ISSUED FOR BID/PERMIT AND DCA REVIEW: DECEMBER 11, 2020
SURGE TANK INSTALLATIONCENTRAL UTILITY PLANT
AutoCAD SHX Text
%%uTITLE
AutoCAD SHX Text
%%uDWG #
AutoCAD SHX Text
%%uMECHANICAL
AutoCAD SHX Text
M-0.1 NOTES AND LEGENDS 0 NOTES AND LEGENDS 0 0 MD-1 FIRST FLOOR MECH DEMO 0 FIRST FLOOR MECH DEMO 0 0 MD-2 MEZZ FLOOR MECH DEMO 0 MEZZ FLOOR MECH DEMO 0 0 M-1 FIRST FLOOR MECH NEW WORK 0 FIRST FLOOR MECH NEW WORK 0 0 M-2 MEZZ FLOOR MECH NEW WORK 0 MEZZ FLOOR MECH NEW WORK 0 0 M-3 ELEVATIONS 0 ELEVATIONS 0 0 M-6.01 DIAGRAM AND SEQUENCE 0 DIAGRAM AND SEQUENCE 0 0 M-6.02 DIAGRAM NORMAL 0 DIAGRAM NORMAL 0 0 M-6.03 DIAGRAM SURGE AS DA 0 DIAGRAM SURGE AS DA 0 0 M-6.04 DIAGRAM BYPASS SURGE 0 DIAGRAM BYPASS SURGE 0 0 M-6.05 PHASING TASKS 1-4 0 PHASING TASKS 1-4 0 0 M-6.06 PHASING TASKS 2-8 0 PHASING TASKS 2-8 0 0 M-6.07 PHASING TASKS 9-12 0 PHASING TASKS 9-12 0 0 M-6.08 PHASING TASKS 13-16 0 PHASING TASKS 13-16 0 0 M-6.09 PHASING TASKS 17-21 0 PHASING TASKS 17-21 0 0 M-6.10 PHASING TASKS 22-23 0 PHASING TASKS 22-23 0 0 E-0.00 ELECTRICAL NOTES & COVER 0 ELECTRICAL NOTES & COVER 0 0 E-2.01 ELECTRICAL DEMO & NEW 0 ELECTRICAL DEMO & NEW 0 0 S-100 STRUCTURAL FRAMING PLANS 0STRUCTURAL FRAMING PLANS 00
AutoCAD SHX Text
%%UREVISION
AutoCAD SHX Text
%%UPROJECT #19P258
AFF ABOVE FINISHED FLOORB.O.P. BOTTOM OF PIPECHWS CHILLED WATER SUPPLYCHWR CHILLED WATER RETRUNC.L. CENTER LINECND CONDENSATECOND. CONDENSATECONT. CONTINUATIONCUP CENTRAL UTILITIES PLANT(D) DEMOLISHDEMO DEMOLITIONDIA. DIAMETER(E) EXISTINGEL ELEVATIONETC ETCETRAETR EXISTING TO REMAINMH MANHOLE(N) NEWSTM STEAMTYP. TYPICALUD UNIVERSITY OF ROWAN
UNIVERSITYU.G. UNDERGROUNDT.O.P TOP OF PIPEU.G. UNDERGROUNDVL VALVE LOCATIONVLV VALVE
@ AT
DEMOLISH TO THIS POINT
NEW TO EXISTING CONNECTION POINT
ITEM CONTINUED
PIPE CONTINUED
NOTE: NOT ALL SYMBOLS AND ABBREVIATIONS MAY BE USED.
1.CONTRACTORS SHALL MAINTAIN A CLEAN AND ORDERLY SITE AND SHALL REMOVE ALL
DEMOLISHED MATERIAL DAILY FROM THE SITE.
2.CONTRACTOR IS RESPONSIBLE FOR SITE SAFETY AND SHALL FOLLOW OSHA, GLOUCHESTER
COUNTY, CITY OF GLASSBORO, AND ROWAN UNIVERSITY SAFETY RULES AND CONDITIONS FOR
CONTRACTORS.
3.CONTRACTOR SHALL CHECK WITH THE OWNER FOR THE PRESENCE OF ASBESTOS CONTAINING
INSULATION OR OTHER SUSPICIOUS MATERIALS PRIOR TO REMOVAL OF THE INSULATION OR
MATERIAL. ANY ABATEMENT SHALL BE PREFORMED BY ROWAN UNIVERSITY AND IS NOT A PART
OF THE CONTRACT.
4.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REQUIRED PERMITS AND INSPECTIONS.
5.CONTRACTOR SHALL COMPLY WITH THE UNIVERSITY'S CONFINED SPACE PERMIT PROCEDURE
WHICH INCLUDES SUBMITTING THE FORMS ELECTRONICALLY ON A DAILY BASIS. ONCE
APPROVAL IS RECEIVED, THE CONTRACTOR MAY ENTER THE CONFINED SPACE.
6.AT THE END OF THE PROJECT, THE CONTRACTOR SHALL CLEAN ALL MECHANICAL ROOMS
WHERE WORK IS PERFORMED. ALL DIRT AND DEBRIS SHALL BE REMOVED FROM ANY ROOMS
WHERE WORK WAS PERFORMED REGARDLESS WHETHER THE DIRT WAS THE RESULT OF
CONSTRUCTION ACTIVITIES.
1. ROWAN SHALL CONTRACT A THIRD PARTY CERTIFIED WELD TESTER TO PERFORM MAGNETIC
PARTICLE (MP) TESTING ON ALL NEW STEAM AND CONDENSATE PIPING INSTALLED IN THIS
PROJECT. ALL PIPING SHALL BE REQUIRED TO PASS A 100% RADIOGRAPHY (X-RAY)
EXAMINATION. ALL WELDS OF THE CARRIER PIPE WELDS SHALL BE INSPECTED.
2. ROWAN SHALL CONTRACT A THIRD PARTY TO PERFORM SOIL COMPACTION TESTS, CONCRETE
COMPRESSIVE STRENGTH TESTS, AND PIPE WELD TESTS THROUGHOUT THE PROJECT. THE
FOLLOWING IS A SUMMARY OF THE TESTING REQUIREMENTS.
A. EXCEPT WHERE INDICATED OTHERWISE, CONCRETE PIPE ANCHORS AND BUILDING WALLS AND
FLOORS SHALL BE TESTED, CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF
4,000 PSI AT 28 DAYS. SLUMP SHALL NOT EXCEED 4 INCHES.
B. WHERE CONDITIONS ARISE WHICH ARE NOT SPECIFICALLY COVERED BY THESE NOTES AND
SPECIFICATIONS, THE
CURRENT STANDARDS OF ACI 301, 304, 305, 306, 311, 315 AND 318 AND ASTM C94 SHALL
GOVERN.
C. CONTRACTOR SHALL PROVIDE AND POUR CYLINDERS TO TEST COMPRESSIVE STRENGTH IN
ACCORDANCE WITH ASTM C31 AND ASTM C39. ONE CYLINDER SHALL BE TESTED AT 7 DAYS,
AND 3 CYLINDERS SHALL BE TESTED AT 28 DAYS.
D. CYLINDERS SHALL BE TAKEN FROM ALL LOADS OF CONCRETE USED FOR THE PROJECT.
3. PROVIDE THIRD PARTY TO THE COMPRESSIVE STRENGTH OF FLOWABLE FILL TO ENSURE THAT
IT MEETS A MINIMUM COMPRESSIVE STRENGTH INDICATED IN THE SPECIFICATION, 28 DAYS
AFTER APPLICATION.
4. SOIL COMPACTION TEST - THE PIPE TRENCH ABOVE THE FLOWABLE FILL THAT SURROUNDS
THE PIPE SHALL HAVE BACKFILL PLACED IN LAYERS NOT MORE THAN 8 INCHES LOOSE
THICKNESS AND COMPACTED TO 95% MAXIMUM DRY DENSITY IN ACCORDANCE WITH MODIFIED
PROCTOR TEST, ASTM D1557.
5. SEDIMENT AND EROSION CONTROL MONITORING SHALL BE PERFORMED BY A LICENSED CIVIL
ENGINEER.
STEAM CONDENSATE
OPERATING PRESSURE 150 PSIG 50 PSIG
DESIGN PRESSURE 150 PSIG 50 PSIG
DESIGN TEMPERATURE 366 °F 300 °F
TEST PRESSURE 225 PSIG 100 PSIG
4THE CARRIER PIPE SHALL BE PNEUMATICALLY TESTED TO THE DESIGN PRESSURE INDICATED.
THE CARRIER PIPE SHALL BE TESTED TO PRESSURES INDICATED ON THE TABLE BELOW.
APPLY A 5 PSI CHARGE TO THE PIPE AND INSTALL A PRESSURE GAGE ON EACH PIPE.
5
HYDRO TEST STEAM AND CONDENSATE PIPING. THE CARRIER PE SHALL BE HYDRAULICALLY
TESTED TO THE DESIGN PRESSURE INDICATED IN THE TABLE.
6PNEUMATIC TEST THE STEAM AND CONDENSATE CASINGS TO 5 PSI. SEE SPECIFICATION FOR
DETAILED REQUIREMENTS.
7INSULATE PIPING INSIDE THE BUILDING AND APPLY PIPE LABELS.
8CONDENSATE PIPE SHALL BE SCH. 160 SEAMLESS TO ASTM A106, GRADE B.
9STEAM PIPE SHALL BE SCH. 80 BELOW 2-INCHES, SCHEDULE 40 FROM 2.5-INCH THRU
10-INCH, AND STANDARD WEIGHT FOR PIPING LARGER THAN 12-INCHES, ERW TO ASTM A53
GRADE B. SEAMLESS MAY BE SUBSTITUTED IN ALL SIZES.
10THE PIPING FOR THIS PROJECT SHALL MEET THE REQUIREMENTS OF INTERNATIONAL
MECHANICAL CODE AND ASME B31.1.
1THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF THEIR SUBCONTRACTOR'S
WORK. THIS WILL INCLUDE SCHEDULING, QUALITY CONTROL, SAFETY, ETC.
2
ALL WELDING SHALL BE PREFORMED BY CERTIFIED WELDERS.
3ALL STEAM AND CONDENSATE PIPING SHALL BE INSTALLED AS INDICATED ON PLANS. REMOVE
EXISTING PIPING WHERE
INDICATED ON THE PLANS. WHERE PIPING IS ABANDONED, FILL PIPES WITH FLOWABLE FILL.
1. CONTRACTOR IS RESPONSIBLE FOR SITE SAFETY AND SHALL FOLLOW OSHA, GLOUCHESTER
COUNTY, CITY OF GLASSBORO AND OWNERS SAFETY STANDARDS, CODES, RULES AND
CONDITIONS FOR CONTRACTORS.
2. CONTRACTOR SHALL REMOVE ALL DEMOLISHED MATERIAL FROM THE SITE DAILY.
3. CONTRACTOR SHALL CHECK WITH THE OWNER FOR THE PRESENCE OF ASBESTOS
CONTAINING INSULATION OR OTHER SUSPICIOUS MATERIALS PRIOR TO REMOVAL OF THE
INSULATION OR MATERIAL. ANY ABATEMENT SHALL BE PERFORMED BY OWNER AND IS NOT
A PART OF THIS CONTRACT.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REQUIRED PERMITS AND INSPECTIONS.
5. CONTRACTOR SHALL COMPLY WITH THE UNIVERSITY'S CONFINED SPACE PERMIT
PROCEDURE WHICH INCLUDES SUBMITTING THE FORMS ELECTRONICALLY ON A DAILY
BASIS. ONCE APPROVAL IS RECEIVED, THE CONTRACTOR MAY ENTER THE CONFINED
SPACE.
6. AT THE END OF THE PROJECT, THE CONTRACTOR SHALL CLEAN ALL NEW AND EXISTING
MANHOLES AND MECHANICAL ROOMS WHERE WORK IS PERFORMED. ALL DIRT AND
DEBRIS SHALL BE REMOVED FROM ANY ROOMS OR MANHOLES WHERE WORK WAS
PERFORMED REGARDLESS WHETHER THE DIRT WAS THE RESULT OF CONSTRUCTION
ACTIVITIES, THE MANHOLE FLOORS SHALL BE FREE FROM DIRT AND DEBRIS.
SHEET NUMBER:
DATE:
PRO
JEC
T N
UM
BER
:
PRO
JEC
T TI
TLE:
FOR DCA REVIEW
STAMP
DR
AW
ING
TIT
LE:
:
DRWN:
CHKD:
DCA APPROVAL
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE
PREPARED OR APPROVED BY ME, SCOTT A. FRENCK, PE, AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF NEW JERSEY.
ENG. CERT. OF AUTH NO. 24GE05246600 EXP DATE: 4-30-22
19P2
58
NO.
DESC
RIPTION
DATE
AIS
SUED
FO
R BI
D, P
ERM
IT, A
ND
DC
A R
EVIE
W12
/11/
2020
CE
NT
RA
L U
TIL
IT
Y P
LA
NT
SU
RG
E T
AN
K IN
ST
AL
LA
TIO
N
ISSUED FOR BID/PERMIT
M-0.1
ME
CH
AN
IC
AL
L
EG
EN
D,
AB
BR
EV
IA
TIO
NS
, A
ND
N
OT
ES
DRD
12/03/20
SF
AutoCAD SHX Text
ABBREVIATIONS & SYMBOLS
AutoCAD SHX Text
STEAM/CONDENSATE THIRD-PARTY TESTING NOTES:
AutoCAD SHX Text
STEAM/CONDENSATE MECHANICAL NOTES:
AutoCAD SHX Text
STEAM/CONDENSATE GENERAL NOTES:
AutoCAD SHX Text
%%uGENERAL NOTES:
1.
1.
1.
3. 4.
2.
1.
1. 1.
5.
6.
6.
6.
6.
6.
SCALE:
1
MD
3/8"=1'-0"
PARTIAL BOILER ROOM 1ST FLOOR - DEMOLITION
GENERAL DEMOLITION NOTES:
DEMOLITION SHEET NOTES:
SHEET NUMBER:
DATE:
PRO
JEC
T N
UM
BER
:
PRO
JEC
T TI
TLE:
FOR DCA REVIEW
STAMP
DR
AW
ING
TIT
LE:
:
DRWN:
CHKD:
DCA APPROVAL
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE
PREPARED OR APPROVED BY ME, SCOTT A. FRENCK, PE, AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF NEW JERSEY.
ENG. CERT. OF AUTH NO. 24GE05246600 EXP DATE: 4-30-22
19P2
58
NO.
DESCRIPTION
DATE
AIS
SUED
FO
R BI
D, P
ERM
IT, A
ND
DC
A R
EVIE
W12
/11/
2020
CE
NT
RA
L U
TILIT
Y P
LA
NT
SU
RG
E T
AN
K IN
ST
ALLA
TIO
N
ISSUED FOR BID/PERMIT
MD-1
ME
CH
AN
IC
AL D
EM
OLIT
IO
N W
OR
K
1S
T F
LO
OR
DRD
12/03/20
SF
AutoCAD SHX Text
1. CONTRACTOR IS RESPONSIBLE FOR SITE SAFETY AND SHALL FOLLOW OSHA, GLOUCESTER CONTRACTOR IS RESPONSIBLE FOR SITE SAFETY AND SHALL FOLLOW OSHA, GLOUCESTER GLOUCESTER COUNTY, CITY OF GLASSBORO AND OWNERS SAFETY RULES AND CONDITIONS FOR CONTRACTORS. 2. CONTRACTOR SHALL REMOVE ALL DEMOLISHED MATERIAL FROM THE SITE DAILY. CONTRACTOR SHALL REMOVE ALL DEMOLISHED MATERIAL FROM THE SITE DAILY. 3. CONTRACTOR SHALL CHECK WITH THE OWNER FOR THE PRESENCE OF ASBESTOS CONTRACTOR SHALL CHECK WITH THE OWNER FOR THE PRESENCE OF ASBESTOS CONTAINING INSULATION OR OTHER SUSPICIOUS MATERIALS PRIOR TO REMOVAL OF THE INSULATION OR MATERIAL. ANY ABATEMENT SHALL BE PERFORMED BY OWNER AND IS NOT A PART OF THIS CONTRACT. 4. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REQUIRED PERMITS AND INSPECTIONS. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REQUIRED PERMITS AND INSPECTIONS. 5. CONTRACTOR SHALL COMPLY WITH THE UNIVERSITY'S CONFINED SPACE PERMIT PROCEDURE CONTRACTOR SHALL COMPLY WITH THE UNIVERSITY'S CONFINED SPACE PERMIT PROCEDURE WHICH INCLUDES SUBMITTING THE FORMS ELECTRONICALLY ON A DAILY BASIS. ONCE APPROVAL IS RECEIVED, THE CONTRACTOR MAY ENTER THE CONFINED SPACE. 6. AT THE END OF THE PROJECT, THE CONTRACTOR SHALL CLEAN ALL MECHANICAL ROOMS AT THE END OF THE PROJECT, THE CONTRACTOR SHALL CLEAN ALL MECHANICAL ROOMS WHERE WORK IS PERFORMED. ALL DIRT AND DEBRIS SHALL BE REMOVED FROM ANY ROOMS WHERE WORK WAS PERFORMED REGARDLESS WHETHER THE DIRT WAS THE RESULT OF CONSTRUCTION ACTIVITIES.
AutoCAD SHX Text
1. AFTER STRUCTURAL WORK IS COMPLETED TO MEZZANINE FOR RELOCATION OF EXISTING AIR AFTER STRUCTURAL WORK IS COMPLETED TO MEZZANINE FOR RELOCATION OF EXISTING AIR COMPRESSOR, CAREFULLY DISCONNECT AND REMOVE EXISTING AIR COMPRESSOR FROM BUILDING AIR MAIN LINES AT POINT INDICATED. STORE EXISTING COMPRESSOR FOR REINSTALLATION IN NEW LOCATION DURING NEW WORK. 2. PROVIDE TEMPORARY AIR COMPRESSOR AND TIE IN TO THE PIPING AT THE EXISTING PROVIDE TEMPORARY AIR COMPRESSOR AND TIE IN TO THE PIPING AT THE EXISTING LOCATION. 3. DISCONNECT PIPE FROM SMALL DA TANK TO THE BOILER FEED PUMPS AT POINT INDICATED, DISCONNECT PIPE FROM SMALL DA TANK TO THE BOILER FEED PUMPS AT POINT INDICATED, TO UNDERSIDE OF DA FOR REMOVAL WITH SMALL DA TANK. 4. PLACE TEMPORARY BLIND FLANGE ON OPEN VALVE TO BE REMOVED LATER DURING NEW PLACE TEMPORARY BLIND FLANGE ON OPEN VALVE TO BE REMOVED LATER DURING NEW WORK. 5. AFTER SURGE TANK IS INSTALLED AND CONDENSATE PIPING FROM THE NORTH LOOP IS IN AFTER SURGE TANK IS INSTALLED AND CONDENSATE PIPING FROM THE NORTH LOOP IS IN PLACE TO THE SURGE TANK, DISCONNECT THE SOUTH LOOP CONDENSATE PIPING FROM THE HOT PIT. EXCAVATE BOILER ROOM FLOOR AS REQUIRED TO LOCATE PIPE RISE FROM PIT TO POINT INDICATED. 6. WHEN SURGE TANK IS OPERATIONAL, DISCONNECT AND REMOVE EXISTING CONDENSATE WHEN SURGE TANK IS OPERATIONAL, DISCONNECT AND REMOVE EXISTING CONDENSATE PUMPS AND FILL HOT PIT WITH FLOWABLE FILL.
SCALE:
1
MD-2
1/2"=1'-0"
PARTIAL BOILER ROOM MEZZ - DEMOLITION
SCALE:
2
MD-2
1/2" = 1'-0"
PARTIAL BOILER ROOM - DEMO ELEVATON
SHEET NUMBER:
DATE:
PRO
JEC
T N
UM
BER
:
PRO
JEC
T TI
TLE:
FOR DCA REVIEW
STAMP
DR
AW
ING
TIT
LE:
:
DRWN:
CHKD:
DCA APPROVAL
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE
PREPARED OR APPROVED BY ME, SCOTT A. FRENCK, PE, AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF NEW JERSEY.
ENG. CERT. OF AUTH NO. 24GE05246600 EXP DATE: 4-30-22
19P2
58
NO.
DESCRIPTION
DATE
AIS
SUED
FO
R BI
D, P
ERM
IT, A
ND
DC
A R
EVIE
W12
/11/
2020
CE
NT
RA
L U
TILIT
Y P
LA
NT
SU
RG
E T
AN
K IN
ST
ALLA
TIO
N
ISSUED FOR BID/PERMIT
MD-2
ME
CH
AN
IC
AL D
EM
OLIT
IO
N -
ME
ZZ
AN
IN
E A
ND
E
LE
VA
TIO
N
DRD
12/03/20
SF
AutoCAD SHX Text
(E) DA 100,000 #/HR 2200 GAL
AutoCAD SHX Text
(E) DA 75,000 #/HR
AutoCAD SHX Text
REMOVE WINDOW AND SUPPORTS AS REQUIRED TO INSTALL NEW SURGE TANK.
AutoCAD SHX Text
DISCONNECT AND REMOVE EXISTING 75000 LB/HR DA.
AutoCAD SHX Text
MODIFY MEZZ AS DIRECTED BY STRUCTURAL ENGINEER DOCUMENTS
AutoCAD SHX Text
DISCONNECT AND REMOVE EXISTING 75000 LB/HR DA.
AutoCAD SHX Text
DISCONNECT BOILER FEED PIPING AT VALVE, INSTALL BLIND FLANGE UNTIL NEW PIPING IS INSTALLED.
2.
5.
10.
9.
8.
6" BFW
3.
10" LP
C
10" LP
C
6" LPC
10" LPC
PUMP
PACKAGE
4.
10" LPC BYPASS UP
TO 10" HEADER TO
SURGE TANK
6" BFW/ LPC DN
FROM SURGE TANK
10" LP
C/B
FW
PU
MP
CO
NT
RO
LLE
R
4" PC TO DA
2" HPR
6" PC
6" P
C
2" H
PR
5.
11.
8.
(N)1" CA
(N)1" CA
(N)1" CA
2" PC
SCALE:
1
M-1
1/2"=1'-0"
PARTIAL BOILER ROOM 1ST FLOOR - NEW WORK
GENERAL NEW WORK NOTES:
NEW WORK NOTES:
SHEET NUMBER:
DATE:
PRO
JEC
T N
UM
BER
:
PRO
JEC
T TI
TLE:
FOR DCA REVIEW
STAMP
DR
AW
ING
TIT
LE:
:
DRWN:
CHKD:
DCA APPROVAL
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE
PREPARED OR APPROVED BY ME, SCOTT A. FRENCK, PE, AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF NEW JERSEY.
ENG. CERT. OF AUTH NO. 24GE05246600 EXP DATE: 4-30-22
19P2
58
NO.
DESCRIPTION
DATE
AIS
SUED
FO
R BI
D, P
ERM
IT, A
ND
DC
A R
EVIE
W12
/11/
2020
CE
NT
RA
L U
TILIT
Y P
LA
NT
SU
RG
E T
AN
K IN
ST
ALLA
TIO
N
ISSUED FOR BID/PERMIT
M-1
ME
CH
AN
IC
AL - P
AR
TIA
L P
LA
N -
NE
W W
OR
K
DRD
12/03/20
SF
AutoCAD SHX Text
REBUILD PIT COVER AND ADD STRUCTURAL ELEMENTS TO SUPPORT LOAD OF RELOCATED AIR COMPRESSOR. PROVIDE VIBRATION ISOLATION BENEATH RELOCATED UNIT.
AutoCAD SHX Text
FLASH TANK FROM HEAT EXCHANGER DISCHARGE TO DUPLEX ELEC COND PUMP SET WITH RECEIVER. RUN VENT TO TIE INTO EXIST PIT VENT. RUN PUMP DISCHARGE TO CONNECT TO EXIST 6" AT RISER. EACH PUMP TO HAVE ISOLATION VALVE AND CHECK VALVE ON DISCHARGE.
AutoCAD SHX Text
1. CONTRACTOR IS RESPONSIBLE FOR SITE SAFETY AND SHALL FOLLOW OSHA, GLOUCESTER CONTRACTOR IS RESPONSIBLE FOR SITE SAFETY AND SHALL FOLLOW OSHA, GLOUCESTER GLOUCESTER COUNTY, CITY OF GLASSBORO AND OWNERS SAFETY RULES AND CONDITIONS FOR CONTRACTORS. 2. CONTRACTOR SHALL REMOVE ALL DEMOLISHED MATERIAL FROM THE SITE DAILY. CONTRACTOR SHALL REMOVE ALL DEMOLISHED MATERIAL FROM THE SITE DAILY. 3. CONTRACTOR SHALL CHECK WITH THE OWNER FOR THE PRESENCE OF ASBESTOS CONTRACTOR SHALL CHECK WITH THE OWNER FOR THE PRESENCE OF ASBESTOS CONTAINING INSULATION OR OTHER SUSPICIOUS MATERIALS PRIOR TO REMOVAL OF THE INSULATION OR MATERIAL. ANY ABATEMENT SHALL BE PERFORMED BY OWNER AND IS NOT A PART OF THIS CONTRACT. 4. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REQUIRED PERMITS AND INSPECTIONS. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REQUIRED PERMITS AND INSPECTIONS. 5. CONTRACTOR SHALL COMPLY WITH THE UNIVERSITY'S CONFINED SPACE PERMIT PROCEDURE CONTRACTOR SHALL COMPLY WITH THE UNIVERSITY'S CONFINED SPACE PERMIT PROCEDURE WHICH INCLUDES SUBMITTING THE FORMS ELECTRONICALLY ON A DAILY BASIS. ONCE APPROVAL IS RECEIVED, THE CONTRACTOR MAY ENTER THE CONFINED SPACE. 6. AT THE END OF THE PROJECT, THE CONTRACTOR SHALL CLEAN ALL MECHANICAL ROOMS AT THE END OF THE PROJECT, THE CONTRACTOR SHALL CLEAN ALL MECHANICAL ROOMS WHERE WORK IS PERFORMED. ALL DIRT AND DEBRIS SHALL BE REMOVED FROM ANY ROOMS WHERE WORK WAS PERFORMED REGARDLESS WHETHER THE DIRT WAS THE RESULT OF CONSTRUCTION ACTIVITIES.
AutoCAD SHX Text
1. OPEN VALVED AIR COMPRESSOR (A/C) PIPING REQUIRED TO CONNECT (E) AIR COMPRESSOR OPEN VALVED AIR COMPRESSOR (A/C) PIPING REQUIRED TO CONNECT (E) AIR COMPRESSOR LOCATED NEAR COGENERATION UNIT TO THE (E) A/C SYSTEM BEING RELOCATED. 2. INSTALL A VALVED CAPPED T TO MAKE FUTURE CONNECTION ONCE COMPRESSOR AND PIPING INSTALL A VALVED CAPPED T TO MAKE FUTURE CONNECTION ONCE COMPRESSOR AND PIPING IS REINSTALLED 3. AFTER CONDENSATE PUMPS ARE REMOVED, AND PIT COVER STRUCTURE IS MODIFIED AS AFTER CONDENSATE PUMPS ARE REMOVED, AND PIT COVER STRUCTURE IS MODIFIED AS REQUIRED, RELOCATE (E) AIR COMPRESSOR TO PIT COVER WHERE INDICATED. CONNECT PIPING TO AIR SYSTEM. 4. INSTALL 10" BOILER FEED/TRANSFER PUMP FEED HEADER. INSTALL 10" BOILER FEED/TRANSFER PUMP FEED HEADER. 5. CONNECT NEW 10" LPC UP TO NEW SURGE TANK LOCATION FROM NEW 10" HEADER. CONNECT NEW 10" LPC UP TO NEW SURGE TANK LOCATION FROM NEW 10" HEADER. 6. REMOVE TEMPORARY BLIND FLANGE ON OPEN VALVE AND CONNECT NEW PIPING TO EXISTING REMOVE TEMPORARY BLIND FLANGE ON OPEN VALVE AND CONNECT NEW PIPING TO EXISTING VALVE. 7. CONNECT 10" BYPASS PIPE FROM 10" HEADER UP TO SURGE TANK LPC HEADER. CONNECT 10" BYPASS PIPE FROM 10" HEADER UP TO SURGE TANK LPC HEADER. 8. RUN NEW CONDENSATE LINES FROM PIT TO SURGE TANK HEADER. RUN NEW CONDENSATE LINES FROM PIT TO SURGE TANK HEADER. 9. EXTEND EXISTING AIR COMPRESSOR PAD AS REQUIRED TO SUIT NEW TRANSFER PUMPSET EXTEND EXISTING AIR COMPRESSOR PAD AS REQUIRED TO SUIT NEW TRANSFER PUMPSET PACKAGE, MATCH PAD HEIGHT AND GROUT TOP TO FILL GAPS. 10. INSTALL NEW TRANSFER PUMP SET, INSTALL NEW TRANSFER PUMP SET, 11. CONNECT PIPING TO EXISTING DA CONDENSATE OPENING. CONNECT PIPING TO EXISTING DA CONDENSATE OPENING.
SCALE:
1
M-2
3/8"=1'-0"
PARTIAL BOILER ROOM MEZZ - NEW WORK
GENERAL NEW WORK NOTES:
NEW WORK NOTES:
SHEET NUMBER:
DATE:
PRO
JEC
T N
UM
BER
:
PRO
JEC
T TI
TLE:
FOR DCA REVIEW
STAMP
DR
AW
ING
TIT
LE:
:
DRWN:
CHKD:
DCA APPROVAL
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE
PREPARED OR APPROVED BY ME, SCOTT A. FRENCK, PE, AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF NEW JERSEY.
ENG. CERT. OF AUTH NO. 24GE05246600 EXP DATE: 4-30-22
19P2
58
NO.
DESCRIPTION
DATE
AIS
SUED
FO
R BI
D, P
ERM
IT, A
ND
DC
A R
EVIE
W12
/11/
2020
CE
NT
RA
L U
TILIT
Y P
LA
NT
SU
RG
E T
AN
K IN
ST
ALLA
TIO
N
ISSUED FOR BID/PERMIT
M-2
ME
CH
AN
IC
AL - M
EZ
ZA
NIN
E -
NE
W W
OR
K P
LA
NS
DRD
12/03/20
SF
AutoCAD SHX Text
(E) DA 100,000 #/HR 2200 GAL
AutoCAD SHX Text
(N) 2500 2500 GAL SURGE TANK 6' X16'
AutoCAD SHX Text
(N)STEEL GRATE MEZZ STEEL GRATE MEZZ WALKWAY REFER TO STRUCTURAL DOCUMENTS FOR FURTHER DETAIL
AutoCAD SHX Text
REINSTALL WINDOW AND SUPPORTS
AutoCAD SHX Text
10" LPC HEADER
AutoCAD SHX Text
10" LPC BYPASS DOWN TO 10" MAIN BELOW
AutoCAD SHX Text
HPR FLASH TANK 60X24
AutoCAD SHX Text
(N)6" PC6" PC
AutoCAD SHX Text
(N) 2" HPR 2" HPR TO FLASH TANK
AutoCAD SHX Text
(N) 2" LPR 2" LPR TO FLASH TANK
AutoCAD SHX Text
(N)6" PC6" PC
AutoCAD SHX Text
(N) 4" PC 4" PC TO DA
AutoCAD SHX Text
(N)CONNECT 4" PC FROM CONNECT 4" PC FROM TRANSFER PUMPS TO (E) DA AT EXISTING LPC RETURN LOCATION.
AutoCAD SHX Text
(N) 4" PC 4" PC TO (E) DA
AutoCAD SHX Text
(N)DOUBLE BLOCK AND DOUBLE BLOCK AND BLEED STEAM VALVE TO SURGE TANK STEAM SPARGER INLET.
AutoCAD SHX Text
(E) STEAM VALVE REMAINS.
AutoCAD SHX Text
2" LPC FROM FLASH TANK TO 6" LPC HEADER
AutoCAD SHX Text
2" VTR OUT THE TOP AND 2" DISCHARGE OUT BOT
AutoCAD SHX Text
MODIFY DCW MAKEUP WATER CONNECTION TO OLD REMOVED DA TO SUIT NEW SURGE TANK. MODIFY EXISTING DCW TO REMAIN TO DA FOR SURGE TANK BYPASS TO PROVIDE PRESSURE VALVE TO OPEN ON PRESSURE DROP TO EXISTING DA.
AutoCAD SHX Text
1.
AutoCAD SHX Text
1.
AutoCAD SHX Text
2.
AutoCAD SHX Text
3.
AutoCAD SHX Text
4.
AutoCAD SHX Text
4.
AutoCAD SHX Text
5.
AutoCAD SHX Text
5.
AutoCAD SHX Text
5.
AutoCAD SHX Text
6.
AutoCAD SHX Text
6.
AutoCAD SHX Text
6.
AutoCAD SHX Text
7.
AutoCAD SHX Text
7.
AutoCAD SHX Text
8.
AutoCAD SHX Text
1. CONTRACTOR IS RESPONSIBLE FOR SITE SAFETY AND SHALL FOLLOW OSHA, GLOUCESTER CONTRACTOR IS RESPONSIBLE FOR SITE SAFETY AND SHALL FOLLOW OSHA, GLOUCESTER GLOUCESTER COUNTY, CITY OF GLASSBORO AND OWNERS SAFETY RULES AND CONDITIONS FOR CONTRACTORS. 2. CONTRACTOR SHALL REMOVE ALL DEMOLISHED MATERIAL FROM THE SITE DAILY. CONTRACTOR SHALL REMOVE ALL DEMOLISHED MATERIAL FROM THE SITE DAILY. 3. CONTRACTOR SHALL CHECK WITH THE OWNER FOR THE PRESENCE OF ASBESTOS CONTRACTOR SHALL CHECK WITH THE OWNER FOR THE PRESENCE OF ASBESTOS CONTAINING INSULATION OR OTHER SUSPICIOUS MATERIALS PRIOR TO REMOVAL OF THE INSULATION OR MATERIAL. ANY ABATEMENT SHALL BE PERFORMED BY OWNER AND IS NOT A PART OF THIS CONTRACT. 4. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REQUIRED PERMITS AND INSPECTIONS. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REQUIRED PERMITS AND INSPECTIONS. 5. CONTRACTOR SHALL COMPLY WITH THE UNIVERSITY'S CONFINED SPACE PERMIT PROCEDURE CONTRACTOR SHALL COMPLY WITH THE UNIVERSITY'S CONFINED SPACE PERMIT PROCEDURE WHICH INCLUDES SUBMITTING THE FORMS ELECTRONICALLY ON A DAILY BASIS. ONCE APPROVAL IS RECEIVED, THE CONTRACTOR MAY ENTER THE CONFINED SPACE. 6. AT THE END OF THE PROJECT, THE CONTRACTOR SHALL CLEAN ALL MECHANICAL ROOMS AT THE END OF THE PROJECT, THE CONTRACTOR SHALL CLEAN ALL MECHANICAL ROOMS WHERE WORK IS PERFORMED. ALL DIRT AND DEBRIS SHALL BE REMOVED FROM ANY ROOMS WHERE WORK WAS PERFORMED REGARDLESS WHETHER THE DIRT WAS THE RESULT OF CONSTRUCTION ACTIVITIES.
AutoCAD SHX Text
1. REMOVE TEMPORARY COVER FROM WINDOW OPENING AND BRING IN AND INSTALL NEW REMOVE TEMPORARY COVER FROM WINDOW OPENING AND BRING IN AND INSTALL NEW SURGE TANK 2. BRING IN AND INSTALL NEW HPR FLASH TANK. DO NOT INSULATE TANK OR ASSOCIATED BRING IN AND INSTALL NEW HPR FLASH TANK. DO NOT INSULATE TANK OR ASSOCIATED FLASH TANK PIPING. 3. CONNECT NEW 10" LPC HEADER TO TOP OPENING ON SURGE TANK. CONNECT NEW 10" LPC HEADER TO TOP OPENING ON SURGE TANK. 4. CONNECT NEW 2" PIPE FROM FLASH TANK TO 10" LPC HEADER (DON'T INSULATE PIPES CONNECT NEW 2" PIPE FROM FLASH TANK TO 10" LPC HEADER (DON'T INSULATE PIPES FROM FLASH TANK.) 5. CONNECT 10" BYPASS PIPE DOWN FROM 10" LPC HEADER TO 10" MAIN BELOW. CONNECT 10" BYPASS PIPE DOWN FROM 10" LPC HEADER TO 10" MAIN BELOW. 6. CONNECT NEW CONDENSATE LINES FROM PIT TO SURGE TANK HEADER. CONNECT NEW CONDENSATE LINES FROM PIT TO SURGE TANK HEADER. 7. CONNECT 4" PUMP TRANSFER PIPE TO EXISTING DA CONDENSATE OPENING. CONNECT 4" PUMP TRANSFER PIPE TO EXISTING DA CONDENSATE OPENING. 8. IN STEAM SHUTDOWN REMOVE EXISTING OF STEAM SUPPLY RISER PIPE SERVING EXISTING IN STEAM SHUTDOWN REMOVE EXISTING OF STEAM SUPPLY RISER PIPE SERVING EXISTING REMOVED DA TANK AND WELD IN NEW T TO PROVIDE 8" LPS SUPPLY TO NEW SURGE TANK SPARGER. PRE FABRICATE PIPING WHERE POSSIBLE TO REDUCE DOWN TIME. AFTER T AND PIPE TO NEW VALVES IS INSTALLED, STEAM MAY BE PUT BACK INTO SERVICE TO EXISTING DA TANK.
SCALE:
1
M-3
1/2" = 1'-0"
PARTIAL BOILER ROOM - ELEVATONSCALE:
2
M-3
1/2" = 1'-0"
TRANSFER PUMP DISCHARGE SIDE - ELEVATON
SHEET NUMBER:
DATE:
PRO
JEC
T N
UM
BER
:
PRO
JEC
T TI
TLE:
FOR DCA REVIEW
STAMP
DR
AW
ING
TIT
LE:
:
DRWN:
CHKD:
DCA APPROVAL
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE
PREPARED OR APPROVED BY ME, SCOTT A. FRENCK, PE, AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF NEW JERSEY.
ENG. CERT. OF AUTH NO. 24GE05246600 EXP DATE: 4-30-22
19P2
58
NO.
DESCRIPTION
DATE
AIS
SUED
FO
R BI
D, P
ERM
IT, A
ND
DC
A R
EVIE
W12
/11/
2020
CE
NT
RA
L U
TILIT
Y P
LA
NT
SU
RG
E T
AN
K IN
ST
ALLA
TIO
N
ISSUED FOR BID/PERMIT
M-3
ME
CH
AN
IC
AL - E
LE
VA
TIO
NS
NE
W W
OR
K
DRD
12/03/20
SF
AutoCAD SHX Text
6" OUTLET BELOW
AutoCAD SHX Text
10" HEADER MAIN TO TRANSFER PUMPS
AutoCAD SHX Text
6" BYPASS PIPE
AutoCAD SHX Text
(E)STEAM HEADER PIPE
AutoCAD SHX Text
2" FLASH TANK PIPING DON'T INSULATE
AutoCAD SHX Text
6" LPC PC PIPE
AutoCAD SHX Text
6" LPC PC PIPE
AutoCAD SHX Text
10" LPC HEADER
AutoCAD SHX Text
8" LPS PIPE TO SURGE TANK STEAM SPARGER
AutoCAD SHX Text
(E)8" LPS PIPE TO EXISTING DA
AutoCAD SHX Text
EXISTING DA
AutoCAD SHX Text
NEW SURGE TANK
AutoCAD SHX Text
NEW FLASH TANK
AutoCAD SHX Text
2" HPR PIPE
AutoCAD SHX Text
2" HPR PIPE
AutoCAD SHX Text
2" HPR PIPE DROP INTO FLASH TANK
AutoCAD SHX Text
INLET ISOLATION VALVE
AutoCAD SHX Text
3"X4" SUCTION DIFF
AutoCAD SHX Text
FLEX CONNECTION
AutoCAD SHX Text
STRAINER WITH BLOW OFF VALVE
AutoCAD SHX Text
CONTROL PANEL
AutoCAD SHX Text
EXISTING EXPANDED HOUSEKEEPING PAD
AutoCAD SHX Text
BASE WITH INTEGRAL VIBRATION ISOLATION CONTROL
AutoCAD SHX Text
10" HEADER MAIN TO TRANSFER PUMPS
AutoCAD SHX Text
NEW TRANSFER PUMPS
AutoCAD SHX Text
4" INLET PIPING
AutoCAD SHX Text
1" 316SS CHEMICAL TREATMENT PIPING, (SODIUM SULFITE) CONNECT BELOW WATER LEVEL. PROVIDE SS BALL VALVE NORMALLY CLOSED
AutoCAD SHX Text
EXIST 6" HOT WATER PIPING
AutoCAD SHX Text
EXISTING FUEL OIL PIPING
AutoCAD SHX Text
DISCHARGE ISOLATION VALVE
AutoCAD SHX Text
3"X4"ELBOW
AutoCAD SHX Text
FLEX CONNECTION
AutoCAD SHX Text
CHECK VALVE
AutoCAD SHX Text
4" DISCHARGE HEADER
AutoCAD SHX Text
CONTROL PANEL
AutoCAD SHX Text
BASE WITH INTEGRAL VIBRATION ISOLATION CONTROL
6" PC
2" HPR
6" PC
2" HPR
6" PC
BOILER
41,200
LBS/HR
BOILER
41,200
LBS/HR
BOILER
26,000
LBS/HR
COGEN
8,500
LBS/HR
COGEN
28,000
LBS/HR
6" PC
PUMPED
COND
FROM
CHILLERS
(N) CONDENSATE
TRANSFER PUMPS
(TYP OF TWO)
TURBINE
(E) BOILER
FEEDWATER
PUMPS
(E) BOILER
FEEDWATER
PUMPS
(E) BOILER
FEEDWATER
PUMPS
MODULATING
INLET VALVE
EXISTING
COCHRAN
MULTIPORT
RELIEF VALVE
STEAM
FROM
BOILERS
(E)STEAM FOR
COND. PREHEAT
OVERFLOW
TRAP
VENT ORIFICE
MAKEUP
WATER VALVE
MAKEUP
WATER VALVE
CHEMICAL TREATMENT
(SODIUM SULFITE)
BOILER ROOM
SUMP PIT
2" HPR
2" HPR
6" PC
6" PC
6" PC FROM CHILLERS
2" HPR
6" PC
2" DRAIN
3" DRAIN
3" DRAIN
6" LPC
(E) DA
100,000
#/HR
(N) VENTED
SURGE TANK
2500 GALLON
16' X 6'DIA
3" DRAIN3" DRAIN
4" PC
4" PC
6" BFW
6" BFW
6" BFW
6" BFW6" BFW6" BFW
6" BFW
(NO) 6" LPC
VALVE
(NC) 6" BFW
VALVE
(NO) 10" LPC
VALVE
(NC) 10" BYPASS
VALVE
4" (NC) LPS VALVES
2" VENT
10" LPC HEADER
(N) VENTED
FLASH TANK
CHEMICAL TREATMENT
(SODIUM SULFITE)
FLUID SENSOR IN
HEADER
CLOSED
3" DRAIN
CLOSED
CLOSED
OVERFLOW
DRAIN
OVERFLOW
DRAIN
3" BYPASS
HEADER SURGE
OVERFLOW
DRAIN
10" LPC BYPASS
(ACTING AS VENT
FOR 10" LPC)
4" (NO) LPS VALVE
T
10" LPC
CLOSED
CLOSED
LOW FLOW
ORIFICE
LFO
LFO
1-1/4" BFWB1-1/4" BFWB
1-1/4" BFWB
1-1/4" BFWB
1-1/4" BFWB
LFO
LFO
SCALE:
1
M-6.01
NONE
CONDENSATE RECOVERY SYSTEM MODIFICATIONS
NORMAL Sequence of Operation Condensate Return Boiler Feed SystemDescription:
REFER TO DRAWING M-6.02 FOR DESCRIPTION AND FLOW DIAGRAM OF NORMAL OPERATION
1. Low pressure (0-15 psig) and medium pressure (approximately 45 psig to 70 psig) steamsystem condensate returns are collected in mechanical spaces at the various buildingsthroughout campus and pumped at varying intervals back to the central plant as PumpedCondensate (PC).
2. High pressure (approximately 70 - 150 psig) steam condensate return is usually piped fromthermodynamic trap discharge directly back to the central plant as High Pressure Return(HPR) from mechanical rooms and also from steam piping traps in manholes. In some cases,HPR is discharged to flash tanks in building mechanical rooms then pumped back as PC.
4. The North HPR and South HPR cond loops are piped directly to a high pressure return ventedflash tank. The high temperature of the HPR flashes to steam as it hits the vented tank. Theflash tank discharge is piped from a vented loop at midway up the flashtank to the inletcondensate header of the surge tank.
5. PC coming back to the central plant from various sources will lift to a header then dropsdown into the vented atmospheric surge tank to be installed on the mezzanine. Any flashsteam is vented from the surge tank. Makeup water is to be added at the surge tank whenthe surge tank level drops. A Low Pressure (LPC) mix of condensate and makeup water (asrequired) is transferred from the surge tank through variable speed, high temperature rated,transfer pumps (TP-1&2) matched to the inlet valve flow and pressure requirements of theDeaerator (DA).
6. The DA preheats the condensate and removes the oxygen and dissolved gasses and leavesthe DA as Boiler Feed Water (BFW).
7. The preheated BFW drops to the three Boiler Feed Water Pumps (BP-1,2,3) where it ispumped back to the boilers.
SERVICE Sequence of Operation SURGE TANK IN DA MODEDescription:
REFER TO DRAWING M-6.03 FOR DESCRIPTION AND FLOW DIAGRAM.
SERVICE Sequence of Operation EMERGENCY BYPASS OPERATIONDescription:
8. REFER TO DRAWING M-6.04 FOR DESCRIPTION AND FLOW DIAGRAM.
SURGE TANKDescription:Cochrane Uni-Pac model 2500 Gallon surge tank:
· Surge Tank Vessel, 6'-0” OD by 16'-0” OL, 2500 gallons to
overflow, Atmospheric, non-Code tank
· Make-Up Water Control Valve, 1.5” threaded, pneumatically
operated valve. 3-15 psig air inlet complete with I/P
transducer. Valve is piped into 1” piping with 3 valve
bypass.
· Vent, 1” NPT Gate Valve with orifice sized for vent flow.
· Fully Assembled Level Column including:
Level Transmitter with 4-20 mA signal.
Magnetic Level Gauge for full range level view with
isolation valves.
Quantity three (3) level switches. Assembled with Level
Gauge. Switches for Low Level Pump Cutoff, High Level
Alarm, and Overflow
Isolation valves and piping to deaerator
· 1.5” Vacuum Breaker
· 2” Overflow Valve with Fail Open Actuator and Solenoid
valve
· Pressure Gauge for Deaerator pressure, 4.5” dial with pigtail
and gauge cock, 0-60 psig range.
· Thermometer for Deaerator Temperature, 5” dial with brass
thermowell, 50-550F.
· TWO PUMPED CONDENSATE RETURN PORTS
· TWO HIGH PRESSURE RETURN PORTS*
· CHEMICAL TREATMENT (SODIUM SULFITE) PORT
· 5 PSI STEAM CONNECTION PORT (WITH SPARGE
TUBE)
· (1) DISCHARGE PORT
TRANSFER PUMP SET:
Grundfos Model: CR 32-2-2 A-G-A-E-HQQE
Two (2) Vertical, multistage centrifugal pumps with inlet and outlet ports
on same the level (inline). The pump head and base are in cast iron – all
other wetted parts are in stainless steel. Cartridge shaft seal, rigid split
coupling. Pipe connection is via ANSI flanges. High Temperature
minimum of 250 deg F maximum capability
Actual calculated flow: 160 US GPM
Resulting head of the pump: 100 ft
Actual impeller diameter: 4.66 in
SHEET NUMBER:
DATE:
PRO
JEC
T N
UM
BER
:
PRO
JEC
T TI
TLE:
FOR DCA REVIEW
STAMP
DR
AW
ING
TIT
LE:
:
DRWN:
CHKD:
DCA APPROVAL
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE
PREPARED OR APPROVED BY ME, SCOTT A. FRENCK, PE, AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF NEW JERSEY.
ENG. CERT. OF AUTH NO. 24GE05246600 EXP DATE: 4-30-22
19P2
58
NO.
DESCRIPTION
DATE
AIS
SUED
FO
R BI
D, P
ERM
IT, A
ND
DC
A R
EVIE
W12
/11/
2020
CE
NT
RA
L U
TIL
IT
Y P
LA
NT
SU
RG
E T
AN
K IN
ST
AL
LA
TIO
N
ISSUED FOR BID/PERMIT
M-6.01
ME
CH
AN
IC
AL
P
IP
IN
G D
IA
GR
AM
A
ND
SE
QU
EN
CE
O
F O
PE
RA
TIO
N
DRD
12/03/20
SF
AutoCAD SHX Text
OVERFLOW DRAIN
AutoCAD SHX Text
%%UDUAL IN-LINE PUMP PIPING DIAGRAM
AutoCAD SHX Text
PRESSURE GAUGE
AutoCAD SHX Text
WITH COCK(TYP)
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
IN-LINE PUMP(TYP)
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
BUTTERFLY VALVE(TYP)
AutoCAD SHX Text
BLOW-OFF VALVE(TYP)
AutoCAD SHX Text
STRAINER WITH
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
CHECK VALVE
AutoCAD SHX Text
LOW FLOW ORIFICE
AutoCAD SHX Text
HP
AutoCAD SHX Text
(2) 7.5
AutoCAD SHX Text
DROP
AutoCAD SHX Text
PRESSURE
AutoCAD SHX Text
FT. HD.
AutoCAD SHX Text
100.0
AutoCAD SHX Text
208/230/460-3-60
AutoCAD SHX Text
COND. TRANSFER
AutoCAD SHX Text
SYSTEM SERVED
AutoCAD SHX Text
CR 32-2-2 A-G-A-E-HQQE
AutoCAD SHX Text
MODEL NO.
AutoCAD SHX Text
REF NO.
AutoCAD SHX Text
-
AutoCAD SHX Text
PUMPSET SCHEDULE
AutoCAD SHX Text
160.0
AutoCAD SHX Text
GPM
AutoCAD SHX Text
ELEC. CHAR.:
AutoCAD SHX Text
RPM
AutoCAD SHX Text
3467
AutoCAD SHX Text
MFR.:
AutoCAD SHX Text
INLINE, CAST IRON PUMP HEAD AND BASE
AutoCAD SHX Text
MOTOR
AutoCAD SHX Text
REMARKS
AutoCAD SHX Text
GRUNDFOS
AutoCAD SHX Text
WETTED PARTS ARE STAINLESS STEEL
AutoCAD SHX Text
HIGH TEMP MIN 250 DEG F.
AutoCAD SHX Text
IMPELLER DIAMETER 4.66 INCHES
AutoCAD SHX Text
TWO VERTICAL MULTISTAGE CENTRIFUGAL PUMPS
AutoCAD SHX Text
CONTROLLS, VFD, LEAD LAG
AutoCAD SHX Text
STEAM FLASH TANK SCHEDULE
AutoCAD SHX Text
24"
AutoCAD SHX Text
INCHES
AutoCAD SHX Text
GAL CAP
AutoCAD SHX Text
-
AutoCAD SHX Text
DIAMETER
AutoCAD SHX Text
MODEL NO.
AutoCAD SHX Text
-
AutoCAD SHX Text
REF
AutoCAD SHX Text
FT-1
AutoCAD SHX Text
NO
AutoCAD SHX Text
REMARKS
AutoCAD SHX Text
WESSELS COMPANY
AutoCAD SHX Text
MFR.:
AutoCAD SHX Text
STEAM/CD
AutoCAD SHX Text
PRESSURE
AutoCAD SHX Text
PROVIDE SUPPORT STRUCTURE, VENT TO ATMOSPHERE
AutoCAD SHX Text
100/0
AutoCAD SHX Text
PSIG
AutoCAD SHX Text
-
AutoCAD SHX Text
REQUIRED
AutoCAD SHX Text
GALLONS
AutoCAD SHX Text
2"
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
VENT
AutoCAD SHX Text
LENGTH
AutoCAD SHX Text
INCHES
AutoCAD SHX Text
60"
AutoCAD SHX Text
DRAIN WITH VALVED HB, HANDHOLE, PRESSURE GUAGE
(N) CONDENSATE
TRANSFER PUMPS
(TYP OF TWO)
TURBINE
(E) BOILER
FEEDWATER
PUMPS
(E) BOILER
FEEDWATER
PUMPS
(E) BOILER
FEEDWATER
PUMPS
MODULATING
INLET VALVE
EXISTING
COCHRAN
MULTIPORT
RELIEF VALVE
STEAM
FROM
BOILERS
(E)STEAM FOR
COND. PREHEAT
OVERFLOW
TRAP
VENT ORIFICE
MAKEUP
WATER VALVE
MAKEUP
WATER VALVE
CHEMICAL TREATMENT
(SODIUM SULFITE)
BOILER ROOM
SUMP PIT
2" HPR
2" HPR
6" PC
6" PC
6" PC FROM CHILLERS
2" HPR
6" PC
2" DRAIN
3" DRAIN
3" DRAIN
6" LPC
(E) DA
100,000
#/HR
(N) VENTED
SURGE TANK
2500 GALLON
16' X 6'DIA
3" DRAIN3" DRAIN
4" PC
4" PC
6" BFW
6" BFW
6" BFW6" BFW6" BFW
6" BFW
(NO) 6" LPC
VALVE
(NC) 6" BFW
VALVE
(NO) 6" LPC
VALVE
(NC) 6" BYPASS
VALVE
4" (NC) LPS VALVES
2" VENT
10" LPC HEADER
(N) VENTED
FLASH TANK
CHEMICAL TREATMENT
(SODIUM SULFITE)
FLUID SENSOR IN
HEADER
CLOSED
3" DRAIN
CLOSED
CLOSED
OVERFLOW
DRAIN
OVERFLOW
DRAIN
3" BYPASS
HEADER SURGE
OVERFLOW
DRAIN
6" LPC BYPASS
(ACTING AS VENT
FOR 10" LPC)
4" (NO) LPS VALVE
T
6" LPC
CLOSED
CLOSED
LOW FLOW
ORIFICE
LFO
LFO
6" BFW
1-1/4" BFWB1-1/4" BFWB
1-1/4" BFWB
1-1/4" BFWB
1-1/4" BFWB
CLOSED
(N) CONDENSATE
TRANSFER PUMPS
(TYP OF TWO)
TURBINE
(E) BOILER
FEEDWATER
PUMPS
(E) BOILER
FEEDWATER
PUMPS
(E) BOILER
FEEDWATER
PUMPS
MODULATING
INLET VALVE
EXISTING
COCHRAN
MULTIPORT
RELIEF VALVE
STEAM
FROM
BOILERS
(E)STEAM FOR
COND. PREHEAT
OVERFLOW
TRAP
VENT ORIFICE
MAKEUP
WATER VALVE
MAKEUP
WATER VALVE
CHEMICAL TREATMENT
(SODIUM SULFITE)
BOILER ROOM
SUMP PIT
2" HPC
2" HPC
6" PC
6" PC
6" PC FROM CHILLERS
2" HPC
6" PC
2" DRAIN
3" DRAIN
3" DRAIN
6" LPC
(E) DA
100,000
#/HR
(N) VENTED
SURGE TANK
2500 GALLON
16' X 6'DIA
3" DRAIN3" DRAIN
4" PC
4" PC
6" BFW
6" BFW
6" BFW
6" BFW6" BFW6" BFW
6" BFW
(NO) 6" LPC
VALVE
(NC) 6" BFW
VALVE
(NO) 6" LPC
VALVE
(NC) 6" BYPASS
VALVE
8" (NC) LPS VALVES
2" VENT
10" LPC HEADER
(N) VENTED
FLASH TANK
CHEMICAL TREATMENT
(SODIUM SULFITE)
FLUID SENSOR IN
HEADER
CLOSED
3" DRAIN
CLOSED
CLOSED
OVERFLOW
DRAIN
OVERFLOW
DRAIN
3" BYPASS
HEADER SURGE
OVERFLOW
DRAIN
6" LPC BYPASS
(ACTING AS VENT
FOR 10" LPC)
8" (NO) LPS VALVE
T
6" LPC
CLOSED
CLOSED
FEEDWATER TO
BOILERS
2" HPC
6" PC
2" HPC
6" PC
6" PC FROM CHILLERS
DCW
DCW
LFO
LFO
LOW FLOW
ORIFICE
1-1/4" BFWB1-1/4" BFWB
1-1/4" BFWB
1-1/4" BFWB
1-1/4" BFWB
CLOSED
SCALE:
1
M-6.02
NONE
CONDENSATE RECOVERY SYSTEM NORMAL OPERATION
DESCRIPTION OF OPERATIONNORMAL OPERATIONAL ARRANGEMENT.
BASIC DESCRIPTION:
1. HPR RETURNS TO VENTED FLASH TANK THEN ATMOSPHERIC CONDENSATE FLOWS TO SURGE TANK
HEADER.
2. PUMPED CONDENSATE RETURNS FROM NORTH, SOUTH AND CHILLER LOOPS AND DROPS THROUGH
SURGE TANK HEADER TO SURGE TANK.
3. MAKEUP WATER IS ADDED THROUGH THE SURGE TANK.
4. NOTE THAT MAKEUP WATER TO THE DEAERETOR IS OPEN BUT SHOULD BE SET AS EMERGENCY OR
SECONDARY TO SURGE TANK FILL.
5. SURGE TANK IS VENTED. DISCHARGE DROPS BY GRAVITY TO 10" LOW PRESSURE RETURN HEADER,
WHICH IS VENTED TO THE FLASH TANK VENT.
6. FLUID SENSOR IN HEADER ENABLES TRANSFER PUMPS. POSITION TO ALLOW ADEQUATE TIME TO
DISABLE PUMPS WHEN FLUID LEVEL IS TOO LOW.
7. CONDENSATE DROPS TO TRANSFER PUMPS.
8. THE ACTIVE TRANSFER PUMP PUMPS CONDENSATE TO DEAERATOR. THE DEAERATOR IS SLIGHTLY
PRESSURIZED AND HAS RESTRICTED VENT.
9. SODIUM SULFITE IS ADDED AT THE DEAERATOR.
10. LOW PRESSURE STEAM IS ADDED TO THE DEAERATOR.
11. THE DEAERATOR PREPARES THE CONDENSATE FOR RETURN TO THE BOILER.
12. OVERFLOW DRAINAGE IS THROUGH THE SURGE TANK AND FLASH TANK OVERFLOW OPENINGS AND
PIPING AND OR THE DA OVERFLOW TRAP. OVERFLOW DRAINAGE CAN ALSO OCCUR THROUGH THE
HEADER PIPE SURGE OVERFLOW DRAIN LINE, BUT IS NOT LIKELY DURING NORMAL OPERATION.
13. THE BOILER FEED WATER IS DISCHARGED FROM THE DEAERATOR TO THE BOILER FEED PUMPS.
14. THE ACTIVE BOILER FEED PUMP PUMPS THE BOILER FEED WATER TO THE ACTIVE BOILERS.
15. BOILERS CREATE THE STEAM THAT IS DISTRIBUTED THROUGHOUT THE CAMPUS.
16. CONDENSATE PUMPS THROUGHOUT THE CAMPUS RETURN THE CONDENSATE TO BOILER ROOM
17. PROCESS REPEATS.
SCALE:
2
M-6.02
NONE
NORMAL OPERATION CONDENSATE FLOW DIAGRAM
SHEET NUMBER:
DATE:
PRO
JEC
T N
UM
BER
:
PRO
JEC
T TI
TLE:
FOR DCA REVIEW
STAMP
DR
AW
ING
TIT
LE:
:
DRWN:
CHKD:
DCA APPROVAL
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE
PREPARED OR APPROVED BY ME, SCOTT A. FRENCK, PE, AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF NEW JERSEY.
ENG. CERT. OF AUTH NO. 24GE05246600 EXP DATE: 4-30-22
19P2
58
NO.
DESCRIPTION
DATE
AIS
SUED
FO
R BI
D, P
ERM
IT, A
ND
DC
A R
EVIE
W12
/11/
2020
CE
NT
RA
L U
TILIT
Y P
LA
NT
SU
RG
E T
AN
K IN
ST
ALLA
TIO
N
ISSUED FOR BID/PERMIT
M-6.02
ME
CH
AN
IC
AL P
IP
IN
G D
IA
GR
AM
NO
RM
AL O
PE
RA
TIO
N
DRD
12/03/20
SF
(N) CONDENSATE
TRANSFER PUMPS
(TYP OF TWO)
TURBINE
(E) BOILER
FEEDWATER
PUMPS
(E) BOILER
FEEDWATER
PUMPS
(E) BOILER
FEEDWATER
PUMPS
MODULATING
INLET VALVE
EXISTING
COCHRAN
MULTIPORT
RELIEF VALVE
STEAM
FROM
BOILERS
(E)STEAM FOR
COND. PREHEAT
OVERFLOW
TRAP
VENT ORIFICE
MAKEUP
WATER VALVE
MAKEUP
WATER VALVE
CHEMICAL TREATMENT
(SODIUM SULFITE)
BOILER ROOM
SUMP PIT
2" HPC
2" HPC
6" PC
6" PC
6" PC FROM CHILLERS
2" HPC
6" PC
2" DRAIN
3" DRAIN
3" DRAIN
6" LPC
(E) DA
100,000
#/HR
(N) VENTED
SURGE TANK
2500 GALLON
16' X 6'DIA
3" DRAIN3" DRAIN
4" PC
4" PC
6" BFW
6" BFW
6" BFW6" BFW6" BFW
6" BFW
(NO) 6" LPC
VALVE
(NC) 6" BFW
VALVE
(NO) 10" LPC
VALVE
(NC) 10"
BYPASS
VALVE
4" (NC) LPS VALVES
2" VENT
10" LPC HEADER
(N) VENTED
FLASH TANK
CHEMICAL TREATMENT
(SODIUM SULFITE)
FLUID SENSOR IN
HEADER
CLOSED
3" DRAIN
CLOSED
CLOSED
OVERFLOW
DRAIN
OVERFLOW
DRAIN
3" BYPASS
HEADER SURGE
OVERFLOW
DRAIN
10" LPC BYPASS
(ACTING AS VENT
FOR 10" LPC)
4" (NO) LPS VALVE
T
10" LPC
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
OFF LINE
OFF LINE
LFO
LFO
LOW FLOW
ORIFICE
6" BFW
1-1/4" BFWB1-1/4" BFWB
1-1/4" BFWB
1-1/4" BFWB
1-1/4" BFWB
CLOSED
CLOSED
(N) CONDENSATE
TRANSFER PUMPS
(TYP OF TWO)
TURBINE
(E) BOILER
FEEDWATER
PUMPS
(E) BOILER
FEEDWATER
PUMPS
(E) BOILER
FEEDWATER
PUMPS
MODULATING
INLET VALVE
EXISTING
COCHRAN
MULTIPORT
RELIEF VALVE
STEAM
FROM
BOILERS
(E)STEAM FOR
COND. PREHEAT
OVERFLOW
TRAP
VENT ORIFICE
MAKEUP
WATER VALVE
MAKEUP
WATER VALVE
CHEMICAL TREATMENT
(SODIUM SULFITE)
BOILER ROOM
SUMP PIT
2" HPC
2" HPC
6" PC
6" PC
6" PC FROM CHILLERS
2" HPC
6" PC
2" DRAIN
3" DRAIN
3" DRAIN
6" LPC
(E) DA
100,000
#/HR
(N) VENTED SURGE TANK
2500 GALLON
16' X 6'DIA
3" DRAIN3" DRAIN
4" PC
4" PC
6" BFW
6" BFW
6" BFW
6" BFW6" BFW6" BFW
6" BFW
(NO) 6" LPC VALVE
(NC) 6" BFW VALVE
(NO) 10" LPC
VALVE
(NC) 10"
BYPASS
VALVE
8" (NC) LPS VALVES
2" VENT
10" LPC HEADER
(N) VENTED
FLASH TANK
CHEMICAL TREATMENT
(SODIUM SULFITE)
FLUID SENSOR IN
HEADER
CLOSED
3" DRAIN
CLOSED
CLOSED
OVERFLOW
DRAIN
OVERFLOW
DRAIN
3" BYPASS
HEADER SURGE
OVERFLOW
DRAIN
10" LPC BYPASS
(ACTING AS VENT
FOR 10" LPC)
8" (NO) LPS VALVE
T
10" LPC
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
OFF LINE
OFF LINE
FEEDWATER TO
BOILERS
DCW
DCW
2" HPC
6" PC
6" PC FROM CHILLERS
2" HPC
6" PC
LOW FLOW
ORIFICE
LFO
LFO
1-1/4" BFWB1-1/4" BFWB
1-1/4" BFWB
1-1/4" BFWB
1-1/4" BFWB
CLOSED
CLOSED
SCALE:
1
M-6.03
NONE
CONDENSATE RECOVERY SYSTEM SURGE TANK OPERATING AS DA
DESCRIPTION OF OPERATIONSURGE TANK OPERATING AS DA ARRANGEMENT.
BASIC DESCRIPTION:
1. DEAERATOR IS VALVED OFFLINE.
2. HPR RETURNS TO VENTED FLASH TANK THEN ATMOSPHERIC CONDENSATE FLOWS TO SURGE TANK
HEADER IN THE SURGE TANK.
3. PUMPED CONDENSATE RETURNS FROM NORTH, SOUTH AND CHILLER LOOPS AND DROPS THROUGH
SURGE TANK HEADER INTO SURGE TANK
4. PIPES TO 10" LOW PRESSURE RETURN HEADER ARE VALVED SHUT.
5. FLUID SENSOR IN HEADER DISABLES TRANSFER PUMPS AND THEY SHOULD BE LOCKED OUT.
6. MAKEUP WATER IS ADDED AT THE SURGE TANK.
7. SODIUM SULFITE IS ADDED AT THE SURGE TANK.
8. LOW PRESSURE STEAM IS ADDED TO THE SURGE TANK AS NEEDED FOR THE BOILER FEEDWATER
REQUIREMENTS.
9. THE SURGE TANK PREPARES THE CONDENSATE FOR RETURN TO THE BOILER.
10. OVERFLOW DRAINAGE IS THROUGH THE SURGE TANK OVERFLOW OPENING.
11. THE BOILER FEED WATER DROPS FROM THE SURGE TANK STRAIGHT TO THE BOILER FEED PUMPS.
12. THE ACTIVE BOILER FEED PUMP PUMPS THE BOILER FEED WATER TO THE ACTIVE BOILERS.
13. BOILERS CREATE THE STEAM THAT IS DISTRIBUTED THROUGHOUT THE CAMPUS.
14. CONDENSATE PUMPS THROUGHOUT THE CAMPUS RETURN THE CONDENSATE TO BOILER ROOM
15. PROCESS REPEATS.
SCALE:
2
M-6.03
NONE
SURGE TANK AS DA OPERATION CONDENSATE FLOW DIAGRAM
SHEET NUMBER:
DATE:
PRO
JEC
T N
UM
BER
:
PRO
JEC
T TI
TLE:
FOR DCA REVIEW
STAMP
DR
AW
ING
TIT
LE:
:
DRWN:
CHKD:
DCA APPROVAL
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE
PREPARED OR APPROVED BY ME, SCOTT A. FRENCK, PE, AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF NEW JERSEY.
ENG. CERT. OF AUTH NO. 24GE05246600 EXP DATE: 4-30-22
19P2
58
NO.
DESCRIPTION
DATE
AIS
SUED
FO
R BI
D, P
ERM
IT, A
ND
DC
A R
EVIE
W12
/11/
2020
CE
NT
RA
L U
TILIT
Y P
LA
NT
SU
RG
E T
AN
K IN
ST
ALLA
TIO
N
ISSUED FOR BID/PERMIT
M-6.03
ME
CH
AN
IC
AL P
IP
IN
G D
IA
GR
AM
SU
RG
E T
AN
K O
PE
RA
TIN
G A
S D
A
DRD
12/03/20
SF
(N) CONDENSATE
TRANSFER PUMPS
(TYP OF TWO)
TURBINE
(E) BOILER
FEEDWATER
PUMPS
(E) BOILER
FEEDWATER
PUMPS
(E) BOILER
FEEDWATER
PUMPS
MODULATING
INLET VALVE
EXISTING
COCHRAN
MULTIPORT
RELIEF VALVE
STEAM
FROM
BOILERS
(E)STEAM FOR
COND. PREHEAT
OVERFLOW
TRAP
VENT ORIFICE
MAKEUP
WATER VALVE
MAKEUP
WATER VALVE
CHEMICAL TREATMENT
(SODIUM SULFITE)
BOILER ROOM
SUMP PIT
2" HPC
2" HPC
6" PC
6" PC
6" PC FROM CHILLERS
2" HPC
6" PC
2" DRAIN
3" DRAIN
3" DRAIN
6" LPC
10" LPC HEADER
(E) DA
100,000
#/HR
(N) VENTED
SURGE TANK
2500 GALLON
16' X 6'DIA
(N) VENTED
FLASH TANK
3" DRAIN3" DRAIN
4" PC
4" PC
6" BFW
6" BFW
6" BFW
6" BFW6" BFW6" BFW
6" BFW
(NO) 6" LPC
VALVE
(NC) 6" BFW
VALVE
(NO) 10" LPC
VALVE
(NC) 10"
BYPASS
VALVE
4" (NC) LPS VALVES
4" (NO) LPS VALVE
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
OFF LINE
CHEMICAL TREATMENT
(SODIUM SULFITE)
CLOSED
CLOSED
FLUID SENSOR IN
HEADER
OVERFLOW
DRAIN
OVERFLOW
DRAIN
3" BYPASS
HEADER SURGE
OVERFLOW
DRAIN
10" LPC
BYPASS
CLOSED
3" DRAIN
2" VENT
T
LFO
LFO
LOW FLOW
ORIFICE
1-1/4" BFWB1-1/4" BFWB
1-1/4" BFWB
1-1/4" BFWB
1-1/4" BFWB
CLOSED
(N) CONDENSATE
TRANSFER PUMPS
(TYP OF TWO)
TURBINE
(E) BOILER
FEEDWATER
PUMPS
(E) BOILER
FEEDWATER
PUMPS
(E) BOILER
FEEDWATER
PUMPS
MODULATING
INLET VALVE
EXISTING
COCHRAN
MULTIPORT
RELIEF VALVE
STEAM
FROM
BOILERS
(E)STEAM FOR
COND. PREHEAT
OVERFLOW
TRAP
VENT ORIFICE
MAKEUP
WATER VALVE
MAKEUP
WATER VALVE
CHEMICAL TREATMENT
(SODIUM SULFITE)
BOILER ROOM
SUMP PIT
2" HPC
2" HPC
6" PC
6" PC
6" PC FROM CHILLERS
2" HPC
6" PC
2" DRAIN
3" DRAIN
3" DRAIN
6" LPC
10" LPC HEADER
(E) DA
100,000
#/HR
(N) VENTED
SURGE TANK
2500 GALLON
16' X 6'DIA
(N) VENTED
FLASH TANK
3" DRAIN3" DRAIN
4" PC
4" PC
6" BFW
6" BFW
6" BFW
6" BFW6" BFW6" BFW
6" BFW
(NO) 6" LPC VALVE
(NC) 6" BFW VALVE
(NO) 10" LPC
VALVE
(NC) 10"
BYPASS
VALVE
4" (NC) LPS VALVES
4" (NO) LPS VALVE
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
OFF LINE
CHEMICAL TREATMENT
(SODIUM SULFITE)
CLOSED
CLOSED
FLUID SENSOR IN
HEADER
OVERFLOW
DRAIN
OVERFLOW
DRAIN
3" BYPASS
HEADER SURGE
OVERFLOW
DRAIN
10" LPC
BYPASS
CLOSED
3" DRAIN
2" VENT
T
DCW
DCW
FEEDWATER TO
BOILERS
2" HPC
6" PC
6" PC FROM CHILLERS
2" HPC
6" PC
LOW FLOW
ORIFICE
LFO
LFO
6" BFW
1-1/4" BFWB1-1/4" BFWB
1-1/4" BFWB
1-1/4" BFWB
1-1/4" BFWB
CLOSED
SCALE:
1
M-1
NONE
CONDENSATE RECOVERY SYSTEM SURGE TANK BYPASS OPERATION
DESCRIPTION OF OPERATIONBYPASS ARRANGEMENT.
NOTE: BYPASS OPERATION IS FOR EMERGENCY USE WHEN THE SURGE TANK IS NOT AVAILABLE DUE TO
MAINTENANCE OR MALFUNCTION. THIS MODE DOES NOT HOLD THE CONDENSATE LONG AND MAY BE
STRESSFUL ON THE TRANSFER PUMPS DUE TO HIGH TEMPERATURE OF RETURNING CONDENSATE. THE
VENTED OVERSIZED 10" LPC PIPE AND AND HIGH PRESSURE RETURN FLASH TANK PROVIDE SOME
DEGREE OF PROTECTION, BUT OPERATING IN THIS MODE SHOULD BE KEPT TO A MINIMUM.
BASIC DESCRIPTION:
1. SURGE TANK IS VALVED OFFLINE.
2. HPR RETURNS TO VENTED FLASH TANK.
3. PUMPED CONDENSATE RETURNS FROM NORTH, SOUTH AND CHILLER LOOPS AND DROPS THROUGH
SURGE TANK HEADER BYPASSING SURGE TANK TO 10" LOW PRESSURE RETURN HEADER, WHICH IS
VENTED TO THE FLASH TANK VENT.
4. FLUID SENSOR IN HEADER ENABLES TRANSFER PUMPS. POSITION TO ALLOW ADEQUATE TIME TO
DISABLE PUMPS WHEN FLUID LEVEL IS TOO LOW.
5. CONDENSATE DROPS TO TRANSFER PUMPS.
6. THE ACTIVE TRANSFER PUMP PUMPS CONDENSATE TO DEAERATOR.
7. MAKEUP WATER IS ADDED AT THE DEAERATOR.
8. SODIUM SULFITE IS ADDED AT THE DEAERATOR.
9. LOW PRESSURE STEAM IS ADDED TO THE DEAERATOR.
10. THE DEAERATOR PREPARES THE CONDENSATE FOR RETURN TO THE BOILER.
11. OVERFLOW DRAINAGE IS THROUGH THE FLASH TANK OVERFLOW OPENING AND PIPING AND OR THE
DA OVERFLOW TRAP. OR THROUGH THE HEADER PIPE SURGE OVERFLOW DRAIN LINE.
12. THE BOILER FEED WATER DROPS FROM THE DEAERATOR TO THE BOILER FEED PUMPS.
13. THE ACTIVE BOILER FEED PUMP PUMPS THE BOILER FEED WATER TO THE ACTIVE BOILERS.
14. BOIELRS CREATE THE STEAM THAT IS DISTRIBUTED THROUGHOUT THE CAMPUS.
15. CONDENSATE PUMPS THROUGHOUT THE CAMPUS RETURN THE CONDENSATE TO BOILER ROOM
PREPARED OR APPROVED BY ME, SCOTT A. FRENCK, PE, AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF NEW JERSEY.
ENG. CERT. OF AUTH NO. 24GE05246600 EXP DATE: 4-30-22
19P2
58
NO.
DESCRIPTION
DATE
AIS
SUED
FO
R BI
D, P
ERM
IT, A
ND
DC
A R
EVIE
W12
/11/
2020
CE
NT
RA
L U
TILIT
Y P
LA
NT
SU
RG
E T
AN
K IN
ST
ALLA
TIO
N
ISSUED FOR BID/PERMIT
M-6.04
ME
CH
AN
IC
AL P
IP
IN
G D
IA
GR
AM
SE
QU
EN
CE
IN
B
YP
AS
S M
OD
E
DRD
12/03/20
SF
SCALE:
2
PH1
NONE
TASK SKETCH #2
(E) 4" PC TO DA
PHASING TASKSDescription:
THIS PHASE TO BE COMPLETED PRIOR TOSTEAM CHILLER USE IS REQUIRED. SOME OFTHESE TASKS REQUIRE BRIEF SHUT DOWN OFTHE CONDENSATE RETURN SYSTEM TODISCONNECT THE PUMPS FROM THE MAINS.
TASK - (ROWAN TASKS)
· INSTALL NEW PUMP #1.· DISCONNECT AND REMOVE THE
EXISTING TRANSFER PUMP #2 ANDPUMP #3.
TASK #3 - (CONTRACTOR TASKS)
· DISCONNECT PIPES TO BACKUP DA
STEAM ON / (E) DA
(E) 4" PC TO DA
PHASING TASKSDescription:
THIS PHASE TO BE COMPLETED PRIOR TOSTEAM CHILLER USE IS REQUIRED
TASK - (ROWAN TASK)
· ISOLATE, DISCONNECT ANDREMOVE THE EXISTING TRANSFERPUMP #1
STEAM ON / (E) DA
SCALE:
1
PH1
NONE
TASK SKETCH #1
PHASING TASKSDescription:
THIS PHASE TO BE COMPLETED PRIOR TOSTEAM CHILLER USE IS REQUIRED
TASKS - (ROWAN - CONTRACTOR)
· DURING STEAM PLANT SHUT DOWNISOLATE THE EXISTING BACKUP DAAND DISCONNECT FOR REMOVAL.
· NOTE REMOVE ALL PIPINGCONNECTED TO THE EXISTING75,000 LBS DA TO BE REMOVED.
· PROVIDE TEMPORARY CAPS ON PIPEOPENINGS REMAINING TO BEREUSED.
· PERMANENTLY CAP PIPE OPENINGSON PIPES THAT REMAIN, BUTOPENINGS ARE NOT REQUIRED INNEW WORK.
· DISCONNECT CONTROLS MODIFY ASREQUIRED TO SUIT NEW WORK.
· RECONFIGURE STEAM RISER TOINSTALL NEW DOUBLE BLOCK ANDBLEED (DBB) VALVES ON STEAMSUPPLY TO CLEAR INSTALLATION OFFUTURE SURGE TANK AND REOPENSTEAM TO REMAINING DA. LOCKAND TAG OUT DBB TO FUTURE SURGE TANK.
SCALE:
3
PH1
NONE
TASK SKETCH #3REQUIRES STEAM PLANTSHUTDOWN (NO DA AVAILABLE)
(E) 4" PC TO DA
STEAM OFF/ NO DA
INSTALL (N) 4" DBL BLOCKFOR LATER CONNECTION OFSTEAM TO (N) SURGE TANKSTEAM INLET. L.&T.O.VALVES OR BLANK FLANGEOPENING.
SCALE:
4
PH1
NONE
TASK SKETCH #4
PHASING TASKSDESCRIPTION:
NOTE - (E) 100,000 DA TO BERE-ENABLED AT THIS TIME. REOPENVALVES AFTER LINES TO BACKUP DAARE CAPPED.
STEAM ON / (E) DA
(E) 4" PC TO DA
STEAM ON TO (E) DA
HPR FROM NORTH LOOP TO DAHPR FROM SOUTH LOOP DUMPED TO PITPC FROM PIT TO DA
GENERAL PHASING NOTES:
SHEET NUMBER:
DATE:
PRO
JEC
T N
UM
BER
:
PRO
JEC
T TI
TLE:
FOR DCA REVIEW
STAMP
DR
AW
ING
TIT
LE:
:
DRWN:
CHKD:
DCA APPROVAL
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE
PREPARED OR APPROVED BY ME, SCOTT A. FRENCK, PE, AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF NEW JERSEY.
ENG. CERT. OF AUTH NO. 24GE05246600 EXP DATE: 4-30-22
19P2
58
NO.
DESCRIPTION
DATE
AIS
SUED
FO
R BI
D, P
ERM
IT, A
ND
DC
A R
EVIE
W12
/11/
2020
CE
NT
RA
L U
TILIT
Y P
LA
NT
SU
RG
E T
AN
K IN
ST
ALLA
TIO
N
ISSUED FOR BID/PERMIT
M-6.05
ME
CH
AN
IC
AL P
HA
SIN
G
TA
SK
S 1-4
DRD
12/03/20
SF
AutoCAD SHX Text
NOTE- ROWAN TO ISOLATE, DISCONNECT AND REMOVE CONDENSATE PUMPS CP-2&3 AT PIT.
AutoCAD SHX Text
NOTE- ROWAN TO INSTALL NEW REPLACEMENT PUMP.
AutoCAD SHX Text
DISCONNECT PC FROM CONDENSATE AT MAIN FROM TRANSFER PUMPS AT PIT TO BACKUP DA. CAP OPENING.
AutoCAD SHX Text
ISOLATE, DISCONNECT AND REMOVE BOILER WATER FEED MAIN TO THE FEED WATER PUMPS FROM THE BACKUP DA TO POSITION INDICATED.
AutoCAD SHX Text
DISCONNECT BOILER FEED WATER FROM CENTER OF UNDERSIDE OF DA.
AutoCAD SHX Text
EXISTING PIPE TO EXISTING REMAINING DA ON MEZZ.
AutoCAD SHX Text
NOTE- ROWAN TO ISOLATE, DISCONNECT AND REMOVE CONDENSATE PUMP CP-1 AT PIT. FOR INSTALLATION OF NEW REPLACEMENT PUMP.
AutoCAD SHX Text
(E) DA 100,000 #/HR 2200 GAL
AutoCAD SHX Text
(E) DA 75,000 #/HR
AutoCAD SHX Text
DISCONNECT EXISTING 75000 LB/HR DA.
AutoCAD SHX Text
DISCONNECT 1" 316SS CHEMICAL TREATMENT PIPING, (SODIUM SULFITE) REMOVE TO BELOW GRATE AT MAIN. TEMPORARY CAP AT MAIN.
AutoCAD SHX Text
DISCONNECT DOMESTIC COLD WATER MAKEUP AND BYPASS FROM EXISTING DA AND CAP TO CLEAR NEW WORK LIMITS.
AutoCAD SHX Text
DISCONNECT LPS CONNECTION AND REMOVE PIPE BACK TO RISER. MODIFY RISER TO REDIRECT THE STEAM SUPPLY TO CLEAR NEW WORK. COORDINATE WITH NEW WORK.
AutoCAD SHX Text
CLOSE DOUBLE BLOCK AT PRV TO DISCONNECT THE BACKUP 75000 LBS DA.
AutoCAD SHX Text
CLOSE DOUBLE BLOCK AND BLEED FROM TURBINE BELOW TO REMAIN OFF UNTIL PROJECT IS COMPLETED, OR UNLESS TURBINE IS NEEDED.
AutoCAD SHX Text
VALVE BELOW MEZZ.
AutoCAD SHX Text
(E)12" HPS12" HPS
AutoCAD SHX Text
6" PC FROM NORTH LOOP
AutoCAD SHX Text
2" LPR FROM NORTH LOOP
AutoCAD SHX Text
(E) DA 100,000 #/HR 2200 GAL
AutoCAD SHX Text
(E) DA 75,000 #/HR
AutoCAD SHX Text
OPEN DOUBLE BLOCK AT PRV TO RESUME OPERATION OF 100,000 #/HR DA.
AutoCAD SHX Text
TURBINE MAY BE USED IF NEEDED. OTHERWISE KEEP CLOSED.
AutoCAD SHX Text
DISCONNECTED 1" 316SS CHEMICAL TREATMENT PIPING, (SODIUM SULFITE) CAPPED BELOW GRATE AT MAIN.
AutoCAD SHX Text
VALVE BELOW MEZZ. (CLOSED)
AutoCAD SHX Text
DA BACK IN OPERATION. CONTRACTOR TO USE CAUTION IN WORK NEARBY AND ON ASSOCIATED SYSTEMS.
AutoCAD SHX Text
(E)12" HPS12" HPS
AutoCAD SHX Text
6" PC FROM NORTH LOOP
AutoCAD SHX Text
1. PHASING PLANS ARE DIAGRAMATIC REPRESENTATIONS AND PHASING PLANS ARE DIAGRAMATIC REPRESENTATIONS AND MAY NOT SHOW ALL VALVES, FITTINGS PIPES, EQUIPMENT, ARCHITECTURAL OR STRUCTURAL ELEMENTS, ETC. 2. PHASING IS SUGGESTED AND NOT MEANT TO LIMIT OTHER PHASING IS SUGGESTED AND NOT MEANT TO LIMIT OTHER APPROACHES. SUBMIT ANY VARIATIONS PLANNED FOR APPROVAL PRIOR TO IMPLEMENTATION. 3. PHASING APPROACHES MUST LIMIT STEAM SYSTEM PHASING APPROACHES MUST LIMIT STEAM SYSTEM DOWNTIME/SHUTDOWNS AS MUCH AS POSSIBLE. 4. NOTE ANY ADDITIONAL SHUTDOWNS FROM THOSE INDICATED NOTE ANY ADDITIONAL SHUTDOWNS FROM THOSE INDICATED IF NEEDED. 5. GIVE ESTIMATED LENGTH OF SHUTDOWNS AND PARTIAL GIVE ESTIMATED LENGTH OF SHUTDOWNS AND PARTIAL SHUTDOWNS EXPECTED. 6. APPROVE ANY SHUTDOWNS WITH ROWAN PERSONNEL PRIOR APPROVE ANY SHUTDOWNS WITH ROWAN PERSONNEL PRIOR TO IMPLEMENTATION. 7. REFER TO NEW WORK, AND DEMO WORK PLANS AND REFER TO NEW WORK, AND DEMO WORK PLANS AND ELEVATIONS AND MODE DRAWINGS AND ELEVATIONS.
SCALE:
1
PH1
NONE
TASK SKETCH #6
PHASING TASKSDescription:
TASK - (ROWAN TASKS)· OPEN AIR LINES FROM
COMPRESSOR NEAR THECO-GENERATION UNIT ANDISOLATE COMPRESSOR NEARSTAIRS FOR REMOVAL.
· DISCONNECT AND REMOVEEXIST AIR COMPRESSOR ANDREFRIGERANT DRIER.
· DESICCANT DRIER IS NOT BEINGRELOCATED. CONTRACTOR TOREMOVE AND OFFER OWNERFIRST RIGHT OF REFUSAL.
10" LPC
10
" L
PC
(N)1" CA
(N)1" CA
INSTALL NEW 1" CA MAINTO NEW COMP LOCATION.
DISCONNECT AND REMOVE AIRCOMP AND REFRIGERANT DRIERFOR RELOCATION.
DISCONNECT AND REMOVE DESICCANT DRIERUNIT. DISPOSE IF DIRECTED BY OWNER.
STEAM ON / (E) DA
(E) 4" PC TO DA
SCALE:
5
PH1
NONE
TASK SKETCH #5
PHASING TASKSDescription:
THIS PHASE MUST BE COMPLETED PRIORTO STEAM CHILLER USE IS REQUIRED
TASK - (ROWAN TASK)
· RUN AIR PIPE FROM CONNECTIONPOINT TO NEW LOCATION OVEREXISTING HOT WELL.
TASK - (CONTRACTOR TASKS)THE FOLLOWING WORK CAN BE DONEAHEAD OF SCHEDULE TO PREPARE FORCONNECTION IN LATER TASKS.
· INSTALL 10" MAIN LPC UNDERMEZZANINE.
10" LPC
10
" L
PC
INSTALL 10" MAINLPC UNDERMEZZANINE.
INSTALL 10" MAINLPC UNDERMEZZANINE.
INSTALL NEW 1" CA MAINTO NEW COMP LOCATION.TEMPORARY PLUG UNTILCONNECTION.
STEAM ON / (E) DA
(E) 4" PC TO DA
BOILER FEED
WATER
(N)1" CA
(N)1" CA
SCALE:
7
PH1
NONE
TASK SKETCH #7
PHASING TASKSDescription:
THE FOLLOWING WORK CAN BE DONEAHEAD OF SCHEDULE TO PREPARE FORCONNECTION IN LATER TASKS.
· MODIFY EXISTING PAD
· INSTALL NEW CONDENSATETRANSFER PUMP SKID IN FORMERAIR COMPRESSOR LOCATION.
· MOVE AIR COMPRESSOR ANDREFRIGERANT DRIER UNITS TOHOT WELL RELOCATION.
10" LPC
10
" L
PC
(N)1" CA
(N)1" CA
MODIFY EXISTING PAD ANDINSTALL NEW TRANSFER PUMPSKID IN FORMER AIR COMPRESSORLOCATION.
6" LPC
PUMP
PACKAGE
PU
MP
CO
NT
RO
LL
ER
4" PC
STEAM ON / (E) DA
(E) 4" PC TO DA
SCALE:
8
PH1
NONE
TASK SKETCH #8
PHASING TASKSDescription:
THE FOLLOWING WORK CAN BE DONEAHEAD OF SCHEDULE TO PREPARE FORCONNECTION IN LATER TASKS.
· CONNECT PUMP SKID PIPING TO10" LPC AND RUN 4" PC TO DATANK TIE IN LOCATION, BUT DONOT TIE IN YET.
10" LPC
10
" L
PC
(N)1" CA
(N)1" CA
CONNECT PUMP HEADER TO 10"LPC HEADER
6" LPC
PUMP
PACKAGE
PU
MP
CO
NT
RO
LL
ER
4" PC TO DA
RUN (N) 4" PC FROM PUMPDISCHARGE HEADER TO TO NEAR(E) 4" PC TO DA. DO NOTCONNECT YET.
STEAM ON / (E) DA
(E) 4" PC TO DA
(N)1" CA
GENERAL PHASING NOTES:
SHEET NUMBER:
DATE:
PRO
JEC
T N
UM
BER
:
PRO
JEC
T TI
TLE:
FOR DCA REVIEW
STAMP
DR
AW
ING
TIT
LE:
:
DRWN:
CHKD:
DCA APPROVAL
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE
PREPARED OR APPROVED BY ME, SCOTT A. FRENCK, PE, AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF NEW JERSEY.
ENG. CERT. OF AUTH NO. 24GE05246600 EXP DATE: 4-30-22
19P2
58
NO.
DESCRIPTION
DATE
AIS
SUED
FO
R BI
D, P
ERM
IT, A
ND
DC
A R
EVIE
W12
/11/
2020
CE
NT
RA
L U
TILIT
Y P
LA
NT
SU
RG
E T
AN
K IN
ST
ALLA
TIO
N
ISSUED FOR BID/PERMIT
M-6.06
ME
CH
AN
IC
AL P
HA
SIN
G
TA
SK
S 5-8
DRD12/03/20
SF
AutoCAD SHX Text
(E)12" HPS12" HPS
AutoCAD SHX Text
(E)12" HPS12" HPS
AutoCAD SHX Text
PATCH OPENINGS AND PROVIDE STRUCTURAL BASE FOR MOUNTING AIR COMPRESSOR BEING RELOCATED TO THIS SPACE.
AutoCAD SHX Text
(E)12" HPS12" HPS
AutoCAD SHX Text
RELOCATE EXISTING AIR COMPRESSOR TO THIS LOCATION. CONNECT TO NEW 1" CA PIPE FROM EXISTING LOCATION TIE IN POINT.
AutoCAD SHX Text
(E)12" HPS12" HPS
AutoCAD SHX Text
1. PHASING PLANS ARE DIAGRAMATIC REPRESENTATIONS AND PHASING PLANS ARE DIAGRAMATIC REPRESENTATIONS AND MAY NOT SHOW ALL VALVES, FITTINGS PIPES, EQUIPMENT, ARCHITECTURAL OR STRUCTURAL ELEMENTS, ETC. 2. PHASING IS SUGGESTED AND NOT MEANT TO LIMIT OTHER PHASING IS SUGGESTED AND NOT MEANT TO LIMIT OTHER APPROACHES. SUBMIT ANY VARIATIONS PLANNED FOR APPROVAL PRIOR TO IMPLEMENTATION. 3. PHASING APPROACHES MUST LIMIT STEAM SYSTEM PHASING APPROACHES MUST LIMIT STEAM SYSTEM DOWNTIME/SHUTDOWNS AS MUCH AS POSSIBLE. 4. NOTE ANY ADDITIONAL SHUTDOWNS FROM THOSE INDICATED NOTE ANY ADDITIONAL SHUTDOWNS FROM THOSE INDICATED IF NEEDED. 5. GIVE ESTIMATED LENGTH OF SHUTDOWNS AND PARTIAL GIVE ESTIMATED LENGTH OF SHUTDOWNS AND PARTIAL SHUTDOWNS EXPECTED. 6. APPROVE ANY SHUTDOWNS WITH ROWAN PERSONNEL PRIOR APPROVE ANY SHUTDOWNS WITH ROWAN PERSONNEL PRIOR TO IMPLEMENTATION. 7. REFER TO NEW WORK, AND DEMO WORK PLANS AND REFER TO NEW WORK, AND DEMO WORK PLANS AND ELEVATIONS AND MODE DRAWINGS AND ELEVATIONS.
SCALE:
9
PH1
NONE
TASK SKETCH #9
PHASING TASKSDESCRIPTION:
· REMOVE THE BOILER ROOM WINDOW TO ALLOW ENTRANCEAND REMOVAL OF EQUIPMENT.
STEAM ON / (E) DA
(E) 4" PC TO DA
STEAM ON TO (E) DA
HPR FROM NORTH LOOP TO DAHPR FROM SOUTH LOOP DUMPED TO PITPC FROM PIT TO DA
(N)1" CA
SCALE:
10
PH1
NONE
TASK SKETCH #10
PHASING TASKSDescription:
· DEMOLISH EXISTING BACKUP DAAND CUT BACK ASSOCIATED PIPINGTO POINTS INDICATED OR TOPOINTS REQUIRED TO ALLOWEXISTING REMAINING DA TOREMAIN IN OPERATION.TEMPORARILY CLOSE OFF WINDOWUNTIL STRUCTURAL WORK IS DONEON MEZZANINE.
STEAM ON / (E) DA
(E) 4" PC TO DA
STEAM ON TO (E) DA
HPR FROM NORTH LOOP TO DAPC FROM PIT TO DA
(N)1" CA
SCALE:
11
PH1
NONE
TASK SKETCH #11
PHASING PLANDescription:
· MAKE STRUCTURALMODIFICATIONS TO MEZZANINENECESSARY TO ALLOW FORINSTALLATION OF NEW SURGETANK
STEAM ON / (E) DA
(E) 4" PC TO DA
STEAM ON TO (E) DA
HPR FROM NORTH LOOP TO DAPC FROM PIT TO DA
(N)1" CA
SCALE:
12
PH1
NONE
TASK SKETCH #12
PHASING PLANDescription:
· INSTALL FLASH TANK FOR HPR.
·· RUN PIPES FROM TANK TOTIE IN POINTS OF HPR, BUTDO NOT CONNECT YET.(NOTE -INSTALLATION OFFLASH TANK MAY BE DONEBEFORE SURGE TANK ISINSTALLED IF IT WON'TINTERFERE WITH SURGETANK INSTALLATION.
(N) INSTALL FLASHTANK FOR HPR
INSTALL (N) 2" HPR TO TIE INLOCATION FOR LATERCONNECTION TO (E) 2" HRP.TEMPORARY PLUG OPEN END.
INSTALL (N) 2" HPR CONNECT TOFLASH TANK. RUN PIPE TO NORTHLOOP TIE-IN LOCATION AT WALL.
STEAM ON / (E) DA
(E) 4" PC TO DA
(N)1" CA
GENERAL PHASING NOTES:
SHEET NUMBER:
DATE:
PRO
JEC
T N
UM
BER
:
PRO
JEC
T TI
TLE:
FOR DCA REVIEW
STAMP
DR
AW
ING
TIT
LE:
:
DRWN:
CHKD:
DCA APPROVAL
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE
PREPARED OR APPROVED BY ME, SCOTT A. FRENCK, PE, AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF NEW JERSEY.
ENG. CERT. OF AUTH NO. 24GE05246600 EXP DATE: 4-30-22
19P2
58
NO.
DESC
RIPTION
DATE
AIS
SUED
FO
R BI
D, P
ERM
IT, A
ND
DC
A R
EVIE
W12
/11/
2020
CE
NT
RA
L U
TILIT
Y P
LA
NT
SU
RG
E T
AN
K IN
ST
ALLA
TIO
N
ISSUED FOR BID/PERMIT
M-6.07
ME
CH
AN
IC
AL P
HA
SIN
G
TA
SK
S 9-12
DRD
12/03/20
SF
AutoCAD SHX Text
(E) DA 100,000 #/HR 2200 GAL
AutoCAD SHX Text
(E) DA 75,000 #/HR
AutoCAD SHX Text
REMOVE WINDOW AND SUPPORTS AS REQUIRED TO INSTALL NEW SURGE TANK. CONTACT STEVE LEWALLEN, SOUTH JERSEY GLASS & DOOR 132. S. DELSEA DR. S. DELSEA DR. GLASSBORO, NJ 08028 P: (856) 881-3838 (856) 881-3838 F: (856) 881-6628
AutoCAD SHX Text
(E)12" HPS12" HPS
AutoCAD SHX Text
6" PC FROM NORTH LOOP
AutoCAD SHX Text
(E) DA 100,000 #/HR 2200 GAL
AutoCAD SHX Text
(E) DA 75,000 #/HR
AutoCAD SHX Text
REMOVE DISCONNECTED BACKUP DA INCLUDING ADDITIONAL STRUCTURAL SUPPORT STEEL NOT BEING REUSED IN NEW WORK. DISPOSE OF REMOVED DA, NOTE ROWAN TO HAVE RIGHT OF FIRST REFUSAL.
AutoCAD SHX Text
TEMPORARY WINDOW COVERING BY WINDOW CONTRACTOR.
AutoCAD SHX Text
VALVE BELOW MEZZ. TO REMAIN
AutoCAD SHX Text
DA IN OPERATION. CONTRACTOR TO USE CAUTION IN WORK NEARBY AND ON ASSOCIATED SYSTEMS.
AutoCAD SHX Text
(E)12" HPS12" HPS
AutoCAD SHX Text
6" PC FROM NORTH LOOP
AutoCAD SHX Text
(E) DA 100,000 #/HR 2200 GAL
AutoCAD SHX Text
TEMPORARY PLYWOOD WINDOW COVERING BY WINDOW CONTRACTOR.
AutoCAD SHX Text
(N)STEEL GRATE MEZZ STEEL GRATE MEZZ WALKWAY REFER TO STRUCTURAL DOCUMENTS FOR FURTHER DETAIL
AutoCAD SHX Text
DA BACK IN OPERATION. CONTRACTOR TO USE CAUTION IN WORK NEARBY AND ON ASSOCIATED SYSTEMS.
AutoCAD SHX Text
(E)12" HPS12" HPS
AutoCAD SHX Text
6" PC FROM NORTH LOOP
AutoCAD SHX Text
(E) DA 100,000 #/HR 2200 GAL
AutoCAD SHX Text
2" VTR OUT THE TOP AND 2" DISCHARGE OUT BOT
AutoCAD SHX Text
DA BACK IN OPERATION. CONTRACTOR TO USE CAUTION IN WORK NEARBY AND ON ASSOCIATED SYSTEMS.
AutoCAD SHX Text
(E)12" HPS12" HPS
AutoCAD SHX Text
6" PC FROM NORTH LOOP
AutoCAD SHX Text
1. PHASING PLANS ARE DIAGRAMATIC REPRESENTATIONS AND PHASING PLANS ARE DIAGRAMATIC REPRESENTATIONS AND MAY NOT SHOW ALL VALVES, FITTINGS PIPES, EQUIPMENT, ARCHITECTURAL OR STRUCTURAL ELEMENTS, ETC. 2. PHASING IS SUGGESTED AND NOT MEANT TO LIMIT OTHER PHASING IS SUGGESTED AND NOT MEANT TO LIMIT OTHER APPROACHES. SUBMIT ANY VARIATIONS PLANNED FOR APPROVAL PRIOR TO IMPLEMENTATION. 3. PHASING APPROACHES MUST LIMIT STEAM SYSTEM PHASING APPROACHES MUST LIMIT STEAM SYSTEM DOWNTIME/SHUTDOWNS AS MUCH AS POSSIBLE. 4. NOTE ANY ADDITIONAL SHUTDOWNS FROM THOSE INDICATED NOTE ANY ADDITIONAL SHUTDOWNS FROM THOSE INDICATED IF NEEDED. 5. GIVE ESTIMATED LENGTH OF SHUTDOWNS AND PARTIAL GIVE ESTIMATED LENGTH OF SHUTDOWNS AND PARTIAL SHUTDOWNS EXPECTED. 6. APPROVE ANY SHUTDOWNS WITH ROWAN PERSONNEL PRIOR APPROVE ANY SHUTDOWNS WITH ROWAN PERSONNEL PRIOR TO IMPLEMENTATION. 7. REFER TO NEW WORK, AND DEMO WORK PLANS AND REFER TO NEW WORK, AND DEMO WORK PLANS AND ELEVATIONS AND MODE DRAWINGS AND ELEVATIONS.
SCALE:
13
PH1
NONE
TASK SKETCH #13
PHASING PLANDescription:
· REMOVE TEMPORARY WINDOWCOVER AND BRING IN NEW SURGETANK AND INSTALL IN PLACE ONMEZZANINE.
STEAM ON / (E) DA
(E) 4" PC TO DA
STEAM ON TO (E) DA
HPR FROM NORTH LOOP TO DAPC FROM PIT TO DA
(N)1" CA
SCALE:
14
PH1
NONE
TASK SKETCH #14
PHASING PLANDescription:
· WINDOW SUBCONTRACTOR TOREINSTALL WINDOW.
STEAM ON TO (E) DA
HPR FROM NORTH LOOP TO DAPC FROM PIT TO DA
(E) 4" PC TO DA
(N)1" CA
SCALE:
15
PH1
NONE
TASK SKETCH #15
PHASING PLANDescription:
PROJECT SHALL BE PHASED TO ALLOWSTEAM SYSTEM TO REMAIN INOPERATION AS LONG AS POSSIBLE.
· INSTALL HEADER PIPE TO SURGETANK, CONNECT PIPES FROMHEADER TO FLASH TANK, FROMHEADER TO 10" LPC MAINBELOW MEZZANINE ANDHEADER TO PC PIPE TIE INLOCATIONS, BUT DO NOT TIE INYET.
STEAM ON / (E) DA
(E) 4" PC TO DA
(N)1" CA
SCALE:
16
PH1
NONE
TASK SKETCH #16
PHASING PLANDescription:
PROJECT SHALL BE PHASED TO ALLOWSTEAM SYSTEM TO REMAIN INOPERATION AS LONG AS POSSIBLE.
· INSTALL CONNECTIONS FROMTHE SURGE TANK DISCHARGEOPENING TO THE 10" LPC MAINAND A CONNECTION TO THEBOILER FEED WATER (BFW)PUMP MAIN AND TIE IN ATVALVE LOCATION WHERE OLDBACKUP DA CONNECTION WASREMOVED.
10" LPC
10
" L
PC
(N)1" CA
6" LPC
PUMP
PACKAGE
PU
MP
CO
NT
RO
LL
ER
4" PC TO DA
6" BFW
6" BFW/ LPC
CONNECT TO
SURGE TANK
RUN (N) 6" LPC FROM SURGE TANKDISCHARGE HEADER TO (N) 10" LPCHEADER.
6" L
PC
RUN (N) 6" BFW (BFW MODE)FROM SURGE TANK DISCHARGEHEADER TO BFW HEADER.CONNECT TO EXISTING VALVE.
(E) 6" BFW(E) 6" BFW
STEAM ON / (E) DA
(E) 4" PC TO DA
(N)1" CA
GENERAL PHASING NOTES:
SHEET NUMBER:
DATE:
PRO
JEC
T N
UM
BER
:
PRO
JEC
T TI
TLE:
FOR DCA REVIEW
STAMP
DR
AW
ING
TIT
LE:
:
DRWN:
CHKD:
DCA APPROVAL
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE
PREPARED OR APPROVED BY ME, SCOTT A. FRENCK, PE, AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF NEW JERSEY.
ENG. CERT. OF AUTH NO. 24GE05246600 EXP DATE: 4-30-22
19P2
58
NO.
DESC
RIPTION
DATE
AIS
SUED
FO
R BI
D, P
ERM
IT, A
ND
DC
A R
EVIE
W12
/11/
2020
CE
NT
RA
L U
TILIT
Y P
LA
NT
SU
RG
E T
AN
K IN
ST
ALLA
TIO
N
ISSUED FOR BID/PERMIT
M-6.08
ME
CH
AN
IC
AL P
HA
SIN
G
TA
SK
S 13-16
DRD12/03/20
SF
AutoCAD SHX Text
(E) DA 100,000 #/HR 2200 GAL
AutoCAD SHX Text
DA BACK IN OPERATION. CONTRACTOR TO USE CAUTION IN WORK NEARBY AND ON ASSOCIATED SYSTEMS.
AutoCAD SHX Text
BRING NEW SURGE TANK IN THROUGH REMOVED WINDOW OPENING.
AutoCAD SHX Text
COORDINATE SURGE TANK DELIVERY AND CRANE LIFT WITH WINDOW REMOVAL. PROVIDE TEMPORARY STRUCTURAL SLIDES /GUIDES, ETC., TO FACILITATE SURGE TANK MOVEMENT
AutoCAD SHX Text
(N) SURGE TANK 100,000 #/HR 2500 GAL
AutoCAD SHX Text
(E)12" HPS12" HPS
AutoCAD SHX Text
OPEN DOUBLE BLOCK AT PRV TO RESUME OPERATION OF 100,000 #/HR DA.
AutoCAD SHX Text
6" PC FROM NORTH LOOP
AutoCAD SHX Text
(E) DA 100,000 #/HR 2200 GAL
AutoCAD SHX Text
DA IN OPERATION. CONTRACTOR TO USE CAUTION IN WORK NEARBY AND ON ASSOCIATED SYSTEMS.
AutoCAD SHX Text
REINSTALL WINDOW
AutoCAD SHX Text
(N) SA 2500 GAL
AutoCAD SHX Text
(E)12" HPS12" HPS
AutoCAD SHX Text
6" PC FROM NORTH LOOP
AutoCAD SHX Text
(E) DA 100,000 #/HR 2200 GAL
AutoCAD SHX Text
10" LPC HEADER
AutoCAD SHX Text
10" LPC BYPASS DOWN TO 10" MAIN BELOW
AutoCAD SHX Text
2" LPC FROM FLASH TANK TO 10" LPC HEADER
AutoCAD SHX Text
CONNECT 10" LPC HEADER TO SURGE TANK
AutoCAD SHX Text
2" LPC FROM FLASH TANK TO 10" LPC HEADER
AutoCAD SHX Text
(N) SA 2500 GAL
AutoCAD SHX Text
(E)12" HPS12" HPS
AutoCAD SHX Text
BYPASS DOWN TO 10" MAIN FROM 10" LPC ABOVE.
AutoCAD SHX Text
(E)12" HPS12" HPS
AutoCAD SHX Text
1. PHASING PLANS ARE DIAGRAMATIC REPRESENTATIONS AND PHASING PLANS ARE DIAGRAMATIC REPRESENTATIONS AND MAY NOT SHOW ALL VALVES, FITTINGS PIPES, EQUIPMENT, ARCHITECTURAL OR STRUCTURAL ELEMENTS, ETC. 2. PHASING IS SUGGESTED AND NOT MEANT TO LIMIT OTHER PHASING IS SUGGESTED AND NOT MEANT TO LIMIT OTHER APPROACHES. SUBMIT ANY VARIATIONS PLANNED FOR APPROVAL PRIOR TO IMPLEMENTATION. 3. PHASING APPROACHES MUST LIMIT STEAM SYSTEM PHASING APPROACHES MUST LIMIT STEAM SYSTEM DOWNTIME/SHUTDOWNS AS MUCH AS POSSIBLE. 4. NOTE ANY ADDITIONAL SHUTDOWNS FROM THOSE INDICATED NOTE ANY ADDITIONAL SHUTDOWNS FROM THOSE INDICATED IF NEEDED. 5. GIVE ESTIMATED LENGTH OF SHUTDOWNS AND PARTIAL GIVE ESTIMATED LENGTH OF SHUTDOWNS AND PARTIAL SHUTDOWNS EXPECTED. 6. APPROVE ANY SHUTDOWNS WITH ROWAN PERSONNEL PRIOR APPROVE ANY SHUTDOWNS WITH ROWAN PERSONNEL PRIOR TO IMPLEMENTATION. 7. REFER TO NEW WORK, AND DEMO WORK PLANS AND REFER TO NEW WORK, AND DEMO WORK PLANS AND ELEVATIONS AND MODE DRAWINGS AND ELEVATIONS.
SCALE:
17
PH1
NONE
TASK SKETCH #17
PHASING PLANDescription:
PROJECT SHALL BE PHASED TO ALLOWSTEAM SYSTEM TO REMAIN INOPERATION AS LONG AS POSSIBLE.
· RUN STEAM PIPE FROM NEW DBBTO SURGE TANK, RUN (N)CONNECTION TO MAKEUP WATER,AND RUN (N) SODIUM SULFITECONNECTING PIPING TO SURGETANK.
STEAM ON / (E) DA
(E) 4" PC TO DA
(N)1" CA
SCALE:
18
PH1
NONE
TASK SKETCH #18
PHASING PLANDescription:
PROJECT SHALL BE PHASED TO ALLOWSTEAM SYSTEM TO REMAIN INOPERATION AS LONG AS POSSIBLE.
· DISCONNECT THE NORTH ROUTEPIPING AT TIE IN POINTS AND TIEIN TO SURGE TANK LINES.
STEAM ON / (E) DA
(E) 4" PC TO DA
(N)1" CA
SCALE:
19
PH1
NONE
TASK SKETCH #19
PHASING PLANDescription:
· AFTER CONNECTION OF NORTHROUTE PIPING IS COMPLETE TOFLASH TANK AND SURGE TANK,VALVE OFF LINES AT HEADER ANDFLASH TANK TO SOUTH LOOP.
(N)1" CA
(N)1" CA
(N)6" PC
(N)2" HPR
STEAM ON / (E) DA
(E)6" LPC
(E)2" HPR
(N)1" CA
SCALE:
20
PH1
NONE
TASK SKETCH #20
PHASING PLANDescription:
· VALVE OFF REMAINING DA ASINDICATED IN SURGE TANK AS DAMODE AND DISCONNECT THEEXISTING 4" FROM THECONDENSATE PIT.
·· DEMOLISH OLD NORTH LOOPHPR BACK TO NEW TIE-INPOINT.
·· OPEN BOILER FEED WATERVALVE FROM SURGE TANKRUNNING IN DA MODE.
(N)1" CA
(N)1" CA
(N)6" PC
(N)2" HPR
CONNECT (N) TO (E) 2" HPRAT WALL.
DISCONNECT (E) 2" HPRREMOVE OLD PIPE BACK TONEW TIE IN LOCATION ATWALL.
STEAM TO SURGE TANKIN DA MODE
STEAM ON TO SURGE TANKIN DA MODEHPR FROM NORTH LOOPTO FLASH TANK THEN TOSURGE TANK
PC FROM NORTH LOOP TOSURGE TANK
(E)6" LPC
(E)2" HPR
(N)1" CA
GENERAL PHASING NOTES:
SHEET NUMBER:
DATE:
PRO
JEC
T N
UM
BER
:
PRO
JEC
T TI
TLE:
FOR DCA REVIEW
STAMP
DR
AW
ING
TIT
LE:
:
DRWN:
CHKD:
DCA APPROVAL
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE
PREPARED OR APPROVED BY ME, SCOTT A. FRENCK, PE, AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF NEW JERSEY.
ENG. CERT. OF AUTH NO. 24GE05246600 EXP DATE: 4-30-22
19P2
58
NO.
DESCRIPTION
DATE
AIS
SUED
FO
R BI
D, P
ERM
IT, A
ND
DC
A R
EVIE
W12
/11/
2020
CE
NT
RA
L U
TILIT
Y P
LA
NT
SU
RG
E T
AN
K IN
ST
ALLA
TIO
N
ISSUED FOR BID/PERMIT
M-6.09
ME
CH
AN
IC
AL P
HA
SIN
G
TA
SK
S 17-20
DRD12/03/20
SF
AutoCAD SHX Text
(E) DA 100,000 #/HR 2200 GAL
AutoCAD SHX Text
10" LPC HEADER
AutoCAD SHX Text
(N)4" LPS 4" LPS
AutoCAD SHX Text
(N)4" LPS 4" LPS
AutoCAD SHX Text
(N)1" SODIUM 1" SODIUM SULFIDE
AutoCAD SHX Text
(N)DOMESTIC DOMESTIC MAKEUP WATER
AutoCAD SHX Text
(N) SA 2500 GAL
AutoCAD SHX Text
(E)12" HPS12" HPS
AutoCAD SHX Text
(E) DA 100,000 #/HR 2200 GAL
AutoCAD SHX Text
10" LPC HEADER
AutoCAD SHX Text
(N)6" PC 6" PC FROM NORTH LOOP
AutoCAD SHX Text
(N)6" PC 6" PC FROM NORTH LOOP
AutoCAD SHX Text
(N)6" PC FOR 6" PC FOR LATER CONNECT TO SOUTH LOOP
AutoCAD SHX Text
(N)6" PC FOR 6" PC FOR LATER CONNECT TO SOUTH LOOP RUN PIPE TO LOCATION FOR LATER CONNECTION.
AutoCAD SHX Text
CLOSE (N) DOUBLE BLOCK ON PC FROM SOUTH LOOP
AutoCAD SHX Text
(N) SA 2500 GAL
AutoCAD SHX Text
(E)12" HPS12" HPS
AutoCAD SHX Text
(E) DA 100,000 #/HR 2200 GAL
AutoCAD SHX Text
10" LPC HEADER
AutoCAD SHX Text
(N)6" PC 6" PC CONNECT TO SOUTH LOOP.
AutoCAD SHX Text
(N)6" PC RISE TO 6" PC RISE TO MEZZANINE LEVEL.
AutoCAD SHX Text
(N)6" PC ELBOW DOWN 6" PC ELBOW DOWN TO LOCATION FOR LATER CONNECTION TO SOUTH LOOP.
AutoCAD SHX Text
(N)2" PC ELBOW DOWN 2" PC ELBOW DOWN TO LOCATION FOR LATER CONNECTION.
AutoCAD SHX Text
(N) SA 2500 GAL
AutoCAD SHX Text
(E)12" HPS12" HPS
AutoCAD SHX Text
(N)2" HPR 2" HPR CONNECT TO SOUTH LOOP.
AutoCAD SHX Text
(E) DA 100,000 #/HR 2200 GAL
AutoCAD SHX Text
10" LPC HEADER
AutoCAD SHX Text
(N)6" PC ELBOW DOWN 6" PC ELBOW DOWN TO LOCATION FOR LATER CONNECTION.
AutoCAD SHX Text
(N)2" HPR ELBOW 2" HPR ELBOW DOWN TO LOCATION FOR LATER CONNECTION.
AutoCAD SHX Text
CLOSE LPS TO DA.
AutoCAD SHX Text
OPEN DOUBLE BLOCK ON LPS TO PLACE SURGE TANK IN DA MODE (REFER TO DIAGRAM)
AutoCAD SHX Text
(N) SA 2500 GAL
AutoCAD SHX Text
(E)12" HPS12" HPS
AutoCAD SHX Text
OPEN THE BOILER WATER FEED TO THE FEED WATER PUMPS FROM THE SURGE TANK RUNNING IN DA MODE.
AutoCAD SHX Text
1. PHASING PLANS ARE DIAGRAMATIC REPRESENTATIONS AND PHASING PLANS ARE DIAGRAMATIC REPRESENTATIONS AND MAY NOT SHOW ALL VALVES, FITTINGS PIPES, EQUIPMENT, ARCHITECTURAL OR STRUCTURAL ELEMENTS, ETC. 2. PHASING IS SUGGESTED AND NOT MEANT TO LIMIT OTHER PHASING IS SUGGESTED AND NOT MEANT TO LIMIT OTHER APPROACHES. SUBMIT ANY VARIATIONS PLANNED FOR APPROVAL PRIOR TO IMPLEMENTATION. 3. PHASING APPROACHES MUST LIMIT STEAM SYSTEM PHASING APPROACHES MUST LIMIT STEAM SYSTEM DOWNTIME/SHUTDOWNS AS MUCH AS POSSIBLE. 4. NOTE ANY ADDITIONAL SHUTDOWNS FROM THOSE INDICATED NOTE ANY ADDITIONAL SHUTDOWNS FROM THOSE INDICATED IF NEEDED. 5. GIVE ESTIMATED LENGTH OF SHUTDOWNS AND PARTIAL GIVE ESTIMATED LENGTH OF SHUTDOWNS AND PARTIAL SHUTDOWNS EXPECTED. 6. APPROVE ANY SHUTDOWNS WITH ROWAN PERSONNEL PRIOR APPROVE ANY SHUTDOWNS WITH ROWAN PERSONNEL PRIOR TO IMPLEMENTATION. 7. REFER TO NEW WORK, AND DEMO WORK PLANS AND REFER TO NEW WORK, AND DEMO WORK PLANS AND ELEVATIONS AND MODE DRAWINGS AND ELEVATIONS.
SCALE:
21
PH1
NONE
TASK SKETCH #21
PHASING PLANDescription:
· DISCONNECT THE SOUTH PC LOOPAND CHILLER LPC LOOP (WILLREQUIRE AN ABSORPTION CHILLERSHUT DOWN)
(N)6" PC
(N)2" HPR
(E) 4" PC TO DA
(E)6" LPC
(E)2" HPR
(E) 6" PC
BELOW FLOOR
STEAM ON TO SURGE TANKIN DA MODEHPR FROM NORTH LOOPTO FLASH TANK THEN TOSURGE TANK
PC FROM NORTH LOOP TOSURGE TANK
(N)1" CA
SCALE:
22
PH1
NONE
TASK SKETCH #22
PHASING PLANDescription:
· DISCONNECT THE SOUTH PC LOOPAND CHILLER LPC LOOP (WILLREQUIRE AN ABSORPTION CHILLERSHUT DOWN)
·· CUT FLOOR AND EXCAVATEDOWN TO COND PC AND HPRPIPES AND TIE IN TO MAINSRUN TO THE NEW SURGETANK HEADER.
·· MAKE TIE IN CONNECTIONTO 4" PC FROM THE NEWTRANSFER PUMPSET
·· INSTALL NEW MAKEUPWATER TO EXISTING DA
(N)6" PC
(N)2" HPR
SURGE TANK INDA MODE
(E) 4" PC TO DA
MODULATING
INLET VALVE
MAKEUP
WATER VALVE
(E)6" LPC
(E)2" HPR
STEAM ON TO SURGE TANKIN DA MODEHPR FROM NORTH LOOPTO FLASH TANK THEN TOSURGE TANKPC FROM NORTH LOOP TOSURGE TANK
(N)1" CA
SCALE:
23
PH1
NONE
TASK SKETCH #23 (MEZZ)
PHASING PLANDescription:
· PLACE SYSTEM IN NORMALOPERATION MODE.
(N)6" PC
(N)2" HPR
STEAM ON / (E) DA
(E) 4" PC TO DA
MODULATING
INLET VALVE
MAKEUP
WATER VALVE
(E)6" LPC
(E)2" HPR
NORMAL MODESTEAM TO DAHPR FROM NORTH AND SOUTH LOOPS LOOPS TOFLASH TANK THEN TO SURGE TANKPC FROM NORTH LOOP AND SOUTH LOOP TOSURGE TANKCLOSE SURGE TANK BOILER FEED VALVE
OPEN (E) DA BOILER FEED VALVE
(N)1" CA
10" LPC
10
" L
PC
(N)1" CA
6" LPC
PUMP
PACKAGE
PU
MP
CO
NT
RO
LL
ER
4" PC TO DA
6" BFW
6" BFW/ LPC
CONNECT TO
SURGE TANK
OPEN LINE TO CONDENSATETRANSFER PUMPS
6" L
PC
CLOSE LINE TO BOILER FEEDPUMPS FROM SURGE TANK
(E) 6" BFW
(E) 6" BFW
(E) 4" PC TO DA
SCALE:
23
PH1
NONE
TASK SKETCH #23 (1ST FLR)
PHASING PLANDescription:
· PLACE SYSTEM IN NORMALOPERATION MODE.
STEAM ON / (E) DA
(N)6" PC
(N)2" HPR
BOILER FEED
WATER
(N)1" CA
GENERAL PHASING NOTES:
SHEET NUMBER:
DATE:
PRO
JEC
T N
UM
BER
:
PRO
JEC
T TI
TLE:
FOR DCA REVIEW
STAMP
DR
AW
ING
TIT
LE:
:
DRWN:
CHKD:
DCA APPROVAL
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE
PREPARED OR APPROVED BY ME, SCOTT A. FRENCK, PE, AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF NEW JERSEY.
ENG. CERT. OF AUTH NO. 24GE05246600 EXP DATE: 4-30-22
19P2
58
NO.
DESCRIPTION
DATE
AIS
SUED
FO
R BI
D, P
ERM
IT, A
ND
DC
A R
EVIE
W12
/11/
2020
CE
NT
RA
L U
TILIT
Y P
LA
NT
SU
RG
E T
AN
K IN
ST
ALLA
TIO
N
ISSUED FOR BID/PERMIT
M-6.10
ME
CH
AN
IC
AL P
HA
SIN
G
TA
SK
S 21-23
DRD
12/03/20
SF
AutoCAD SHX Text
(E) DA 100,000 #/HR 2200 GAL
AutoCAD SHX Text
10" LPC HEADER
AutoCAD SHX Text
CONNECT (N) TO 6" PC BELOW FLOOR. RISE WITH VALVE AND CONNECT TO PREVIOUSLY INSTALLED PIPE.
AutoCAD SHX Text
(N) SA 2500 GAL
AutoCAD SHX Text
(E)12" HPS12" HPS
AutoCAD SHX Text
(N)2"HPR FROM 2"HPR FROM SOUTH LOOP
AutoCAD SHX Text
(N)6" LPC 6" LPC FROM CHILLERS
AutoCAD SHX Text
SAW CUT FLOOR AND EXCAVATE DOWN TO PIPES BELOW FLOOR.
AutoCAD SHX Text
CONNECT (N) TO 2" HPR BELOW FLOOR. RISE WITH VALVE AND CONNECT TO PREVIOUSLY INSTALLED PIPE.
AutoCAD SHX Text
DISCONNECT (E) 4" PC FROM PUMPS.
AutoCAD SHX Text
REMOVE (E) 4" PC FROM PUMPS TO DA.
AutoCAD SHX Text
(E) DA 100,000 #/HR 2200 GAL
AutoCAD SHX Text
10" LPC HEADER
AutoCAD SHX Text
OPEN 6" PC VALVE IN RISER
AutoCAD SHX Text
OPEN 2" HPR VALVE IN RISER
AutoCAD SHX Text
(N) SA 2500 GAL
AutoCAD SHX Text
(E)12" HPS12" HPS
AutoCAD SHX Text
BACKFILL AND RESTORE FLOOR, PATCH TO MATCH ADJACENT.
AutoCAD SHX Text
(N) 4" PC 4" PC UP FROM TRANSFER PUMPS
AutoCAD SHX Text
OPEN 2" HPR VALVE
AutoCAD SHX Text
OPEN 6" LPC VALVE
AutoCAD SHX Text
(E) DA 100,000 #/HR 2200 GAL
AutoCAD SHX Text
10" LPC HEADER
AutoCAD SHX Text
OPEN 6" PC VALVE IN RISER
AutoCAD SHX Text
OPEN 2" HPR VALVE IN RISER
AutoCAD SHX Text
(N) SA 2500 GAL
AutoCAD SHX Text
(E)12" HPS12" HPS
AutoCAD SHX Text
BACKFILL AND RESTORE FLOOR, PATCH TO MATCH ADJACENT.
AutoCAD SHX Text
OPEN 2" HPR VALVE
AutoCAD SHX Text
OPEN 6" LPC VALVE
AutoCAD SHX Text
BYPASS DOWN TO 10" MAIN FROM 10" LPC ABOVE.
AutoCAD SHX Text
(E)12" HPS12" HPS
AutoCAD SHX Text
1. PHASING PLANS ARE DIAGRAMATIC REPRESENTATIONS AND PHASING PLANS ARE DIAGRAMATIC REPRESENTATIONS AND MAY NOT SHOW ALL VALVES, FITTINGS PIPES, EQUIPMENT, ARCHITECTURAL OR STRUCTURAL ELEMENTS, ETC. 2. PHASING IS SUGGESTED AND NOT MEANT TO LIMIT OTHER PHASING IS SUGGESTED AND NOT MEANT TO LIMIT OTHER APPROACHES. SUBMIT ANY VARIATIONS PLANNED FOR APPROVAL PRIOR TO IMPLEMENTATION. 3. PHASING APPROACHES MUST LIMIT STEAM SYSTEM PHASING APPROACHES MUST LIMIT STEAM SYSTEM DOWNTIME/SHUTDOWNS AS MUCH AS POSSIBLE. 4. NOTE ANY ADDITIONAL SHUTDOWNS FROM THOSE INDICATED NOTE ANY ADDITIONAL SHUTDOWNS FROM THOSE INDICATED IF NEEDED. 5. GIVE ESTIMATED LENGTH OF SHUTDOWNS AND PARTIAL GIVE ESTIMATED LENGTH OF SHUTDOWNS AND PARTIAL SHUTDOWNS EXPECTED. 6. APPROVE ANY SHUTDOWNS WITH ROWAN PERSONNEL PRIOR APPROVE ANY SHUTDOWNS WITH ROWAN PERSONNEL PRIOR TO IMPLEMENTATION. 7. REFER TO NEW WORK, AND DEMO WORK PLANS AND REFER TO NEW WORK, AND DEMO WORK PLANS AND ELEVATIONS AND MODE DRAWINGS AND ELEVATIONS.
SHEET NUMBER:
DATE:
PRO
JEC
T N
UM
BER
:
PRO
JEC
T TI
TLE:
FOR DCA REVIEW
STAMP
DR
AW
ING
TIT
LE:
:
DRWN:
CHKD:
DCA APPROVAL
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE
PREPARED OR APPROVED BY ME, SCOTT A. FRENCK, PE, AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF NEW JERSEY.
ENG. CERT. OF AUTH NO. 24GE05246600 EXP DATE: 4-30-22
19P2
58
NO.
DESC
RIPTION
DATE
AIS
SUED
FO
R BI
D, P
ERM
IT, A
ND
DC
A R
EVIE
W12
/11/
2020
CE
NT
RA
L U
TIL
IT
Y P
LA
NT
SU
RG
E T
AN
K IN
ST
AL
LA
TIO
N
ISSUED FOR BID/PERMIT
E-0
EL
EC
TR
ICA
L C
OV
ER
SHE
ET
DEDC12/03/20
DRW
AutoCAD SHX Text
ELECTRICAL DRAWING LIST E-0 ELECTRICAL COVERSHEET ELECTRICAL COVERSHEET E-1 ELECTRICAL DEMOLITION AND NEW WORK POWER PLANSELECTRICAL DEMOLITION AND NEW WORK POWER PLANS
AutoCAD SHX Text
MECHANICAL EQUIPMENT LEGEND:
AutoCAD SHX Text
ELECTRICAL ABBREVIATIONS:
AutoCAD SHX Text
POWER LEGEND:
AutoCAD SHX Text
CH
AutoCAD SHX Text
#
AutoCAD SHX Text
CABINET HEATER. PROVIDED BY MECHANICAL CONTRACTOR
AutoCAD SHX Text
DRYER EXHAUST BOOSTER FAN. PROVIDED BY MECHANICAL CONTRACTOR
AutoCAD SHX Text
UNIT HEATER. PROVIDED BY MECHANICAL CONTRACTOR
AutoCAD SHX Text
CONDENSING UNIT. PROVIDED BY MECHANICAL CONTRACTOR
AutoCAD SHX Text
DB
AutoCAD SHX Text
#
AutoCAD SHX Text
UH
AutoCAD SHX Text
#
AutoCAD SHX Text
CU
AutoCAD SHX Text
#
AutoCAD SHX Text
AHU
AutoCAD SHX Text
#
AutoCAD SHX Text
EF
AutoCAD SHX Text
#
AutoCAD SHX Text
WH
AutoCAD SHX Text
#
AutoCAD SHX Text
MOTORIZED EQUIPMENT. "#" IF PRESENT INSIDE SYMBOL IDENTIFIES MOTOR HORSEPOWER.
AutoCAD SHX Text
AIR HANDLING UNIT. PROVIDED BY MECHANICAL CONTRACTOR
20A, 120V AC, NEMA 5-20R, HALF-SWITCHED DUPLEX RECEPTACLE. MOUNTING HEIGHT TO CENTER OF DEVICE = 18" A.F.F., + = ABOVE COUNTER HEIGHT MOUNT (COORDINATE WITH MILLWORK).
AutoCAD SHX Text
WP
AutoCAD SHX Text
+
AutoCAD SHX Text
ELECTRICAL POWER PANEL
AutoCAD SHX Text
+
AutoCAD SHX Text
J
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
3
AutoCAD SHX Text
S
AutoCAD SHX Text
M
AutoCAD SHX Text
CIRCUIT BREAKER. "#A" AND "3P" IDENTIFY CIRCUIT BREAKER AMPACITY AND 3 POLES UNLESS OTHERWISE NOTED.
AutoCAD SHX Text
FUSIBLE SWITCH TYPE COMBINATION STARTER UNIT WITH DOOR MOUNTED H-O-A SWITCH AND RED "MOTOR RUNNING" LED TYPE PILOT LIGHT. PROVIDE AUXILIARY CONTACT. NEMA SIZE AS INDICATED. "#A" IDENTIFIES DISCONNECT SWITCH AMPACITY RATING. "#A", IF PRESENT, IDENTIFIES APPROXIMATE FUSE RATING. UNLESS OTHERWISE NOTED, ALL FUSIBLE DISCONNECT SWITCHES SHALL BE COMPLETE WITH APPROPRIATELY SIZED DE, TD, CL, CLASS RK5 FUSES.
AutoCAD SHX Text
CIRCUIT BREAKER TYPE COMBINATION STARTER UNIT WITH DOOR MOUNTED H-O-A SWITCH AND RED "MOTOR RUNNING" LED TYPE PILOT LIGHT. PROVIDE AUXILIARY CONTACT. "#A" IDENTIFIES DISCONNECT SWITCH AMPACITY RATING. NEMA SIZE AS INDICATED.
AutoCAD SHX Text
FUSIBLE DISCONNECT SWITCH. "#A" IDENTIFIES DISCONNECT SWITCH AMPACITY RATING. "#AF", IF PRESENT, IDENTIFIES APPROXIMATE FUSE RATING. UNLESS OTHERWISE NOTED, ALL FUSIBLE DISCONNECT SWITCHES SHALL BE COMPLETE WITH APPROPRIATELY SIZED DE, TD, CL, CLASS RK5 FUSES.
AutoCAD SHX Text
+
AutoCAD SHX Text
#
AutoCAD SHX Text
FEEDER REFERENCE TAG, REFER TO FEEDER LEGEND.
AutoCAD SHX Text
GROUND.
AutoCAD SHX Text
TRANSFORMER.
AutoCAD SHX Text
M
AutoCAD SHX Text
ELECTROMAGNETIC DOOR HOLDER
AutoCAD SHX Text
TYPICAL BRANCH CIRCUITING HOME RUN SYMBOL. GENERALLY 15A BRANCH CIRCUITS CONSISTS OF (2) #14 AWG CU. AND (1) #14 AWG CU. GND. IN 3/4" CONDUIT AND 20A BRANCH CIRCUITS CONSISTS OF (2) #12 AWG CU. AND (1) #12 AWG CU. GND. IN 3/4" CONDUIT, UNLESS OTHERWISE NOTED. "#" IDENTIFIES PANEL BOARD CIRCUIT NUMBER. REFER TO CIRCUITING NOTES FOR SPECIFIC PANEL DESIGNATION.
AutoCAD SHX Text
20A, 120V AC, NEMA 5-20R, DUPLEX RECEPTACLE. MOUNTING HEIGHT TO CENTER OF DEVICE = 18" AFF TO CENTER OF DEVICE BOX U.O.N., + = ABOVE COUNTER HIEGHT MOUNT (COORDINATE WITH MILLWORK).
AutoCAD SHX Text
20A, 120V AC, NEMA 5-20R, DOUBLE DUPLEX RECEPTACLE. MOUNTING HEIGHT TO CENTER OF DEVICE = 18" A.F.F., + = ABOVE COUNTER HIEGHT MOUNT (COORDINATE WITH MILLWORK).
AutoCAD SHX Text
20A, 120V AC, NEMA 5-20R, GROUND FAULT CIRCUIT INTERRUPTER (GFCI) TYPE DUPLEX RECEPTACLE. MOUNTING HEIGHT TO CENTER OF DEVICE = 18" A.F.F., + = ABOVE COUNTER HIEGHT MOUNT (COORDINATE WITH MILLWORK).
AutoCAD SHX Text
20A, 120V AC, NEMA 5-20R, GROUND FAULT CIRCUIT INTERRUPTER (GFCI) DUPLEX RECEPTACLE WITH WEATHERPROOF COVER. 18" AFF TO CENTER OF DEVICE BOX U.O.N.
AutoCAD SHX Text
JUNCTION BOX OR EQUIPMENT CONNECTION.
AutoCAD SHX Text
SPECIAL PURPOSE ELECTRICAL RECEPTACLE. NEMA CONFIGURATION AS SHOWN NEXT TO RECEPTACLE.
AutoCAD SHX Text
20A, 120-277V AC, SINGLE TOGGLE SWITCH. SWITCH MOUNTING HEIGHT = 48" A.F.F. TO CENTER OF DEVICE BOX, U.O.N..
AutoCAD SHX Text
20A, 120-277V AC, THREE-WAY TOGGLE SWITCH. SWITCH MOUNTING HEIGHT = 48" A.F.F. TO CENTER OF DEVICE BOX, U.O.N..
AutoCAD SHX Text
SINGLE-POLE OR TWO-POLE (AS REQUIRED), 250V AC, 1 HP RATED, TOGGLE TYPE MANUAL MOTOR STARTED UNIT WITH MELTING ALLOY TYPE THERMAL OVERLOAD RELAY, APPROPRIATELY SIZED THERMAL UNITS, NEMA TYPE 1 OR 4 (AS REQUIRED) ENCLOSURE, AND HANDLE GUARD/LOCK-OFF. SQUARE D CLASS 2510 FG OR FW TYPES (AS REQUIRED) OR APPROVED EQUAL. THREE-POLE, 250V AC, 1 OR 2 HP RATED (AS REQUIRED), TOGGLE TYPE MANUAL MOTOR STARTER UNIT WITH MELTING ALLOY TYPE THERMAL OVERLOAD RELAY, APPROPRIATELY SIZED THERMAL UNITS, NEMA TYPE 1 ENCLOSURE AND HANDLE GUARD/LOCK-OFF. SQUARE D CLASS 2510 K TYPE OR APPROVED EQUAL.
AutoCAD SHX Text
1600 SQ, FT. COVERAGE WALL MOUNTED OCCUPANCY SENSOR. ADAPTIVE TECHNOLOGY, DUAL TECHNOLOGY (ULTRASONIC AND PASSIVE INFRARED). SENSOR MOUNTING HEIGHT = 10'-0" A.F.F. TO CENTER OF DEVICE BOX, U.O.N. SENSOR SHALL BE MODEL NUMBER ATD1600W AS MANUFACTURED BY HUBBELL. SENSOR SHALL BE PROVIDED WITH A 120/277V AC CONTROL UNIT, MODEL NUMBER SHALL BE CU300A AS MANUFACTURED BY HUBBELL.
AutoCAD SHX Text
2000 SQ. FT. COVERAGE CEILING MOUNTED OCCUPANCY SENSOR. ADAPTIVE TECHNOLOGY, DUAL TECHNOLOGY (ULTRASONIC AND PASSIVE INFRARED). SENSOR SHALL BE MODEL NUMBER ATD2000CRP AS MANUFACTURED BY HUBBELL. SENSOR SHALL BE PROVIDED WITH A 120/277V AC CONTROL UNIT, MODEL NUMBER SHALL BE CU300A AS MANUFACTURED BY HUBBELL.
AutoCAD SHX Text
20A, 120/277V AC, WALL MOUNTED OCCUPANCY SWITCH, SWITCH MOUNTING HEIGHT = 48" A.F.F. TO CENTER OF DEVICE BOX, U.O.N. SWITCH SHALL BE MODEL NUMBER AT1277W AS MANUFACTURED BY HUBBELL.
AutoCAD SHX Text
S
AutoCAD SHX Text
OC
AutoCAD SHX Text
OC
AutoCAD SHX Text
OC
AutoCAD SHX Text
A
AutoCAD SHX Text
DATA OUTLET CONSISTING OF ONE 4" SQUARE BOX, TILE RING (DEPTH AS REQUIRED), DEVICE PLATE (COLOR AS SPECIFIED BY ARCHITECT/ENGINEER AND/OR OWNER), AND 3/4" CONDUIT STUBBED UP INTO THE NEAREST ACCESSIBLE CEILING. MOUNTING HEIGHT=18" AFF TO THE CENTER OF DEVICE BOX UNLESS OTHERWISE NOTED.
AutoCAD SHX Text
TELEPHONE OUTLET CONSISTING OF ONE 4" SQUARE BOX, TILE RING (DEPTH AS REQUIRED), DEVICE PLATE (COLOR AS SPECIFIED BY ARCHITECT/ENGINEER AND/OR OWNER), AND 3/4" CONDUIT STUBBED UP INTO THE NEAREST ACCESSIBLE CEILING. MOUNTING HEIGHT=18" AFF TO THE CENTER OF DEVICE BOX UNLESS OTHERWISE NOTED.
AutoCAD SHX Text
TV
AutoCAD SHX Text
FUTURE TELEVISION OUTLET. PROVIDE STANDARD SQUARE DEVICE BOX, TILE RING (DEPTH AS REQUIRED), DEVICE PLATE (COLOR AS SPECIFIED BY ARCHITECT/ENGINEER AND/OR OWNER), STUB-UP 3/4" CONDUIT TO NEAREST ACCESSIBLE SPACE. MOUNTING HEIGHT = 18" A.F.F. TO CENTER OF DEVICE.
AutoCAD SHX Text
COMMUNICATIONS LEGEND:
AutoCAD SHX Text
COMBINATION TELE/DATA OUTLET CONSISTING OF ONE 4" SQUARE BOX, TILE RING (DEPTH AS REQUIRED), DEVICE PLATE (COLOR AS SPECIFIED BY ARCHITECT/ENGINEER AND/OR OWNER), AND 3/4" CONDUIT STUBBED UP INTO THE NEAREST ACCESSIBLE CEILING. MOUNTING HEIGHT=18" AFF TO THE CENTER OF DEVICE BOX UNLESS OTHERWISE NOTED.
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
120V-277V AC, BATH FAN / LIGHT SWITCH/ DELAY AND VENTILATION CONTROLLER. SWITCH MOUNTING HEIGHT = 48" A.F.F. TO CENTER OF DEVICE BOX, U.O.N. SWITCH MODEL SHALL BE SMARTEXHAUST AS MANUFACTURED BY AIRCYCLER.
AutoCAD SHX Text
S
AutoCAD SHX Text
VS
AutoCAD SHX Text
120V-277V AC, DUAL TECHNOLOGY (ULTRASONIC & PASSIVE INFRARED) VACANCY SENSOR, 1000 SQ. FT COVERAGE, (1) OR (2) RELAYS, (1) OR (2) BUTTONS, 1000W FLUORESCENT RATED. SWITCH MOUNTING HEIGHT = 42" A.F.F. TO CENTER OF DEVICE BOX, U.O.N. SWITCH MODEL SHALL BE LHMT(S)D(1)2-G-X-M AS MANUFACTURED BY HUBBELL BUILDING AUTOMATION. COLOR AS COORDINATED WITH ARCHITECT/OWNER.
SHEET NUMBER:
DATE:
PRO
JEC
T N
UM
BER
:
PRO
JEC
T TI
TLE:
FOR DCA REVIEW
STAMP
DR
AW
ING
TIT
LE:
:
DRWN:
CHKD:
DCA APPROVAL
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE
PREPARED OR APPROVED BY ME, SCOTT A. FRENCK, PE, AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF NEW JERSEY.
ENG. CERT. OF AUTH NO. 24GE05246600 EXP DATE: 4-30-22
19P2
58
NO.
DESC
RIPTION
DATE
AIS
SUED
FO
R BI
D, P
ERM
IT, A
ND
DC
A R
EVIE
W12
/11/
2020
CE
NT
RA
L U
TIL
IT
Y P
LA
NT
SU
RG
E T
AN
K IN
ST
AL
LA
TIO
N
ISSUED FOR BID/PERMIT
E-1
EL
EC
TR
IC
AL
D
EM
OL
IT
IO
N A
ND
N
EW
WO
RK
P
LA
NS
DEDC12/03/20
DRW
AutoCAD SHX Text
EXISTING COMPRESSED AIR DRYER TO BE RELOCATED. SEE NOTE 6.
AutoCAD SHX Text
EXISTING AIR COMPRESSOR TO BE RELOCATED. SEE NOTE 6.
AutoCAD SHX Text
EXISTING PANEL MDP-SUB TO REMAIN
AutoCAD SHX Text
EXISTING BOILER MDP TO REMAIN
AutoCAD SHX Text
EXISTING BOILER MCC TO REMAIN
AutoCAD SHX Text
EXISTING MDP-SUB ENCLOSED CIRCUIT BREAKER TO REMAIN
AutoCAD SHX Text
EXISTING FLOOR MOUNTED RECEPTACLE TO BE DEMOLISHED. SEE NOTE 7.
AutoCAD SHX Text
EXISTING PANEL BPP#2 TO REMAIN
AutoCAD SHX Text
EXISTING AIR COMPRESSOR STARTER TO BE RELOCATED. SEE NOTE 6. (TYPICAL OF 2)
AutoCAD SHX Text
CONDENSATE PUMP 1 (CP-1) TO BE DEMOLISHED.
AutoCAD SHX Text
CONDENSATE PUMP 2 (CP-2) TO BE DEMOLISHED.
AutoCAD SHX Text
CONDENSATE PUMP 3 (CP-3) TO BE DEMOLISHED.
AutoCAD SHX Text
EXISTING COMPRESSED AIR DRYER TO BE RELOCATED. SEE NOTE 6.
AutoCAD SHX Text
EXISTING PANEL LP TO REMAIN
AutoCAD SHX Text
NEW DUAL VFD PUMP CONTROL PANEL. SEE NOTE 8.
AutoCAD SHX Text
EXISTING PANEL MDP-SUB TO REMAIN
AutoCAD SHX Text
EXISTING BOILER MDP TO REMAIN
AutoCAD SHX Text
EXISTING BOILER MCC TO REMAIN
AutoCAD SHX Text
EXISTING MDP-SUB ENCLOSED CIRCUIT BREAKER TO REMAIN
AutoCAD SHX Text
EXISTING PANEL BPP#2 TO REMAIN
AutoCAD SHX Text
RELOCATED COMPRESSED AIR DRYER. SEE NOTE 9.
AutoCAD SHX Text
RELOCATED AIR COMPRESSOR. SEE NOTE 9.
AutoCAD SHX Text
LP-29
AutoCAD SHX Text
TCP
AutoCAD SHX Text
1
AutoCAD SHX Text
TCP
AutoCAD SHX Text
2
AutoCAD SHX Text
MCC 3FB
AutoCAD SHX Text
NEW DUPLEX CONDENSATE PUMP SET. SEE NOTE 10.
AutoCAD SHX Text
30A
AutoCAD SHX Text
LP-28,30
AutoCAD SHX Text
MCC-2J
AutoCAD SHX Text
BPP2-7,9,11
AutoCAD SHX Text
EXISTING PANEL LP TO REMAIN
AutoCAD SHX Text
MCC-3FA
AutoCAD SHX Text
(3) #12 AWG CU. & (1) #12 AWG CU. GND. IN 3/4" C.
AutoCAD SHX Text
(3)#12 AWG CU. & (1) #12 #12 AWG CU. & (1) #12 AWG CU. GND. IN 3/4" C.
AutoCAD SHX Text
1
AutoCAD SHX Text
E-1
AutoCAD SHX Text
%%UFIRST FLOOR ELECTRICAL DEMOLITION PLAN
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text
2
AutoCAD SHX Text
E-1
AutoCAD SHX Text
%%UFIRST FLOOR ELECTRICAL NEW WORK POWER PLAN
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text
DRAWING NOTES: 1. DISCONNECT AND REMOVE IN THEIR ENTIRETY ALL ITEMS SHOWN DARK AND DASHED THE DEMOLITION PLAN, U.ON. ALL ITEMS DISCONNECT AND REMOVE IN THEIR ENTIRETY ALL ITEMS SHOWN DARK AND DASHED THE DEMOLITION PLAN, U.ON. ALL ITEMS SHOWN DARK AND SOLID ON NEW WORK PLANS SHALL REPRESENT NEW WORK. ALL ITEMS SHOWN LIGHT AND SOLID ON PLANS SHALL REPRESENT EXISTING TO REMAIN ITEMS. 2. DEMOLITION OF ELECTRICAL EQUIPMENT SHALL INCLUDE THE DISCONNECTION AND REMOVAL OF THE ITEM SHOWN INCLUDING DEMOLITION OF ELECTRICAL EQUIPMENT SHALL INCLUDE THE DISCONNECTION AND REMOVAL OF THE ITEM SHOWN INCLUDING ANY PERIPHERIAL DISCONNECTING MEANS, CONTROL DEVICES, WIRES, CABLES, CONDUIT, AND OTHER RACEWAY SYSTEMS ASSOCIATED WITH ELECTRICAL SYSTEMS, EQUIPMENT, AND MATERIALS CITED FOR DEMOLITION. DEDICATED FEEDERS SHALL BE REMOVED IN THEIR ENTIRETIES BACK TO THE SOURCE PANELBOARD. FEEDERS THAT SERVE MULTIPLE LOADS THAT ARE CITED FOR DEMOLITION SHALL BE REMOVED IN THEIR ENTIRETIES BACK TO THE SOURCE PANELBOARD. FEEDERS THAT SERVE MULTIPLE LOADS THAT ARE, AND ARE NOT, CITED FOR DEMOLITION SHALL BE REMOVED BACK TO THE NEAREST SPLICE. EXISTING CIRCUIT BREAKERS OR COMBINATION STARTERS SHALL BE KEPT AND SAFEGUARDED FOR REUSE. 3. ALL DEMOLITION WORK SHALL BE PHASED, COORDINATED, AND ACCOMPLISHED IN ACCORDANCE WITH THE TIME AND MILESTONE ALL DEMOLITION WORK SHALL BE PHASED, COORDINATED, AND ACCOMPLISHED IN ACCORDANCE WITH THE TIME AND MILESTONE SCHEDULES ESTABLISHED BY THE CONSTRUCTION MANAGER, OR OWNER'S REPRESENTATIVE. 4. PROVIDE AND MAINTAIN THROUGHOUT THE ENTIRE CONSTRUCTION SITE AND FOR THE ENTIRE CONSTRUCTION PERIOD, PROVIDE AND MAINTAIN THROUGHOUT THE ENTIRE CONSTRUCTION SITE AND FOR THE ENTIRE CONSTRUCTION PERIOD, TEMPORARY (CONSTRUCTION) LIGHTING. EXTENT OF TEMPORARY LIGHTING SHALL BE CONSISTENT WITH PROJECTS OF SIMILAR SCOPE AND SHALL MEET OR EXCEED ALL APPLICABLE CODES AND REGULATIONS INCLUDING OSHA. REPLACE BURNED OUT TEMPORARY (CONSTRUCTION) LIGHTING LAMPS AS SOON AS POSSIBLE AND AS DIRECTED BY THE CONSTRUCTION MANAGER. PROVIDE AND MAINTAIN THROUGHOUT THE ENTIRE CONSTRUCTION SITE AND FOR THE ENTIRE CONSTRUCTION PERIOD, TEMPORARY CONSTRUCTION POWER GFCI PROTECTED DUPLEX RECEPTACLES. PROVIDE TEMPORARY CONSTRUCTION POWER GFCI PROTECTED DUPLEX RECEPTACLES WITHIN 25 FT. OF ALL POSSIBLE DEMOLITION AND CONSTRUCTION ACTIVITIES. MOVE TEMPORARY CONSTRUCTION POWER GFCI DUPLEX RECEPTACLES AROUND THE CONSTRUCTION SITE AS REQUIRED TO ACCOMMODATE CHANGES IN DEMOLITION AND CONSTRUCTION ACTIVITIES. 5. E.C. SHALL COORDINATE ALL DEMOLITION, NEW WORK, AND EQUIPMENT LOCATIONS IN FIELD WITH MECHANICAL CONTRACTOR. E.C. SHALL COORDINATE ALL DEMOLITION, NEW WORK, AND EQUIPMENT LOCATIONS IN FIELD WITH MECHANICAL CONTRACTOR. 6. E.C. SHALL DE-ENERGIZE AND DISCONNECT EXISTING AIR COMPRESSOR STARTERS AND AIR DRIER FOR RELOCATION TO NEW E.C. SHALL DE-ENERGIZE AND DISCONNECT EXISTING AIR COMPRESSOR STARTERS AND AIR DRIER FOR RELOCATION TO NEW LOCATION ON FIRST FLOOR AS SHOWN ON NEW WORK PLAN. E.C. SHALL DEMOLISH EXISTING CONDUCTORS AND CONDUITS BACK TO POINT OF ORIGINATION. E.C. SHALL SAFEGUARD EXISTING STARTERS AND CIRCUIT BREAKERS IN THEIR RESPECTIVE PANELS/MCC FOR RECONNECTION TO AIR COMPRESSOR 1 & 2. EXISTING STARTERS ARE CONNECTED TO AIR COMPRESSOR AND SHALL REMAIN INTACT. 7. E.C. SHALL DE-ENERGIZE, DISCONNECT AND DEMOLISH EXISTING FLOOR MOUNTED RECEPTACLE, BOX AND COVERPLATE. E.C. E.C. SHALL DE-ENERGIZE, DISCONNECT AND DEMOLISH EXISTING FLOOR MOUNTED RECEPTACLE, BOX AND COVERPLATE. E.C. SHALL DEMOLISH EXISTING BRANCH CIRCUIT BACK TO NEAREST SPLICE POINT OR POINT OF ORIGINATION, WHICHEVER IS NEAREST. E.C. SHALL CUT EXISTING CONDUIT FLUSH WITH FLOOR AND ABANDON. 8. E.C. SHALL PROVIDE CONDUIT AND BRANCH CIRCUIT FEEDER TO VFD CONTROL PANEL. E.C. SHALL FURNISH AND INSTALL VFD E.C. SHALL PROVIDE CONDUIT AND BRANCH CIRCUIT FEEDER TO VFD CONTROL PANEL. E.C. SHALL FURNISH AND INSTALL VFD RATED WIRING FOR INSTALLATION OF NEW TRANSFER CONDENSATE PUMPS FROM TWO (2) EXISTING 20A, 3P CIRCUIT BREAKERS LOCATED IN BOILER MCC POSITIONS AS SHOWN ON PLAN. E.C. SHALL WIRE PUMPS IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTALLATION INSTRUCTIONS. E.C. SHALL FURNISH AND INSTALL DISCONNECT SWITCH FOR EACH PUMPS VFD WITH AUXILIARY CONTACTS FOR POWER SHUT-OFF TO VFD'S PRIOR TO INTENTIONAL DISCONNECTION OF POWER. E.C. SHALL FURNISH AND INSTALL #14 AWG CU. WIRE FROM AUXILIARY CONTACT TO VFD FOR PRE-BREAK SIGNAL. REFER TO BOILER MCC DIAGRAM FOR MORE INFORMATION. 9. E.C. SHALL FURNISH AND INSTALL TWO (2) NEW BRANCH CIRCUIT AND CONDUCTORS TO FEED RELOCATED COMPRESSOR IN E.C. SHALL FURNISH AND INSTALL TWO (2) NEW BRANCH CIRCUIT AND CONDUCTORS TO FEED RELOCATED COMPRESSOR IN NEW LOCATION FROM TWO (2) EXISTING CIRCUIT BREAKERS TO EXISTING STARTERS CONNECTED TO AIR COMPRESSOR. E.C. SHALL COORDINATE ALL CONDUIT RUNS IN FIELD WITH EXISTING MECHANICAL AND PLUMBING DUCTS, GAS AND WATER PIPING. BRANCH CIRCUITS SHALL CONSIST OF (3) #12 AWG CU. & (1) #12 AWG CU. GND. IN 3/4" C. 10. E.C. SHALL FURNISH AND INSTALL DISCONNECT SWITCH AT DUPLEX CONDENSATE PUMP CONTROL PANEL. E.C. SHALL MOUNT E.C. SHALL FURNISH AND INSTALL DISCONNECT SWITCH AT DUPLEX CONDENSATE PUMP CONTROL PANEL. E.C. SHALL MOUNT DISCONNECT ON A 1-1/2" SQUARE UNISTRUT FRAME MOUNTED SECURELY TO FLOOR. E.C. SHALL REMOVE AND RETURN TWO EXISTING 20A, 1P CIRCUIT BREAKERS TO OWNER AND FURNISH AND INSTALL A NEW 20A, 2P CIRCUIT BREAKER IN POSITIONS IN EXISTING PANEL LP AS SHOWN ON NEW WORK PANEL SCHEDULE. 11. E.C. SHALL COORDINATE ALL PHASING OF WORK WITH MECHANICAL DRAWINGS AND MECHANICAL CONTRACTOR IN FIELD PRIOR E.C. SHALL COORDINATE ALL PHASING OF WORK WITH MECHANICAL DRAWINGS AND MECHANICAL CONTRACTOR IN FIELD PRIOR TO STARTING WORK ON PROJECT.
AutoCAD SHX Text
H
AutoCAD SHX Text
%%UEXISTING BOILER MCC
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
K
AutoCAD SHX Text
J
AutoCAD SHX Text
1L
AutoCAD SHX Text
2H
AutoCAD SHX Text
3H
AutoCAD SHX Text
BLANK
AutoCAD SHX Text
F
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
A
AutoCAD SHX Text
2D
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
MECHANICAL EQUIPMENT LEGEND:
AutoCAD SHX Text
ELECTRICAL ABBREVIATIONS:
AutoCAD SHX Text
POWER LEGEND:
AutoCAD SHX Text
TCP
AutoCAD SHX Text
#
AutoCAD SHX Text
MOTORIZED EQUIPMENT. "#" IF PRESENT INSIDE SYMBOL IDENTIFIES MOTOR HORSEPOWER.
AutoCAD SHX Text
TRANSFER CONDENSATE PUMP. PROVIDED BY MECHANICAL CONTRACTOR
FUSIBLE SWITCH TYPE COMBINATION STARTER UNIT WITH DOOR MOUNTED H-O-A SWITCH AND RED "MOTOR RUNNING" LED TYPE PILOT LIGHT. PROVIDE AUXILIARY CONTACT. NEMA SIZE AS INDICATED. "#A" IDENTIFIES DISCONNECT SWITCH AMPACITY RATING. "#A", IF PRESENT, IDENTIFIES APPROXIMATE FUSE RATING. UNLESS OTHERWISE NOTED, ALL FUSIBLE DISCONNECT SWITCHES SHALL BE COMPLETE WITH APPROPRIATELY SIZED DE, TD, CL, CLASS RK5 FUSES.
AutoCAD SHX Text
+
AutoCAD SHX Text
#
AutoCAD SHX Text
TYPICAL BRANCH CIRCUITING HOME RUN SYMBOL. GENERALLY 15A BRANCH CIRCUITS CONSISTS OF (2) #14 AWG CU. AND (1) #14 AWG CU. GND. IN 3/4" CONDUIT AND 20A BRANCH CIRCUITS CONSISTS OF (2) #12 AWG CU. AND (1) #12 AWG CU. GND. IN 3/4" CONDUIT, UNLESS OTHERWISE NOTED. "#" IDENTIFIES PANEL BOARD CIRCUIT NUMBER. REFER TO CIRCUITING NOTES FOR SPECIFIC PANEL DESIGNATION.
AutoCAD SHX Text
20A, 120V AC, NEMA 5-20R, DUPLEX RECEPTACLE. MOUNTING HEIGHT TO CENTER OF DEVICE = 18" AFF TO CENTER OF DEVICE BOX U.O.N., + = ABOVE COUNTER HIEGHT MOUNT (COORDINATE WITH MILLWORK).
AutoCAD SHX Text
20A, 120V AC, NEMA 5-20R, GROUND FAULT CIRCUIT INTERRUPTER (GFCI) TYPE DUPLEX RECEPTACLE. MOUNTING HEIGHT TO CENTER OF DEVICE = 18" A.F.F., + = ABOVE COUNTER HIEGHT MOUNT (COORDINATE WITH MILLWORK).
AutoCAD SHX Text
JUNCTION BOX OR EQUIPMENT CONNECTION.
AutoCAD SHX Text
SINGLE-POLE OR TWO-POLE (AS REQUIRED), 250V AC, 1 HP RATED, TOGGLE TYPE MANUAL MOTOR STARTED UNIT WITH MELTING ALLOY TYPE THERMAL OVERLOAD RELAY, APPROPRIATELY SIZED THERMAL UNITS, NEMA TYPE 1 OR 4 (AS REQUIRED) ENCLOSURE, AND HANDLE GUARD/LOCK-OFF. SQUARE D CLASS 2510 FG OR FW TYPES (AS REQUIRED) OR APPROVED EQUAL. THREE-POLE, 250V AC, 1 OR 2 HP RATED (AS REQUIRED), TOGGLE TYPE MANUAL MOTOR STARTER UNIT WITH MELTING ALLOY TYPE THERMAL OVERLOAD RELAY, APPROPRIATELY SIZED THERMAL UNITS, NEMA TYPE 1 ENCLOSURE AND HANDLE GUARD/LOCK-OFF. SQUARE D CLASS 2510 K TYPE OR APPROVED EQUAL.
AutoCAD SHX Text
STARTER UNIT WITH DOOR MOUNTED H-O-A SWITCH AND RED "MOTOR RUNNING" LED TYPE PILOT LIGHT. PROVIDE AUXILIARY CONTACT. NEMA SIZE AS INDICATED. "#A" IDENTIFIES DISCONNECT SWITCH AMPACITY RATING. "#A", IF PRESENT, IDENTIFIES APPROXIMATE FUSE RATING. UNLESS OTHERWISE NOTED, ALL FUSIBLE DISCONNECT SWITCHES SHALL BE COMPLETE WITH APPROPRIATELY SIZED DE, TD, CL, CLASS RK5 FUSES.
AutoCAD SHX Text
1B
AutoCAD SHX Text
PANEL LP 225A MLO
AutoCAD SHX Text
39
AutoCAD SHX Text
41
AutoCAD SHX Text
31
AutoCAD SHX Text
33
AutoCAD SHX Text
37
AutoCAD SHX Text
35
AutoCAD SHX Text
11
AutoCAD SHX Text
25
AutoCAD SHX Text
23
AutoCAD SHX Text
21
AutoCAD SHX Text
27
AutoCAD SHX Text
29
AutoCAD SHX Text
13
AutoCAD SHX Text
15
AutoCAD SHX Text
17
AutoCAD SHX Text
19
AutoCAD SHX Text
7
AutoCAD SHX Text
5
AutoCAD SHX Text
3
AutoCAD SHX Text
9
AutoCAD SHX Text
1
AutoCAD SHX Text
CKT
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
15
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
BRK
AutoCAD SHX Text
SZ.
AutoCAD SHX Text
20
AutoCAD SHX Text
PHASE
AutoCAD SHX Text
BRK
AutoCAD SHX Text
A
AutoCAD SHX Text
SZ.
AutoCAD SHX Text
B
AutoCAD SHX Text
40
AutoCAD SHX Text
42
AutoCAD SHX Text
34
AutoCAD SHX Text
32
AutoCAD SHX Text
38
AutoCAD SHX Text
36
AutoCAD SHX Text
12
AutoCAD SHX Text
26
AutoCAD SHX Text
28
AutoCAD SHX Text
30
AutoCAD SHX Text
22
AutoCAD SHX Text
24
AutoCAD SHX Text
14
AutoCAD SHX Text
16
AutoCAD SHX Text
18
AutoCAD SHX Text
20
AutoCAD SHX Text
8
AutoCAD SHX Text
6
AutoCAD SHX Text
4
AutoCAD SHX Text
10
AutoCAD SHX Text
2
AutoCAD SHX Text
CKT
AutoCAD SHX Text
NO.
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
120/208V, 225A MLO, 1%%C, 3W
AutoCAD SHX Text
10 KAIC, MOUNTED IN MCC
AutoCAD SHX Text
%%UNAME:
AutoCAD SHX Text
%%ULOCATION:%%U BOILER MCC
AutoCAD SHX Text
%%UPURPOSE:%%U LIGHTING AND POWER
AutoCAD SHX Text
%%USOURCE:%%U BOILER MCC
AutoCAD SHX Text
PANEL LP
AutoCAD SHX Text
(NEW WORK)
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
REC - AIR DRYER
AutoCAD SHX Text
#7 TIME CLOCK
AutoCAD SHX Text
NEW DRAIN
AutoCAD SHX Text
BOILER FEED
AutoCAD SHX Text
AGITATOR
AutoCAD SHX Text
PUMP ALARM
AutoCAD SHX Text
CLOCK OUTLET
AutoCAD SHX Text
GAS HOUSE
AutoCAD SHX Text
FAN EXHAUST
AutoCAD SHX Text
HOT WELL ALARM
AutoCAD SHX Text
OUTLETS
AutoCAD SHX Text
DUPLEX CONDENSATE PUMP SET
AutoCAD SHX Text
PUMP #3
AutoCAD SHX Text
CONSOLE
AutoCAD SHX Text
OUTLETS
AutoCAD SHX Text
GAS HOUSE
AutoCAD SHX Text
OUTLETS SIDE #2 BOILER
AutoCAD SHX Text
OUTLETS B HALL
AutoCAD SHX Text
CONDENSATE ALARM
AutoCAD SHX Text
DRINKING FOUNTAIN
AutoCAD SHX Text
OUTLETS GAS HOUSE
AutoCAD SHX Text
WATER COLUMN LIGHTS
AutoCAD SHX Text
GAS HOUSE
AutoCAD SHX Text
LIGHTS UPPER LEVEL
AutoCAD SHX Text
BOILER CONTROL #1
AutoCAD SHX Text
OUTSIDE LIGHTS
AutoCAD SHX Text
OUTLET BACK #2 BOILER
AutoCAD SHX Text
BOILER CONTROL #2
AutoCAD SHX Text
DC TRANSFORMER
AutoCAD SHX Text
39
AutoCAD SHX Text
41
AutoCAD SHX Text
31
AutoCAD SHX Text
33
AutoCAD SHX Text
37
AutoCAD SHX Text
35
AutoCAD SHX Text
11
AutoCAD SHX Text
25
AutoCAD SHX Text
23
AutoCAD SHX Text
21
AutoCAD SHX Text
27
AutoCAD SHX Text
29
AutoCAD SHX Text
13
AutoCAD SHX Text
15
AutoCAD SHX Text
17
AutoCAD SHX Text
19
AutoCAD SHX Text
7
AutoCAD SHX Text
5
AutoCAD SHX Text
3
AutoCAD SHX Text
9
AutoCAD SHX Text
1
AutoCAD SHX Text
CKT
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
15
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
BRK
AutoCAD SHX Text
SZ.
AutoCAD SHX Text
20
AutoCAD SHX Text
PHASE
AutoCAD SHX Text
BRK
AutoCAD SHX Text
A
AutoCAD SHX Text
SZ.
AutoCAD SHX Text
B
AutoCAD SHX Text
40
AutoCAD SHX Text
42
AutoCAD SHX Text
34
AutoCAD SHX Text
32
AutoCAD SHX Text
38
AutoCAD SHX Text
36
AutoCAD SHX Text
12
AutoCAD SHX Text
26
AutoCAD SHX Text
28
AutoCAD SHX Text
30
AutoCAD SHX Text
22
AutoCAD SHX Text
24
AutoCAD SHX Text
14
AutoCAD SHX Text
16
AutoCAD SHX Text
18
AutoCAD SHX Text
20
AutoCAD SHX Text
8
AutoCAD SHX Text
6
AutoCAD SHX Text
4
AutoCAD SHX Text
10
AutoCAD SHX Text
2
AutoCAD SHX Text
CKT
AutoCAD SHX Text
NO.
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
120/208V, 225A MLO, 1%%C, 3W
AutoCAD SHX Text
10 KAIC, MOUNTED IN MCC
AutoCAD SHX Text
%%UNAME:
AutoCAD SHX Text
%%ULOCATION:%%U BOILER MCC
AutoCAD SHX Text
%%UPURPOSE:%%U LIGHTING AND POWER
AutoCAD SHX Text
%%USOURCE:%%U BOILER MCC
AutoCAD SHX Text
PANEL LP
AutoCAD SHX Text
(DEMOLITION WORK)
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
#7 TIME CLOCK
AutoCAD SHX Text
NEW DRAIN
AutoCAD SHX Text
BOILER FEED
AutoCAD SHX Text
AGITATOR
AutoCAD SHX Text
PUMP ALARM
AutoCAD SHX Text
CLOCK OUTLET
AutoCAD SHX Text
GAS HOUSE
AutoCAD SHX Text
FAN EXHAUST
AutoCAD SHX Text
HOT WELL ALARM
AutoCAD SHX Text
OUTLETS
AutoCAD SHX Text
PUMP #3
AutoCAD SHX Text
CONSOLE
AutoCAD SHX Text
OUTLETS
AutoCAD SHX Text
GAS HOUSE
AutoCAD SHX Text
OUTLETS SIDE #2 BOILER
AutoCAD SHX Text
OUTLETS B HALL
AutoCAD SHX Text
CONDENSATE ALARM
AutoCAD SHX Text
DRINKING FOUNTAIN
AutoCAD SHX Text
OUTLETS GAS HOUSE
AutoCAD SHX Text
WATER COLUMN LIGHTS
AutoCAD SHX Text
GAS HOUSE
AutoCAD SHX Text
LIGHTS UPPER LEVEL
AutoCAD SHX Text
BOILER CONTROL #1
AutoCAD SHX Text
OUTSIDE LIGHTS
AutoCAD SHX Text
OUTLET BACK #2 BOILER
AutoCAD SHX Text
BOILER CONTROL #2
AutoCAD SHX Text
DC TRANSFORMER
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
2B
AutoCAD SHX Text
2F
AutoCAD SHX Text
2K
AutoCAD SHX Text
BLANK
AutoCAD SHX Text
BLANK
AutoCAD SHX Text
BLANK
AutoCAD SHX Text
BLANK
AutoCAD SHX Text
BLANK
AutoCAD SHX Text
BLANK
AutoCAD SHX Text
BLANK
AutoCAD SHX Text
2M
AutoCAD SHX Text
N
AutoCAD SHX Text
M
AutoCAD SHX Text
3D
AutoCAD SHX Text
3B
AutoCAD SHX Text
3FA/B
AutoCAD SHX Text
1E
AutoCAD SHX Text
1N
AutoCAD SHX Text
4D
AutoCAD SHX Text
4B
AutoCAD SHX Text
BLANK
AutoCAD SHX Text
BLANK
AutoCAD SHX Text
BLANK
AutoCAD SHX Text
BLANK
AutoCAD SHX Text
600A MLO
AutoCAD SHX Text
EXISTING BOILER MCC IS 480/277V, 3 , 4W
E
4
45
E
SCALE:
A
S-100 3/4" = 1'-0"
DETAIL
SCALE:
1
S-100 1/4" = 1'-0"
FRAMING PLAN AT TANK PLATFORM
SCALE:
3
S-100 1/4" = 1'-0"
ELEVATION - TANK PLATFORMSCALE:
2
S-100 1/4" = 1'-0"
ELEVATION - TANK PLATFORM
SCALE:
B
S-100 3/4" = 1'-0"
DETAIL
SCALE:
C
S-100 3/4" = 1'-0"
DETAIL
S-100
ST
RU
CT
UR
AL P
LA
N A
ND
ELE
VA
TIO
NS
NJL
2/20/20
SF
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE
PREPARED OR APPROVED BY ME, NEIL J. LIPPERINI, PE AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF NEW JERSEY.
ENG. CERT. OF AUTH NO. 24GE03542200 EXP DATE: 4-30-2022