swissfel diagnostics review, 2013-03-04 screen monitor rasmus ischebeck
DESCRIPTION
SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck. Task: Measurement of Transverse Profiles. Technical Requirements Operational Requirements * With the possible exception of the last monitor before the beam dump. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck](https://reader035.vdocuments.net/reader035/viewer/2022062301/56815001550346895dbdcd29/html5/thumbnails/1.jpg)
SwissFEL Diagnostics Review, 2013-03-04
Screen MonitorRasmus Ischebeck
![Page 2: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck](https://reader035.vdocuments.net/reader035/viewer/2022062301/56815001550346895dbdcd29/html5/thumbnails/2.jpg)
Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor
Task: Measurement of Transverse Profiles
> Technical Requirements
> Operational Requirements
* With the possible exception of the last monitor before the beam dump
22
Beam Size 5 … 500 µm rms
Bunch Charge 10 pC … 200 pC
Field of View 4 mm (h) × 15 mm (v)
Observation Measurement
Acquisition Rate 10 Hz 100 Hz
Synchronized Data Acquisition No Yes
Use for Feedbacks No*
![Page 3: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck](https://reader035.vdocuments.net/reader035/viewer/2022062301/56815001550346895dbdcd29/html5/thumbnails/3.jpg)
> 23 Screen Monitors:
Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor
Distribution in SwissFEL
33
Section Number
SIN 14
S10/20/30 3
SAR 5
SAT (Phase I)
1
Type Number
Observation
10
Measurement
13
![Page 4: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck](https://reader035.vdocuments.net/reader035/viewer/2022062301/56815001550346895dbdcd29/html5/thumbnails/4.jpg)
Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor
Measurement Principle
> Combination of two monitors:
> Scintillating crystal
> Optical transition radiation
> Wire scanners: See Gian Luca’s presentation
44
![Page 5: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck](https://reader035.vdocuments.net/reader035/viewer/2022062301/56815001550346895dbdcd29/html5/thumbnails/5.jpg)
Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor
Design Considerations
> Scheimpflug imaging principle
> Snell’s law of refraction
55
Observation of the Scheimpflug imaging principleallows to image the entire screen without depth-of-field issues.To avoid astigmatism, the lens is not tilted, butthe detector is tilted. For a 1:1 imaging, we tiltthe CMOS sensor by 15º.
The YAG / LuAG scintillators are observed at suchan angle that Snell’s law of refraction is observed.As a consequence, we can image beams that aresmaller than the thickness of the scintillator.
![Page 6: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck](https://reader035.vdocuments.net/reader035/viewer/2022062301/56815001550346895dbdcd29/html5/thumbnails/6.jpg)
Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor
Implementation
66
to camera
(coherent)OTR
![Page 7: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck](https://reader035.vdocuments.net/reader035/viewer/2022062301/56815001550346895dbdcd29/html5/thumbnails/7.jpg)
Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor
Implementation: Prototype installed in SITF
77
![Page 8: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck](https://reader035.vdocuments.net/reader035/viewer/2022062301/56815001550346895dbdcd29/html5/thumbnails/8.jpg)
Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor
Measurements with the Prototype
88
The smallest beam in this measurement is 50 µm rms.Beams of 10 µm rms have been measured.
> Emittance Measurement
![Page 9: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck](https://reader035.vdocuments.net/reader035/viewer/2022062301/56815001550346895dbdcd29/html5/thumbnails/9.jpg)
Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor
Measurements with the Prototype
> Slice emittance measurement of a 10 pC beam
99Eduard Prat, Marta
Divall
![Page 10: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck](https://reader035.vdocuments.net/reader035/viewer/2022062301/56815001550346895dbdcd29/html5/thumbnails/10.jpg)
Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor
Measurements with the Prototype
> Slice emittance measurement of a 1.3 pC beam
1010Eduard Prat, Marta Divall
![Page 11: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck](https://reader035.vdocuments.net/reader035/viewer/2022062301/56815001550346895dbdcd29/html5/thumbnails/11.jpg)
Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor
Status / Time Plan
> Fabrication by external company planned
> Presently starting industrialization study
1111
Requirements Defined 01/ 2012 √
Decision on Measurement Principle 01 / 2012 √
Prototyping 2012 √
Prototype Tested 12 / 2012 √
Design for Series Production 2013
Ready for Fabrication Q4 / 2013
Fabrication 2014
System Acceptance Test Q3 / 2014
Ready for Installation Q1 / 2015
![Page 12: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck](https://reader035.vdocuments.net/reader035/viewer/2022062301/56815001550346895dbdcd29/html5/thumbnails/12.jpg)
Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor
Time Plan
1212
![Page 13: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck](https://reader035.vdocuments.net/reader035/viewer/2022062301/56815001550346895dbdcd29/html5/thumbnails/13.jpg)
Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor
Resources
1313⊠
![Page 14: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck](https://reader035.vdocuments.net/reader035/viewer/2022062301/56815001550346895dbdcd29/html5/thumbnails/14.jpg)
Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor
Open Issues / Questions to the Committee
> Please evaluate the presented solution with respect to
> Suitability of the chosen concepts
> Appropriateness of the design for the given specifications
> Feasibility of the technical designs
> Assess whether the presented time plans and resource planning is appropriate
> Time plan
> Material resources
> Personnel planning
1414
![Page 15: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck](https://reader035.vdocuments.net/reader035/viewer/2022062301/56815001550346895dbdcd29/html5/thumbnails/15.jpg)
Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor
Budget for Prototype
1515⊠