IAEAInternational Atomic Energy Agency
Summary of MODARIA II WG1 Status
Ming Zhu, Ph.D., PE, PMP, F. ASCEU.S. Department of Energy
MODARIA II TM3
Vienna, Austria
25 October 2018
IAEA
WG1 Sessions Attendance @ TM3
2
WG1 IAEA Scientific Secretary: Tamara YankovichWG1 Leader: Ming Zhu (USA)
16 (33*) Participants
9 (19*) Member states
* (including joint sessions)
IAEA
Work Scope
3
WG 1: Assessment and Decision Making of Existing Exposure Situations for NORM and Nuclear Legacy Sites
– Methods and tools for radiological impact assessments and application to specific situations
– Methodologies for decision analyses for remediation and closure of NORM and legacy sites
– Communication and engagement with relevant interested parties
– Training for end users for the use of the relevant software
IAEA
Sites Selected for Case Studies
4
Tessenderlo Phosphate Processing SiteBelgium
Zapadnoe Uranium Mill Tailings SiteUkraine
Former Tin Processing SiteBrazil
Grote Laak
Winterbeek
IAEA
Work Performed This Week
5
– Training session by Daria Koliabina on “NORMALYSA Tool for Safety Assessment and Uranium Residues Management”.
– Updates of model-model/data comparisons for the Case Studies for the Tenssenderlo Chemie Phosphase Processing Site, the Zapadnoe Uranium Tailing Site, and the Brazil Tin Processing Site.
– Presentation by Daria Koliabina on “Update on the ZapadnoeMill Tailings Site Case Study”.
– Joint Session with the LeTrench Project Team, to share program and discuss opportunities for leveraging/collaboration.
– Presentation by Danyl Pérez-Sánchez on “Spanish Huelva Site case study of long-lasting NORM exposure situation: Analysis of Social Impact and stakeholder involvement”.
IAEA
Work Performed This Week (ctd)
6
– Presentation by . Joël Rajaobelison on “Case Study of Legacy Vatovory Uranium Mining Site And Its Surroundings (Madagascar): Public Exposure Due to Natural Radioactivity using Direct and Indirect Methods”.
– Joint Session with the WG4 Kd Team on requirements for Kd
data in WG1 case studies and Alternative Models to the Kd
approach.
– Reviews and Updates of Chapters 2-8 and Appendices of the draft Interim Report
– Preliminary plan for WG1 Third Interim Meeting, for May/June 2019
IAEA
Collaboration with the LeTrench Project
• Both groups expressed interest in collaboration
• LeTrench shared draft report; final report in April 2019
• WG1 and LeTrench participants will jointly prepare a section in WG1 Chap. 2 to summarize lessons learned and explore opportunities for using risk-informed decision-making approach in management of legacy trenches.
Australia
UK
Canada7
IAEA
Leveraging the TERRITORIES Project
• The Spanish Huela Site Case Study final report to be completed in April 2019
• WG1 and TERRITORIES participants to jointly summarize the case study for in WG1 Interim Report
8
Tinto River
North PondSouth Pond
Perimetral
Channel
Regulation Dam
Estero del Rincón
Industry-Ponds
Pipeline
Huelva City
Pump Station Perimetral
Wall
IAEA
Collaboration with the WG4 Kd Team
• The Kd Team to share their Kd database for fresh water environment
• Paul Black provided his compilation of the Kd data collected from the U.S. DOE sites
• WG1 to provide the draft Interim Report to the Kd Team for review of alternative treatments and Kd data selections for the Case Studies
• Joint team to explore the possibilities for developing a case study to demonstrate the application of alternative models post MODARIA II
9
IAEA
Making Progress on Draft Interim Report
• Chapter 3 (Risk-formed decision making approach): Expanded draft.
• Chapter 4 (Additional Considerations):
✓ Annotated outline for completing draft on Models for Intended Use and on the KdApproach and Alternative Methods.
✓ Completed draft section on Decision Processes for Legacy Trench Management
✓ Continued discussion of consistency between and integration of chemical vs. radiological risk assessments.
• Chapter 5 (Example Toolsets):
✓ Compiled list of codes used in Case Studies.
✓ Prepared summary sections on NORMALYSA and AMBER capabilities.
• Chapter 6 (Tessenderlo Phosphate Processing Site Case Study):
✓ Completed draft on PC-CREAM Model setup; checking results of initial runs.
• Chapter 7 (Zapadnoe Uranium Mill Tailings Site Case Study):
✓ GOLDSIM model set up; Checking results of initial runs.
• Chapter 8 (Brazil Tin Processing Case Study):
✓ Expanded Chap. 8 and added Appendix C with details for site description and model setup
10
IAEA
Plan for Next Meeting
WG1 3rd Interim
Meeting,Norway,
May/June 2019 (Tentative)
11
IAEA
Hope
12