summary of cavity performance in s1-global

25
E. KAKO (KEK) 2011' Mar. 22 ALCPG11 meeting 1 Summary of Cavity Performance in S1-Global

Upload: tara-rollins

Post on 31-Dec-2015

50 views

Category:

Documents


0 download

DESCRIPTION

Summary of Cavity Performance in S1-Global. Outline. Overview of S1-Global Cryomodule Cavity Performance 4-cavity, 7-cavity operation Summary. Cryomodule - C. Cryomodule - A. International Team for S1-Global. A. Bosotti, C. Pagani, R. Paparella, P. Pierini, INFN (Italy) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Summary of Cavity Performance in S1-Global

E. KAKO (KEK) 2011' Mar. 22 ALCPG11 meeting

Global Design Effort

1

Summary of Cavity Performance in S1-Global

Page 2: Summary of Cavity Performance in S1-Global

E. KAKO (KEK) 2011' Mar. 22 ALCPG11 meeting

Global Design Effort

2

Outline• Overview of S1-Global Cryomodule• Cavity Performance• 4-cavity, 7-cavity operation• Summary

Cryomodule - C Cryomodule - A

Page 3: Summary of Cavity Performance in S1-Global

E. KAKO (KEK) 2011' Mar. 22 ALCPG11 meeting

Global Design Effort

3

A. Bosotti, C. Pagani, R. Paparella, P. Pierini, INFN (Italy)

K. Jensch, D. Kostin, L. Lilje, A. Matheisen, W.-D. Moeller, M. Schmoekel, P. Schilling, H. Weise,

DESY (Germany)

T. Arkan, S. Barbanotti, M. Battistoni, H. Carter, M. Champion, A. Hocker, R. Kephart, J. Kerby, D. Mitchell,

Y. Pischalnikov, T.J. Peterson, M. Ross, W. Schappert, B. Smith, FNAL (USA)

C. Adolphsen, C. Nantista, SLAC (USA)

M. Akemoto, S. Fukuda, K. Hara, H. Hayano, N. Higashi, E. Kako, H. Katagiri, Y. Kojima, Y. Kondo, T. Matsumoto, S. Michizono, T. Miura, H. Nakai, H. Nakajima, K. Nakanishi, S. Noguchi, N. Ohuchi, T. Saeki,

M. Satoh, T. Shishido, T. Shidara, T. Takenaka, A. Terashima,N. Toge, K. Tsuchiya, K. Watanabe, S. Yamaguchi,

A. Yamamoto, Y. Yamamoto, K. Yokoya, KEK (Japan)

International Team for S1-Global

Page 4: Summary of Cavity Performance in S1-Global

E. KAKO (KEK) 2011' Mar. 22 ALCPG11 meeting

Global Design Effort

4

S1-Global Cryomodule (8 cavities)

2 FNAL 2 DESY 2 KEK 2 KEK

INFN/Milano

S1-Global Cryomodule

Page 5: Summary of Cavity Performance in S1-Global

E. KAKO (KEK) 2011' Mar. 22 ALCPG11 meeting

Global Design Effort

5

Blade Tuner (FNAL) Saclay Tuner (DESY)

Slide-Jack Tuner (KEK)

TTF-III Coupler (DESY/FNAL) STF-II Coupler (KEK)

TESLA Cavity (DESY/FNAL)Tesla-like Cavity (KEK)

Cavities, Tuners, Couplers in S1-G Cryomodule

Comparisonof

Performance

Page 6: Summary of Cavity Performance in S1-Global

E. KAKO (KEK) 2011' Mar. 22 ALCPG11 meeting

Global Design Effort

6

2 cavities from FNAL 2 cavities from DESY

8 Cavities for S1-Global (ave. 30 MV/m)4 cavities from KEK

Vertical Test Results of 8 Cavities

Page 7: Summary of Cavity Performance in S1-Global

E. KAKO (KEK) 2011' Mar. 22 ALCPG11 meeting

Global Design Effort

7

Collaboration for Cryomodule Assembly

Cavity string assembly (2010, Jan.)

Tuner assembly (2010, Feb.)

Coupler assembly (2010, Mar.)

KEK Cavity string assembly (2010, Mar.)

Page 8: Summary of Cavity Performance in S1-Global

E. KAKO (KEK) 2011' Mar. 22 ALCPG11 meeting

Global Design Effort

8

Collaboration for Cryomodule Tests

Tuner performance tests (2010, July)

Cavity processing (2010, Sept.)

Lorentz detuning tests (2010, Oct.) Dynamic loss meas. (2010, Nov.)

Page 9: Summary of Cavity Performance in S1-Global

E. KAKO (KEK) 2011' Mar. 22 ALCPG11 meeting

Global Design Effort

9

High power system in S1-Global

Cryomodule-CFNAL (AES004, ACC011) cav.DESY (Z108, Z109) cavities4 TTF-III couplers(cylindrical rf window, 40 )

Cryomodule-A4 KEK cavities(MHI-05, MHI-06, MHI-07, MHI-09)4 STF-II couplers(coaxial disk rf window, 60 )

Page 10: Summary of Cavity Performance in S1-Global

E. KAKO (KEK) 2011' Mar. 22 ALCPG11 meeting

Global Design Effort

10

RF processing of input couplers

Cryomodule-C /KLY#1 (2MW)Cryomodule-A /KLY#2 (5MW)

0.5 ms, 5 Hz, 500 kW1.5 ms, 5 Hz, 200 kW

Aug. 25 ~ Sept. 07 (10 days)

Page 11: Summary of Cavity Performance in S1-Global

E. KAKO (KEK) 2011' Mar. 22 ALCPG11 meeting

Global Design Effort

11

RF processing time of input couplers

Cryomodule-C(TTF-III couplers)ave. processing time~ 21 hours

Cryomodule-A(STF-II couplers)ave. processing time~ 13 hours

20 hr

20 hr

.

Vacuum I/L ; 2.x10-4 Pa

at room temperature

Page 12: Summary of Cavity Performance in S1-Global

E. KAKO (KEK) 2011' Mar. 22 ALCPG11 meeting

Global Design Effort

12

Adjustment of frequency (f0 )

Cryomodule - C Cryomodule - A

1300.00MHz 1300.00MHz

1299.92MHz

fo = 1299.92 MHz

(A4/MHI-09; 1299.91 MHz, limit)C2/ACC011; Tuner did not work.

Page 13: Summary of Cavity Performance in S1-Global

E. KAKO (KEK) 2011' Mar. 22 ALCPG11 meeting

Global Design Effort

13

QL of Variable Input Coupler

2.4 X 106

Cryomodule – C(TTF-III couplers)

Cryomodule – A(STF-II couplers)

QL = 2.4 x 106 f bw = 542 Hz

Page 14: Summary of Cavity Performance in S1-Global

E. KAKO (KEK) 2011' Mar. 22 ALCPG11 meeting

Global Design Effort

14

MHI-09MHI-07

MHI-06MHI-05AES004 ACC011 Z108 Z109

FNAL DESY

Vertical Testave. 30 MV/m

2010’Oct. 21

Flat-top = 1.0 ms, 5 Hz

Comparison of VT and CT

Cryomodule Test ave. 28 MV/m

Individual cavity test

Page 15: Summary of Cavity Performance in S1-Global

E. KAKO (KEK) 2011' Mar. 22 ALCPG11 meeting

Global Design Effort

15

Comparison of VT and CT

Severe degradationof 9~12 MV/m inACC011 (FNAL)

Z108 (DESY)

ave. Eacc,max= 25.3 MV/m

(Cryomodule-C)

ave. Eacc,max= 30.4 MV/m

(Cryomodule-A)

Page 16: Summary of Cavity Performance in S1-Global

E. KAKO (KEK) 2011' Mar. 22 ALCPG11 meeting

Global Design Effort

16

Required rf power for 8-cav. operation

MHI-09MHI-07

MHI-06MHI-05AES004 ACC011 Z108 Z109

FNAL DESY KEK

26 MV/m

24 MV/m

18 MV/m

29 MV/m

20 MV/m

38 MV/m

33 MV/m

23 MV/m

Stable operating Eacc (individual cavity) Calc. ave. EaccC : 25 MV/mA : 29 MV/mC&A : 27 MV/m

Page 17: Summary of Cavity Performance in S1-Global

E. KAKO (KEK) 2011' Mar. 22 ALCPG11 meeting

Global Design Effort

17

4-Cavity Operation in Cryomodule-CFB/on, Piezo/off, ave. Eacc = 22.5 MV/m

C1/AES004 C2/ACC011 C3/Z108 C4/Z109

24.6 MV/m 21.3 MV/m 16.8 MV/m 27.0 MV/mEacc =

100Hz/div 50Hz/div 50Hz/div 100Hz/div

Page 18: Summary of Cavity Performance in S1-Global

E. KAKO (KEK) 2011' Mar. 22 ALCPG11 meeting

Global Design Effort

18

4-Cavity Operation in Cryomodule-AFB/on, Piezo/off, ave. Eacc = 28.4 MV/m

A1/MHI-05 A2/MHI-06 A3/MHI-07 A4/MHI-09

23.7 MV/m 25.6 MV/m 31.1 MV/m 23.0 MV/mEacc =

100Hz/div 100Hz/div 100Hz/div 50Hz/div

Page 19: Summary of Cavity Performance in S1-Global

E. KAKO (KEK) 2011' Mar. 22 ALCPG11 meeting

Global Design Effort

19

Frequency shift due to Lorentz detuning

C4/Z109 (29MV/m) A2/MHI-06 (38MV/m)

FB/on, Piezo/off FB/on, Piezo/off

Pre-detuningby motor tuner& piezo tunerwith DC voltage

Compensationby piezo tuner inpulsed operation

Flat TopFlat Top

Rise Time Rise Time

200~500 Hz 2~3 kHz

Page 20: Summary of Cavity Performance in S1-Global

E. KAKO (KEK) 2011' Mar. 22 ALCPG11 meeting

Global Design Effort

20

Comparison of Detuning Frequency by LFD

MHI-09MHI-07

MHI-06MHI-05AES004

ACC011Z108 Z109

FNAL DESY KEK

TESLA cavityBlade tuner

TESLA cavitySaclay tuner

Tesla-like cavitySlide-jack tuner

Page 21: Summary of Cavity Performance in S1-Global

E. KAKO (KEK) 2011' Mar. 22 ALCPG11 meeting

Global Design Effort

21

7-cavity operation in Cryomodule-C&A

A1 : 16 MV/m A2 : 39 MV/m A3 : 34 MV/m A4 : 22 MV/m

C1 : 26 MV/m

C3 : 18 MV/m

C4 : 30 MV/m

C : ave. 25 MV/m

A : ave. 27 MV/m

Ave. Eacc = 26.2 MV/m ; FB/on, Piezo/on, 1299.900 MHz

100Hz/div 200Hz/div 200Hz/div 100Hz/div

100Hz/div 100Hz/div 100Hz/div

C2 : Detune

Page 22: Summary of Cavity Performance in S1-Global

E. KAKO (KEK) 2011' Mar. 22 ALCPG11 meeting

Global Design Effort

22

7-cavity operation in Cryomodule-C&A

Ave. Eacc = 25.4 MV/m ; FB/on, Piezo/off, 1299.923 MHz

C : ave. 23 MV/m

A : ave. 29 MV/m

C1 : 24 MV/mA1 : 15 MV/m

C2 : 23 MV/mA2 : 38 MV/m

C3 : 17 MV/m

A3 : 33 MV/m

C4 : 38 MV/m

A4 : Detune

200Hz/div 200Hz/div

200Hz/div200Hz/div

100Hz/div 100Hz/div

100Hz/div

A4 : Detune

Page 23: Summary of Cavity Performance in S1-Global

E. KAKO (KEK) 2011' Mar. 22 ALCPG11 meeting

Global Design Effort

23

MHI-09MHI-07

MHI-06MHI-05AES004 ACC011 Z108 Z109

FNAL DESY KEK

Comparison of cavity performance

ave. Eacc,max VT : 30 MV/m1 cav : 27 MV/m7 cav : 26 MV/m

D

C

D : DetuneC : Coupler

D

Op

era

tin

g E

acc

[M

V/m

]

Page 24: Summary of Cavity Performance in S1-Global

E. KAKO (KEK) 2011' Mar. 22 ALCPG11 meeting

Global Design Effort

24

Summary Achieved ave. 27 MV/m in cryomodule tests was 10% reduction from ave. 30 MV/m in vertical tests. Ave. Eacc of 26 MV/m was successfully demonstrated in the 7-cavity operation by the vector-sum control. Stable operation with a dynamic Lorentz-detuning compensation by a piezo tuner was achieved. Two cavities showed the performance degradation of the Eacc,max from vertical tests to cryomodule tests. Two frequency tuning systems did not work correctly. Vacuum I/L in a warm coupler limited the performance.

For the next step: Disassembly of S1-Global cryomodule is scheduled in order to understand above troubles.

Page 25: Summary of Cavity Performance in S1-Global

E. KAKO (KEK) 2011' Mar. 22 ALCPG11 meeting

Global Design Effort

25

END

Thank you for your attention.........