×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [primary proton beam]
EuroNu CERN February 5, 2008 Marco Zito Super-Beam work package Marco Zito Dapnia-Saclay On behalf of the SB w2 team EuroNu 5/2/2008 Thanks to M. Dracos
215 views
S.Kopp: NuFact ’02, Imperial College, London 1 The NuMI Neutrino Beam I. Status of 0.4MW Beam II. Potential for 1.6MW II. What’s it Good For? Sacha E
219 views
September 12, 2013 PSTP 2013 G. Atoian a *, V. Klenov b, J. Ritter a, D. Steski a, A. Zelenski a, V. Zubets b a Brookhaven National Laboratory, Upton,
219 views
February 13, 2012 Mu2e Production Solenoid Design V.V. Kashikhin Workshop on Radiation Effects in Superconducting Magnet Materials (RESMM'12)
217 views
J . Donald Cossairt Fermi National Accelerator Laboratory Batavia, IL
36 views
Super-Beam work package
40 views
High-Intensity Polarized H - Beam production in Charge-exchange Collisions A.Zelenski, BNL PSTP 2011, September 14, St.Petersburg
226 views
J. Donald Cossairt Fermi National Accelerator Laboratory Batavia, IL Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with
226 views
Polarized source upgrade. Source upgrade project -2010-12. Main component delivery: Atomic Beam Source- August 2011 Superconducting solenoid- March-2012
223 views
High-Intensity Polarized H - Beam production in Charge-exchange Collisions A.Zelenski, BNL
33 views