TABLE OF CONTENTS

02 | PART 1 - GENERAL SUMMARYREFERENCESADMINISTRATIVE REQUIREMENTSSUBMITTALSQUALITY ASSURANCEWARRANTY

MANUFACTURERSFABRICATORSACCESSORIES AND MACHINEARIES

EXAMINATIONPREPARATIONFINISH

06 | PART 2 - PRODUCTS

08 | PART 3 - EXECUTION

01

System Specifications

Work Area - 32x18 inchesMaximum Part Size - 37x23x9 inchesDimensions - 44x39x36 inchesRotary Capacity - Max Diameter 8 inchesMotorized Z Axis Lifting Capacity - 40 lbsLenses - 1.5, 2.0, 2.5, 4.0 inchesOptic Protection - Air Assist OptionalLaser Options - 10, 25, 30, 40, 50, 60 and 75 WattsPower Requirements - 220V-240V/15AExhaust Connection - Two 4 in ports, 500 CFM @ 6 inches static pressure.

Specifications Provided by, USLinc.com

Concrete FinishBrooklyn, New York

Enny Filpo, Baljinder Kaur, Michelle Yang

Section - D670

PART 1 - GENERAL

1.1 SUMMARY A. Section Includes: 1.Concretefinishforgeneralandspecificpurposeapplications. 2.Use©Rhinocerossoftwareprogrammingtomodela9”x9”x9”concretecubethatadquiresaparticularcharacteristic(s). Samplesofconcretemustbetestedbeforefinalproductisproduced. NOTE:concretesamplesdonotnecessarilyneedtobefromsametypeasfinalproductsincetheprojectisnottestingthe strengthofconcretebutrathertheappearance. 3.Alsoadditionalconcrete2”-3”cylindershapestobetestedandcuredbeforefinalproductisproduced.NOTE:samplesmay includedifferentaggregatesanddesignmaterials. 3.UsePLS6.150DLaserCutterMachine(UniversialLaserSystems)Seepage01fordetails.

B.RelatedRequirements: 1.Rapidsetcement(multipurposeconstructionmaterial). 3.Concretepowderormixmustbehandledwithpropercare;noexposuretoairmustbepermittedwhennotinuse. 4.Plexiglasssheetsshallbemaintainedproperlybylasercuttermonitortopreventfireormeltingofthematerial. 5.Plexiglasssheetsmustbecutdownto9in.by9in.squares(exactsize). 6.Vaselinewillbeusedasareleasingagentforeasyremovaloftheconcreteblockfromitsformwork. 7.Processformixingconcreteandaggregatesmustbeconductedinwellventilatedandsuitedareas.Keepapreferabletem peratureof55-65degreesF.NOTE:Concretemixturemaydryorsettledownfastbeforethepouringprocessifleftout too long

1.2 REFERENCES A.AbbreviationandMachineries 1.V.O.C.VolatileOrganicCompound.Specified,SCIGRIP®smarteradhesivesolutions(clear,water-thinsoventcement, 1.PLS6.150DbyUniversalLaserSystems(PowerLaserSystem)

1.3 ADMINISTRATIVE REQUIREMENTS: A.SustainableCoordination:Non-specificitemsusedintheworkofthissectioninclude; 1.Re-cycledplywoodforcementformwork 02

03

04

B.DelegatedDesignRequirements: 1.DesignRequirements:Properlymixed,pourandcuringofcementmix. a.Meetorexceedthespecifiedappearance b.ProvideaTerra-Cottafinishofconcretealongwithsmothtexture. c.Determinethethicknessofformworkforproperlyexecutingpourandcuringprocess.

1.4 SUBMITTALS A.ActionSubmittals: 1.ProductData:Todemonstrateeachconformanceitisimportanttogetthenecessarymaterials.Materialsincludeany typeofplywoodtocreateanexteriorformworktobeusedasaconcretemold.RapidSet®CementAll(55lbmulti-purpose constructionmaterial)andSAKRETE®(1lbcementcolor;red).Plexiglassforconcreteformwork.Five(5ct)Plexiclear1-1/2” andfive(5ct)1”cubesforconcretearchitecturaldetailandappearance.SCIGRIP®adhesivesolutiontocreateplexi formwork.GlovestoproperlyhandleSCIGRIP®adhesivesolutionandRapidSet®cement. a.Include1”to2“concretetestsamplestoexperimentwithcolorandappearanceofconcretefinish. 2.MaterialSamples: a.submitatleast4differentconcretesamples.Provideeachsamplewithafabricator’slabelstatingmaterial,thickness andproductsusedinthesamples.Imagesforsamplesareprovidedonpgs05,07and09.

B.InformationalSubmittals: 1.Timeframe:Submitarecordofnecessarytimeframe,waitrequiredtimeforcuring. 2.ProductCertificates:Submitcertificatessignedbythemanufactureroffabricatorcertifyingthattheitemsfurnishedconformto thespecificrequirements.

1.5 QUALITY ASSURANCE A.QualityStandardRequirements:Unlessmorestringentrequirementsareindicatedorspecified,complywiththefollowingandreferto thesepublicationsfortermsnototherwisedefinedinthissection.

B.Qualifications: 1.Manufactureandfabricator:Musteachbelegalbusinessentitywithatleast10consecutiveyearsexperiencefabricatingor manufacturingitemssimilarinmaterial,design,complexityandextenttothisprojectandwhoseproductsandfabrication haveresultedinapplicationwitharecordofsuccessfulin-serviceperformance.

Concrete FinishBrooklyn, New York

Enny Filpo, Baljinder Kaur, Michelle Yang

05

06

Concrete FinishBrooklyn, New York

Enny Filpo, Baljinder Kaur, Michelle Yang

2.Installer:Mustbeacompanyandindividualswithatleast5consecutiveyearsexperienceintheinstallationofprojectssimilar inmaterial,design,complexityandextenttothisprojectthathaveresultedinapplicationwithadocumentedrecordof successfulin-serviceperformance. a.Individualinstallermustbeemployeesoftheinstallerandmustbecertified b.Verifythatinstallersdesignatedtoperformanyoftheworkofthissectionarecurrentinthiercertification. c.Ifanyofthoseinstallersneedre-certification,thencausethere-certificationofthoseinstallerspriortoperformingthe workofthissection.

1.6 WARRANTY A.Manufacturer’sWarranty:AllmaterialsmustbecoveredbyawrittenwarrantythatprotectstheOwnerduringthewarrantyperiod against 1.Deterlorations; 2.Defectiveproducts,materials,manufacturedunits,components,accessories,assembliesandfabrications; 3.Patentorlatentdefects;and 4.Incipientorcatastrophicfailure.

B. Warranty Periods: 1.Atleast10yearsaftersubstantialcompletion 2.Atleast5yearsaftersubstantialcompletion 3.Atleast10yearsaftersubstantialcompletion 4.WarrantyTerms: 5.Remedy:Ifproduct,fabricationorinstallationfailswithinthespecifiedwarrantyperiod,thenthemanufacturer,fabricatoror installer,asapplicable,shallreplace.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A.Manufacturers:Providedproductsmanufacturedbyoneofthefollowing 1.Description:Usefollowingcementandcementcolorforfinalproductandappearance.Modeloverallconceptofdesignusing RobertMcNeel&Associates,©Rhinoceroscomputerprogrammingsoftware.

07

Concrete FinishBrooklyn, New York

Enny Filpo, Baljinder Kaur, Michelle Yang

2.Products:Plexiglass,RapidSet®CementAll(55lbmulti-purposeconstructionmaterial)andSAKRETE®(1lbcementcolor; red).Plexiclear1-1/2”and1”cubesforconcretearchitecturaldetailandappearance.SCIGRIP®adhesivesolutiontocreate plexiformwork.GlovestoproperlyhandleSCIGRIP®adhesivesolutionandRapidSet®cement. 3.PerformanceRequirements:Cementmustbemixed,pouredandcuredproperly.

2.2 FABRICATORS A.Fabricators:Provideproductsfabricatedbyoneofthefollowing. 1.Allowfora18”x26”PlexiglasssheettoaccompanyUniversalPLS®forlasercutting.

2.3 ACCESSORIES AND MACHINEARIES A.PLS6.150DLaserCutterMachine(UniversialLaserSystems) B.Scrapplywoodforformwork C.Black&Decker®powerdrill(Lithium)andGripRiteFAS’NERS®(coarsethreaddrywallscrew2”x8 D.PlexiGlass E.Plexiclear1-1/2”and1”cubes F.LatexGloves G.Vaseline®(usedasreleaseagent) H.Cleartape(noparticulartapenecessary) I. Closet light J.Bucketformixingcement K.Rodformixingcement

PART 3 - EXECUTION

3.1 EXAMINATION

A.Withtheinstallerpresent,examinethecementtomakesureitisproperlymixedwithcolorandwatertocementratioisproperly distributed 1.Inspectcementmixandmakesureitisfreefromaggregates.Concreteblockwillnotbetestedforitscompressionstrength. 2.Allowforaminimumof1/16”atsidesof9”x9”x9”ofplywoodformworktoproperlyplaceplexiglassformworkinside. 3.Inspectthatplexiglassformworkisproperlyadheredoneachofthesides.Ifneeded,sealcornerswithcleartapeasaformof proofinganycementleakageafterpouringinmold.

08

09

Concrete FinishBrooklyn, New York

Enny Filpo, Baljinder Kaur, Michelle Yang

B.Examineplywoodformworkandlocateexteriorandinteriorsurfaces. 1.Labeleachsideofformwork(I.e.,top,bottem,face1,2,3,4) 2.Materialsmaybeleftwithmarksandnotations.Formworkwillberemovedafterwards. C.Proceedwithinstallationonlyafterunsatifactoryconditionshavebeencorrected.

3.2. PREPARATION

A.UsePLS6.150Dlasercuttermachinetocutoutsquareholesinplexiclearcubeswillbeplaced.

B.Cutoutlipsforplexiclearcubesfromscrapplexisheetasamechanicalbondbetweenplexiandconcrete. Seeimageonpg13and14fordetails. C.Ifanydiscrepancy,usemorecleartapetocoveranyescapecrevasseswherecementcanpossibleseepthrough. D.Drillplywoodsheetstogethertocreateadditionalformworktomaintainshapeofplexisheetandkeepitfromdeflectingaftercement is poured. E.Createaboxusingplexisheetsforcloserlighttositinsideofconcreteblock.UseSCIGRIP®adhesivesolutiontoadhereplexilight boxtoplexiclearcubes. F.Usevaselineandplaceitontheinsidefacesoftheplexiglass.Makessureallfacesarecoverwithvaseline. NOTE:vaselineismeanttobeareleaseagent.Failuretoevenlydistrubutevaselinemayresultinconcretenotbeingabletobe detachtfromformwork F.Add10cylindercups(10”height)ofRapidSet®CementAllcementintobucket.Addclean*wateraccordinglyintobucket. (*)Veryimportant.Pleasetakeintoconsideration. G.AddSAKRETE®cementcolorasdesired.NOTE:themorecementcolorthatisaddedtomix,thedarkertheconcretewillcure.

3.3 FINISH

A.Usecylindertopourthecementmixintoconcretemold. B.Uselatexglovesandevenlydistributecementmixintomold.Makesurecementcoversallairspaces. C.RepeatstepAasneededtofillentire9”x9”x9”cubewithcementmix. D.Allowfor24to48hourstocureforhandling. E.Safetlyuncrewplywoodformworkandremoveplexiinteriorforworkfromconcrete.(NOTE)Removaloftheplexiglassshouldbe handleddelicatelyensurethepreventionoftheconcreteblockfromcrackingorspalling.

10

11

Concrete FinishBrooklyn, New York

Enny Filpo, Baljinder Kaur, Michelle Yang

3.4 CLEANING

A.Useabrushtobrushoffanyresidueleftonconcreteblockwhencured.

3.5 PROTECTION

A.Protectfromdamagebyleavingconcreteblockinsafeconditions.Preventionfromfallingortippingover. B.Afterfinalconcretemixturehasbeenpouredandatleast48hourshaspast,concretecanberemovedfromformwork. C.Maintainproductindoorsata55-65degreesF,roomtemperature.

END OF SECTION

12

13

14

15

16

17

18

19

20

21

22

23

24

25

TheNewYorkCityCollegeofTechnology|AdvanceMaterials|SP14|EnnyFilpo,BaljinderKaur,MichelleYang 26

27

28

29