Mesquite Solar 1Photovoltaic energy plant
![Page 2: Tbk enviro design arcsa mesquite sm](https://reader036.vdocuments.net/reader036/viewer/2022062515/55c43932bb61ebdb118b468a/html5/thumbnails/2.jpg)
Mesquite Solar 1Project Overview
Active rainwater harvesting for irrigation and fire suppression
• Industry/Sector: public utilities
• Client: Pacific Gas & Electric, Consolidated Edison Development
• Location: Phoenix, Arizona
• Completion: 2012
• Description: Active rainwater harvesting system for fire suppression and irrigation in the desert west of Phoenix. This 3,800-acre solar storage complex has a capacity up to 700 MW and powers up to 260,000 homes.
![Page 3: Tbk enviro design arcsa mesquite sm](https://reader036.vdocuments.net/reader036/viewer/2022062515/55c43932bb61ebdb118b468a/html5/thumbnails/3.jpg)
Mesquite Solar 1 Design Data
• Water use: landscape irrigation, fire suppression
• Annual average rainfall: 8.2 in.
• Available roof area: 26'10" dia. x 11' eave ht, 8'5" total ht.
• Roof material: corrugated steel
• Hardscape material: concrete, soil
![Page 4: Tbk enviro design arcsa mesquite sm](https://reader036.vdocuments.net/reader036/viewer/2022062515/55c43932bb61ebdb118b468a/html5/thumbnails/4.jpg)
Mesquite Solar 1 Rainwater System
• Storage: 46,617 gal
• System: Westeel Pre-engineered, galvanized corrugated steel with liner
• Roof and surface conveyance: wet
• Irrigation: gravity
• Overflow: landscape
![Page 5: Tbk enviro design arcsa mesquite sm](https://reader036.vdocuments.net/reader036/viewer/2022062515/55c43932bb61ebdb118b468a/html5/thumbnails/5.jpg)
Mesquite Solar 1 Average Annual Precipitation (in.)
Jan
Feb
Mar
ch
April
May
June
July
Aug
Sept
OctNov
Dec
0.00
1.00
2.00
3.00
![Page 6: Tbk enviro design arcsa mesquite sm](https://reader036.vdocuments.net/reader036/viewer/2022062515/55c43932bb61ebdb118b468a/html5/thumbnails/6.jpg)
![Page 7: Tbk enviro design arcsa mesquite sm](https://reader036.vdocuments.net/reader036/viewer/2022062515/55c43932bb61ebdb118b468a/html5/thumbnails/7.jpg)
![Page 8: Tbk enviro design arcsa mesquite sm](https://reader036.vdocuments.net/reader036/viewer/2022062515/55c43932bb61ebdb118b468a/html5/thumbnails/8.jpg)
![Page 9: Tbk enviro design arcsa mesquite sm](https://reader036.vdocuments.net/reader036/viewer/2022062515/55c43932bb61ebdb118b468a/html5/thumbnails/9.jpg)
Mesquite Solar 1 Team
• Developer: Sempra Energy • Designer: TBK Environmental Design
• Installer: NatureWest Landscaping • General Contractor: Durazo
Construction
![Page 10: Tbk enviro design arcsa mesquite sm](https://reader036.vdocuments.net/reader036/viewer/2022062515/55c43932bb61ebdb118b468a/html5/thumbnails/10.jpg)
SkywaterP.O. Box 2100Prescott, Arizona 86302928-445-3515
skywaterarizona.com