tcdsb holy angels catholic school replacement local
TRANSCRIPT
What we Heard: 6 Themes
1. Quality of Learning Spaces
2. Flexible Learning Environments
3. Healthy, Comfortable, Sustainable
4. Welcoming
5. Outdoor Spaces for Play and Learning
6. Safe and Secure
New School Space Program
Grades JK to 8 - 600 pupil places
Child Care 5 spaces - 1 infant, 2 toddler, 2 preschool rooms
School Board:
Grade Range:
Program:
School Name:
m² ft² m² ft²
Kindergarten 5 111 1,200 557 6,000 26 130
Classroom 20 70 750 1,394 15,000 23 460
Art Room - - - 23 -
Science Room - - - 23 -
Music Vocal - - - 23 -
Computer Laboratory - - - 23 -
Technical/Vocational - - - 23 -
Special Education Area 2 70 750 139 1,500 9 18
Musical Instrumental - - - -
Resource Area - Loaded (400-699 sf) - - - 12 -
Resource Area - Unloaded (<400 sf) 4 35 375 139 1,500 -
Gymnasium Area and Stage 1 511 5,500 511 5,500 -
Change Rooms 2 33 350 65 700 -
Library 1 204 2,200 204 2,200 -
General Purpose 1 139 1,500 139 1,500 -
3,149 33,900 608 Total GFA and OTG of Instructional Area
Instructional Space #Size Floor Area
Load OTG
Holy Angels Replacement School
JK to 8
English
TCDSB
ELEMENTARY SCHOOL SPACE TEMPLATE
Holy Angels Replacement School m² ft² m² ft²
General Office 130 1,400
Staff Room and Teacher Work Rooms 102 1,100
Kitchen 20 210
Custodial Areas 95 1,020
Meeting Room 21 230
Academic Storage 56 600
Washrooms 178 1,920
Gymnasium Storage 31 330
Chair Storage (in Gymnasium) 12 130
Mechanical Spaces 325 3,500
970 10,440
3,149 33,900
4,119 44,340
40.0% 1,648 17,736
5,767 62,076
9.49 102.10
m² ft²
Child Care 790 8,500
Early Years Hub -
Community Use -
Total Community Use Rooms Area 790 8,500
Total Square Feet 6,557 70,576
Community Use Rooms
Gross Floor Area
Area per Pupil
Total Operational and Instructional
Gross Up Added
Total Operational Area
Total Instructional (from above)
Operational SpacePer Pupil Floor Area
Site Plan
• Separation of bus and car
drop-off
• Safe pedestrian access to
playground
• Large play areas with good
sight-lines for supervision
• Appropriately sized
kindergarten play and child
care play with separate entry
• Outdoor classroom
• Sports field, running track,
basketball courts, relocated
play structure
• Eco features – rain garden,
shade trees, permeable
pavers
Ground Floor Plan
• Welcoming entrance
designed for safe arrival
• Generous corridors
• Multi-purpose gym with
stage and general purpose
room
• Shared break-out &
collaboration spaces with
sinks
• Bright and inviting learning
commons with flexible, multi-
purpose spaces, including
maker-space
Second Floor Plan
• Multi-use resource and
collaborative spaces
• Grade 7/8 zone
• Classrooms with generous,
operable windows
• Staff work and lounge space
• Sustainable features – green
roof, energy efficient & bird
friendly glazing, premium
HVAC system (high outdoor
air ventilation rates), LED
lighting
2020 2021 2022 2023
Project Schedule
Design, City Approvals, Tendering
Site Prep
Construction
Demolition of
Candy Factory
Occupancy