table of contents – boring logs chapter 26 of contents – boring logs chapter 26 ... automatic...

11
VOL. V - PART 2 DATE: 14Jun2010 SHEET 1 of 1 BORING LOGS TABLE OF CONTENTS – CHAPTER 26 FILE NO. 26.TOC TABLE OF CONTENTS – BORING LOGS CHAPTER 26 FILE NO. TITLE DATE TABLE OF CONTENTS AND INTRODUCTION 26.TOC Table of Contents – Chapter 26 ...............................................................14Jun2010 26.00 Introduction – Chapter 26.........................................................................14Jun2010 GINT SOFTWARE 26.01 General Information..................................................................................14Jun2010 CONVERSION PROCESS 26.02-1 General Information..................................................................................14Jun2010 26.02-2 General Information..................................................................................14Jun2010 26.02-3 General Information..................................................................................14Jun2010 26.02-4 General Information..................................................................................14Jun2010 26.02-5 General Information..................................................................................14Jun2010 26.02-6 General Information..................................................................................14Jun2010 SAMPLE PLANS 26.03-1 Sample Sheet for SPT Composite Log ....................................................14Jun2010 26.03-2 Sample Sheet for Fence Diagram............................................................14Jun2010 * Indicates 11 x 17 sheet; all others are 8½ x 11.

Upload: hoangnguyet

Post on 20-May-2018

227 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TABLE OF CONTENTS – BORING LOGS CHAPTER 26 OF CONTENTS – BORING LOGS CHAPTER 26 ... Automatic Hammer Other Test(s): ... LAB DATA M IS T U R C N T (%) P L A S T I IT Y I E X L IQU

VOL. V - PART 2

DATE: 14Jun2010

SHEET 1 of 1

BORING LOGS TABLE OF CONTENTS – CHAPTER 26

FILE NO. 26.TOC

TABLE OF CONTENTS – BORING LOGS

CHAPTER 26

FILE NO. TITLE DATE

TABLE OF CONTENTS AND INTRODUCTION

26.TOC Table of Contents – Chapter 26 ...............................................................14Jun2010 26.00 Introduction – Chapter 26.........................................................................14Jun2010

GINT SOFTWARE 26.01 General Information..................................................................................14Jun2010

CONVERSION PROCESS 26.02-1 General Information..................................................................................14Jun2010 26.02-2 General Information..................................................................................14Jun2010 26.02-3 General Information..................................................................................14Jun2010 26.02-4 General Information..................................................................................14Jun2010 26.02-5 General Information..................................................................................14Jun2010 26.02-6 General Information..................................................................................14Jun2010

SAMPLE PLANS 26.03-1 Sample Sheet for SPT Composite Log ....................................................14Jun2010 26.03-2 Sample Sheet for Fence Diagram............................................................14Jun2010

* Indicates 11 x 17 sheet; all others are 8½ x 11.

Page 2: TABLE OF CONTENTS – BORING LOGS CHAPTER 26 OF CONTENTS – BORING LOGS CHAPTER 26 ... Automatic Hammer Other Test(s): ... LAB DATA M IS T U R C N T (%) P L A S T I IT Y I E X L IQU

VOL. V - PART 2

DATE: 14Jun2010

SHEET 1 of 1

BORING LOGS INTRODUCTION – CHAPTER 26

FILE NO. 26.00

GENERAL PROCEDURES Chapter 26 of this manual establishes the practices for the completion of boring logs for a plan assembly.

These sheets were generated using a MDL program; however, the Materials Division has adopted gINT software for the creation of boring logs. In the past, fence diagrams (See File No. 26.03-2) have only been included when requested. Fence diagrams will be included with the boring logs for all projects beginning with the July 2011 advertisement.

NOTE: Due to various restrictions on placing files in this manual onto the Internet, portions of the drawings shown do not necessarily reflect the correct line weights, line types, fonts, arrowheads, etc. Wherever discrepancies occur, the written text shall take precedence over any of the drawn views.

Page 3: TABLE OF CONTENTS – BORING LOGS CHAPTER 26 OF CONTENTS – BORING LOGS CHAPTER 26 ... Automatic Hammer Other Test(s): ... LAB DATA M IS T U R C N T (%) P L A S T I IT Y I E X L IQU

VOL. V - PART 2

DATE: 14Jun2010

SHEET 1 of 1

BORING LOGS GINT SOFTWARE

GENERAL INFORMATION FILE NO. 26.01

General: The GEOXT, GINT, Microstation, and GEOPAK Integrator software and manual may be downloaded from the external website at the following link: http://www.virginiadot.org/business/materials-download-docs.asp After running the gINT software, the standard penetration test (SPT) composite logs will typically need to be converted from DXF files to DGN format. The macro provided will convert all line weights and fonts to conform to VDOT standards. However, some editing in the MicroStation file may be required to fix errors created by the conversion process. The macro is also available to convert Fence Diagrams.

Page 4: TABLE OF CONTENTS – BORING LOGS CHAPTER 26 OF CONTENTS – BORING LOGS CHAPTER 26 ... Automatic Hammer Other Test(s): ... LAB DATA M IS T U R C N T (%) P L A S T I IT Y I E X L IQU

VOL. V - PART 2

DATE: 14Jun2010

SHEET 1 of 6

BORING LOGS CONVERSION PROCESS

FILE NO. 26.02-1

General: The following instructions are to be followed when creating bridge plan sheets using the Materials Division Engineering Geology sheet to be included within the final Bridge Plan Assembly after notification from the Materials section that the converted DGN files are available in FALCON.

It should be noted that at this time this is the only drawing where reference files may be used.

1. Within MicroStation, insert the GSHT cell from bdetails1.cel, and type “XY=0,0” into the key-in

box to indicate cell insertion point. If the key-in box is not activated, select Utilities – Key-in to access command window.

XY=0,0 (Insertion point)

Page 5: TABLE OF CONTENTS – BORING LOGS CHAPTER 26 OF CONTENTS – BORING LOGS CHAPTER 26 ... Automatic Hammer Other Test(s): ... LAB DATA M IS T U R C N T (%) P L A S T I IT Y I E X L IQU

VOL. V - PART 2

DATE: 14Jun2010

SHEET 2 of 6

BORING LOGS CONVERSION PROCESS

FILE NO. 26.02-2

2. The Materials subdirectory in Falcon should contain the Materials Geology sheets as shown

below.

From the top bar select MicroStation then Attach Reference. This will prompt the Reference Attachment Settings box to appear.

Page 6: TABLE OF CONTENTS – BORING LOGS CHAPTER 26 OF CONTENTS – BORING LOGS CHAPTER 26 ... Automatic Hammer Other Test(s): ... LAB DATA M IS T U R C N T (%) P L A S T I IT Y I E X L IQU

VOL. V - PART 2

DATE: 14Jun2010

SHEET 3 of 6

BORING LOGS CONVERSION PROCESS

FILE NO. 26.02-3

Set Scale (Master Ref), key-in scale 1.0625:1.000 then select OK.

Page 7: TABLE OF CONTENTS – BORING LOGS CHAPTER 26 OF CONTENTS – BORING LOGS CHAPTER 26 ... Automatic Hammer Other Test(s): ... LAB DATA M IS T U R C N T (%) P L A S T I IT Y I E X L IQU

VOL. V - PART 2

DATE: 14Jun2010

SHEET 4 of 6

BORING LOGS CONVERSION PROCESS

FILE NO. 26.02-4

3. Move reference file to match the upper left hand corner of the GSHT cell with the same point in the reference file. To access, the reference fill command window if not already opened select File – Reference.

Top left corner

Page 8: TABLE OF CONTENTS – BORING LOGS CHAPTER 26 OF CONTENTS – BORING LOGS CHAPTER 26 ... Automatic Hammer Other Test(s): ... LAB DATA M IS T U R C N T (%) P L A S T I IT Y I E X L IQU

VOL. V - PART 2

DATE: 14Jun2010

SHEET 5 of 6

BORING LOGS CONVERSION PROCESS

FILE NO. 26.02-5

4. From the Main Toolbar, place fence by using element fence type and clip the reference file. After completion, to hide the fence pattern, turn off construction lines. Top left corner point matched. Clip Reference

Fence pattern

Page 9: TABLE OF CONTENTS – BORING LOGS CHAPTER 26 OF CONTENTS – BORING LOGS CHAPTER 26 ... Automatic Hammer Other Test(s): ... LAB DATA M IS T U R C N T (%) P L A S T I IT Y I E X L IQU

VOL. V - PART 2

DATE: 14Jun2010

SHEET 6 of 6

BORING LOGS CONVERSION PROCESS

FILE NO. 26.02-6

4. Fill in Project Data.

Initialize the bsht mdl application using the VDOT BRIDGE MDL task bar (shown below) to fill in the project data. Select Existing and Interior sheet type. Fill in Project Block, Title Block and Description as shown below then click execute to run mdl.

Title Description 1. Project Number 2. COUNTY (upper case) 3. ENGINEERING GEOLOGY (upper case)

Page 10: TABLE OF CONTENTS – BORING LOGS CHAPTER 26 OF CONTENTS – BORING LOGS CHAPTER 26 ... Automatic Hammer Other Test(s): ... LAB DATA M IS T U R C N T (%) P L A S T I IT Y I E X L IQU

DateDesigned: ...........

Drawn: ................

Checked: ............2010, Commonwealth of Virginiac

No. Description Date

STRUCTURE AND BRIDGE DIVISION

COMMONWEALTH OF VIRGINIA

DEPARTMENT OF TRANSPORTATION

Revisions

ROUTE

FEDERAL AID

PROJECT ROUTE PROJECT

STATE SHEET

NO.

VA.

STATEROUTE

FEDERAL AID

PROJECT ROUTE PROJECT

STATE SHEET

NO.

VA.

STATE

investigation, interpretation and judgment by the bidders.

by the Department, and are not intended as a substitute for personal

have access to subsurface data identical to that which is possessed

The boring logs are made available to bidders in order that they may

ciency of the information for bid purposes.

in any way guarantee, either expressly or by implication, the suffi-

pretive and altogether speculative. Further, the Department does not

borings shown; and any such projections by bidders are purely inter-

can be projected as indicative of conditions beyond the limits of the

Department does not in any way warrant or guarantee that such data

subsurface conditions at the sites where the borings were taken. The

mation is not reasonably accurate as an approximate indication of the

project. The Department has no reason to suspect that such infor-

for use by the Department in establishing design controls for the

was obtained with reasonable care and recorded in good faith solely

The subsurface information shown on the boring logs in these plans

District Office.

is on file in the

submittal

geotechnical

original signed

A copy of the

1421 1421-082-000, B603 30

Sept. 2010

ANB

MTK

TED

1421-082-337

ROCKINGHAM COUNTY

7

12

11

13

5

8

12

23

97

100

100

92

25

40

85

65

100

100

100

100

92

8

11

14

16

0

2

4

6

8

8.3

8.7

13.7

18.7

23.7

28.7

60

60

9

9

8

11

50/4

0.0 / 1,041.0

TOPSOIL TOPS

0.3 / 1,040.7

ALLUVIUM: Brown silty CLAY, contains root fragments, stiff, dry

CL

3.0 / 1,038.0

ALLUVIUM: Orange-brown gray mottled silty CLAY, contains root

fragments and black inclusions, very stiff, moist CL

7.0 / 1,034.0

ALLUVIUM: Gray and light brown mottled CLAY, hard, moist CH

8.7 / 1,032.3

BEDROCK: Slightly weathered, soft, moderately fractured, dark

blue-gray LIMESTONE; with thin crystalline quartz seams and

calcite seam 1/8inch at 12.8 feet LST

13.7 / 1,027.3

Unweathered, moderately hard, moderately fractured, dark

blue-gray LIMESTONE; with thin crystalline quartz seams LST

SAME; slightly fractured below 18.7 feet

Rock coring terminated at 28.7 feet below ground surface.

27.4

22.6

23.7

19.7

23.4

08BH-006

GROUND WATER

REMARKS: RIG TYPE: CME-55.

FIELD DESCRIPTION OF STRATA

OFFSET: 8.99 L

COORD. DATUM: NAD 83

boring location.

ST

AN

DA

RD

PE

NE

TR

ATIO

N

TES

T

HA

MM

ER

BL

OW

S

SOIL

RE

CO

VE

RY (%)

CO

RE

RE

CO

VE

RY (%)

Date(s) Drilled: 8/11/08 - 8/11/08

Drilling Method(s): 3.25 Hollow-stem auger

SPT Method: Automatic Hammer

Other Test(s):

Driller: Double J

Logger: J. Kirchner

FIELD DATA

JOIN

TS

ST

RA

TA

LE

GE

ND

RO

CK

QU

ALIT

YD

ESIG

NA

TIO

N

S O I L

STATION: 108+17.61

SURFACE ELEVATION: 1,041.0 ft

EL

EV

ATIO

N (ft)

2

4

6

8

10

12

14

16

18

20

22

24

26

28

NOT ENCOUNTERED DURING DRILLING

STABILIZED AT 8.5 ft AFTER 24 HOURS

SA

MP

LE

LE

GE

ND

SA

MP

LE IN

TE

RV

AL

ST

RA

TA

R O C K

1040

1035

1030

1025

1020

1015

DEP

TH (ft)

ABUTMENT A

LL

LAB DATA

MOIS

TU

RE

CO

NT

EN

T (%)

PL

AS

TICIT

Y IN

DE

X

LIQ

UID

LIMIT

PI

BC No. 89-81-09

UPC 12345Note:

Legend:

See Material and Sample Symbols List

Groundwater, initially encountered

Groundwater, stabilized

4

9

21

12

4

12

21

13

45

93

90

100

65

100

100

100

95

100

90

100

6

13

19

50/3

0

2

4

6

7.8

8

13

18

23

28

60

60

3

3

10

10

0.0 / 1,043.0

TOPSOIL TOPS

0.4 / 1,042.6

ALLUVIUM: Orange-brown gray mottled silty CLAY, contains root

fragments, firm, dry CL

SAME; no root fragments, very stiff, moist below 2 feet

SAME; hard below 4 feet

5.5 / 1,037.5

ALLUVIUM: Orange-brown gray mottled silty CLAY, contains

rock fragments, very stiff, moist CH

8.0 / 1,035.0

BEDROCK: Moderately weathered, soft, highly fractured, light

gray LIMESTONE; contains clay seam along bedding plane LST

10.5 / 1,032.5

Slightly weathered, moderately hard, moderately fractured, dark

blue-gray LIMESTONE; contains crystalline quartz seams LST

Rock coring terminated at 28.5 feet below ground surface

31.4

20.5

22.7

27.1

08BH-007

PAGE 1 OF 1

GROUND WATER

REMARKS: RIG TYPE: CME-55.

FIELD DESCRIPTION OF STRATA

OFFSET: 8.65 R

COORD. DATUM: NAD 83

Boring caved at 28.5’ bgs on 8/12/08. Surface covered with knee high grasses.

ST

AN

DA

RD

PE

NE

TR

ATIO

N

TES

T

HA

MM

ER

BL

OW

S

SOIL

RE

CO

VE

RY (%)

CO

RE

RE

CO

VE

RY (%)

Date(s) Drilled: 8/11/08 - 8/11/08

Drilling Method(s): 3.25 Hollow-stem auger

SPT Method: Automatic Hammer

Other Test(s):

Driller: Double J

Logger: J. Kirchner

FIELD DATA

JOIN

TS

ST

RA

TA

LE

GE

ND

RO

CK

QU

ALIT

YD

ESIG

NA

TIO

N

S O I L

STATION: 108+08.91

SURFACE ELEVATION: 1,043.0 ft

EL

EV

ATIO

N (ft)

2

4

6

8

10

12

14

16

18

20

22

24

26

28

NOT ENCOUNTERED DURING DRILLING

STABILIZED AT 5.9 ft AFTER 24 HOURS

SA

MP

LE

LE

GE

ND

SA

MP

LE IN

TE

RV

AL

ST

RA

TA

R O C K

1040

1035

1030

1025

1020

1015

DEP

TH (ft)

ABUTMENT A

LL

LAB DATA

MOIS

TU

RE

CO

NT

EN

T (%)

PL

AS

TICIT

Y IN

DE

X

LIQ

UID

LIMIT

PI

4

6

4

25

3

8

7

30

60

71

76

94

40

75

90

90

80

94

100

94

5

9

11

26

0

2

4

6

8

13

18

23

28

>60

3

5

7

17

0.0 / 1,038.0

TOPSOIL TOPS

0.2 / 1,037.8

ALLUVIUM: Dark brown silty CLAY, contains root fragments,

firm, dry CL

SAME; stiff below 2 feet

4.5 / 1,033.5

ALLUVIUM: Light brown sandy CLAY, contains root fragments

and rock fragments, stiff, moist CL

7.0 / 1,031.0

ALLUVIUM: Brown-gray sandy CLAY, contains highly weathered

limestone fragments, very hard, wet CL

8.0 / 1,030.0

BEDROCK: Slightly weathered, moderately hard, slightly

fractured, dark gray LIMESTONE LST

Rock coring terminated at 28 feet below ground surface

25.4

28.3

23.5

24.4

08BH-008

PAGE 1 OF 1

GROUND WATER

REMARKS: RIG TYPE: CME-550.

FIELD DESCRIPTION OF STRATA

OFFSET: 10.96 L

COORD. DATUM: NAD 83

Boring caved at 28’ bgs on 8/9/08. Surface covered with knee-high grasses.

ST

AN

DA

RD

PE

NE

TR

ATIO

N

TES

T

HA

MM

ER

BL

OW

S

SOIL

RE

CO

VE

RY (%)

CO

RE

RE

CO

VE

RY (%)

Date(s) Drilled: 8/8/08 - 8/8/08

Drilling Method(s): 3.25 Hollow-stem auger

SPT Method: Automatic Hammer

Other Test(s):

Driller: Double J

Logger: J. Kirchner

FIELD DATA

JOIN

TS

ST

RA

TA

LE

GE

ND

RO

CK

QU

ALIT

YD

ESIG

NA

TIO

N

S O I L

STATION: 108+74.08

SURFACE ELEVATION: 1,038.0 ft

EL

EV

ATIO

N (ft)

2

4

6

8

10

12

14

16

18

20

22

24

26

28

NOT ENCOUNTERED DURING DRILLING

STABILIZED AT 8.0 ft AFTER 24 HOURS

SA

MP

LE

LE

GE

ND

SA

MP

LE IN

TE

RV

AL

ST

RA

TA

R O C K

1035

1030

1025

1020

1015

1010

DEP

TH (ft)

PIER 1

LL

LAB DATA

MOIS

TU

RE

CO

NT

EN

T (%)

PL

AS

TICIT

Y IN

DE

X

LIQ

UID

LIMIT

PI

recovered 2’ E of

Boring caved at 28.7’ bgs on 8/12/08. Surface covered with knee high grasses. Shelby tubesPAGE 1 OF 1

Plan

999

b99999030.d

gn

FILE NO. 26.03-1

SHEET 1 of 2

DATE: 14Jun2010

VOL. V - PART 2SAMPLE SHEET FOR SPT COMPOSITE LOG

BORING LOG SHEET

Page 11: TABLE OF CONTENTS – BORING LOGS CHAPTER 26 OF CONTENTS – BORING LOGS CHAPTER 26 ... Automatic Hammer Other Test(s): ... LAB DATA M IS T U R C N T (%) P L A S T I IT Y I E X L IQU

1,050

1,055

1,060

1,065

1,070

1,075

1,080

1,085

1,090

1,095

1,100

1,105

1,110

1,115

1,120

1,050

1,055

1,060

1,065

1,070

1,075

1,080

1,085

1,090

1,095

1,100

1,105

1,110

1,115

1,120

REC 94

RQD 82

REC 58

RQD 56

REC 0

RQD 0

REC 100

RQD 100

08BH-001

REC 83

RQD 56

REC 27

RQD 0

REC 81

RQD 67

REC 100

RQD 74

08BH-002

REC 84

RQD 68

REC 100

RQD 100

REC 100

RQD 67

08BH-003

REC 100

RQD 90

REC 100

RQD 96

REC 100

RQD 100

08BH-004

REC 68

RQD 32

REC 100

RQD 92

08BH-005

REC 63

RQD 27

REC 40

RQD 20

REC 96

RQD 90

08BH-006

REC 100

RQD 85

REC 100

RQD 100

REC 32

RQD 0

08BH-007

REC 32

RQD 0

REC 68

RQD 36

REC 0

RQD 0

REC 56

RQD 0

08BH-008

REC 67

RQD 90

REC 34

RQD 12

REC 32

RQD 0

REC 49

RQD 10

REC 64

RQD 41

08BH-009 08BH-010

REC 100

RQD 88

REC 100

RQD 58

08BH-011

EL

EV

ATIO

N (ft)

0738-011-244, B665

BOTETOURT COUNTY

ABUTMENT A PIER 1

12 - SPT N-value

Notes: See borehole logs for complete data.

See Material and Sample Symbols List.

Legend:

Groundwater, initially encountered

Groundwater, stabilized

13

17

WT

WT

50R

3

7

15R

10

21

14

50R

5

2

4

11

14

25R

WT

25R

4

8

16

6

12

8

20

50R

RP4

32R

18

22

3

1

13

50R

50R

25

3

3

WH

5

16

28

11

ABUTMENT B

ROUTE 738 OVER GLADE CREEK - BOTETOURT CO.

Fill Fill

Fill

Silty SAND

Silty SANDSilty SAND

Silty SAND

Silty SANDSilty SAND

Silty SAND

Silty SAND

Silty SAND

Lean CLAY

Lean CLAY

Lean CLAY

DOLOSTONE

Weathered

DOLOSTONE

Weathered

CLAY Seam

DOLOSTONE

Lean CLAY

DOLOSTONE

CLAY Seam

DOLOSTONE

CLAY Seam

DOLOSTONE

DOLOSTONE

Weathered

DOLOSTONE

Asphalt

DOLOSTONE

DOLOSTONE

Weathered

DOLOSTONE

DOLOSTONESANDSTONE and

CLAY Seam

DOLOSTONE

DOLOSTONE

Weathered

DOLOSTONE

CLAY Seam

DOLOSTONE

CLAY Seam

DOLOSTONE

Lean CLAY

DOLOSTONE

DOLOSTONE

Weathered

Lean CLAY

DOLOSTONE

CLAY Seam

DOLOSTONE

CLAY Seam

DOLOSTONE

CLAY Seam

DOLOSTONE

CLAY Seam

DOLOSTONE

CLAY Seam

DOLOSTONE

Sandy SILT

Sandy SILT

SHALE/SILTSTONE

Weathered

Sandy SILT

SHALE/SILTSTONE

Asphalt

Fat CLAY

SHALE/SILTSTONE

Weathered

DOLOSTONE

42

1

1

2

REC - Recovery

RQD - Rock Quality Designation

50R - SPT Blow Count to Refusal

WT - Weight of Tooling SPT Advance

RP4 - Rock Prejudiced SPT Blow Count

BC# 08-52-02

UPC# 17993

WH - Weight of Hammer SPT Advance

Fill

1

DateDesigned: ...........

Drawn: ................

Checked: ............2010, Commonwealth of Virginiac

No. Description Date

STRUCTURE AND BRIDGE DIVISION

COMMONWEALTH OF VIRGINIA

DEPARTMENT OF TRANSPORTATION

Revisions

ROUTE

FEDERAL AID

PROJECT ROUTE PROJECT

STATE SHEET

NO.

VA.

STATEROUTE

FEDERAL AID

PROJECT ROUTE PROJECT

STATE SHEET

NO.

VA.

STATE

investigation, interpretation and judgment by the bidders.

by the Department, and are not intended as a substitute for personal

have access to subsurface data identical to that which is possessed

The boring logs are made available to bidders in order that they may

ciency of the information for bid purposes.

in any way guarantee, either expressly or by implication, the suffi-

pretive and altogether speculative. Further, the Department does not

borings shown; and any such projections by bidders are purely inter-

can be projected as indicative of conditions beyond the limits of the

Department does not in any way warrant or guarantee that such data

subsurface conditions at the sites where the borings were taken. The

mation is not reasonably accurate as an approximate indication of the

project. The Department has no reason to suspect that such infor-

for use by the Department in establishing design controls for the

was obtained with reasonable care and recorded in good faith solely

The subsurface information shown on the boring logs in these plans

District Office.

is on file in the

submittal

geotechnical

original signed

A copy of the

1421 1421-082-000, B603 32

Sept. 2010

ANB

MTK

TED

Plan

999 FILE NO. 26.03-2

SHEET 2 of 2

DATE: 14Jun2010

VOL. V - PART 2SAMPLE SHEET FOR FENCE DIAGRAM

BORING LOG SHEET

b99999032.d

gn