TRAINING REPORT
ON
“QUALITY CONTROL / QUALITY IMROVEMENT WITHSTATISTICAL ANALYSIS”
(With special reference to PTC INDUTRIES LIMITED,LUCKNOW)
(Transforming Metal)
(IN PARTIAL FULFILLMENT OF THE TQMPROGRAMME OF LUCKNOW UNIVERSITY, Lucknow)
SUBMITTED TO:
SUBMITTED BY:
7/29/2019 Summer Training Project-tqm
http://slidepdf.com/reader/full/summer-training-project-tqm 2/25
23
DECLARATION
I, do hereby declare that the project report titled “QUALITY
CONTROL / QUALITY IMROVEMENT WITH STATISTICAL
ANALYSIS ” is a genuine training project work undertaken by me and it
has not been published anywhere earlier and is only beneficial to me.
Date:
Place:
7/29/2019 Summer Training Project-tqm
http://slidepdf.com/reader/full/summer-training-project-tqm 3/25
23
Acknowledgement
My sincere thanks to faculty supervisor__________ and company
supervisor____________under whose able guidance and kind cooperation I
was able to complete the project work titled “ QUALITY CONTROL /
QUALITY IMROVEMENT WITH STATISTICAL ANALYSIS & AUDIT
PROCEDURE”. All those employees of P.T.C.INDUSTRIES LTD. deserve
special thanks for their cooperation and help in the collection of necessary and
relevant material for this work.
I am highly thankful to the DIRECTOR of Total Quality
Management Programme, University of Lucknow, Dr. AQIL AHMAD who
arranged my training in such an esteemed organization.
We are indebted to our respected faculty members R. NATH (AVM), GR.
CAPTAIN H.C.UPRETI and SHRI. P. K.SETHI who nurtured my quality
instincts, sharpened analytical skills and honed my understanding &knowledge of the quality discipline by sharing the distillate of their lifelong
experiences and insights with us.
Every effort has been made to enhance the quality of work. However, I owe the
sole responsibility of the shortcoming, if any in the study.
7/29/2019 Summer Training Project-tqm
http://slidepdf.com/reader/full/summer-training-project-tqm 4/25
23
Contents
1. SCOPE OF THE PROJECT
2. PREFACE
3. CUSTOMER FOCUS
4. INSIGHT OF PTCIL
5. INTRODUCTION TO PTCIL
6. CERTIFICATES AWARDED TO PTCIL
7. AWARDS AND RECOGNITION
8. ORGANISATION CHART OF PTCIL
9. QUALITY MANAGEMENT SYSTEM
10. QUALITY ORGANISATIONAL CHART
11. 5 S CHECK LIST
12. CASTING PROCESS FLOW CHART
13. REJECTED CASTINGS
14. Q C TOOLS
15. FISHBONE DIAGRAM SHOWING VARIOUS DEFECT’S CAUSE & EFFECT
16. STATISTICAL DATA
17. CUSTOMER WISE REJECTION ANALYSIS (FOR FY 2010-11)
18. DEFECT WSIE REJECTION ANALYSIS (FOR FY 2010-11)
19. QUARTERLY REJECTION ANALYSIS AND COMPARISION
20. TERMS AND DEFINITIONS AS PER ISO 9001:2008
21. CLAUSES APPLICABLE IN PTCIL
22. AUDIT TYPES AND PROCEDURE
23. NON CONFORMITY REPORT AND ITS CLOSURE
24. ENVIRONMENT, HEALTH & SAFETY POLICY
25. CONCLUSION
7/29/2019 Summer Training Project-tqm
http://slidepdf.com/reader/full/summer-training-project-tqm 5/25
23
CHAPTER 1
Scope of the Project
During my training, I tried to find out the causes which affect most of
the processes through INTERNAL PRE- AUDIT, so that the
company can improve its process and provide Customer Satisfaction.
During the production of the castings, as it goes through various
processes, I found the compiled report of Process Description and
rectified Quality System Procedure (QSP) in various departments.
In most of the departments of PTC, there were no major issues found
to be raised as Non Conformities. In this project, I have evaluated the
Statistical Quality by using control tools which PTCIL is committed
to improve for Total Quality product as well as for the benefit of the
organization.
In the short span of two months, I visited almost all the departments
e.g. Production, Maintenance, Fettling, CFS, CNC, CMM, IT,
Marketing and Stores etc. and thoroughly learnt all the related things.
Apart from the critical learning from all the departments, I got the
working knowledge about the world’s best machineries e. g. CMM,
CNC, Robotic machines etc.
I also grasped fruitful knowledge about the calibration of various
gauges being used in PTCIL for maintaining higher accuracy in its
measurements.
7/29/2019 Summer Training Project-tqm
http://slidepdf.com/reader/full/summer-training-project-tqm 6/25
23
Though I have tried to express all the gathered knowledge but project is
having some limitations and I hope it will be a good reading material for
the Quality Professionals
CHAPTER 2
PREFACE
Quality as a concept has been widely used in the business for improving the
performance of organizations. In its initial stages, it was applied only to the
manufacturing sector, but subsequently it spread to the service sector.
Applying quality principles to government industry (PTC INDUSTRIESLIMITED) is a small step from their application to the service sector. At the
first glance, one might believe that the relevance of quality or total quality
management (TQM), to be precise, might be restricted to public sector
undertaking, particularly those engaged in manufacturing activities.
However, in the context of the citizen’s charter in various parts of the
world, including India, customer focus has permitted all segments of
government. This has in turn, led to the realization of importance of quality
initiative in government enterprise.
Increasing public awareness has further made the citizen ask the question:
‘why can’t the government be more like the private sector?
A Quality initiative has necessarily to focus on customer satisfaction,
continuous improvement, people involvement, empowerment of the
employees, team work, data-driven decision making etc.
In the entire context, TQM is a difficult and unending journey. It is more in
government organizations which are hamstrung by several overarchingrules, procedures and practices. However, Quality is a state of mind and it is
possible to practice it, in howsoever small a measure, under any
circumstances.
7/29/2019 Summer Training Project-tqm
http://slidepdf.com/reader/full/summer-training-project-tqm 7/25
23
The quality project which is covered to PTC INDUSTRIES LIMITED,
LUCKNOW, UTTAR PRADESH, is;
QUALITY CONTROL/ QUALITY IMPROVEMENT WITH STATISTICAL
ANALYSIS and AUDIT PROCEDURE.
INSIGHT OF PTCIL SHOP FLOOR
(CNC MACHINE) (MELTING PROCESS)
(CMM) (MICRO STRUCTURE ANALYSER)
7/29/2019 Summer Training Project-tqm
http://slidepdf.com/reader/full/summer-training-project-tqm 8/25
23
(SHOP FLOOR)
(Pouring Of Centrifugal Casting)
7/29/2019 Summer Training Project-tqm
http://slidepdf.com/reader/full/summer-training-project-tqm 9/25
23
CHAPTER 3
ORGANIZATIONAL PROFILE PTC INDUSTRIES LTD was established in the year 1963 and its
commercial production started in the year 1968. Its activities include manufacturing of high quality ferrous and non-ferrous castings, finish machining of valves and
equipments. PTC INDUSTRIES have been manufacturing and exporting almost 2/3rd of
production to United State of America, Finland, Spain, Germany, Italy, United
Kingdom, Japan & other developed countries since 1986.
A dynamic, forward looking innovative company, PTC INDUSTRIES is
continually seeking to improve its capability through investment in new technology
process, and people. PTC INDUSTRIES LTD now offers its customer still more value
for money by offering value castings produced by REPLICAST process that would to
give them a distinct edge in highly competitive market.
PTC INDUSTRIES LTD is the first company in Asia to offer this
advanced technology developed by Castings Technology International, Sheffield, UK.
PTC has invested considerably to extract maximum benefits frominformation technology & internet in order to improve and monitor its system and to
provide a much better service to its esteemed customers. Customers can now keep
themselves informed of their order status, search & download material test reports andtrack their shipments.
With foundries located at Lucknow, Bhiwadi and Mehsana and also
machining facilities at Lucknow and Mehsana, PTC has capacity to produce more than
2000 tons per year, of castings.
1.CUSTOMER PROFILE
PATRONS OF THE PRODUCT OF PTC INDUSTRIES LIMITED
1. INTERNATIONAL-
• Metso, Metso paper-Finland
• Sulzer pump
• Siemens automation-Germany
• KITZ-Japan
7/29/2019 Summer Training Project-tqm
http://slidepdf.com/reader/full/summer-training-project-tqm 10/25
23
• Nigita masollean-Japan
• Westad industry-Norway
• Metso automation-Shanghai
• Endress +hauser-Switzerland
• Tyco valves & controls-Switzerland
• Alfa Lval ltd. –UK
• Weatherford uk ltd. –UK
• Worcester controls limited –UK
• Flowserve corporation –USA
• Neles jamesbury –USA
• Textron inc. –USA
• Trinity marine product –USA
• Weir valves &control –USA
• Yokogava corporation –USA
2. DOMESTIC
• Bharat Earth Movers ltd- Bangalore
• Caterpillar industries Ltd. –Chennai
• Bharat heavy eletricals Ltd. –Hardwar
• Hyderabad , Trichannapalli
• Rail coach factory – kapoorthala
• Nevyveli lignite corporation –Nevyveli
7/29/2019 Summer Training Project-tqm
http://slidepdf.com/reader/full/summer-training-project-tqm 11/25
23
• Alfa Laval India –pune
• Gas turbine research establishment –Hyderabad
3. ASSORTMENT OF INDUSTRIES CATERED TO FOLLOWING :
• Auto Tractors
• Construction & Bridges
• Fertilizer & Chemicals
• Mining : Coal & Mineral
• Oil exploration & Rigs
• Petroleum Refining
• Power Generation : steam and hydro
• Pumps
• Rail Transportation
• River Transportation
• Road transportation
• Valves & Pipe Fitting
ABOUT PTCIL – LUCKNOW PLANT
Molding Processes: 1. Centrifugal
2. Rapidcast/ Replicast
Melting Capacity: The installed Induction Furnaces are –
1. 350 KW - 2 No. (500 kg.)2. 1000KW – 1 No. (1500 kg.)
7/29/2019 Summer Training Project-tqm
http://slidepdf.com/reader/full/summer-training-project-tqm 12/25
23
3. 1000 KW – 1 No. (2500 kg.)
Material Range: The Castings that are produced have metallurgies including all
Grades of Carbon Steel like WCB, 1.0619, LCC, Stainless
Steel like CF8M 1.4408, CF3M, CA6NM, 1.4404, 1.4581, Austenitic
ductile iron Nickel & Cobalt based Alloys, Alloy Steel etc Haste alloy,duplex material etc. As per various International Standards like ASTM,
AISI, JIS, EN, DIN, BS & Harmonized Standards.
Service Sectors: PTCIL caters to the requirements of the Core Sector
Industries like:
1. Valves & Pumps
2. Thermal & Nuclear Power 3. Cement4. Railways5. General Engineering Industry
Special In-house Facilities: 1. PTCIL have In-house Computerized Methoding &
Simulation Facilities for Casting Designing, Pattern
Making, Heat Treatment etc. using CAM Software.
2. CNC machine shop for finish machining of castings.
Testing Facilities: PTC has installed full in-house testing facilities both for
Destructive & Non Destructive tests like, Radiography,
Magnetic Particle Inspection, Ultrasonic Flaw
Detection, Dye Penetrant Test,
Vacuum Spectrometer for Chemical Analysis, Tensile &
Impact Testing, Hardness, IGC & Ferrite Percentage,
Microstructure Analysis, Pressure and Sand Testing
Facilities.
CERTIFICATES AWARDED TO PTCIL
7/29/2019 Summer Training Project-tqm
http://slidepdf.com/reader/full/summer-training-project-tqm 13/25
23
1. ISO 9001: 2008 by TUV Nord India Pvt. Limited
2. PED 97/23/EC
3. AD 2000
Merkblatt
W0
7/29/2019 Summer Training Project-tqm
http://slidepdf.com/reader/full/summer-training-project-tqm 14/25
23
4. Approval of Manufacturer by Det Norske Veritas
5. Approval of Manufacturer by American Bureau of
Shipping
7/29/2019 Summer Training Project-tqm
http://slidepdf.com/reader/full/summer-training-project-tqm 15/25
23
6. Approval of Manufacturer by Lloyd’s Register
7/29/2019 Summer Training Project-tqm
http://slidepdf.com/reader/full/summer-training-project-tqm 16/25
23
7. Approval of Manufacturer by Bureau Veritas
8. Approval of
Manufacturer by
Nuclear Power
Corporation of India
7/29/2019 Summer Training Project-tqm
http://slidepdf.com/reader/full/summer-training-project-tqm 17/25
23
AWARDS AND RECOGNITION
1. National award for R&D efforts in area of technology
ABSORPTION-2006.
2. Outstanding vendor award for on-time delivery and outstanding
quality by center line -1988.
3. Three star-category award from the state government for excellent
performance in export.
4. Dhatunayak-award from All India induction furnaces Association.
5. Outstanding export performance awards from engineering export
promotion council (Northern Region)India, continuously from 1989-1996.
6. Recognition by central boiler board as well known foundry.
7. Recognition by research design and standards organization as class a
foundry. .
MEMBERS OF
ASSOCIATION
7/29/2019 Summer Training Project-tqm
http://slidepdf.com/reader/full/summer-training-project-tqm 18/25
23
• CTI
• INDIAN FOUNDRY ASSOCIATION
• EEPC
• FIEE
QUALITY POLICY-
• We are continually striving to identify new growing market and products.
• We are committed to manufacture and supply casting as per the requirement of
the customers.
• Customer’s satisfaction is the keyword and our aim is to become a reliable
supplier.
• We shall continually strive for improvement of our performance by implementing
quality management system.
VISION STATEMENT
We focus on our customer’s success ours will surely follow. We at PTC are driven
by a solitary vision – to be a part of our customer‘s competitive edge , because only
in their triumph lies our success.
MISSION STATEMENT-
“We aim to refurbish ourselves into an organization that can fulfill the needs of our
customers and provide high quality products with prompt delivery.
To work towards being a global leader by implementing constant innovation and
total quality management.
We work towards expanding our capabilities with a sense of responsibility towards our environment.
We also endeavor to provide customer delight to our international and
national customers.”
Organization chart
7/29/2019 Summer Training Project-tqm
http://slidepdf.com/reader/full/summer-training-project-tqm 19/25
23
Quality Organization Chart
7/29/2019 Summer Training Project-tqm
http://slidepdf.com/reader/full/summer-training-project-tqm 20/25
23
Process Chart
7/29/2019 Summer Training Project-tqm
http://slidepdf.com/reader/full/summer-training-project-tqm 21/25
23
SCAN COPY
Deptt wise manufacturing summary & objectives
7/29/2019 Summer Training Project-tqm
http://slidepdf.com/reader/full/summer-training-project-tqm 22/25
23
Contract Review / Marketting
Accepted customer requirements are communicated to the respective departments for theexecution of Castings delivery conditions and Delivery Schedules.
Objective - 10% growth in turnover
Turnover statics.. blab la bla
2006- 123
2007-145
2008- 150
2010 - 156
2011- 160
Bla bla bla
Planning
7/29/2019 Summer Training Project-tqm
http://slidepdf.com/reader/full/summer-training-project-tqm 23/25
23
Delivery schedules are the basis for our monthly planning and day today Production andDispatches. Targets are closely monitored and executed.
Objective- Compliance to customer schedule
Capacity utilization
LIKEWISE Describe diff departments and objectives
Show some data and make a chart
In the end take defects/ customer complaint stats and make chart
Department name-
Marketing
CAD
Planning
Quality
Production-
Moulding shop
Melting pouring shop
Fettling
Heat treatment
Stores
7/29/2019 Summer Training Project-tqm
http://slidepdf.com/reader/full/summer-training-project-tqm 24/25
23
MR
Etc.