A Rising Tide Lifts All Boats: A Strategy for the Redevelopment and Recovery of Barguna March 3, 2012 Committee Members: Barguna District Disaster Management Committee Frank Burkybile Kathy Jo Carstarphen Nathan Hadley Chinazor Iwuaba Leah Strickland Allen Young

Upload: heather-lee

Post on 16-Apr-2017

710 views

Category:

Technology


0 download

TRANSCRIPT

Page 1: Team 2

A Rising Tide Lifts

All Boats: A Strategy for the

Redevelopment and Recovery of Barguna

March 3, 2012

Committee Members:

Barguna District Disaster Management Committee

Frank BurkybileKathy Jo CarstarphenNathan Hadley

Chinazor IwuabaLeah StricklandAllen Young

Page 2: Team 2

Lessons Learned from Sidr

– 2 –

SIDR

Environmental

factors

Infrastructure

Social factors

Deforestation

Destroyed roads Poorly-

built houses

Poor embankments

Lack of evacuation

Lost jobs

Increased flooding

Land ownership

Water supply

Poor rebuilding resources

Impaired communicatio

n

Disaster

Page 3: Team 2

Connecting

Resources

Monitoring & evaluation

Strengthen infrastructur

e

Networking community &

NGOs

Resilience

BuildingEnvironment

al preservation

Community action plan

Renewable energy

Creating Assets

Empowerment Centers

Community education

Sustainable local industry

Paths to sustainable communities

– 3 –

Regional Stability

Page 4: Team 2

– 4 –

Empowerment Center

Disaster Preparedn

ess

Resource Control & Coordinati

on

Education & Training

Community

Investment

Project Managem

ent

A harbor during and after the storm

Page 5: Team 2

Empowerment Center Headquarters in Barguna

– 5 –

Centrally-located headquartersSurrounding geography maximized

Satellite centers in 13 high risk districts

Page 6: Team 2

– 6 –

Empowerment Center Headquarters• Cyclone shelters for

1600• Space for animals• Supply storage• Solar & wind-powered

Disaster resource

Community integration

Coordinating center

• Registration of locals• Identification of those in

highest need• Project financing• Employment

opportunities• Land ownership rights• School – children/adults

Page 7: Team 2

– 7 –

Disaster Preparedness

• Empowerment Centers • Disaster training• Coordination with CRA

Committee & LDRRF

• Drills• Open communication

channels with radio & cell phone

• Disaster relief fund • Mitigate impact of future

disasters• Continued monitoring &

evaluation

Short-term Mid-term Long-term

Empowerment Center

Disaster Preparedn

ess

Resource Control & Coordinati

on

Education & Training

Community

Investment

Project Manageme

nt

Page 8: Team 2

– 8 –

• NGO coordination• Organize foreign experts• Provide onsite translators

for NGOs• Landscape analysis of

NGO work• Fill in gaps in housing

• Committee for evaluation of projects

• Accounting committee

• Continued monitoring & evaluation

• Annual report• Regularly scheduled

meetings

Resource Control & Coordination

Ongoing goals:

HousingLatrines

Clean waterGoods distribution

Short-term Mid-term Long-term

Empowerment Center

Disaster Preparedn

ess

Resource Control & Coordinati

on

Education & Training

Community

Investment

Project Manageme

nt

Page 9: Team 2

– 9 –

• Ensure community cooperation

• Vocational training– Sustainable farming & aquaculture– Construction & manufacturing

• Job placement• Literacy of women & children

• Continue skills training & education

• Livelihood diversification

• Market skilled laborers• Future leaders• Community-directed

improvements• Continued monitoring &

evaluation

Education & Training

Vocational trainingBamboo farming, hanging gardens, floating gardens, sustainable farming & fishing

Construction; windmill, embankment & tidal plant repair

Short-term Mid-term Long-term

Empowerment Center

Disaster Preparedn

ess

Resource Control & Coordinati

on

Education & Training

Community

Investment

Project Manageme

nt

Page 10: Team 2

– 10 –

• Health Days & first aid– Health monitoring

• Donate supplies & labor to mosque

• Collectives & co-ops• Indoor market during

rainy season• Distribution of family

arsenic filters yearly

• Continue skills training & education

• Career development• Community investment:

income from markets & collectives

• Continued monitoring & evaluation

Community InvestmentShort-term Mid-term Long-term

Empowerment Center

Disaster Preparedn

ess

Resource Control & Coordinati

on

Education & Training

Community

Investment

Project Managem

entHealth DaysImmunizationsNutritional status assessmentDeworming

Page 11: Team 2

– 11 –

• Technology & Innovation– Community expos– Build windmills– Construct tidal power

plants

• Build Infrastructure– Embankment

construction– Road construction

• Reforestation

• Establish outside investors– Windmills– Tidal power– Roads– Embankments

• Utilize energy surplus for farming & fish processing

• Continue construction• Sell charged batteries to

locals• Technology &

development expos• Monitor growth of

mangroves

• Distribute renewable energy nationally

• Expansion of energy resources

• Growth in community empowerment centers

• Continued monitoring & evaluation

Project ManagementShort-term Mid-term Long-term

Empowerment Center

Disaster

Preparedness

Resource

Control &

Coordination

Education &

Training

Community Investment

Project Management

Page 12: Team 2

ManMain building

Raw material storage

Construction skills training

Water collection

& Sanitation

training

Tidal power demo

Women’s center

Sustainable agriculture

Sustainable fishing

Mangrove area

River

Page 13: Team 2

Spending allotment - $17M ($3M saved)

– 13 –

Year 1$5M

Year 2$5 M

Year 3$4 M

Year 4-5$3 M

Empowerment Centers

Infrastructure

Sustainable Energy

Training & Education

$2 M

$250,000

$2 M

$500,000

$250,000

$2 M

$750,000

$2 M $500,000

$500,000

$2 M

$1 M

$500,000

$500,000

$1 M

$1 M

Page 14: Team 2

Investment & Return: 5-Year Plan

– 14 –

DDMC budgetNGO InvestmentReturn

Earned

Spent

Year 1 Year 2 Year 3 Year 4Community

wealth

Page 15: Team 2

A rising tide lifts all boats.

Page 16: Team 2

Appendix

Page 17: Team 2

Shoreline Restoration• Strategy 1: Reforestation• Planting seedlings along cleared

shoreline – Decrease storm surge– Shoreline retention

• Naluvedapathy example– Indian village affected by tsunami– Planted 80,244 Casuarina saplings– Completely protected from tsunami

winds and rain after 2 years

– 17 –

Page 18: Team 2

Mangrove farms

– 18 –

• Prevents erosion, builds up ecosystem• Hire farmers to plant, infuses money

into economy• Subsidies for land owners that continue

upkeep of mangrove farms

Page 19: Team 2

Need for Sustainable energy

– 19 –

• National natural gas and electric power shortage– Market for sustainable energy source– Small reserves of oil and coal, but large natural gas

resources. • Electricity can improve farming business and

fishing industry– Shrimp unable to be exported because of unsafe

processing• Tap into established power grid to export energy

to rest of the country

Resilience

BuildingRenewable

energy

Page 20: Team 2

Wind farms

– 20 –

• Cyclone proof• $23,000• Pilot project built with a few• Outside investors

– Government– Renewable Energy Policy of Bangladesh– Kyoto Protocol

• Carbon Credits through Clean Development Mechanism– Bangladesh Rural Advancement Committee– Grameen Shakti– Sustainable Energy Development Authority

• Paying landowners to use property• Constructed and maintained by Vergnet (France)

– 275 kW / hr• Average household uses 136 kW / hr per annum

Page 21: Team 2

Tidal power

– 21 –

• Constructed on sluice gates on embankments– $4,270 per power plant– 2~5 meter tidal head/height rise and fall

• Create pond on land side for shrimp farming• Rice paddies on banks• Electricity used for fish processing, farming• Seek supplemental funding

– Rural Electrification Board (REB)– Centre for Mass Education in Science (CMES)– Grameen Bank– Institute for Sustainability and Technology Policy

(ISTP)– Tidal Energy Australia (TEA)

Page 22: Team 2

Tidal power

– 22 –

Tide coming inEstuary

Page 23: Team 2

Sustainable Aquaculture

– 23 –

• Current practices degrade prevents mangrove destruction

• Create fishing sanctuaries• Electric power from alternative energy

sources• Ice produced with energy from wind and

tide used in packing of shrimp and fish• Processing harvest with energy from wind

and tide increases distance of export

Page 24: Team 2

Renewable Energy

– 24 –

Year 1 Year 2 Year 3 Year 4

• Create pilot windmill

• Seek outside investors

• Build embankments

Win

dmill

s

• Create pilot tide power plant

• Build embankments• Seek outside

investors

• Utilize energy for farming, fish processing

• Seek outside investors• Build more plants and

embankments• Sell charged batteries to

locals

• Build more windmills• Build tube wells

attached to the windmills

• Seek outside investors

• Connect to national power grid for energy distribution

Tida

l pow

er

Energy conservation is the foundation of energy independence.

Page 25: Team 2

Roads

– 25 –

• Needed because unable to get supplies for building• Cyclone proof• Provide skilled workers and distribution center• Seeking outside investors, Partnerships with

– Rural Transport Improvement Project (World Bank) $180 M budget

– National Land Transport Policy– Road Maintenance and Improvement Project

• $117 M budget• Focus on fixing secondary roads

– National, regional, zila roads

Connecting

Resources

Roads

Page 26: Team 2

Embankments

– 26 –

• On coastal fronts• Outside investors

– Coastal Embankment Rehabilitation & Reconstruction Project (World Bank)

o an estimate cost of $ 53.00  million budget

o Use recycled materials to create embankments

o Cost is based on acres being used and materials already available

• Creation of sluice gates for tidal power– an estimate cost of

$31,000 for 200 acres

Page 27: Team 2

Clean water• Community Involvement issue • Places about 70 million people at

risk • NGOs distribute Family filters for

arsenic removal• $35 per year per family

• Arsenic poisoning not a serious concern for this area

• Tube wells raised by NGOs after cyclone

• Brake fern (Pteris vittata ) is effective in extracting arsenic

– 27 –

Page 28: Team 2

Financial Report: Year 1

– 28 –

Cost Breakdown of Year 1

Cost per Item Quantity Estimated Total Cost

Empowerment Center Budget

Shelters (by size)

500 people 78,000 13 1,014,000

1,600 people 214,000 1 214,000

Facility vehicles

Land vehicles 10,000 4 40,000

Motor boats (cargo) 6,500 10 65,000

Non-motor boats 50 50 2,500

Speed boats 2,500 3 7,500

Associated costs -- -- 30,750

Communication Fees

Internet ($40 initial) 90 14 1,260

Satellite 137 1 137

Worker phones 30 62 1,860

Office supplies 500 14 7,000

Page 29: Team 2

Financial Report: Year 1

– 29 –

Cost Breakdown of Year 1 (Continued)

Cost per Item Quantity Estimated Total Cost

Empowerment Center Budget (Continued)

Center supplies (beds, etc.) -- -- 7,500

Personnel wages

Directors salary 2,300 6 13,800

Specialized workers 1,700 30 51,000

Skill laborers (9 mo) 200 62 12,400

Translators 1,500 6 9,000

Center program budget

Women’s shelter Bed, food, clothes, etc… 25,000

Public relations Health, mosque, etc.. 1,300

Skills training Supplies, tools, etc… 6,500

Mangrove plan $200/hectare, 50,000 sub. 125,000

Arsenic-filter plan $35/filter 5000 175,000

Flood-tolerant rice plan

Seedlings, and etc… 20,000

Mirco-grant program 50,000

Housing development 250,000

Page 30: Team 2

Financial Report: Year 1

– 30 –

Cost Breakdown of Year 1 (Continued)

Cost per Item Quantity Estimated Total Cost Estimated Cost Taka

Empowerment Center Budget (Continued)

Additional center costs

Storage buildings 500 25 12,500

Latrines 40 50 2,000

Solar panels 500 30 15,000

Rainwater storage 250 60 15,000

Funds for additional centers

500,000

Unexpected cost budget 100,000

Funds for infrastructure 2,000,000

Sustainable energy fund 500,000

Year 1 Total Costs 5,025,007 taka

Page 31: Team 2

Financial Report: Year 2

– 31 –

Cost Breakdown of Year 2

Cost per Item Quantity Estimated Total Cost Estimated Cost Taka

Empowerment Center Budget

Shelters

500 people 78,000 10 780,000

300 people 9,300 15 139,500

Facility vehicles

Land vehicles 10,000 2 20,000

Motor boats (cargo) 6,500 5 32,500

Non-motor boats 50 60 3,000

Speed boats 2,500 2 5,000

Associated costs -- -- 50,750

Communication fees

Internet 90 28 2520

Worker phones 30 124 3,720

Office supplies 500 28 14,000

Page 32: Team 2

Financial Report: Year 2

– 32 –

Cost Breakdown of Year 2

Cost per Item Quantity Estimated Total Cost

Empowerment Center Budget

Center supplies (beds, etc.) -- -- 15,000

Personnel wages

Directors salary 2,300 6 13,800

Specialized workers 1,700 45 76,500

Skill laborers (9 mo) 200 114 22,800

Translators 1,500 8 12,000

Center program budget

Women’s shelter Bed, food, clothes, etc… 40,000

Public relations Health, mosque, etc.. 3,900

Skills training Supplies, tools, etc… 19,500

Mangrove plan $200/hectare, 50,000 sub. 250,000

Arsenic-filter plan $35/filter 7,500 262,500

Flood-tolerant rice plan

Seedlings, and etc… 60,000

Mirco-grant program 75,000

Page 33: Team 2

Financial Report: Year 2

– 33 –

Cost Breakdown of Year 2

Cost per Item

Quantity

Estimated Total Cost

Empowerment Center Budget (Continued)

Additional center costs

Storage buildings 500 25 12,500

Latrines 40 85 3,400

Solar panels 500 45 22,500

Rainwater storage 250 45 11,250

Unexpected cost budget

200,000

Funds for infrastructure 2,000,000

Sustainable energy fund 750,000

Year 2 Total Costs 4,638,140 taka

Page 34: Team 2

Financial Report: Year 3

– 34 –

Cost Breakdown of Year 3

Cost per Item Quantity Estimated Total Cost

Empowerment Center Budget

Shelters (by size)

Maintenance -- -- 200,000Wages -- --

Facility vehicles

Maintenance -- --Associated costs -- -- 30,750

Center Program Budget

Women’s shelter Bed, food, clothes, etc… 50,000

Public relations Health, mosque, etc.. 2,600

Skills training Supplies, tools, etc… 13,000

Mangrove plan $200/hectare, 50,000 sub. 500,000

Arsenic-filter plan $35/filter 5000 350,000

Flood-tolerant rice plan

Seedlings, and etc… 40,000

Mirco-grant program 100,000

Page 35: Team 2

Financial Report: Year 3

– 35 –

Cost Breakdown of Year 3 (Continued)

Cost per Item

Quantity Estimated Total Cost

Unexpected cost budget 200,000

Funds for infrastructure 2,000,000

Sustainable energy fund 1,000,000

Year 3 Total Costs 4,036,350

Page 36: Team 2

Financial Report: Year 4

– 36 –

Cost Breakdown of Year 4

Cost per Item Quantity Estimated Total Cost

Empowerment Center Budget

Shelters (by size)

Maintenance -- -- 200,000Wages -- --

Facility vehicles

Maintenance -- --Associated costs -- -- 30,750

Center Program Budget

Women’s shelter Bed, food, clothes, etc… 50,000

Public relations Health, mosque, etc.. 10,000

Skills training Supplies, tools, etc… 50,000

Mangrove plan $200/hectare, 50,000 sub. 1,000,000

Arsenic-filter plan $35/filter 5000 350,000

Flood-tolerant rice plan

Seedlings, and etc… 100,000

Mirco-grant program 200,000

Page 37: Team 2

Financial Report: Year 4

– 37 –

Cost Breakdown of Year 4 (Continued)

Cost per Item Quantity Estimated Total Cost

Unexpected cost budget 200,000

Year 3 Total Costs 2,017,707

Page 38: Team 2

Financial Report: Year 5

– 38 –

Cost Breakdown of Year 5

Cost per Item Quantity Estimated Total Cost

Empowerment Center Budget

Shelters (by size)

Maintenance -- -- 200,000Wages -- --

Facility vehicles

Maintenance -- --Associated costs -- -- 30,750

Center Program Budget

Women’s shelter Bed, food, clothes, etc… 50,000

Public relations Health, mosque, etc.. 5,200

Skills training Supplies, tools, etc… 50,000

Mangrove plan $200/hectare, 50,000 sub. 1,000,000

Arsenic-filter plan $35/filter 5000 350,000

Flood-tolerant rice plan

Seedlings, and etc… 50,000

Mirco-grant program 200,000

Page 39: Team 2

Financial Report: Year 5

– 39 –

Cost Breakdown of Year 5 (Continued)

Cost per Item

Quantity Estimated Total Cost

Unexpected cost budget 200,000

Funds for infrastructure 1,000,000

Sustainable energy fund 1,000,000

Year 5 Total Costs 4,017,707

Page 40: Team 2

REFERENCES • Salequzzaman, M. (2003) Can Tidal Power Promote Sustainable Integrated Coastal

Development in Bangladesh? (1-334).• Country Focus: Bangladesh. (2009). Retrieved March 2, 2012, from http://www.rrmac.net/ • Ahmed, I., Jezeph, M. Kadushkin, A., Shipin , V. Arsenic Contamination of Ground

Water and its Mitigation in the Province of Punjab (Pakistan) in the Light of the Situation in South Asia.

• Attz, M. (2003) Flood and Storm Control. Retrieved March 1, 2012, from http://www.maweb.org/documents/document.316.aspx.pdf (1-18).

• Dhaka. (2005). Bangladesh Launches First Wind Generated Power Plant. Retrieved March 1, 2012, from:

http://www.redorbit.com/news/science/169525/bangladeshlaunchesfirstwindgeneratedPowerplant

• Flood Disaster “Learning from previous relief and recovery operations”. (2008) Retrieved March 1, 2012 from http://www.alnap.org/pool/files/ALNAP-

ProVention_flood_lessons.pdf

Page 41: Team 2

REFERENCES • Government of Bangladesh. (April 2008) Cyclone Sidr in Bangladesh “Damage, Loss and Needs Assessment For Disaster Recovery

and Reconstruction”. (1-182). • World Bank. Building Resilient Communities “Risk Management and Response to

Natural Disasters through Social Funds and Community-Driven Development Operations”. Retrieved on March 2, 2012 (1-430).

• Tango International. ( May 2010) DAP Emergency Program (Cyclone Sidr Response) Save the Children-USA and Partners. (1-44).

• Bangladesh: Disaster Risk Reduction as Development. Retrieved on March 2 2012, from:

http://www.undp.org/content/undp/en/home/ourwork/crisispreventionandrecovery/projects_initiatives/Bangladesh-drr-casestudy-transformational-change.html

• Agarwal. Cyclone Resistant Building Architecture. Retrieved on March 1, 2012 from: http://www.ndmindia.nic.in/techAdvGroup/rvs/CycloneArchitecture.pdf (1-22)

Page 42: Team 2

REFERENCES • Ministry of Food and Disaster Management. (2008) SUPERCYCLONE SIDR2007

Impacts and Strategies for Interventions. (1-56).• United States Agency for International Development. (April 2010). Gender

Assessment USAID/Bangladesh. (2-93).• Asian Disaster Reduction Center. Chapter 3: Total Disaster Risk Management

“Good Practices”. (32-33). • Tamima. (December 2009) Population Evacuation Need Assessment in Cyclone

Affected Barguna District. Journal of Bangladesh Institute of Planners, 2: 145-157.

• Miyan, M. Cyclone Disaster Mitigation in Bangladesh. (1-8) • Alam, M. (2009) Cyclone disaster vulnerability and response experiences in

coastal Bangladesh. (1-28).

Page 43: Team 2

REFERENCES• Gunasekara, H. Hazarika, K. Rana, B. Samarakoon, M. Siddiquee, J. (2010)

Application of Remote Sensing and GIS for Cyclone Disaster Management in Coastal Area: A Case Study at Barguna District, Bangladesh. International Archives of the Photogrammetry, Remote Sensing and Spatial Information Science, 38; 8:122-127.

• Asian Development Bank. ( August 2010) Bangladesh: Road Maintenance and Improvement Project (3-15).

• Department of Environment Ministry of Environment and Forests . (2007). Bangladesh: National Programme of Action for Protection of the Coastal and Marine Environment from Land- Based Activities. (1-60)

• Ahmed, M. Dasgupta, H., Huq, K., Mukherjee, P. ( May 2011) Vulnerability of Bangladesh to Cyclones in a Changing Climate. ( 1-24).