team 3 status report#4
DESCRIPTION
TRANSCRIPT
![Page 1: Team 3 status report#4](https://reader034.vdocuments.net/reader034/viewer/2022051211/553b4d8c4a79591a7b8b46b5/html5/thumbnails/1.jpg)
VOIDDStatus Report #4
Voice Recognition for the Deaf – VOIDD
Team 3Ahmad Turki
Joaquim JaimeMarcos Francisco
February 7, 2011
![Page 2: Team 3 status report#4](https://reader034.vdocuments.net/reader034/viewer/2022051211/553b4d8c4a79591a7b8b46b5/html5/thumbnails/2.jpg)
Overall Need Design an all-in-one portable device that will
allow the hard of hearing to be aware of their surroundings
Design Milestones◦ Design the overall Electric Diagram January
2011◦ Test the Speech Recognition Circuit January
2011◦ Microcontroller Programming & Testing
February 2011◦ Testing the prototype March
2011◦ Design system casing March
2011
![Page 3: Team 3 status report#4](https://reader034.vdocuments.net/reader034/viewer/2022051211/553b4d8c4a79591a7b8b46b5/html5/thumbnails/3.jpg)
Completed TasksTasks Completed Recently
◦Received all project parts◦Testing the voice recognition circuit
binary number combinations output
![Page 4: Team 3 status report#4](https://reader034.vdocuments.net/reader034/viewer/2022051211/553b4d8c4a79591a7b8b46b5/html5/thumbnails/4.jpg)
Ongoing/Pending TasksCoding Microcontroller Working on Interfacing the
Prototype
![Page 5: Team 3 status report#4](https://reader034.vdocuments.net/reader034/viewer/2022051211/553b4d8c4a79591a7b8b46b5/html5/thumbnails/5.jpg)
Upcoming TasksConnect and test the LCD and
the vibratorDesign the system casing
![Page 6: Team 3 status report#4](https://reader034.vdocuments.net/reader034/viewer/2022051211/553b4d8c4a79591a7b8b46b5/html5/thumbnails/6.jpg)
Functional Block Diagram
![Page 7: Team 3 status report#4](https://reader034.vdocuments.net/reader034/viewer/2022051211/553b4d8c4a79591a7b8b46b5/html5/thumbnails/7.jpg)
Schedule
![Page 8: Team 3 status report#4](https://reader034.vdocuments.net/reader034/viewer/2022051211/553b4d8c4a79591a7b8b46b5/html5/thumbnails/8.jpg)
Schedule
100%
40%
0%
20%
20%
40%
40%
![Page 9: Team 3 status report#4](https://reader034.vdocuments.net/reader034/viewer/2022051211/553b4d8c4a79591a7b8b46b5/html5/thumbnails/9.jpg)
Schedule
![Page 10: Team 3 status report#4](https://reader034.vdocuments.net/reader034/viewer/2022051211/553b4d8c4a79591a7b8b46b5/html5/thumbnails/10.jpg)