System Process DocumentSwitching between a Primary and Alternate Routing
Department
Responsibility/Role
File Name 27762852.docRevision
Document Generation Date 18/01/2010 09:38:00
Date Modified 1/18/2010 09:38:00 AM
Last Changed by
Status
Switching between a Primary and Alternate Routing
Trigger:
Concept
A primary routing is the list of operations most frequently performed to build a product. You can
define one primary routing and many alternate routings for an item. When you define a new
primary routing, you specify only the item (no alternate name) and you can assign a routing
revision. For example, you can define a routing for an item that includes two operations - an
assembly and a testing operation. You typically build your product with these operations, so you
define this routing as the primary routing for the item. You can define an alternate routing to
describe a different manufacturing process used to produce the same product.
You can use the Routings page to switch between primary and alternate routings.
In this topic, you will switch between a primary and alternate routing.
Required Field(s) Comments
Output - Result(s) Comments
Additional Information
Last changed on: 1/18/2010 09:38:00 AM Page 1
-
8/14/2019 Switching Between a Primary and Alternate Routing_SPD
2/17
System Process DocumentSwitching between a Primary and Alternate Routing
Procedure
Step Action
1. Begin by navigating to the Routings page.
Click the vertical scrollbar.
Page 2 Last changed on: 1/18/2010 09:38:00 AM
-
8/14/2019 Switching Between a Primary and Alternate Routing_SPD
3/17
System Process DocumentSwitching between a Primary and Alternate Routing
Step Action
2. Click the Manufacturing and Distribution Manager link.
Last changed on: 1/18/2010 09:38:00 AM Page 3
-
8/14/2019 Switching Between a Primary and Alternate Routing_SPD
4/17
System Process DocumentSwitching between a Primary and Alternate Routing
Step Action
3. Click the vertical scrollbar.
Step Action
4. Click the Routings link.
Page 4 Last changed on: 1/18/2010 09:38:00 AM
-
8/14/2019 Switching Between a Primary and Alternate Routing_SPD
5/17
System Process DocumentSwitching between a Primary and Alternate Routing
Step Action
5. Use the Organizations page to select your organization.
Last changed on: 1/18/2010 09:38:00 AM Page 5
-
8/14/2019 Switching Between a Primary and Alternate Routing_SPD
6/17
System Process DocumentSwitching between a Primary and Alternate Routing
Step Action
6. Click the M1 Seattle Manufacturing list item.
Step Action
7. Click the OKbutton.
orPress [Alt+O].
Page 6 Last changed on: 1/18/2010 09:38:00 AM
-
8/14/2019 Switching Between a Primary and Alternate Routing_SPD
7/17
System Process DocumentSwitching between a Primary and Alternate Routing
Step Action
8. Use the Routings page to define the operations for a routing and the sequence to
perform them.
You can define a primary or an alternate routing.
Last changed on: 1/18/2010 09:38:00 AM Page 7
-
8/14/2019 Switching Between a Primary and Alternate Routing_SPD
8/17
System Process DocumentSwitching between a Primary and Alternate Routing
Step Action
9. Click in the Item field.
Step Action
10. Press [F11].
Page 8 Last changed on: 1/18/2010 09:38:00 AM
-
8/14/2019 Switching Between a Primary and Alternate Routing_SPD
9/17
System Process DocumentSwitching between a Primary and Alternate Routing
Step Action
11. Enter the desired information into the Item field. Enter "RT_Routing".
Last changed on: 1/18/2010 09:38:00 AM Page 9
-
8/14/2019 Switching Between a Primary and Alternate Routing_SPD
10/17
System Process DocumentSwitching between a Primary and Alternate Routing
Step Action
12. Press [Ctrl+F11].
Step Action
13. Click the Tools menu.
orPress [Alt+T].
Page 10 Last changed on: 1/18/2010 09:38:00 AM
-
8/14/2019 Switching Between a Primary and Alternate Routing_SPD
11/17
System Process DocumentSwitching between a Primary and Alternate Routing
Step Action
14. Click the Switch to Primary menu.
Last changed on: 1/18/2010 09:38:00 AM Page 11
-
8/14/2019 Switching Between a Primary and Alternate Routing_SPD
12/17
System Process DocumentSwitching between a Primary and Alternate Routing
Step Action
15. Use the Switch to Primary page to select the alternate path of routing.
Step Action
16. Click in the Alternate for Primary field.
Page 12 Last changed on: 1/18/2010 09:38:00 AM
-
8/14/2019 Switching Between a Primary and Alternate Routing_SPD
13/17
System Process DocumentSwitching between a Primary and Alternate Routing
Step Action
17. Use the Alternates page to choose the alternate routing.
Last changed on: 1/18/2010 09:38:00 AM Page 13
-
8/14/2019 Switching Between a Primary and Alternate Routing_SPD
14/17
System Process DocumentSwitching between a Primary and Alternate Routing
Step Action
18. Click the EBOM list item.
Step Action
19. Click the OKbutton.
Page 14 Last changed on: 1/18/2010 09:38:00 AM
-
8/14/2019 Switching Between a Primary and Alternate Routing_SPD
15/17
System Process DocumentSwitching between a Primary and Alternate Routing
Step Action
20. Click the OKbutton.
Last changed on: 1/18/2010 09:38:00 AM Page 15
-
8/14/2019 Switching Between a Primary and Alternate Routing_SPD
16/17
System Process DocumentSwitching between a Primary and Alternate Routing
Step Action
21. The Note page enables you to confirm your action.
Step Action
22. Click the OKbutton.
Page 16 Last changed on: 1/18/2010 09:38:00 AM
-
8/14/2019 Switching Between a Primary and Alternate Routing_SPD
17/17
System Process DocumentSwitching between a Primary and Alternate Routing
Step Action
23. You have completed the Switching between a Primary and Alternate Routing
procedure.
End of Procedure.