×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [bunch measurements]
Federico Alessio Supervisors Diego Gamba, Angelo Rivetti Richard Jacobsson A complete system for controlling and monitoring the timing of the LHCb experiment
220 views
FLASH. Free-Electron Laser in Hamburg Overview and Status of the Standard Electron Beam Diagnostics at FLASH N. Baboi, DESY for the Diagnostics Team
224 views
Beam Instrumentation Challenges Dr. Rhodri Jones Head of the CERN Beam Instrumentation Group 1 st oPAC Topical Workshop Grand Challenges in Accelerator
225 views
Abstract
17 views
X-ray Monitor R&D at ATF2 Extraction Line J.W. Flanagan, T. Mitsuhashi, H. Ikeda, H. Fukuma, M. Arinaga (KEK) G.S. Varner, J. Anderson, M. Andrew, S. Negrashov,
214 views
Beam I nstrumentation Challenges
31 views
Polarized beam in RHIC in Run 2011. Polarimetry at RHIC A.Zelenski, BNL
54 views
SPS wirescanner measurements present status and issues
35 views