sunset cove phase 2 advocacy

34
12 acre site Spectacular views of Jamaica Bay and NYC Located at extreme south end of Broad Channel NYC Parks land adjacent to NPS wetlands Wetland cove and upland area Unique Opportunity to restore Degraded shoreline area

Upload: ecowatchers

Post on 19-Feb-2017

224 views

Category:

Environment


0 download

TRANSCRIPT

Page 1: Sunset cove phase 2 advocacy

12 acre site Spectacular views of Jamaica Bay and NYC Located at extreme south end of Broad

Channel NYC Parks land adjacent to NPS wetlands Wetland cove and upland area Unique Opportunity to restore Degraded

shoreline area

Page 2: Sunset cove phase 2 advocacy
Page 3: Sunset cove phase 2 advocacy
Page 4: Sunset cove phase 2 advocacy
Page 5: Sunset cove phase 2 advocacy
Page 6: Sunset cove phase 2 advocacy
Page 7: Sunset cove phase 2 advocacy
Page 8: Sunset cove phase 2 advocacy
Page 9: Sunset cove phase 2 advocacy

Small Marina since the 40’s Marina greatly expanded thru illegal fill in

1970’s and 80’s. Court action at both state and Federal level Resulted in 1998 decision to reduce size 2008 decision for additional violations led to

state acquisition 2008 Land put under jurisdiction of

NYC DCAS

Page 10: Sunset cove phase 2 advocacy

Broad Channel Civic Association led effort to have area deeded to NYC Parks.

Worked thru Councilman Ulrich’s office to have transferred to NYC Parks in 2009

BCCA passed unanimous resolution in February of 2010 endorsing wetlands restoration, upland forest, walking trails, boardwalk plan.

BCCA plan submitted to NYC PARKS RFEI—only plan submitted

Page 11: Sunset cove phase 2 advocacy

Effort led by Broad Channel Civic Association

Letters of support obtained from ◦ Senator Schumer ***◦ Congressman Meeks◦ Congressman Jeffries◦ State Senator Addabbo◦ Assemblyman Goldfeder◦ Councilman UlrichFederal lobbying coordinated with Harbor Coalition

Page 12: Sunset cove phase 2 advocacy
Page 13: Sunset cove phase 2 advocacy

NYC Parks-Lead Agency NYC DEP NYS DEC NPS Jamaica Bay Ecowatchers American Littoral Society

Page 14: Sunset cove phase 2 advocacy

Create shoreline wetlands High Marsh Berm/Dune tidal break Upland maritime forest Walking Trails Interactive Boardwalk over wetlands Oyster studies

Page 15: Sunset cove phase 2 advocacy

Boardwalk out across the wetlands to viewing/learning platform

360 degree views of restored wetlands and forest and Jamaica Bay

Pathway access to waters edge Ramp out to Eco Dock to be used for oyster

studies and school group access Oyster Cages to be hung across the cove

from

Page 16: Sunset cove phase 2 advocacy

Federal CDBG Hurricane Sandy Funding to be disbursed by the State

Outside of NYC for individual home rebuilding

Within NYC For community based resiliency projects

Broad Channel separate zone -6.3 Million Parsons Brinckerhoff lead design firm Eight funded Resiliency Projects

including Sunset Cove—Phase 2

Page 17: Sunset cove phase 2 advocacy
Page 18: Sunset cove phase 2 advocacy
Page 19: Sunset cove phase 2 advocacy

Total final cost estimate $750,000

Committed Funding◦ Broad Channel CRZ- -----$500,000◦ Assemblyman Goldfeder - $125,000◦ Broad Channel Civic thru Participatory Budget-$200,00

* all design costs for Louis Berger firm from NY Rising

Additional funding potential— Queens Borough--President Melinda Katz( in budget office) NY Rising Assemblyman Goldfeder

Page 20: Sunset cove phase 2 advocacy

Phase 1—Funded/Design Completed Construction to start late fall 2016/Spring 2017

Phase 2-Funding in Place/Design underway by Louis Berger/Construction to

start fall 2017/2018

Page 21: Sunset cove phase 2 advocacy
Page 22: Sunset cove phase 2 advocacy
Page 23: Sunset cove phase 2 advocacy
Page 24: Sunset cove phase 2 advocacy
Page 25: Sunset cove phase 2 advocacy
Page 26: Sunset cove phase 2 advocacy
Page 27: Sunset cove phase 2 advocacy
Page 28: Sunset cove phase 2 advocacy
Page 29: Sunset cove phase 2 advocacy
Page 30: Sunset cove phase 2 advocacy
Page 31: Sunset cove phase 2 advocacy
Page 32: Sunset cove phase 2 advocacy
Page 33: Sunset cove phase 2 advocacy
Page 34: Sunset cove phase 2 advocacy