Page 1: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects
Page 2: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects

TABLE OF CONTENT

COMPANY INTRODUCTION

1. Establishment and Addresses

2. CEO Message

3. Target sectors and services offered

4. Key Professionals

5. Human Resources list

6. Projects – Ongoing

7. Projects – Completed

8. Industrial Sectors Served – Management Experience

9. Major Clients

10. Tool & Plant

11. Quality Policy

12. HSE Policy

13. Registration Certificates

14. Completion Certificates

15. Associates / Partners

Page 3: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects

Name : WATCON Engineering

Short Name : WATCON

:

98-A CMA Colony, Abid Majeed Road, Lahore Cantt., Pakistan

Telephone No : +92 42 37187067

Fax : +92 42 37187067

E-mail : [email protected]

Website www.watconengg.com

Contact Person : Muhammad Taj Dad

Director Operation & BD

Mobile No : +92 300 4116189

Works : Work with Associated Partners

Status of Company : Partnership

Company Reg. No : Registrar of Firm: 1952 & Member CCI Lahore

PEC Registration : C4 / 09615

Income Tax No : 7202494-1

Sales Tax No : 32-77-8761-227-66

Punjab Sales Tax No : P7202494-1

1- ESTABLISHMENT AND ADDRESS

Office Address

Page 4: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects

2- CEO Message

WATCON is a young, exciting, fast growing engineering company, which has a strong dedication to customer satisfaction, and a drive to provide positive technical contributions to the nation’s most difficult technological problems. We love to work on exciting and complex problems that challenge us to bring best out of the top engineering minds.

In today’s global market place we recognize you have many choices to pick a service provider with all very impressive credentials. Team WATCON ensures you if given an opportunity to serve your needs our organization will strive to create best possible experience for you without a doubt. It is our firm belief that by embracing these values, we will achieve success:

Leadership Leaders set quantifiable objectives and define the direction for the group. As today’s thought leaders they create and embrace change and set the example for all to follow. Leaders demonstrate initiative, and follow through.

Integrity The golden rule of business is doing it with highest degree of integrity between words and deeds.

Vision Delivering world class integrated solutions to our clients while building long-term relationships based on mutual trust.

Mission We believe in simplicity of ideas that’s why our mission is straight forward “deliver on promise by building best team to execute”

This is an exciting time to be at WATCON, and we’ve really only just begun. With a strong foundation of talented people, work ethics and the right strategy, we’re defining new opportunities that will help us achieve good growth, deliver value to all our stakeholders and lead us to a bolder future where we’re an even greater company.

A. Waheed Khan Chief Executive Officer

Page 5: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects

3- Target sectors and services offered

The management team of WATCON Engineering brings more than two decades of expertise in engineering trade with strong work ethics to provide project management services in the field of construction engineering, plant overhauling / maintenance related to civil, electrical and mechanical engineering across the geographical regions.

WATCON engineering draws it strength from being a dynamic young enterprise, which is fully geared to deal with complex engineering problems of today’s world. We serve following sectors

Power Sector; Thermal / WHR / Hydro Power

Oil & Gas

Petro-chemical Industry

Foods & Agro Based Industries

Cement Industry

Fertilizer Industry

Civil /MEP and Infrastructure

We believe in long term relationships forged with our clients, partners, vendors, sub-contractors and more important our own employees. WATCON engineering has team of highly trained engineers and skilled craftsmen who are part of our growing enterprise and ready to be deployed to any challenging environment. Keeping such strengths in view we offer following services:

Design & Engineering Services for Process Industry & Plant Construction

Industrial/ Plants Construction & Maintenance Services (E&M)

Civil Construction Retrofitting & Maintenance

Underground Piping for Process Plants & Infrastructure Network

Shop as well as on site Fabrication of Equipment, Steel Structure, Tanks and Piping

Site installations; Stationary/ Rotary Equipment, Steel Structure, Tanks and Piping etc… Supply of Plants Materials for E&M and Civil/ MEP

Supply & installation of PEB, HVAC & Firefighting (Fire Safety System/EPC)

Insulation, Refractory, Coating/ Wrapping & Industrial Painting

Procurement & Installation of Electrical Systems and Instrumentation & Controls

Chemical Cleaning, Plant Testing & Commissioning Assistance Plant Maintenance /Turn Around Services

Supply Chain/ Procurement Services

Skilled Manpower Supply

Project Management & Construction Supervision and allied Consulting Services

Page 6: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects

4- Key Professionals

The company is founded and managed by a group of professional engineers who have diversified work experience across different sectors and geographical regions – following is a brief description of its key management players:

Abdul Waheed Khan

Chief Executive Officer

Waheed provides strategic leadership of WATCON and is responsible for the execution of corporate goals and operations. Prior to founding WATCON Engineering, Waheed’s last job was at a global financial institution Morgan Stanley in New York City as Vice President catering to some of largest global hedge funds. Waheed lead a global cross-divisional team, which designed, implemented and rolled out Morgan Stanley’s real time portfolio analytical platform used by some of largest clients. He is a senior leadership level executive with 22 years plus experience in project finance, product development, marketing, business development, corporate strategy and vendor management. Waheed holds Bachelors of Science degree in Electrical engineering from UET, Lahore and Master in Business Administration from Drexel, PA, USA.

Muhammad Taj Dad

Director Operation & BD

Taj provides engineering acumen to WATCON as leading partner in the firm. He holds a Bachelor Degree in Mechanical Engineering with MS in TQM and has more than 22 years of experience in project planning and management for plant construction & maintenance services related to oil and gas, cement, chemical, agro- based industry, hydro/ thermal power plants and infrastructure development projects. Before WATCON he worked in leadership roles at some of leading firms like, DESCON, EKL & SENDAN Int’l (KSA) in local as well as overseas assignment (Qatar, UAE & KSA) successfully and attained a good repute within Professional Network and Engineering sector/ market (National & MNCs). A few of his major projects:

Incharge Planning & Control at 184 MW Chashma Hydropower Project

Project Manager at Rafhan Maize Products Project at Jaranwala

Project Manager at 52 MW Naudero Rental Power - Larkana

Manager Planning & Monitoring at SENDAN Int’l for E&I works at Sadara Petro-chemical Plants

/YASREF YERP-3 Oil Refinery & Rabigh Power Plant-2 in KSA

Project Manager at Installation of Gas Plant for UEP – Tando Adam

Page 7: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects

Muhammad Akmal

Director PSS

Akmal is an accomplished telecom expert with excellent project management, team management and analysis skills. He has done graduation in Elect Engineering from UET Lahore and brings a deep knowledge of Middle East & Pakistan’s telecom and wire line sector including fiber optics and HFC networks. He has a good exposure to work in multi-disciplinary environment in coordination with clients and various consultants & contractors. His expertise includes designing of diversified wireless and wire-line networks; turn key projects delivery with installation and Operation & Maintenance of network. Some of his previous assignments are as below,

National Manager Fiber & HFC Networks, WorldCall Telecom Ltd.

Regional Manager Fiber Optics Operations, Mobilink (ORASCOM TELECOM)

Project Manager, SIS (C-COR/PHILIPS) (DUBAI, UAE)

Testing & Commissioning Engineer, Alcatel NSD (DUBAI, UAE)

Application Engineer, Allied Engineering & Services Ltd. (Pakistan)

Assistant Manager Elect, Gharibwal Cement & Power Ltd (Pakistan)

Electrical Engineer, Friends Power Limited (Pakistan)

Faisal Ayub

Manager Projects

Faisal heads projects control department and responsible for project management and control at project sites and at the head office. He is also responsible for all technical issues related to project planning, scheduling, monitoring, proposal preparation, and resources (material, man-hours, consumables, and tools). His responsibilities also include project estimations, evaluations, budget monitoring, comparative analysis of cost trends against actual and forecast costs, and the evaluation of changes in scope through field directives and change requests. He prepares execution and inspection procedures and bills of material, as well as marking and cutting plans, drawings, sketches, as-builds and piping isometrics. Before joining WATCON he worked with firms like, DESCON & EKL in local as well as overseas assignments successfully in engineering sector/ market (National & MNCs). He holds Bachelor of Science degree in Chemical Engineering and Master of Science degree with more than 12 years of experience.

Page 8: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects

5- Human Resources List

S. # Name Designation Qualification Yrs. of Exp.

1 Abdul Waheed Khan Chief Executive B.Sc. Engg. (Elect.), MBA (USA) 22

2 Muhammad Taj Dad Director Operation| BD B.Sc. Engg. (Mech.), MS TQM 22

3 Muhammad Akmal Director Proj. Support B.Sc. Engg. (Elect.) 22

4 Faisal Ayub Manager Projects B.Sc. Chemical, M.Sc. 15

5 Jawad Haider Project Engineer B.Sc. Engg. (Mech.) 06

6 Allah Rakha Site Manager DAE (Mech.) 22

7 Khalid Mahmood Site Manager DAE (Mech) 25

8 Muhammad Ayub Site Manager DAE (Mech.) 16

9 M Babar Khan Site Manager MBA, BGAS Painting Inspector GII 15

10 Muhammad Arif Painting Supdt. Certificate 19

11 Mulazim Hussain Site Administrator DAE + BA 25

12 Muhmmad Sajid Planning Engineer B-Tech (Mech.) 10

13 Asad Raza Manager Accounts CA 05

14 Noor ur Rehman Project Engineer B.Sc. Engg. (Mech.) 03

15 Zeshan Ahmad Planning & Estimation Engineer

B.Sc. Engg. (Mech.) 03

16 Adeel Nawaz NDT Sup. B. Tech (Mech.) 04

17 Riaz Ahmad Supdt. Rep./Maint. DAE (Mech.) 25

18 Mudassar Hussain I/c HSE Inter + NEBOSH/ Certificates 15

19 Khawar Bashir CM Civil DAE (Civil) 15

20 M Arslan Siddique Sup. / Admin DAE Civil 02

21 M. Wajid Mill Wright Supdt. TTC 15

22 Muhammad Akbar Project Engineer DAE (Mech.) 12

23 Muhammad Maroof Planning Engineer B.Sc. Engg. (Mech.) 01

24 Junaid Khalid Site Coordinator B.Sc. Engg. (Mechatronics) 02

25 Gh Abbas Malik Purchaser / Logistics Certificate 05

Page 9: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects

6- Projects – On-going

Sr. #

Proj. # Description of Work Cost (mils)

Client

6 P-132 Hydraulic/ Lube Oil Pipes Chemical Cleaning/ Pickling & Oil Flushing works for Power Cement Project, Nooriabad Karachi

7.6 CEEC TEPC/ FLS_PCL

5 P-131

(b)

Maintenance; Dismantling, Fabrication/ Repair & Erection of Stacker and Reclaimer Rails at DG Cement Factory Chakwal

5 DGKCCL / Nishat Group

4 P-130 Construction of 1st Phase of Commercial Mall (15000 sft) at Kasur

15 Private

3 P-121 Maintenance work/ servicing of gas supply lines SNGPL Shahdara & Sheikhupura

Running SNGPL

2 P-120 Installation/ Erection of Pioneer Cement Line-II, 7700 TPD Plant at Joharabad – Khushab (includes supply of manpower & materials)

+ 30 / Running

Sinoma – CDI

1 P-106

(b)

Rehabilitation of Steel Structure and Equipment; Sandblasting & Painting at DGK Cement Factory, Dera Ghazi Khan (2nd PO at DGKCCL-DGK)

51 DGKCCL/ Nishat Group

7- Projects – Completed

(a- WATCON completed projects)

Sr. # Proj. # Description of Work Cost

(mils) Client

28 P-131

(a)

Supply of Manpower for the shutdown work at DG Cement Factory Chakwal (~ 300 MP Nos. for 01 month)

15 DGKCCL / Nishat

Group

27

P-129 Supply of Materials (Flender Flexible Coupling) to KCP-I Jauharabad

0.35

PAEC, Kundian Chemical Plant-I

26

P-127 Services for Painting of miscellaneous parts at Hayat Kimya Factory, Faisalabad

0.5

Hayat Kimya Pakistan (Pvt). Ltd. (Turkish MNC)

25 P-122

Supply of Rental Equipment at AMS Power Fabrication Shop – Lahore

0.7 AMS Power

24 P-118 Construction of 10,000 Sft. Private Residence 20.0 Private

23

P-126

Services for Rehabilitation of Water Supply Lines (Fabrication & Installation/ Laying – A/G & U/G); CS Lines from 2” ~ 12” at BCL Plant-3 Chakwal

0.226

BCL (Bestway Cement Ltd.)

Page 10: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects

22

P-125

Services for Chemical Anchoring at CF Silo-1 Walls & Roofs for Inst. of 250 TPD raw material transport Bucket Elevator at PCL Khushab

0.69

PCL (Pioneer Cement Ltd.)

21 P-124 Civil Work Retrofitting (Wire/ Saw Cutting & Cores etc.) at ICI Morinaga – Sheikhupura

1.5 SINACO/ SCBS

20

P-106

(a)

Rehabilitation of Steel Structure and Equipment; Sandblasting & Painting at DGK Cement Factory, Dera Ghazi Khan

57.9

DGKCCL/ Nishat Group

19 P-123 Rehabilitation and Maintenance Services for JB Foods (Potato Processing Unit) – Lahore

1.2 JB Foods

18

P-112

Fabrication, Laying & Commissioning of U/G Gas Pipeline MS pipe size 1-1/4” & 2” at Pasroor – Sialkot Region

7.5

SNGPL Partially completed /works suspended

17

P-119

Retrofitting of Cooling Water System (Fabrication & Erection of Piping, Structure & Equipment) at 32 MW Power Plant

1.0

Altern Energy/Descon Power Solutions

16 P-114 Services of Tower Painting (Erected) WPP-09 Lot-2 Transmission Line from Gharo to Jhimpir – Sindh

2.44 AHTC; Al-Hussain Traders Contractors

15 P-115 Office Renovation for Impact Media Solutions (Pvt.) Ltd. Lahore

0.65 Impact Media

14 P-116 Supply of Stores (Compressor Parts) to KCP-1 Joharabad 0.49 PAEC, Kundian Chemical Plant-1

13

P-117

Supply, Fabrication & Installation of Safety Railing & Ladders at Warehouse APL Depot – Machhike Sheikhupura

0.325

APL

12 P-111 Surface Cleaning and Paint application of Oil Tanks at APL, Rawalpindi

0.7 Attock Petroleum Limited

11

P-105

(b)

Surface Cleaning & Paint application (incl. Procurement of Paint) on Steel Tower for CPP-02 Project (NTDC) 1,180 ton, at NTDC Warehouse Jamshoro – Sindh

12.5 Nanjing Daji Steel Tower Manufacturing Co., Ltd. China

10

P-110

Procurement and services of Fiberglass-reinforced Plastic (FRP) Coating for condensate storage tank (T- 4405 A & T-4401B) at OGDCL Qadirpur, Ghotki – Sindh

0.8 Oil & Gas Development Company Ltd.

9 P-113 Sand Blasting of Chemical Tank at Pharas Chemical Industry Multan Road Lahore

0.5 Pharas Chemicals

8

P-105

(a)

Surface Cleaning & Paint application on Steel Tower for CPP-02 Project (NTDC) ~ 6,000 ton, at NTDC Warehouse Jamshoro – Sindh

71.5

Nanjing Daji Steel Tower Manufacturing Co., Ltd. China

7

P-101

Sandblasting & painting works at Fauji Cement Rehab Project at FCCL site (1,200 tons/ 21,000 sqm.), Jhang Bahtar – Attock

5.0 Mechcon (Pvt) Ltd. Islamabad

Page 11: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects

6

P-107

Procurement and services of Fiberglass-reinforced Plastic (FRP) Coating for condensate storage tank (T- 2821) Capacity 3000 BBL at OGDCL Qadirpur, Ghotki – Sindh

1.2 Oil & Gas Development Company Ltd

5

P-109

Procurement and services of Fiberglass-reinforced Plastic (FRP) Coating for condensate storage tank (T- 2801) Capacity 3000 BBL at OGDCL Qadirpur, Ghotki – Sindh

1.4 Oil & Gas Development Company Ltd

4

P-108

Procurement and services of Fiberglass-reinforced Plastic (FRP) Coating for condensate storage tank (CPI 4401A) at OGDCL Qadirpur, Ghotki – Sindh

0.5

Oil & Gas Development Company Ltd

3

P-104

Procurement and services of Fiberglass-reinforced Plastic (FRP) Coating for condensate storage tank (T- 2821) at OGDCL Qadirpur, Ghotki – Sindh material at Qadirpur, Ghotki – Sindh

2.0

Oil & Gas Development Company Ltd

2 P-102 Procurement, Manufacturing (LT & MCC Panels) and Electrical Installation Works

3.5 RIE Metals (Pvt) Ltd. SIE Lahore

1

P-103

EPC for Retrofitting/ DBN Process of Chemical Plant at TA Industries, Manga Mandi – Lahore

2.0 Tahir Asad Industries (Pvt) Ltd. Lahore

Projects (b- Proficient Engineers (now merged into WATCON) till 2015)

List of important projects before merging the operations of M/s. Proficient Engineers

S # Description of Work Cost (mils) Client

12 Construction of PCC & soling Tehsil CS Shah Chakwal

1200 meters Road in UC Ara 2.3

TMA CS Chakwal

Shah,

11 Rehabilitation work and construction of civil facilities in BHU Ara, Chakwal

3.0 NLC

10

Excavation, Fabrication, Installation and Hydro-testing, Pneumatic testing and pigging of feeder Line Ø4” well #14, Aadhi Field, Gujar Khan

3.0

Pakistan Petroleum Limited

9 Construction of Control House Buildings & Misc. Civil Works at 500/220/132 kVA Grid Station

2.8 Potential Engineers (Pvt.) Ltd. Lahore

8

Sandblasting Painting of Cement Factory fabricated structure (5,000 ton) and Insulation work of Pakistan Cement Co. Ltd; Kalar Kahar, Chakwal

25.5

ORASCOM Construction Industries – Asia

7 Excavation, Fabrication, Installation and Pneumatic Testing of Ø18” Gas pipeline, 4 km SNGPL, SMS-2 to Defense Road Lahore

4.0 SNGPL Lahore

6 Construction of retaining wall of Askari Housing Scheme, Rawalpindi

0.85 Al-Syed Enterprises

Page 12: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects

5 Execution of laying canal water line from Mohajar canal to OCL plant, Warchha

2.72 Olympia Chemical

4

Provision of Plant O&M Services i.e. Supply of Skillful Manpower on Call out Basis

4.5

Tahir Industries Ltd; Lahore

Asad (Pvt.)

3

Sandblasting & Painting of Steel Towers of WAPDA /NTDC (2,000 ton) for Construction of Transmission Line in Hub Chowki, Karachi

5.8

Potential Engineers Pvt. Ltd; Lahore

2 Manpower Supply Contract to at Pakistan Cement Project for mechanical erection works

1.8 Orascom Construction Ind.

1 Manpower supply for construction of cement mill and civil structure at Chakwal Cement Ltd.

1.5 Gammon Pakistan

Page 13: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects

8- Industrial Sectors Served – Management Experience

WATCON management brings in two decades of exposure to global and local industrial sector while serving their respective employers they worked on some of major projects around the globe. When today you will hire WATCON to do a certain project you are hiring astute professionals whose experience is honed over years of hard work and service to their clients. Some of such projects planned and executed where senior management participated are listed hereunder:

Major Industrial Projects completed in:

Oil & Gas;

1- LNG/ LPG Extraction / Processing Plants

2- Wellhead Gathering Facilities

3- Oil Refineries

Gas Processing Facility Expansion Project; EPIC of ADHI LPG/NGL Plant-II. for PPL and Orient Petroleum GPF NaimatBassal

MAJOR PROJECTS:

1. Repair/ Maintenance of Tanks at PRL Karachi; cleaning, refurbishment, rebuilding & construction of oil storage tanks, works schedule: Aug. 2014 ~ Jun. 2016

2. UEP’ United Energy Pak. Ltd; (former BP) Installation of 160 MMSCFD Gas Train; Naimat Ph-5, Project Schedule: Nov-2014 ~ May 2015

3. ARL Up-gradation Project - Rawalpindi; Fab. & Erection of Piping , Steel Str. Equip & Tanks and misc. works with EPCC Hyundai for about 3.8 million man-hours, Project Schedule: 2014~2016

4. MOL Pakistan Ltd.; Construction of SWHF’ Surface Well Head Facilities (4 Nos.) at MOL Karak Block KPK, Project Completion: 2015

5. EPC for Fire Protection System: Berth No. 54 & 62 at KFI Port Jubail KSA for SATORP (E&M Part; Piping, Structure, Equipment and I &C), Project Sch. May 2014~Dec 2015)

6. Sadara Gas Supply Project: CAS (Civil, Arch. & Str.) Works for 1x16 NPS GAN pipeline: 16km & 2x24 NPS pipelines (GAN & GOX): 5km,from Jubail-1 Sadara Chemical Complex (KSA) subcontract from ETEC Arabia Ltd under SABIC PMT, fast-track Project (Jan ~ Jun-2014)

7. Yanbu Export Refinery Project; Pkg-3&4; E&I installation works subcontract from DAELIM Arabia Ltd (EPC) more than 03 Million Planned Man-hours – Yanbu KSA (Y-2012~2014)

8. Ruwais Sulfur Handling Terminal-2; erection of steel str./equipment & piping (13 months/ 1.5 Million Mhrs job) with Al-Jaber as a main Contractor (for GASCO) – Abu Dhabi (Y-2012)

9. 13.5 KM 8” ND Gas Pipe Line; from OPL Ratana Gas Fields to POL Mayal Gas (LPG) Plant (Pak), a fast track Project thru Rocky/Hilly Terrain (2 month time schedule) – April ~ May 2012

Page 14: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects

10. OGDCL Dakhni Expansion Project (Pak) a PCC’ Procurement, Construction & Commissioning Contract for SRU (Civil, E&M) under PMT Supervision of the consultant “ENAR Pak Pvt. Ltd” works schedule (Aug-2011 ~ Jun-2012)

11. EPC for LPG/LNG Expansion Project; PPL – Adhi Gas Field – Rawalpindi Pakistan (Y-2004-5)

12. JJVL LPG/LNG Extraction Project; Jamshoro (Pak); EPC with Hanover Inc. SA for Associated Group Lahore (Y-2004)

13. Qatar Gas DBN; LPG/LNG Expansion Project; – Qatar (with DESCON Engineering Ltd.) EPC with CTJV; Chiyoda Technip JV (Y-2003)

14. ATA/ Maintenance Jobs:

Plants Services/Refurbishment Jobs; in East / West Provinces KSA with SENDAN Int’l Co. Ltd. for O&G / Petrochemical Industry (2012~14)

Pakistan various O&G Operating Companies (in 4 Provinces) likewise; OGDCL (Uch & Dhakhni Gas Plants), PPL (Adhi Gas Plant), ARL,PARCO, OMV (Sawan)& ENI (Bhit) etc… Overseas: at Qatar Gas DBN-2003

Thermal & Hydro Power;

1- WHR Systems

Construction of Thermal Power Plants GTG & Diesel/ HFO Generation Projects Captive Power

(Waste Heat Recovery)

2- Steam Turbines / Combined Cycle

3-

Diesel/ HFO Gen- Sets

184 MW Chashma Hydropower Project; Installations, Testing & Commissioning of Hydro Electric Equipment

4-

Low Heads / High Heads Hydro Power Projects

Page 15: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects

MAJOR PROJECTS:

1. Rafhan Maize Product Co-Gen Plant Jaranwala-Pak; Installation & Commissioning of 12 MW Coal Fired Power Plant; Project Schedule Aug-15 ~ Jan-16

2. Sitara Energy (SCIL) Faisalabad-Pak; Installation & Commissioning of 35 MW Coal Fired Power Plant; Project Schedule: Jun-15 ~ Nov-15

3. DOOSAN Heavy Industries; EPC/ Rabigh Power Plant-II KSA; E&I Construction for 2/4 units Thermal Power Plant (4x700: 2800 MW) Man-hours: 2.7 Millions – 2012 ~ 14

4. Pro Energy Services Pak (Pvt.) Ltd. the EPCC of Walter Power Intl. (USA)in Pakistan; Construction (Civil, Mech. E&I and Testing/Commissioning) of 51MW Fast-Track Rental Power Project ‘2 x Rolls Royce GTG’ at Naudero Sindh.– 2010

5. HUBCO Power Narowal / MAN Diesel Pakistan (Pvt.) Ltd. 220MW Power Plant (MAN Diesel): Construction (E&M) of 11 x 18V 48/60 Gen. Set with Co-gen. exhaust boilers, exhaust gas & steam system & auxiliaries – 2010

6. WHR_PP in Cement Sector; Bestway, Maple Leaf, Cherat, Attock& DG Cement BCCL: 14 MW, MLCF: 13.9 MW, CCCL: 7 MW, ACPL: 12 MW & DGKCCL: 8.6 MW (2008~2012)

7. Orient Energy Systems Pvt. Ltd. Karachi; Supply, fabrication, erection, construction works for 90MW (32 engines) gas fired power plant project at K.E.S.C. S.I.T.E., Karachi – 2009

8. Century Paper & Board Mills Ltd; Multan Road Lahore Installation of 4 Nos. GTG Sets. Kawasaki Type GPB-70, and 4 Nos. HRSG of capacity 15 tons/hr at 14 bar including associated ducts, accessories & stacks etc. – 2007.

9. Consortium of Mitsui Corporation & Toshiba Plant Construction Ltd. Japan, 1450MW (290 MW X 5 units – Francis Turbine)Ghazi Brotha Hydro Power Project; assembly & installation work of Generator units & Auxiliaries (Electro Mech.) supplied by Toshiba Corporation Ltd., Japan – 2004

10. Marubeni Corporation & Fuji Electric Co – Japan Erection & Testing of Hydro Electric Equipment at 184MW Chashma Hydropower Project Mianwali;(Low-head Bulb-nose Turbines: 8 x 23) – 2001; Man-hours: 1.5 Million in 1999 to 2001

11. Tomen Power (Japan) Singapore at Gul Ahmed Energy Ltd. Karachi; Fabrication, Erection /Commissioning of 136.17 MW (9 DG Set by Wartsila, Finland) Furnace Oil Fired Power Plant, GAEL Karachi – 1996-7

Page 16: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects

Chemical Process Industry;

Chemical, Petro-chemical/ Processing Plants

E&M and Civil Structure

Civil Construction & Super Structure for Industrial Building; Sadara KSA & P&G Plant at Port Qasim – Karachi

MAJOR PROJECTS:

i. P&G Pakistan Port Qasim – Karachi; Civil Construction (RCC & Steel Str.) of Process Building & Warehouse Schedule: Dec-2015 to May-2016

ii. DAELIM Arabia Ltd. at Sadara Petro-chemical Complex, Jubail- KSA; E&I Construction Works at two major projects; MFC & Isocyanate of about 2.3 Million Mhrs/ Schedule: Y-2012-

iii. JGC Gulf Intl. Co. Ltd., Al Khobar – KSA; Civil, E&I Construction Projects at Sadara Aromatics & KJO – Khafji/ Schedule: 2013

iv. Ibrahim Fibers Ltd; Faisalabad – Pakistan; Construction (Mech., E&I) for 600 TPD S/L Polyester Fiber Plant in 2012 and 400 TPD line in 2001-2; Tech. by Zimmer AG

Cement Industry;

Fabrication & Installation (E &M) of Cement Plants; 6700 TPD in Pakistan Plant Mfg. by FLS Denmark

Cement Plants Rehabilitation Work at FCCL & Retrofitting at PAKCEM _ BCCL KalarKahar

MAJOR PROJECTS:

i. Lafarge Pakistan Cement Co. Ltd. KallarKahar (5,500 TPD) for its Retrofitting & Expansion Projects; Procurement, Detail Engineering, Fabrication & Erection of: (Jan- 2011 to Apr 2012) b. Alternate Fuel (Coal) Belt Conveyor to Pre-Calciner c. Kiln Feed Bucket Elevator (Energy Efficient) System d. Repair of Insulation for Pre-heater e. Steel Silo for Cement

i. Procurement, Fabrication & Erection of WHR Power Plants; at BCCL, MLCF, DGK CCL &Attock CCL. (Jan-2009~ Oct-2011)

Page 17: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects

ii. Fabrication & Erection of Gulf Cement Co. (5000 TPD) Qatar; as Subcontractor of M/s. Simplex Infrastructure Ltd. for Material Storage & Misc. Loose Parts & Manpower Supply. (Apr-2008 to Dec-2008)

iii. DG Khan Cement Co. Ltd. Chakwal (6,000 TPD) for its Fabrication & Erection of: Locally Manufactured; Steel Structure (+5000 ton) & Equipment (2000 ton) and Off-shore Equipment (1850 ton) for Clinker Cooler, Cement Mill & Packing Plant (by FLS-Denmark) (Jan-2005 to Mar- 2007)

iv. Procurement, Fabrication & Erection of Coal Firing Plants; at Askari & Fauji Cement Plants in Hassan Abdal (2003~2004)

v. Maintenance Jobs at Cement Plants as follows: (2007~2008)

Replacement of Kiln Shell at:

Askari Cement Hassan Abdal

Maple Leaf Cement Mianwali

Gharibwal Cement Jhelum

Refractory Repair at QNCC Qatar

vi. Engineering & Expansion Works at Gharibwal Cement Co. Ltd. Jhelum; (1800 TPD) for Fabrication & Erection of EP, Coal Firing Plant, Misc. Maintenance & Refurbishment Jobs. Sep- 1995~Oct-1996

Food Processing/ Agro-based Industry;

Fabrication & Installation (E &M) of CPC Rafhan Maize Products Co. Ltd. 450 TPD; Jaranwala (Faisalabad)

Installation of Bio Blitz Green House Project and a PEB Shed’ Gujar Khan Rawalpindi

MAJOR PROJECTS:

i. Koh e Noor Sugar Mills, Wali Oil Mills, Dalda Oils, Nestle, Engro Foods, Milac Foods; Construction Projects: Distilleries, Vegetable Oil, Beverages, Rice Processing, & Milk Plants etc… done during Year 2001-2012

ii. CPC Rafhan Maize Products Pak. (Pvt.) Ltd. Construction (Mech., E&I) for major Plants; at Jaranwala 2001-2003 & at Hyderabad in 2011-2012

Infrastructure Projects;

MAJOR PROJECTS:

i. Sadara Gas Supply Project: CAS (Civil, Arch.& Str.) Works for 1x16 NPS GAN pipeline: 16km & 2x24 NPS pipelines (GAN & GOX): 5km, from Jubail-1 Sadara Chemical Complex (KSA) subcontract from ETEC Arabia Ltd under SABIC PMT, fast-track Project (Jan ~ Jun-2014)

Page 18: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects

ii. 9 KM 14 NPS Water Pipeline; from SADAF Petro-chem. Plant to EDC Plant within RC Corridor Jubail-1 (KSA) in 2014

iii. Improvement of Water Supply Project (under JICA~WASA – Faisalabad): The Extension of Water Supply System; water source, collector main, transmission and distribution facilities (U/G 36 NPS Pipeline: 11 KM) capacity of water supply: 91,000m3/day. (2009~2011)

iv. Taunsa Barrage Rehabilitation Works for Gates (Mechanical, Electrical & Civil) Project: under KURIMOTO LTD. Minato-ku, Tokyo Japan (main contractor) from Govt. of Punjab PID’ schedule: 2006 ~ 2009

Telecom Sector; MAJOR PROJECTS:

i. ETISALAT Broad Band Access Network Project: Designing, Installation, Testing & Commissioning and Operation & Maintenance of Etisalat’s 1st broadband access network project in Dubai &Abu Dhabi.

ii. ETISALAT Wireless Broad Band Access Network Project: Designing, Installation, Testing & Commissioning and Operation & Maintenance of Etisalat’s 1st broadband wireless access network project in Ajman & Al Ain.

iii. Dubai International Airport Project: Designing, Installation, Testing & Commissioning of Dubai Airport Project on Hybrid Fiber & Coax segment.

iv. Mobilink: Deployment, Testing and O&M of Fiber network for long haul and Metro fiber

References; WATCON Top Management Exposure / Experience with Multinational EPC Contractors:

Oil & Gas Sector;

a. Hyundai Engineering Korea / ARL Pakistan

b. SAMSUNG Engineering Korea /KSA c. Mitsubishi ‘MHI Japan / KSA d. Siemens GmbH / KSA e. DAELIM / SK E&C/ eTEC of Korea / KSA f. Ranhill Engineers & Constructors Sdn Bhd – Malaysia g. Chiyoda Corporation Japan/ TECHNIP Middle East FZCO (France): CTJV at Qatar Gas h. Hanover International S.A (USA) i. Marubeni Corp. Japan j. CPECC; China Petroleum k. ABB for OMV Pakistan l. OPII ‘Orient Petroleum Intl. Inc.’

Power Sector;

a. Nanjing Daji Steel Tower Manufacturing Co., Ltd. China b. DOOSAN DHI Korea / KSA c. Mitsui Corp./ Toshiba Plant Kensetsu Co. Ltd. Japan d. Fuji Electric Co. Ltd. Japan e. Tomen Power Singapore / Toshiba Japan f. Wartsila NSD Corporation Finland g. PREUSSAG Noell Stahl – und Maschienbou GmbH h. ALSTOM (CEGELEC) France i. VOITH HYDRO Germany j. ALFA-LAVAL Sweden

Page 19: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects

k. MAN of Germany

Petro-Chemical / Process Industry;

a. Fluor Arabia b. Zimmer AG c. FL Smith and Co. Denmark d. MEM-BAU / CEMAG Group (Cement Plants etc) GmbH e. ORASCOM Construction Industry Asia f. CBMC (China)

Misc. Jobs;

a. Consortium Taisei Corp. & Kurimoto Limited of Japan b. Kone Cranes Components Finland c. Shin Nippon Air Technologies (Pvt.) Ltd. (SNK) Singapore

Page 20: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects

9- Major Clients (WATCON Engineering)

Sr. Company Logo Company Name Role/ Status

20

CEEC (Pakistan) Tianjin Electric Power Construction (Pvt) Ltd

Main Contractor of

FLS

19

FLSmith & Co. Denmark

EPCC at Power

Cement Ltd

18

Power Cement Ltd

Owner

17

Hayat Kimya (Pvt) Ltd

Client

16

Bestway Cement Ltd

Client

15

Pioneer Cement Ltd., Khushab

Client

14

Sinoma – CDI (Chinese EPC at Pioneer Cement Ltd

Khushab – Pakistan)

Client

13

ALTERN ENERGY LTD

(Subsidiary of DESCON)

Client

12

ATTOCK PETROLEUM LIMITED

Client

11

SUI NORTHERN GAS PIPELINES

LIMITED

Client

10

NISHAT GROUP

D.G. KHAN CEMENT COMPANY LTD

Client

Page 21: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects

9

PAEC JOHARABAD

(SCM;

SUPPLY OF COMPRESSOR PARTS)

Client

8

NANJING DAJI TOWERS MANUFACTURING CO. LTD., CHINA

Client

7

NATIONAL TRANSMISSION & DISPATCH COMPANY “NTDC”, WAPDA

Owner

6

NESPAK (PVT) LTD., LAHORE

Consultant

5

OIL & GAS DEVELOPMENT COMPANY LIMITED

“QADIRPUR GAS FIELDS”

Client

4

TMA INTERNATIONAL, LAHORE

Client

3

RIE METALS (PVT.) LTD., SUNDAR (LAHORE)

Client

2

FAUJI CEMENT COMPANY LIMITED

JHANG BAHTAR

Owner

1

MECHCON (PVT.) LTD., ISLAMABAD

Client

Page 22: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects

10- Tools/ Equip. & Plants

S. # Tools/ Equipment Description Qty/ Nos. Remarks

1 Crane Hydraulic 45 T (Tandano) 01 RT

2 Crane Hydraulic 25 T (Tandano) 02 1 TM / 1 RT

3 Air Compressor (Elect.) 08

4 Air Compressor (Diesel) 02

5 Welding Plant/ Gen. Set 08

6 Diesel Gen Set 150 kVA 01

7 Gas Cutting Set 04

8 Grinder/ Wheel Cutter Lot

9 Chain Blocks/ Rigging Tools Lot

10 Mechanical Hand Tools Lot

11 Painting machines/ accessories 10 set

12 Dumper Trucks 02

13 Excavator 01

14 Tractor/ Trolley 02

15 Hilux Pick-up 01

16 Mixer Machine (01 Bag) 01

17 Water Tanker 01

18 Compactor m/c 01

19 Concrete cutter 01

20 Hand Tools for Digging 1 Lot

21 Shuttering Material Lot

22 Scaffolding Pipes & Planks Lot + Rft 100,000

Page 23: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects

23 Insulation Tools / Accessories 3 Set

24 Hand Tools (Civil Works) Lot

25 Hand Tools (Elect. Works) 5 Set

26 Residential Portacabin 04

27 Container Store 40’ 01

28 Containers Store 20’ 02

Important Note:

(Company own & associated/ vendors; services of reliable venders are aligned upon award of any project including fresh purchase of desired machinery, tools and materials)

Page 24: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects

Quality Policy

11- Quality Policy

WATCON Engineering

is committed to serve its customers by understanding their requirement and endeavoring to meet the same safely,

professionally, reliably, timely,

economically & consistently.

for WATCON Engineering

Chief Executive Officer

Page 25: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects

HSE Policy

12- HSE Policy

WATCON Engineering

has a primary and continuing commitment to

conduct its activities in a manner to ensure, the

safety and health of its employees, its customers

and others impacted by its activities, the

protection of the environment; protection of

employees, capital, information and other assets

from deliberate harm, damage or loss.

for WATCON Engineering

Chief Executive Officer

Page 26: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects

13- Registration Certificates

Page 27: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects
Page 28: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects

14- Completion Certificates (a few & references can be provided on request)

Page 29: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects
Page 30: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects
Page 31: TABLE OF CONTENT · COMPANY INTRODUCTION 1. Establishment and Addresses 2. CEO Message 3. Target sectors and services offered 4. Key Professionals 5. Human Resources list 6. Projects

[email protected]

15- Associates / Partners

1. Electrical (I&C); GAIN Control Systems Lahore {PEC Reg. C-5} URL: www.gain.com.pk | https://www.facebook.com/gaincontrolsystems

2. Civil; AL-SYED Enterprises Govt. Contractors & General Order Suppliers

House no.1, Lane no.1, Nadir street adyala Road Rawalpindi

3. Spit; French Technologies; Website : www.spit.fr

4. H H Robertson Pak (Pvt.) Ltd. 169-A, Allaudin Road, Lahore Cantt., Pakistan. Tel: +92-42-36660507-11 Website: www.hhrobertson.com.pk ; Email: PEB Solutions, Porta-cabins, Pre-fab Steel Structure & General Fabrication

5. Adnan Engineering Services (Pvt). Ltd (AES) Suit no.209, 2nd floor, Annum Blessing, Block 7/8, K.C.H.U

Main, Shara-e-faisal, Karachi, Pakistan.

URL: www.aespk.com, Email: [email protected]