suspension performance vs. specs passive attenuation in band: ok for adv mirror hor. swing damping...
TRANSCRIPT
SUSPENSION Performance vs. Specs
PASSIVE ATTENUATION IN BAND: OK for AdV
MIRROR HOR. SWING DAMPING “IN VELOCITY”: Ok for Locking in Adv
MIRROR HOR. SWING DAMPING “IN DISPLACEMENT”: Ok for low noise controlbut not when wind !
Factor 30 out
Susp E&S to tune system according to wind and reduce noise
Tiltmeters to read tilt
Piezo to control tilt
Accelerometers & ID (to understand role of longitudinal loop and possible improv.)
Monolithic Legs (Displace resonance and understand role)
Filter Zero (Displace resonance and understand role – preisolator ?)
0-150 mHz
Above ….
SAT
SAT 1 - Tilltmeters (RM2-PISA, Resp: A.Giazotto)
SAT 2 - Piezo (PISA, Resp: F.Frasconi)
SAT 3 - Monolithic Legs (PISA, Resp: F.Frasconi)
SAT 4 - Accelerometers (EGO-PISA, Resp: F.Paoletti) + NAPLES (Ext)
SAT 5 - Filter Zero (PISA, Resp: R.Passaquieti)
R&D Program detailed in SAFE proposal & Susp Electronics Documentation
Signal Recycling is not presently considered in SAT !!
SAT 6 - Suspension Electronics (PISA, Resp: A.Gennai)
See presentations ad Adv Meetings DOCUMENTATION CONCLUDED
SPECS: Fixed (see SAFE Proposal)
STATUS: First test failed (robustness). OK electronic chainFlex-Pivot Supports (15/01) – New Flex Pivot (29/01)
Test of new system (February)
WORKS
SURELY IN ADVANCED(12 Pieces – Scarce Impact)
DOES NOT WORK
ONLY MSC WHEN WIND
SAT 1 - Tiltmeters
SAT 2 - Piezo
STATUS: 3 Piezo on site. Tests will start in April just for lack of manpower
SPECS: Available
SCENARIO: Test plan available – High power supply – validation by 2008:If tiltmeter+piezo OK tilt control tests on SAFE. (If failure only MSC to contrast wind)
SCENARIO: It should work. Understand the necessity of the replacement is partof the R&D programm. If answer is positive massive production.
SPECS & GOAL:Specs not clear, goal to displace resonances above 20 Hz
STATUS: Design & simulation done, Delivering on site 03/07, Mounted on SAFE
SAT 3 – Monolithic Legs
SAT 5 – Filter Zero
STATUS: Cross-checked simulation available (Ruggi & Passaquieti).First result on March to displace resonances at high frequency. First contacts with MSC – Vertical Damping (Vincenzo-Roberto)
SPECS:To be defined. In the meanwhile goals 1) How to displace internal resonance over 20 Hz, 2) Conceptual way for a pre-isolator.
SCENARIO: If we do not need, just a picture of what we have to doIf we need to displace resonance prototype and testsIf we need a pre-isolator stage Serious new R&D will start.
SAT 4 – Accelerometers
STATUS: Measurement plan ready – Start in March – Noise budget in May 08 R&D Naples-Salerno goes on indipendently (comparisons).
SPECS:To be defined (Strong Interaction with MSC)
SCENARIO: After the budget and specs fix plan (12/08). If present acc.are enough no problem, otherwise implement improvements keeping eyes on Naples-Salerno R&D.
SCENARIO: VIRGO + in action, Commissioning will drive improvementsOther tasks: HP supply for piezos, Tiltmeters, Acc Boards.
SAT 6 – SUSP ELECTRONICS
SPECS: See SAFE Document:- Connected to other item R&D succeed :
STATUS: VIRGO+ Upgrading (well known programme)
7
2007-08
2009 2010
MRM
SAFE