technical information of bwms prior to installation (for...

61
Technical Information of BWMS prior to installation For Ship-owner, Surveyor and PSCO September 2018 Marine & Ocean Equipment Team of KR

Upload: others

Post on 28-Feb-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Technical Information of BWMS prior to installationFor Ship-owner, Surveyor and PSCO

September 2018Marine & Ocean Equipment Team of KR

Page 2: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships
Page 3: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

BWM Convention(Recent Decisions of MEPC)

Page 4: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Port-based Mobile Ballast Water Treatment Facilities

Schematic diagram of the BWTBoat concept to serve ships

More Guidance is needed for situations where ballast water is loaded to a ship departing for an international voyage without an intention to discharge the ballast water to a BWTBoat or reception facility

Page 5: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Consideration for Major Conversion

MEPC 65 approved a BWM Circular referring that new installation of ballast water management systems should not be treated as a ‘major conversion’ as defined in regulation A-1.5 of the BWM Convention as BWM Convention does not stipulate clearly whether the new installation of ballast water management systems should be treated as a ‘major conversion’.

1. which changes its ballast water carrying capacity by 15 percent or greater

2. which changes the ship type

3. which, in the opinion of the Administration, is projected to prolong its life by ten years or more

4. which results in modifications to its ballast water system other than component replacement-in-kind. Conversion of a ship to meet the provisions of regulation D-1 shall not be deemed to constitute a major conversion for the purpose of this Annex.

Page 6: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Having considered documents MEPC 64/7/2 and MEPC 64/7/7 providing amendments to the MARPOL Annex IV and BWM G4 guidelines, the Committee rejected further discussion….

1. BWM Convention has not yet entered into force,

2. Grey water is not regulated under MARPOL IV,

3. Detailed technical consideration is needed,

4. There are concerns over the implications,

5. There is a need to address the difficulties,(not allowed to discharge sewage in port ?)(have to use additional tanks for temporary

storage of sewage)

6. Untreated sewage should be prohibited to be transferred to ballast water tanks as operational problems will be expected.

Handling of Grey water and Sewage contained in Ballast Water Tank on board ships

Page 7: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Guidelines for port States control under the BWM Convention

Page 8: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Ballast Water Sampling Guidance approved as BWM/Circ.42

• 2~3 years • without any legal-

binding or PSC detention

• the assessment for sampling and analysis technique

Page 9: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Exception and Exemption of the Convention and associated Guidelines for risk assessment under Reg. A-4 of the BWMC

MEPC 68 considered a proposed amendment to article 2 (application) of theConvention to enable the establishment of “same risk area”

1. domestic voyages – even if distance isvery long and may have differentenvironment between ports, they areexempted from the Convention

2. Ocean going – even if distance is short,they are to comply with the Convention

3. Ships engaged in the short internationalvoyages are required to undertake ballastwater exchanges

* Having noted that ballasting operation at the same location is subject to the‘exception’ and exemption of ballast water management is subject to the riskassessment in accordance with G7, MEPC 68 agreed to develop a guidance onestablishment of “same risk area” by new methodology for Risk Assessmentin short sea shipping

Page 10: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Application schedule for New G8, BWMS Code and Installation of BWMS onboard

Old G8 (Res. MEPC. 125(53) and MEPC. 174(58)) New G8 (Res. MEPC. 279(70)): 2016 Guidelines for approval of ballast water

management systems BWMS Code (Res. MEPC. 300(72)): Mandatory requirement for approval of

BWMS which were based on New G8

201628th Oct.

201828th Oct.

201913rd Oct.

202028th Oct.

Old G8

New G8 &BWMS CodeInstallation of *1st

Gen. BWMSInstallation of **2nd Gen. BWMS

* 1st Gen. BWMS is type approved by Old G8** 2nd Gen. BWMS is type approved by New G8 or BWMS Code

Page 11: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Amendment of regulation B-3

Last IOPP Renewal Survey Due date for fitting BWMS onboard

1

2

3

4

20128th Sep.

20148th Sep.

20178th Sep.

20198th Sep.

20228th Sep.

20248th Sep.

E.I.F.

Constructed = Keel laid

Due date for D-2

Due date for D-2Renewal surveyRenewal survey

Renewal survey

Ships without IOPP Certificate

1. Ships constructed on or after 8th Sep. 2017 shall be comply with D-2 standard as of ships delivery.2. A case where previous IOPP renewal survey had been completed between 8th Sep. 2014 and 7th Sep. 2017, the ships

shall comply with D-2 standard by the first IOPP renewal survey after entry into force (E.I.F.) of the Convention.3. A case where previous IOPP renewal survey had been completed between 8th Sep. 2012 and 7th Sep. 2014, the ships

comply with D-2 standard by the second IOPP renewal survey after E.I.F of the Convention.4. Ships not subject to IOPP renewal survey (normally less than 400 GT) shall comply with D-2 standard by 8th Sep. 2024.

Page 12: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Guidance on entry or re-entry of ships into exclusive operation within waters under the jurisdiction of single Party approved as BWM.2/Circ.52 Rev. 1

How to manage BW in ships operating within national waters

Ships operating pursuant to articles 3.2(b) to (d) that cease to operate exclusively in the relevant waters will lose their exclusion from the Convention, which then fully applies to them on an ongoing basis

A case where a ship intends to operate within waters under the jurisdiction of a single Party again, following should be verified :

Holds a valid IBWM Certificate;Discharges all ballast water, any residual ballast water and all sediments; Has a procedure in its approved BWMP for cleaning its BW tanks

A exempted ship (regulation A-4): performs BWE in accordance with regulation B-4, D-1 and approved BWMP (The requirements of regulation A-4.1.4 should be addressed to the satisfaction of the countries of origin and destination of the ship)

Page 13: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Roadmap for implementation of BWM Convention

Early movers should not be required to replace these systems due to the application of the revisedGuidelines

if maintained and operated correctly, should not be required to replace these systems due tooccasional lack of efficacy for reasons beyond the control of the shipowners and ship’s crew

Early movers should not be penalized (sanctioned, warned, detained or excluded) solely due to anoccasional exceedance of the D-2 standard

Data Gathering Data Analysis Convention Review

Port based treatment system: standard connection needed as per G5 / port or ship infrastructure/ Barge / BWTBoats / Ships, etc.

Shipboard contingency measure :BWE / BWE with water treated by BWMS / internal circulation

Page 14: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

MEPC 72 : a draft guidance on sampling and analysis of treated ballast waterat initial survey and invited interested Parties to submit proposals on NewOutput for an amendment to regulation E-1.1.1 of the BWM Convention with aview to providing legal basis to carry out validation of D-2 standard at initialsurvey in the Convention

Page 15: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Class Survey of BWMS prior to

installation

Page 16: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Ballast Water Management

Convention (MEPC 71th, 3~7th July

2017 IMO)

Page 17: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships
Page 18: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships
Page 19: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships
Page 20: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships
Page 21: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships
Page 22: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships
Page 23: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships
Page 24: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships
Page 25: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships
Page 26: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships
Page 27: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships
Page 28: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

BWMS type-approved by

Administrations(IMO) and USCG

Page 29: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

* Updated on August 2018

Page 30: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

* Updated on August 2018

Page 31: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

* Updated on May 2018

0

2

4

6

8

10

12

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

BA

FA

Num

ber

Year

Page 32: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

* Updated on May 2018

China20%

Denmark4%

France2%

Germany12%

Greece1%

Japan17%

Netherlands6%

Norway15%

Marshal Island3%

Republic of Korea15%

Singapore1%

South Africa1%

United Kingdom3%

ChinaDenmarkFranceGermanyGreeceJapanNetherlandsNorwayMarshal IslandRepublic of KoreaSingaporeSouth AfricaUnited Kingdom

Page 33: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

* Updated on May 2018

UV52%

Electrolysis22%

Chemical9%

Ozone3%

Etc.,14%

UV

Electrolysis

Chemical

Ozone

Etc.,

Page 34: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Considerations for ship owners

prior to BWMS installation

Page 35: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Type approval certificate for BWMS To install a BWMS on board your ship, it must be 'type approved‘. If the

system uses an active substances, basic and final approval from the IMO need to be obtained before the type approval can be granted.

The capacity of BWMS A BWMS has a "Total capacity rate“. This is utilized as an indicator to show how many

cubic meters of ballast water management system can be processed per hour. You will need to choose a system with a TRC high enough to handle a ship’s ballast capacity and operational pumping rate

The required space for the installation of BWMSSystem footprints range from approximately 0.25m² to 145m² depending on their TRC.

Consequently, you should review the specifications for selected BWMS.

Page 36: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Enough power to operate BWMSConsidering that additional power will be required to operate BWMS, you should check to see if you will need to run another generator when the BWMS is in operation or consider installing an additional generator set or have a spare breaker available in the electrical distribution board to provide power to the BWMS.

Negative effect on the structures and coatings of ballast water tankCorrosion is a potential negative effect that may be brought on by BWMS substances and processes. Therefore, you should consider the corrosion inside of ballast water tank or negative effect on coating additionally.

"Gas Safe" or not (Oil/Chemical/Gas Tanker)In case of a tanker, the BWMS will be installed in the "Gas Dangerous Zone“ and

therefore the BWMS will need to be approved as "Gas Safe“.

Page 37: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Manufacturer’s Quality• Verified activities to adequately support customer’s demand

• The control of their supply chain if the capacity is stretched

Installation Bottle Neck• Manufacturer’s production capacity need to meet the anticipated increase in the

number of orders.

Cost consideration (Installation, Running and Maintenance)The main cost considerations are less power consumption, easy maintenance and installation, running and installation cost (USD 400,000 ~ 830,000 : 1,000m/h)

Implications for crew training regarding the operation of BWMSWhatever BWMS you have adopted, training will be required for operation and maintenance of the system. Training requirements will need to be included in the ballast water management plan required by the Convention

Page 38: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Ballast Water Major Noncompliance surveyed by US EPA

• Failure to monitor• Monitoring values exceed effluent limitation• Failure to record de-ballasting correctly• Used wrong reporting form• BWMP incomplete• Exchange occurred within 200NM of shore• Failed to operated BWMS• Falsification of records

Page 39: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Port State Control – Inspection Guidance

IMO/USCGIMO

Guidance Res. MEPC.252(67)

USCGNVIC 07-04, Change 1

MI Notice 05-12

Phase 1 / Documents

TA Certificate – DocumentationBWMP- Training

TA Certificate – BWMP – BWRBDocuments – IOPP Certificate

Phase 2/ Crew Knowledge

BWMS InspectionBWMP ReviewOperation Parameters

Crew knowledge

Phase 3 / Equipment Condition and Operation

Indicative Sampling &Microbial Analysis to D2 Standard

Vessel ExaminationOperational InspectionEquip. compare BWMS log to documents

Phase 4 / Sample Discharge

Sampling of discharge if warranted, Lab Analysis

Sampling of discharge if warranted, Lab Analysis

Page 40: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Example of BWMS installation

onboard

Page 41: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

BWTSSea

Chest Ballast TankMechanical, Physical or Chemical process

Neutralization Process OVBD’ Discharge

: Treated Ballast Water : Ballast Water

General Flow Diagram of BWTS

Page 42: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Example of BWMS Type1) FILTRATION + IN-LINE (FULL FLOW) EC + NEUTRALIZATION

Page 43: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Example of BWMS Type2) FILTRATION + SIDE-STREAM EC + NEUTRALIZATION

Page 44: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Example of BWMS Type3) OZONE TREATMENT + NEUTRALIZATION

Page 45: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Example of BWMS Type4) FILTRATION + UV TREATMENT

Page 46: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Example of BWMS Type5) FILTRATION + CHEMICAL INJECTION + NEUTRALIZATION

Page 47: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

For ship’s stability, the following needs to be confirmed

Detailed weights and centres(LCG and VCG) calculation to adjust the lightship properties should be carried

Surveyor should confirm the deviations and sign on the calculated lightweight data sheets

Inclining test should be carried out and Stability booklet should be re-approved

YESNO

1) The deviation of lightweight exceeds 2% or more of the original approved lightweight or 2tones, whichever is greater, or

2) The deviation of lightship longitudinal centre of gravity exceeds 1% or more of the LBP

Do any one of two items listed above apply to your vessel?

Inclining test may be exempted. Re-approval of Stability booklet may be exempted

Page 48: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships
Page 49: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Step by Step Process of How to

Choose and Install/Retrofit

Page 50: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships
Page 51: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships
Page 52: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships
Page 53: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships
Page 54: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships
Page 55: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships
Page 56: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships
Page 57: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships
Page 58: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Feasibility Study for Retrofitting

BWMS

Page 59: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Electrolysis (Side stream type)- Filter installation- Electrolysis module installation- Neutralization module installation- Electrical panel installation- Ballast/system pipe-work installation & modification- Auxiliary system integration- New valves and instrumentation

- New electrical panels - System power- Control valves- Brine transfer pump & control system(if necessary)- Ship IPMS integration

- Work-in-way of installation- Fleeting/ lifting arrangements- Electrical power upgrades- Workshop conversion(if necessary)

- Ventilation upgrades

Electrolysis (Direct flow type)- Electrolysis module(s) installation- Electrical panel installation- Ballast/system pipe-work installation & modification- Auxiliary system integration- New valves and instrumentation

- New electrical panels- System power- Control valves- Ship IPMS integration

- Work-in-way of installation- Fleeting/ lifting arrangements- Electrical power upgrades

Chemical Injection Type- Metering Feeder Unit installation- Dissolving Unit installation- Neutralizer Unit installation- Electrical panel installation- Ballast/system pipe-work installation & modification- Auxiliary system integration- New valves and instrumentation

- New electrical panels- System power- Control valves- Ship IPMS integration

- Work-in-way of installation- Fleeting/ lifting arrangements- Electrical power upgrades- Ventilation upgrades- Chemical handling process and space

Ozone Type- Ozone module installation- Neutralization module Install.- Oxygen generator module Install.- Chilled water integration- Electrical panel installation- Ballast/system pipe-work installation & modification- Auxiliary system integration- New valves and instrumentation

- New electrical panels- System power- Control valves- Ship IPMS integration

- Work-in-way of installation- Fleeting/ lifting arrangements- Electrical power upgrades- Workshop conversion- Ventilation upgrades

Mechanical Electrical Vessel Dependent

Page 60: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Comparison Table for Chemical Injection and Electrolysis Type

NaDCC(Chemical Injection Type) Electrolysis Type

Active substance Solid(Powder or granule)(Solid -> liquefaction -> Injection)

NaOCl(Side Stream or Full type)

Chlorine content Solid: Max. 62%Liquid: Max. 28% at 25℃

Side Stream: Max. 0.2%Full type: Max. 10mg/L

Advantagea) Low Power Consumptionb) Low CAPEXc) No consider salinity

a) No consider dangerous goods b) Low OPEXc) Salinity Solution ready

Weaknessa) Dangerous Goods to be handled

by crewb) Cost for NaDCC regularly

a) Consider temperature of intake water

b) High power consumption

Page 61: Technical Information of BWMS prior to installation (for …eclass.krs.co.kr/TECHNICAL_FILE/0101/Technical... · 2018-09-06 · Schematic diagram of the BWTBoat concept to serve ships

Thank you for your attention!

www.krs.co.kr

Thank you for your attention!

Marine and Ocean Equipment TeamKorean RegisterTel: +82-70-8799-8240Fax.: +82-70-8799-8269E-mail: [email protected]