taesang choi [email protected]

8
The 6th CJK NGN Working Group Meeting April 10 ~ 12, 2006, Hangzhou, China CJK NGN Test-bed Proposal by TTA Taesang Choi [email protected]

Upload: barid

Post on 05-Jan-2016

32 views

Category:

Documents


0 download

DESCRIPTION

Taesang Choi [email protected]. CJK NGN Test-bed Proposal by TTA. Contents. Testing Call Server Architecture Testing Network Architecture Test Scenarios and Items Testing Schedule Proposal. CCSA’s Proposal. ETRI’s CS Architecture. Back-End Servers. Application Server. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Taesang Choi choits@etri.re.kr

The 6th CJK NGN Working Group Meeting

April 10 ~ 12, 2006, Hangzhou, China

CJK NGN Test-bed Proposal by TTA

Taesang Choi

[email protected]

Page 2: Taesang Choi choits@etri.re.kr

The 6th CJK NGN Working Group Meeting 2

Testing Call Server Architecture

Testing Network Architecture

Test Scenarios and Items

Testing Schedule Proposal

ContentsContents

Page 3: Taesang Choi choits@etri.re.kr

The 6th CJK NGN Working Group Meeting 3

CCSA’s ProposalCCSA’s Proposal

Page 4: Taesang Choi choits@etri.re.kr

The 6th CJK NGN Working Group Meeting 4

ETRI’s CS ArchitectureETRI’s CS Architecture

SCP

STP

CircuitSwitc

h

TG

SG

Softswitch

Application Server

Back-End Servers

SIP Network

SSW Network

H.323 Network

External IP Network

H.323

SIP-TH.323BICC*

SIP(-T)

OSA/Parlay

SIP(-T)

SS7 ISUP/TCAP/SCCP

AIN INAP Sigtran(SCTP/M3UA)

SS7

TDM(ISUP)

INAP

MS/IVR

SIPMGCPH.248/Megaco

SIPH.323MGCPH.248/Megaco*

MGCP H.248/Mega

co

BSS NMS

FTP orProprietary

SNMP

3rd Party Application

Server

SIPServer

SSW

GKServer

SIP

DiameterRADIUS

Proprietary

Residential AccessEnterprise Access

GK IP-PBX

SIP(-T),H.323

OSA/ParlayGateway

AG / RG

SBC

Page 5: Taesang Choi choits@etri.re.kr

The 6th CJK NGN Working Group Meeting 5

Testing Network ArchitectureTesting Network Architecture

• APII Testbed– Korean Side

• Name: KOREN• NOC: KIX in NCA• Connectivity:

– POS OC3: 155 Mbps to China– 2 x 1Gbps Ethernet to Japan

– China/Japan Side• TBD

– Type• IPv4/IPv6 network• No MPLS & other QoS functionality available yet

– TBD• Need investigation on MPLS/QoS support• Current link capacity may not be enough

Page 6: Taesang Choi choits@etri.re.kr

The 6th CJK NGN Working Group Meeting 6

BorderRouter

CERNETCERNET

Meeting Room

InternetInternet

PSTN모델망

Support FacilityManagement/Monitoring System, GW, SIP phones,…

100BT 100BT 100BT

2G Ethernet

155M POS

100BTE1 TDMSignaling LinkBearer Link

SG/TG RACFCS PacketMonitor

GBE, 100BT, 10BT

AS/MS

100BT 100BT

GBE

SBC

100BT

L2 스위치

100BT(VLAN)

JapanJapan

ETRI’s CS Lab Network ConfigurationETRI’s CS Lab Network Configuration

Page 7: Taesang Choi choits@etri.re.kr

The 6th CJK NGN Working Group Meeting 7

Test Scenarios and ItemsTest Scenarios and Items

• Target Test Scenarios– VoIP Interworking– PES/PSS Interworking– VoIP Performance Evaluation– PES/PSS Performance Evaluation – VOIP/PES/PSS Interworking with RACF Involvement

• Testing Items– Basic Functionality Testing cases

• Call Setup• E2E Call Setup Delay• Call Completion Rate• Each Segment IPTD/IPDV/IPLR/Path unavailability• Call Traffic Accounting• Harmonization Testing of Service QoS class differences among CJK

– Equipment Related Testing cases• Various User Terminal Testing

– Network Related Testing cases• IP address allocation• Network connectivity setup• Etc.

Page 8: Taesang Choi choits@etri.re.kr

The 6th CJK NGN Working Group Meeting 8

Testing Schedule ProposalTesting Schedule Proposal

• Phase I: 2006 3rd/4th Quarter– Network Connectivity– VoIP Testing– VoIP Performance Evaluation– First Report/Demo during 8th CJK NGN Meeting (2006 Nov or Dec)

• Phase II: 2007 1st/2nd Quarter– PES/PSS Interworking– PES/PSS Performance Evaluation– Second Report/Demo during 10th CJK NGN Meeting (2007 July or Aug)

• Phase III: 2007 3rd/4th ~ 2008 1st/2nd Quarter– VoIP/PES/PSS Interworking with RACF involvement– Performance Evaluation for VoIP/PES/PSS Interworking with RACF

involvement– Third Report/Demo (2008 July or Aug)