156,000.00$ $750.00 292,500.00$ 840.00$ 327,600.00$ 405.00$ 157,950.00$
5Boring and Jacking, 24‐inch Diameter Casing (0.375" Steel), Railroad, as shown on plans (Includes 16‐inch DI Carrier Pipe) 145 LF $500.00 72,500.00$ $1,000.00 145,000.00$ 720.00$ 104,400.00$ 410.00$ 59,450.00$
6Boring and Jacking, 16‐inch Diameter Casing (0.375" Steel), as shown on plans (Includes 8‐inch DI Carrier Pipe) 55 LF $500.00 27,500.00$ $625.00 34,375.00$ 700.00$ 38,500.00$ 300.00$ 16,500.00$
7 16‐inch C‐900 DR18 PVC Restrained Joint Water Distribution Pipe, Open Cut 3800 LF $75.00 285,000.00$ $180.00 684,000.00$ 112.00$ 425,600.00$ 90.00$ 342,000.00$ 8 16‐inch C‐900 DR18 PVC Water Distribution Pipe, Open Cut 15526 LF $45.00 698,670.00$ $150.00 2,328,900.00$ 80.00$ 1,242,080.00$ 75.00$ 1,164,450.00$
916‐inch RJ CL 350 DIP Water Distribution Pipe, Open Cut (Contaminated Soils) 500 LF $100.00 50,000.00$ $200.00 100,000.00$ 180.00$ 90,000.00$ 115.00$ 57,500.00$
10 8‐inch C‐900 DR18 PVC Restrained Joint Water Distribution Pipe, Open Cut 250 LF $25.00 6,250.00$ $130.00 32,500.00$ 97.00$ 24,250.00$ 40.00$ 10,000.00$ 11 4‐inch C‐900 Water Distribution Pipe, Open Cut 430 LF $20.00 8,600.00$ $120.00 51,600.00$ 37.00$ 15,910.00$ 25.00$ 10,750.00$ 12 16‐inch, C153 90 Degree RJ Bend 3 EA $1,525.00 4,575.00$ $1,250.00 3,750.00$ 2,000.00$ 6,000.00$ 1,325.00$ 3,975.00$ 13 16‐inch, C153 45 Degree RJ Bend 39 EA $1,325.00 51,675.00$ $1,000.00 39,000.00$ 1,700.00$ 66,300.00$ 1,225.00$ 47,775.00$ 14 16‐inch, C153 22.5 Degree RJ Bend 16 EA $1,300.00 20,800.00$ $950.00 15,200.00$ 1,500.00$ 24,000.00$ 1,200.00$ 19,200.00$ 15 16‐inch, C153 11.25 Degree RJ Bend 15 EA $1,325.00 19,875.00$ $975.00 14,625.00$ 1,500.00$ 22,500.00$ 1,200.00$ 18,000.00$ 16 8‐inch C153 90 Degree RJ Bend 2 EA $475.00 950.00$ $300.00 600.00$ 600.00$ 1,200.00$ 495.00$ 990.00$ 17 4‐inch C153 90 Degree RJ Bend 4 EA $100.00 400.00$ $200.00 800.00$ 400.00$ 1,600.00$ 275.00$ 1,100.00$ 18 Fire Hydrant Assembly 26 EA $5,875.00 152,750.00$ $5,000.00 130,000.00$ 7,800.00$ 202,800.00$ 7,570.00$ 196,820.00$ 19 2‐inch Blow‐Off Assembly 4 EA $1,650.00 6,600.00$ $1,500.00 6,000.00$ 3,000.00$ 12,000.00$ 2,885.00$ 11,540.00$ 20 Tangential Blow‐off Assembly 5 EA $7,750.00 38,750.00$ $2,500.00 12,500.00$ 4,700.00$ 23,500.00$ 4,085.00$ 20,425.00$ 21 16" x 8" C153 Reducer 1 EA $1,050.00 1,050.00$ $675.00 675.00$ 1,000.00$ 1,000.00$ 905.00$ 905.00$ 22 16" x 8" C153 Cross 1 EA $1,925.00 1,925.00$ $1,500.00 1,500.00$ 2,500.00$ 2,500.00$ 1,675.00$ 1,675.00$ 23 16" x 16" C153 Tee 3 EA $2,050.00 6,150.00$ $3,000.00 9,000.00$ 2,400.00$ 7,200.00$ 1,900.00$ 5,700.00$ 24 8" x 8" C153 Tee 1 EA $625.00 625.00$ $450.00 450.00$ 800.00$ 800.00$ 650.00$ 650.00$ 25 8" C153 MJ Cap 1 EA $300.00 300.00$ $200.00 200.00$ 800.00$ 800.00$ 280.00$ 280.00$ 26 16" x 8" Tapping Sleeve and Gate Valve 3 EA $7,750.00 23,250.00$ $5,000.00 15,000.00$ 7,300.00$ 21,900.00$ 5,615.00$ 16,845.00$ 27 16" x 6" Tapping Sleeve and Gate Valve 1 EA $7,150.00 7,150.00$ $5,000.00 5,000.00$ 6,300.00$ 6,300.00$ 4,925.00$ 4,925.00$ 28 16" x 4" Tapping Sleeve and Gate Valve 4 EA $6,675.00 26,700.00$ $5,000.00 20,000.00$ 5,800.00$ 23,200.00$ 4,600.00$ 18,400.00$
LOW BIDDER
T. A. Loving CompanyP.O. Drawer 919
Goldsboro, NC 27533License # 325
Ruby‐Collins, Inc.4875 Martin Court, SESmyrna, GA 30082License # 6613
Garney Companies, Inc.5828 Oak Drive
Mint Hill, NC 28227License # 25801
Herring‐Rivenbark, Inc.P.O. Box 3425
Kinston, NC 28502License # 3937
WATER
Page 1 of 2
SUMMARY BID TABNORTHERN WATER MAINS PROJECT
CAPE FEAR PUBLIC UTILITY AUTHORITYWilmington, North Carolina
HIGHFILL Project No.: CFA1801HIGHFILL INFRASTRUCTURE ENGINEERING, P.C
7/16/2019 LOW BIDDER
T. A. Loving CompanyP.O. Drawer 919
Goldsboro, NC 27533License # 325
Ruby‐Collins, Inc.4875 Martin Court, SESmyrna, GA 30082License # 6613
Garney Companies, Inc.5828 Oak Drive
Mint Hill, NC 28227License # 25801
Herring‐Rivenbark, Inc.P.O. Box 3425
Kinston, NC 28502License # 3937
29 16" Gate Valve Assembly 37 EA $8,200.00 303,400.00$ $10,000.00 370,000.00$ 12,000.00$ 444,000.00$ 9,900.00$ 366,300.00$ 30 8" Gate Valve Assembly 4 EA $1,425.00 5,700.00$ $1,500.00 6,000.00$ 12,000.00$ 48,000.00$ 2,740.00$ 10,960.00$ 31 Water Service Connection, 5/8", Same Side 85 EA $920.00 78,200.00$ $1,000.00 85,000.00$ 1,400.00$ 119,000.00$ 945.00$ 80,325.00$ 32 Water Service Connection, 5/8", Opposite Side 90 EA $1,100.00 99,000.00$ $1,500.00 135,000.00$ 1,700.00$ 153,000.00$ 1,010.00$ 90,900.00$ 33 Water Service Connection, 6", Same Side (Open Cut) 1 EA $6,500.00 6,500.00$ $10,000.00 10,000.00$ 6,900.00$ 6,900.00$ 900.00$ 900.00$ 34 Commercial Water Service Connection and Valve Vault 1 EA $37,500.00 37,500.00$ $30,000.00 30,000.00$ 41,000.00$ 41,000.00$ 35,750.00$ 35,750.00$ 35 Connect to Existing 16‐inch Waterline 4 EA $5,000.00 20,000.00$ $5,000.00 20,000.00$ 10,000.00$ 40,000.00$ 7,145.00$ 28,580.00$ 36 Connect to Existing 8‐inch Waterline 2 EA $2,000.00 4,000.00$ $2,500.00 5,000.00$ 3,000.00$ 6,000.00$ 4,525.00$ 9,050.00$ 37 Contaminated Soil Removal and Replacement 750 CY $98.50 73,875.00$ $200.00 150,000.00$ 92.00$ 69,000.00$ 80.00$ 60,000.00$ 38 Contaminated Groundwater Residuals 20000 GAL $0.95 19,000.00$ $2.00 40,000.00$ 7.00$ 140,000.00$ 2.50$ 50,000.00$ 39 Contaminated Soil Testing Allowance (Station 16+00 and Station 21+00) 1 LS $15,000.00 15,000.00$ $15,000.00 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$
40 Asphalt Driveway Repair 60 SY $80.00 4,800.00$ $85.00 5,100.00$ 60.00$ 3,600.00$ 150.00$ 9,000.00$ 41 Concrete Driveway and Sidewalk Repair 300 LF $120.00 36,000.00$ $75.00 22,500.00$ 69.00$ 20,700.00$ 80.00$ 24,000.00$ 42 Gravel Driveway Repair 832 LS $7.50 6,240.00$ $15.00 12,480.00$ 34.00$ 28,288.00$ 40.00$ 33,280.00$ 43 Power Pole Stabilization Allowance 1 LS $20,000.00 20,000.00$ $20,000.00 20,000.00$ 20,000.00$ 20,000.00$ 20,000.00$ 20,000.00$ 44 Undercut Excavation and Stabilization Stone 1000 CY $75.00 75,000.00$ $50.00 50,000.00$ 93.00$ 93,000.00$ 40.00$ 40,000.00$ 45 Select Backfill 1000 CY $25.00 25,000.00$ $30.00 30,000.00$ 31.00$ 31,000.00$ 30.00$ 30,000.00$ 46 Sampling Station 3 EA $2,500.00 7,500.00$ $1,000.00 3,000.00$ 2,000.00$ 6,000.00$ 4,750.00$ 14,250.00$
47 Temporary Erosion Control Measures and Seeding 1 LS $250,000.00 250,000.00$ $150,000.00 150,000.00$ 102,000.00$ 102,000.00$ 127,290.00$ 127,290.00$ Total 3,928,860.00$ Total 6,429,720.00$ Total 5,509,428.00$ Total 4,212,191.00$
48Horizontal Directional Drilling of 18‐inch DIPS PE4710 DR11 HDPE (200 PSI)
1 LS $120,000.00 120,000.00$ $93,810.00 93,810.00$ 203,238.00$ 203,238.00$ 175,500.00$ 175,500.00$ Note: Alternate 1 Total replaces item 3 with item 48. Total with Alt. 1 3,757,260.00$ Total with Alt. 1 6,145,530.00$ Total with Alt. 1 5,334,666.00$ Total with Alt. 1 4,168,991.00$
Garney total was $5,525,428.00
MISCELLANEOUS
EROSION CONTROL MEASURES
Page 2 of 2
SUMMARY BID TABNORTHERN WATER MAINS PROJECT
CAPE FEAR PUBLIC UTILITY AUTHORITYWilmington, North Carolina
HIGHFILL Project No.: CFA1801HIGHFILL INFRASTRUCTURE ENGINEERING, P.C
7/16/2019
Pay Item No.
Item Description Est. Qty. Unit UNIT PRICE EXTENDED TOTAL UNIT PRICE
EXTENDED TOTAL UNIT PRICE EXTENDED TOTAL
1 Mobilization (max. 3% of total) 1 LS $185,000.00 185,000.00$ 175,000.00$ 175,000.00$ $209,720.00 209,720.00$
2 Horizontal Directional Drilling, 18‐inch DIPS DR11 HDPE (200 PSI)a STA. 54+12 to STA. 58+07 (SR 1358) 1 LS $128,375.00 128,375.00$ 143,000.00$ 143,000.00$ $141,946.00 141,946.00$ b STA. 66+77 to STA. 70+62 (SR 1358) 1 LS $125,125.00 125,125.00$ 141,000.00$ 141,000.00$ $139,096.00 139,096.00$ c STA. 80+59 to STA. 84+44 (NC 133) 1 LS $125,125.00 125,125.00$ 140,000.00$ 140,000.00$ $139,096.00 139,096.00$ d STA. 103+63 to STA. 106+99 (NC 133) 1 LS $109,200.00 109,200.00$ 130,000.00$ 130,000.00$ $126,273.00 126,273.00$ e STA. 113+49 to STA. 118+82 (NC 133) 1 LS $173,225.00 173,225.00$ 177,000.00$ 177,000.00$ $181,840.00 181,840.00$ f STA. 123+80 to STA. 126+65 (NC 133) 1 LS $92,625.00 92,625.00$ 117,000.00$ 117,000.00$ $110,601.00 110,601.00$ g STA. 214+59 to STA. 217+99 (SR 2158) 1 LS $110,500.00 110,500.00$ 130,000.00$ 130,000.00$ $126,273.00 126,273.00$ h STA. 219+83 to STA. 223+23 (SR 2158) 1 LS $110,500.00 110,500.00$ 130,000.00$ 130,000.00$ $126,273.00 126,273.00$
3Boring and Jacking, 24‐inch Diameter Casing (0.375" Steel), Roadways Excluding I‐140, as shown on plans (Includes 16‐inch DI Carrier Pipe) 540 LF $1,080.00 583,200.00$ 815.00$ 440,100.00$ $1,163.00 628,020.00$
4Boring and Jacking, 24‐inch Diameter Casing (0.375" Steel), I‐140, as shown on plans (Includes 16‐inch DI Carrier Pipe) 390 LF $780.00 304,200.00$ 735.00$ 286,650.00$ $1,154.00 450,060.00$
5Boring and Jacking, 24‐inch Diameter Casing (0.375" Steel), Railroad, as shown on plans (Includes 16‐inch DI Carrier Pipe) 145 LF $1,050.00 152,250.00$ 815.00$ 118,175.00$ $1,139.00 165,155.00$
6Boring and Jacking, 16‐inch Diameter Casing (0.375" Steel), as shown on plans (Includes 8‐inch DI Carrier Pipe) 55 LF $970.00 53,350.00$ 780.00$ 42,900.00$ $1,049.00 57,695.00$
7 16‐inch C‐900 DR18 PVC Restrained Joint Water Distribution Pipe, Open Cut 3800 LF $117.00 444,600.00$ 125.00$ 475,000.00$ $130.00 494,000.00$ 8 16‐inch C‐900 DR18 PVC Water Distribution Pipe, Open Cut 15526 LF $86.00 1,335,236.00$ 82.00$ 1,273,132.00$ $97.00 1,506,022.00$
9 16‐inch RJ CL 350 DIP Water Distribution Pipe, Open Cut (Contaminated Soils) 500 LF $167.00 83,500.00$ 190.00$ 95,000.00$ $131.00 65,500.00$
10 8‐inch C‐900 DR18 PVC Restrained Joint Water Distribution Pipe, Open Cut 250 LF $115.00 28,750.00$ 100.00$ 25,000.00$ $40.00 10,000.00$ 11 4‐inch C‐900 Water Distribution Pipe, Open Cut 430 LF $107.00 46,010.00$ 85.00$ 36,550.00$ $20.00 8,600.00$ 12 16‐inch, C153 90 Degree RJ Bend 3 EA $1,490.00 4,470.00$ 1,650.00$ 4,950.00$ $1,701.00 5,103.00$ 13 16‐inch, C153 45 Degree RJ Bend 39 EA $1,350.00 52,650.00$ 1,425.00$ 55,575.00$ $1,497.00 58,383.00$ 14 16‐inch, C153 22.5 Degree RJ Bend 16 EA $1,330.00 21,280.00$ 1,400.00$ 22,400.00$ $1,472.00 23,552.00$ 15 16‐inch, C153 11.25 Degree RJ Bend 15 EA $1,330.00 19,950.00$ 1,425.00$ 21,375.00$ $1,489.00 22,335.00$ 16 8‐inch C153 90 Degree RJ Bend 2 EA $610.00 1,220.00$ 425.00$ 850.00$ $615.00 1,230.00$ 17 4‐inch C153 90 Degree RJ Bend 4 EA $460.00 1,840.00$ 220.00$ 880.00$ $381.00 1,524.00$ 18 Fire Hydrant Assembly 26 EA $8,500.00 221,000.00$ 5,900.00$ 153,400.00$ $8,192.00 212,992.00$ 19 2‐inch Blow‐Off Assembly 4 EA $4,400.00 17,600.00$ 1,200.00$ 4,800.00$ $2,658.00 10,632.00$ 20 Tangential Blow‐off Assembly 5 EA $5,900.00 29,500.00$ 2,400.00$ 12,000.00$ $3,636.00 18,180.00$ 21 16" x 8" C153 Reducer 1 EA $1,000.00 1,000.00$ 900.00$ 900.00$ $1,167.00 1,167.00$ 22 16" x 8" C153 Cross 1 EA $1,900.00 1,900.00$ 2,100.00$ 2,100.00$ $2,159.00 2,159.00$ 23 16" x 16" C153 Tee 3 EA $2,100.00 6,300.00$ 2,300.00$ 6,900.00$ $2,305.00 6,915.00$ 24 8" x 8" C153 Tee 1 EA $750.00 750.00$ 620.00$ 620.00$ $778.00 778.00$ 25 8" C153 MJ Cap 1 EA $430.00 430.00$ 200.00$ 200.00$ $441.00 441.00$ 26 16" x 8" Tapping Sleeve and Gate Valve 3 EA $9,200.00 27,600.00$ 14,500.00$ 43,500.00$ $8,571.00 25,713.00$ 27 16" x 6" Tapping Sleeve and Gate Valve 1 EA $8,300.00 8,300.00$ 7,750.00$ 7,750.00$ $7,974.00 7,974.00$ 28 16" x 4" Tapping Sleeve and Gate Valve 4 EA $8,000.00 32,000.00$ 7,400.00$ 29,600.00$ $7,329.00 29,316.00$
WATER
R.H. Moore Company, Inc.P.O. Box 830
Murrells Inlet, SC 29576License # 15276
State Utility Contractors, Inc.P.O. Box 5019
Monroe, NC 28111License # 17793
Carolina Civilworks Inc.P.O. Box 80337
Raleigh, NC 27623License # 74658
Page 1 of 2
SUMMARY BID TABNORTHERN WATER MAINS PROJECT
CAPE FEAR PUBLIC UTILITY AUTHORITYWilmington, North Carolina
HIGHFILL Project No.: CFA1801HIGHFILL INFRASTRUCTURE ENGINEERING, P.C
7/16/2019 R.H. Moore Company, Inc.
P.O. Box 830Murrells Inlet, SC 29576
License # 15276
State Utility Contractors, Inc.P.O. Box 5019
Monroe, NC 28111License # 17793
Carolina Civilworks Inc.P.O. Box 80337
Raleigh, NC 27623License # 74658
29 16" Gate Valve Assembly 37 EA $8,700.00 321,900.00$ 8,500.00$ 314,500.00$ $9,630.00 356,310.00$ 30 8" Gate Valve Assembly 4 EA $1,800.00 7,200.00$ 1,500.00$ 6,000.00$ $1,780.00 7,120.00$ 31 Water Service Connection, 5/8", Same Side 85 EA $1,400.00 119,000.00$ 1,200.00$ 102,000.00$ $2,808.00 238,680.00$ 32 Water Service Connection, 5/8", Opposite Side 90 EA $3,500.00 315,000.00$ 2,600.00$ 234,000.00$ $4,846.00 436,140.00$ 33 Water Service Connection, 6", Same Side (Open Cut) 1 EA $1,550.00 1,550.00$ 7,800.00$ 7,800.00$ $6,213.00 6,213.00$ 34 Commercial Water Service Connection and Valve Vault 1 EA $50,000.00 50,000.00$ 45,000.00$ 45,000.00$ $34,564.00 34,564.00$ 35 Connect to Existing 16‐inch Waterline 4 EA $11,000.00 44,000.00$ 4,900.00$ 19,600.00$ $16,101.00 64,404.00$ 36 Connect to Existing 8‐inch Waterline 2 EA $9,500.00 19,000.00$ 2,300.00$ 4,600.00$ $11,209.00 22,418.00$ 37 Contaminated Soil Removal and Replacement 750 CY $85.00 63,750.00$ 162.00$ 121,500.00$ $189.00 141,750.00$ 38 Contaminated Groundwater Residuals 20000 GAL $3.00 60,000.00$ 8.00$ 160,000.00$ $3.25 65,000.00$ 39 Contaminated Soil Testing Allowance (Station 16+00 and Station 21+00) 1 LS $15,000.00 15,000.00$ 15,000.00$ 15,000.00$ $15,000.00 15,000.00$
40 Asphalt Driveway Repair 60 SY $310.00 18,600.00$ 74.00$ 4,440.00$ $400.00 24,000.00$ 41 Concrete Driveway and Sidewalk Repair 300 LF $148.00 44,400.00$ 125.00$ 37,500.00$ $237.00 71,100.00$ 42 Gravel Driveway Repair 832 LS $30.00 24,960.00$ 40.00$ 33,280.00$ $68.00 56,576.00$ 43 Power Pole Stabilization Allowance 1 LS $20,000.00 20,000.00$ 20,000.00$ 20,000.00$ $20,000.00 20,000.00$ 44 Undercut Excavation and Stabilization Stone 1000 CY $105.00 105,000.00$ 71.00$ 71,000.00$ $123.00 123,000.00$ 45 Select Backfill 1000 CY $32.00 32,000.00$ 38.00$ 38,000.00$ $62.00 62,000.00$ 46 Sampling Station 3 EA $4,700.00 14,100.00$ 2,600.00$ 7,800.00$ $2,765.00 8,295.00$
47 Temporary Erosion Control Measures and Seeding 1 LS $207,500.00 207,500.00$ 175,000.00$ 175,000.00$ $178,257.00 178,257.00$ Total 6,121,521.00$ Total 5,860,327.00$ Total 7,045,391.00$
48Horizontal Directional Drilling of 18‐inch DIPS PE4710 DR11 HDPE (200 PSI)
1 LS $137,700.00 137,700.00$ 190,000.00$ 190,000.00$ $173,139.00 173,139.00$ Note: Alternate 1 Total replaces item 3 with item 48. Total with Alt. 1 5,676,021.00$ Total with Alt. 1 5,610,227.00$ Total with Alt. 1 6,590,510.00$
MISCELLANEOUS
EROSION CONTROL MEASURES
Page 2 of 2