TECHNICAL WORKlNC CROUP

1300 S/10/79

1. Agenda, 1300, 5/10/79, Technical Working Croup

• 2. Radioactive Releases and RCS Profile

3. Top Priorities List

4. Action Items from 1300, 5/9/79, Technical Working Croup

S. Plant Operations Planning

6, Task Lists

t •

Page 2: TECHNICAL WORKlNC CROUP 1300 S/10/79 4. S.1979-05-10) 1300 hrs... · TECHNICAL WORKlNC CROUP 1300 S/10/79 1. Agenda, 1300, ... A-1 A-1 A-1 A-2 ... LS.2 Tech. Spec. 4nd Surveill~nce

AGENDA

TECHNICAL WORKING CROUP

1300 5/10/79

1. Radioactive Releases

.

a. ~-S, 219, Auxiliary Building Fans

b. Vent Header and Drain Trunk

e. Dome Radiation Monitor

---2. - Plant Status----

a. RCS Profile

b. Plant Operations Schedule

DHP 'B' LC4k Test DHP 'A' Teso;

c. Schedule for next solid operations

d. Schedule for next RCS sample

e. Heater Alarm circuit

3. Containment Level Determination - Cycle DHV-68

May 10, 1979 1300

4. Pressurizer Level - Evaluate LT-3 indication discrepancy

5. Construction Status

a . Tank Far111

b. OTSG 'B' Longterm Coolin&

c. EPICOR (CAP-GUN II)

d. RCS Pressure/Voluao Control turnover for testing

e. Aux. Bldg. Roof Ventilation Fans

full availability system complete

f. Aux. Diesel Generators (A & B)

g. Alternate Decay Heat Removal

Estimated Completion

5/16

5/14

5/18

5/14

5/10 5/13

5/10 & 5/12

6/1

I •

Page 3: TECHNICAL WORKlNC CROUP 1300 S/10/79 4. S.1979-05-10) 1300 hrs... · TECHNICAL WORKlNC CROUP 1300 S/10/79 1. Agenda, 1300, ... A-1 A-1 A-1 A-2 ... LS.2 Tech. Spec. 4nd Surveill~nce

TOP PRIORI riES

Development of plan for management of radioactivfty in Auxiliary and Containment Buildings.

Identify and isolate sources of iodine leakage.

Complete tank farm in Unit 2 spent fuel pool.

Complete roof-top Stack Filtration System. _

5/10179

coini>le-tio~· of . EPicoR (cAP:-GuN-=·xi) ·system:--=::..::.---- -- ·· - ---

A-1

A-1

A-1

A-2

A.:2 --

Development of plan for treatment of Auxiliary Building B-1 liquid waste.

Complete "B" OTSG cooling and modification (long-term). C-1

Upgrade Decay Heat Removal System. C-1

Develop and calibrate alternate pressurizer level measurement. C-1

Development of alternate system for pressure/volume control C-1 system.

Complete external valve pit for ADHR System. C-2

CATEGORY

A

B

c

Control {i.e., containment) of radioactivity in Auxiliary and Containment Buildings.

Recovery of Auxiliary Building to near normal operations.

Place the plant in a cold condition suitable for depressurization with long-term pressure/ volume control.

' .

Page 4: TECHNICAL WORKlNC CROUP 1300 S/10/79 4. S.1979-05-10) 1300 hrs... · TECHNICAL WORKlNC CROUP 1300 S/10/79 1. Agenda, 1300, ... A-1 A-1 A-1 A-2 ... LS.2 Tech. Spec. 4nd Surveill~nce

1.

2.

3.

4.

s. 6.

7.

8.

9.

ACTION I~

TECHUICAL WORKING CROUP MEETING

1300 5/9/79

Items

Detercine the core fission product inventory which ·has been released from the fuel.

Continue preparations for change out of the FHB Train 'B' filters.

Oev~lop pressurizer heater alarm response procedure.

Resolve 011 flow element flange bolt material procureoent problems.

Obtain RCS saople on 5/10/79.

Deteroine voltage to be applied to pressurizer heaters during low power energization.

Id£ntify procedure rev4ew priorities and expedite PORC review.

Resolve NRC request for all non-redundant BOP diesel loads to be powered by the same diesel.

Determine if a path or time existed for radioactivity to reach the S I G' s from the RC drain tank.

Action

Rusche/W~lson/rletke

Rusche/Herbein

Herbein/Wilson

Herbein

Herbein/Hetrick

Wilson

Wilson/Herbein

Co bean

Wilson

"n 0 ', 7 91

I '

Page 5: TECHNICAL WORKlNC CROUP 1300 S/10/79 4. S.1979-05-10) 1300 hrs... · TECHNICAL WORKlNC CROUP 1300 S/10/79 1. Agenda, 1300, ... A-1 A-1 A-1 A-2 ... LS.2 Tech. Spec. 4nd Surveill~nce

..)

""'-.) . . ....!J • i"-'

t • •

I I -, . ·:·. ; ' ' ... • • - ··· J ... ! - •• - - -·· • :

. I. • : . I • I I '

- i .. l j! ' :i - ·· ,· I

i I I . I ! , . .. I ..

. .

' . ·l . t . I ' .. ; . . ; ..: - ~ . l -· !.. _:__i __ •. - ~

I •• I • : .. ,.: 1. ' . . .. . . . . . .

I. I I . -··-----l . • l . ! : . !

' I

._ ... :J . I : I I !

' I .. I ~ 1 ' I ' I • I I ; • I .

~~-:· :··,.- ·: · -,·,-:--,~: · I I " . I !

I ~ 1 .. c ! ~ I i

; ! : I . ___2::_

I I . J .! ' I

• • I • 1

:I i H ~ 1 . I.,. • I '

: :-1 I o . !

• ' ! I ! I

. I:

....... ,

I . I • ~ I' i ' i - : ' .

• I : • I

. I . . -l

I

t I

I '

I : '

' ,-

t• ., : . .i

. .. !

l. .. . I '

I ·I .. I

I I . . . . !' ' .

I • I I I

MOND-'"\'~U~SO~Y 5/7- eva

: l I I I l ; l

Fl!,,,.y ~ s.;..;;~,~\I:""""Y ·I ~ .. , ... y ~~.. ~, . ~z. ~J ~t'

I . ! I I : ' I . I l I I I I I . :1 - '

' . ! I I I

I !

' , ! ... :

' i , . I I . .. ; : I : i . ''I i I ! l ·1·-· ------··

• i I I i 'l ! I l I .. i I I I "1 I .. I I

I II' I ··;

I I I • • I I ...

I t

i-:-:-r~-

; 1: i I ·, .. ::; · I I I·· · : I 1 • I

. . I i •

' I I ' 1 ~ ' • I "'t

~ • It i1 •f I 1

' - ·~

' I

1

-· - ··-·-

I o '

1 I • . ' ··--· --~· .. ; : " I

'

' i 1

·;Ti-~~ ; .. ; ~ -- l ~ --: ; ~ i 1 I· I • ' 1 : ''J I f "It · 1 : : ' i

! . • . ... I I I j ~ I i ; : : I !

. ' '• I 1 ' 1,. • I I I . ' . ' I . I • ' ' I . : . l I • i ... ' l "f

• ... I' •·- ... _ .. ,_, ...... -· ·- ..... · I · . .... - T • I I . . . ' , t •• I ' i • I ' I . . I '' , . .

I o

I - ' • . I

I · :· I

• • I 1 1 I ; . i . I : • • • : i: . : I I .

I • I I I • I • I I l l . I • I I

I •• I . I I· .. I I I I l.

I I II II I· ,, I , .... I ,. 1 ; , .. I .... 1 • I I

• I • ' .. I I I I I I I : l . I 1 l" .· _! .l ~ I . ! . . .. , . ! .... - . ; . ~ . . . .

.... . . 't

!.

I t 1 . ..

i .... -1 , .. I I I •

l ..

i; . ! :. 1 t.:ott&·'TEll"\ k:.oo'-'l4& l ·; '~· 0\ ~"' ~-OP£1Z., ,.

•j II

li . • l

,: . .:..., 1_ ...... ..

• li I i .:· I : I· I . •

. , ' I •

• ·r- 1· ·

I ; ... l .. i. t

. I

. ·• .

I I

. !

I j I

I •

Page 6: TECHNICAL WORKlNC CROUP 1300 S/10/79 4. S.1979-05-10) 1300 hrs... · TECHNICAL WORKlNC CROUP 1300 S/10/79 1. Agenda, 1300, ... A-1 A-1 A-1 A-2 ... LS.2 Tech. Spec. 4nd Surveill~nce

?age 1 of 2 1300 5/10/79

PLANT OPERATION STAFF

Task Descriptfon

1. Obtain RCS sacple (Primary letdown).

2. Boron Concent~ation : Take RC sample.

3. Obt ain !-IEC approval (Tie-in approval only).

. ...:._ -----·--·-·-- . ·----· ---

4.

5.

6.

SSRW pump 1 IC repair.

Decay Heat S; stec.

Repai r secondary plant leaks and clean ~P water around cond. pumps.

7. Get sec. plant sump levels down.

8. Isolate Unit gl and 12 sample stations.

9. Training on Di esel .

10.

11.

Training on Decay Heat.

Develop balancing scheme for Aux. Bldg. HVAC.

12. Set up alarm system on PZR Htrs. for low-level detection.

13. ~alibration of Rad. monitor ~4 Aux. Bldg. Vent ~1 & 02 Shut Down-Elec. tie-in lfl, 2 . 3. & 4 all balanced

Expected Prioritv ~moletion

C-1 Obtain 5/11, 0900

C-1 llext sample 5/ll

C-1 Need status.

·-·---- - -·--

l'4Sk StAtus Coord.

Possible 5/10. Thorpe/ Hetrick

Ueed ECM's 109, 132, 133, 141. 148, _110 • . 181 • . 185, 228. 239.

Kunder

Porter/ Faulkner/ .Seeli_nger.

C-1 "A"-In Servic« Disassembling. "B"-Available

C-1

B-1

C-1

B-1

B-1 B-1

"C"-Available Complete 5/15 .

Hydro "B" 5/8. Hydro "A" 5/8._ Cycle DUV- 6 after "B" hydro.

In progress. Due 5/10 _ ..

Repair "B" leaks and re­hydro 5/8; flow element run 5/8.

Toole

n l-V4B complete Shovlin/ Kunder

Kunder

Need new sample Limroth/ ~ink . McGoey

In progress Troffer/

In progress. Resolve NRC coa:cents.

.On hold .

No date.

5/7 2400 5/9 5/7

In progress.

Complete. In progress . Complete.

' ,

Kunder/ Toole ·

Troffer/ Kunder/ Toole

Toole

K•Jnder/ Shovlin/ Braulke

Page 7: TECHNICAL WORKlNC CROUP 1300 S/10/79 4. S.1979-05-10) 1300 hrs... · TECHNICAL WORKlNC CROUP 1300 S/10/79 1. Agenda, 1300, ... A-1 A-1 A-1 A-2 ... LS.2 Tech. Spec. 4nd Surveill~nce

r Page 2 "of 2 1300 5/10/79

P~~ OPERATIO~ S~FF

-Ex;lec:ted l'ask Task Desc:riot1on Priority Com:> let ion Status Coord.

14. Sacple AB/FHB c:h3rc:oal beds. JCundcr/ Hetrick ·

15. SFAS Disabling. Use TP310/3. Keaten

16. Synchronize grey diesel. 5/10 - 5/11 Toole

5/12 - .5/13 . - . . . . ... Sync:~!_ze ~~_te diesel. .. -- ~- . ·- -· -. - - -· .. Toole - ·---·- -·-

17. Reduce RCS pressure to 500-psig. A-1 5/10 0200 Begun 0415, Her be in 5/8.

18. Flush ~nd bydro fire service the AB Roof H&V.

to 5/9 Toole

19. RCP Seal Return Temperature. Need quid;1nc:e Kunder

20. Test sample trailer. Toole

- ..

/ '"'nP.' 794 . .. .I

. I 1 •

Page 8: TECHNICAL WORKlNC CROUP 1300 S/10/79 4. S.1979-05-10) 1300 hrs... · TECHNICAL WORKlNC CROUP 1300 S/10/79 1. Agenda, 1300, ... A-1 A-1 A-1 A-2 ... LS.2 Tech. Spec. 4nd Surveill~nce

1300 5/10/79

PLANT MODIFICATIONS

Ex;lected }'ask ~ Descr~tfon Priority _Comt~letion Status Coord.

WG-1 Install ~/FHB Filter system. A-1 Units 1. 2. SysteCI. opera- I Shubert 3 and 4 - tional 5/10; fans. operable complete 5/13.

WG-2 Decon. vater in AB using EPICOR A-l Operational Schedule Lacy/ (L-l) ion exchange proces;~. 5/19. slipping to Fricke - . . 5/19 due to ··---- - -·- -··-· ·-- - · - --... · -- ·-.. - - •• 0 ---··--... ·-.-..-·-- --· piping; velds . -·----· - -· . 49% complete.- -

WG-6 Install storage vessels in A-1 Operational Hydro 5/12 Gibson (L-2) F~el Pool "A". by 5/16.

WC-11 Water Chemistry Lab for A-1 System com- Tolle/ use vith CAP-GUN (WG-2). plete by 5/7. Rao

WC-12 Ventilation filtration system A-l No status; Shubert for dcc~y heat pits. on hold.

TS-13 Install elec. heaters on Aux. A-2 No status; Shubert Bldg. intake ducts. on hold.

TS-JC Develop complete package for C-l System opera- Surge tank Jordan/ loug-term cooling of OTSG "B". tional - 5/1'4. delivery is Lanza

Demin. - 5/17. expected 5/10.

TS-6B RCS pressure control system. C-1 Turn over for Miller/ test 5/15. Lilly

TS-11 Develop electrical distribution C-1 system for (2) 2500 kv diesel

Operation4l 5/12.

Gagliardo

generators - 13. 2 kv line.

TS-14 Sldelding for decay hent pump. C-2 5/8 ECM not Lieberman approved.

TS-18 Temporary cart-mounted C-2 To be Co bean demineralizers. scheduled .

. ?95 I ., "p

I .I

..

Page 9: TECHNICAL WORKlNC CROUP 1300 S/10/79 4. S.1979-05-10) 1300 hrs... · TECHNICAL WORKlNC CROUP 1300 S/10/79 1. Agenda, 1300, ... A-1 A-1 A-1 A-2 ... LS.2 Tech. Spec. 4nd Surveill~nce

~- ~-----.-~~~~~------------

1300 s /10/7 9

U£STINGIIOUS E

Expected task T:.sk Descriptfon Priori:v Co::t!>letion Status Coord.

I.B.S DHR flow/pressure tests 1 S/8 Lehr

II.A.1 Firu1l AD!IR test procedure 1 S/3 Ongoing ·Siano

II.B ADHR Installation (See Note) 1 6/1 Ongoing Leitr

Qualify vall penetration C-1 7 No statuo . a. and grout mockup

... · - --- · . - - -- -----.-. - . . ---- .. . . . ... b. · -Assemble ADHR ski.d --- ..

- ~C-1 . . - ·--'l ·\- - - .. ... . - . -- -· - -.:.· -:. . No status-

c. Asumble CCtl skid · C-1 7 No status

d. Co::plete elec. tr01Uer C-1 'l No status .

e. Install penetration C-l 'l No status isolation box

f. Core bore 12 holes in C-1 'l No status west vall

g. Install pipe cable pene-tration

C-1 7 No status

h. Install 8" suction pipe C-1 7 - .·:·

'No status

1. Install 6" pipe ("A" train) C-1 7 No status

j. Instdl 6" pipe ("B" train) C-1 7 No status

.

. NOTE: Drilling of thirteen

(13) holes in the Auxiliary Building for the ADHR to start when interference proble= is resolved.

. ., r, f' ' ?9 ' :_ , , _, ' • 0

' .

Page 10: TECHNICAL WORKlNC CROUP 1300 S/10/79 4. S.1979-05-10) 1300 hrs... · TECHNICAL WORKlNC CROUP 1300 S/10/79 1. Agenda, 1300, ... A-1 A-1 A-1 A-2 ... LS.2 Tech. Spec. 4nd Surveill~nce

T.ssk D~sc~iotion

LS.2 Tech. Spec. 4nd Surveill~nce and Bases Ch4n&cs to those left deletions. additions.

LS.J Initial Reporting of Event.

TH.23 Reactor Coolant System P/V Control. -· ·· -- · ·

---·· ·· . ,- .------.-,.,_., TM.JO Determine what BOP loads

need backup electrical power.

'nl. 35 Long-tem pl3nt instrucentation requiremP.nts (criteria).

AA 61 . Updated SAR

AA 66. D. How to ~intain primary · boron cone.

AA 69. Define all plant mods needed for long-term operations.

AA 80. Analytical and Tech. Planning Support for updated procedures (EP-32. etc.).

AA 83. Identify critical valves and instruments which may be damaged by high sump levels.

AJ\ 84. Identify flow paths from the containaent sump.

AA 87. Solid Pressurizer An~lysis.

AA 96. Boron concentration in RB sump 4/30 throu;;h 5/16.

n1. 37 Instnll:ltion of cartridge-type Demineralizer for cle~n-up of S.C. "B" second4ry side.

AA 1. Letdown Flow Analyain (continuing curve development).

AA 71. Determine requirements to perform sample analysis locally.

TECHNICAL SUPPORT

tx~ected Priori~ Com!)lction

1 ?

1 5/15 to NRC.

1

1

1

1

l

1

1

1

1

1

1

1

1

1

5/11

Continuing

On hold.

?

?

'l

?

1

·-···

B&R invest!-gating.

?

'l

EC!·l issued.

Continuing

1

1300 5/10/7?.

rask Status Coord.

Active: ~me I .. • W. Hard! n[ interactions under negoti:l-tion.

Active. ~. A. Lenge 1

Active. ~ob~an··· - .. .. ..... . __ · ... -.. "' ~ . -··- . .... _.. ·----·-·

Draft criteria ~apodanno/ document issued 4/24.

~ngenba.:h

Cr..i.teria doca. ~apodanno/ be in;; revised. "'angenbach

Draft received. ~&U

Active. ~PUSC/HPR

~roneberger

Continuing. ~. A. Daniel

Active. Prelim.~. Lon~ list available.

Active.

Active.

Active.

~. Hoore

IJ. tloore

Revisin& design. C~pod3nno/ Lansenbach

Active.

?

. .

He t-Ed Control Roo··

Page 11: TECHNICAL WORKlNC CROUP 1300 S/10/79 4. S.1979-05-10) 1300 hrs... · TECHNICAL WORKlNC CROUP 1300 S/10/79 1. Agenda, 1300, ... A-1 A-1 A-1 A-2 ... LS.2 Tech. Spec. 4nd Surveill~nce

. . Page l of 7

T;uk I L-l

Desc::i:)tfon

Design. instal~tion. and operation of EPICOR for Unit 2.

·/'·-

WASTE HANACni::~l!" C:WUP

Priori~v .

B-1

~ecteci ~t" • ., leeton

5/19

1300 5/10/79

Stetus

Des!gn - 97% Construction-50%

c. ' Licensing -~c con­currence

d . Operation -est. S/14.

iask Coord.

Snider/ Can:an/ McCutcheon/

*Waller/ *Collins

- .. . . ,...._.,~ ...... ---·~~~ ~- _______ ..,_.._.. .._---, .

.___,_ .. - .

L-2

L-10

L-14

Desi~n. install~tion. and operation of c:erge.ncy surge tanks (tank far=) in Unit 2 "A" Fuel Pool.

Pursue activities on process1ng Unit l •o~ater through CAP-CU:l to both provide support to insure available freeboard for Unit 2 and to develop resin forcula­tions for Unit 2 vater.

~valu~te vaste gas vent header leakage problecs and recom=~end fixes de;~endtng on results.

* NRC contact

!-1 5/ll

--:

A-1

A-1

Piping installa­tion sli~ping schedule to 5/19 COClp. date.

75% coap. piping in FP.B.

30% co:p. \:elds i:l AB pipe. FB. pipe .

Prefab. pi;~e :.eady for installation in AB.

"!" train pour planned for 5/7; "A" train pour c:ooplete.

75% concrete slabs ph c:ed atop fuel pool.

:n prog::ess.

\/orkiL~ per J. See~inger•s vaste g~s plan of 4/17/iQ.

Rein::um/ Snider/

*Welle::/ *Collin:.

Carc<1n/ *Well~sr

McConnell/ Arthur/

*Bl3nd

..... _______ _....._. ......... ___________________________ . __________ . __ _

Page 12: TECHNICAL WORKlNC CROUP 1300 S/10/79 4. S.1979-05-10) 1300 hrs... · TECHNICAL WORKlNC CROUP 1300 S/10/79 1. Agenda, 1300, ... A-1 A-1 A-1 A-2 ... LS.2 Tech. Spec. 4nd Surveill~nce

WAS'CE ~~AC~!E:rf CRO!JP

L-36 Invest!g~t~ the e£fects ~hich the operations associated

L-42

vith reactor plant 1onz-tera cooldovn vill have on discharge to the vaste systems. Related to L-6. •

Exi'ected Prior!:•r Co~oleti.on

C-1

C-l

1300 5/10/79

Sta::.~s

In prog:-ess.

l'ask Coord.

McGoey/ Ross/

*Collins

Developcent reeom:endations and procedure for drain!ng and .-~. disposition of RCBT vater to support plant needs to cake up vith degassed de=in. vater.

- , -... :;;.._----·1 -------

McGoey/ Rosa/

*Collins

L-44

L-47

G-1

£valu~te syste~ designs vith Technical func:ions and ~ to assess possible interference proble~s fr~ standpoint of locations, operations, ~4inte~nce, etc.

Resolve sao?le lab raquireaents versus capabilities to support tPICO?. I and II opera­tions .

Install AB/FH3 off-gas fiiter systam to back-up plant system.

* NRC contact;

B-1

B-l .

- ···

Report being prepared; delayed by higher priority t.lSkS ,

Meeting held 5/1/79; resolution fn progress.

Phases I, II, and III design complete . System desc:rip-tion a~ start-up procedures are c:or:!ple te. Stack cut-in is made. Phases ti and Ill lead to percanen: syste~ schedule sho~s S/6 operation.

Kr:J.f.t/ *Weller

.l<raft

Montgoaer Itsc:hner/

*Collins

.

·) ., r· , I l i 29 9 ..

y,

Page 13: TECHNICAL WORKlNC CROUP 1300 S/10/79 4. S.1979-05-10) 1300 hrs... · TECHNICAL WORKlNC CROUP 1300 S/10/79 1. Agenda, 1300, ... A-1 A-1 A-1 A-2 ... LS.2 Tech. Spec. 4nd Surveill~nce

. P3ge l ·of i

1300 5/10/79 ,_ ·.

YASTE: HANAG ~!E~"T GROU?

I Prio:-i:•t I E.~ileC :ed Task Task Oes:::-befo':\ Cor:!? let:ion Sta:us Coord.

G-5 Change out Aa/FH3 HVAC vent A-1 Long-ter:~ &Connell filter. train charcoal bed. storage plan Et.warc!s/

I

defined. 45 *\:aller pera:anent storage/shippinl! . containers in . . . ... .. .... .. .. . - fabrication • .. . ...

- . . --·- ....... . - ... 3S delivered. __: ·-· . . . - . --~,.·--------· -- !'A" train of the A3 f.ilters and "A" train of FHB filters re:10ved a::.d replaced, units back in se=vice. High radiation level in "B'' train dictates delay "B" train change out . Deluge syste::lS

: secured on all renewed filter . - ·~- trains. Spent filter tray removal scheduled to begi.'\ 5/S.

G-ll Deter::~ine dr flow paths b ·A-1 Opera.ting 'S.at.~az/ AB/FH3. matrix Itschner/ developed and Robison/ avaibble. *lleller . G-32 Deter::~ine that there .are no A-1 £xa.cination of Na•.raz/

untdentilied air flow il&ths. plant statua/ ltschner/ configurat.ion Robison/ undert.Jay . First cust . revi~w cooplete .

-* l-"ltC cont.lc t

. . .

--:· il n ' l \..1 ! 00' .

.

I •

Page 14: TECHNICAL WORKlNC CROUP 1300 S/10/79 4. S.1979-05-10) 1300 hrs... · TECHNICAL WORKlNC CROUP 1300 S/10/79 1. Agenda, 1300, ... A-1 A-1 A-1 A-2 ... LS.2 Tech. Spec. 4nd Surveill~nce

P~sa . 4 of 7 • -.

1300 5/l'J/7~

----~----------------------~------~~--~~--r-----------~~----1 I Ex~ected T&sk T.1s~: D~se-:btfon Pried.:~· C::~'ll'!tion St&tus Coord.

G-JS

(;-tiO ·

L-3

L-12

L-26

L-27

Develop plan !or ventilation syst~= opc-:·:ion ~ased on fan/ filter train status and on door openings and och~r plane operation evaluAtions.

Criteria for and control tasks resulting in t~a evolution of .. concaoinatas that c~uld poison ch.1rcoal filters.

Deceroination of leakage paths and flow ratas in Unit 2 Au:<. Bld&. ar.d Fn3 an~ repa!r of leaks ~here possible. Plant has leak3&~ ID and Status Board in Uni t 2 Control Roo=. Pursue Plant activities associated vith this. •

~i&~ level solid ~aste disposal investigation.

Perforo assessoent of the value and need for a closed circuit TV Monitor to ~rovide remote indicator of rad~aste ~anel data.

~evelop sa=plin; ~lan to assess AB waste for trar.suranic content . Insure t~~t Met-~d Ops. coordinate sample require­ments vith O~~L to insure satisfactort analysis results.

* ~RC cont.:J.ct

B-1

A-1

:feed identified to set cp a plan.. Control/ advise on local and systeo ven-tilation practice.

Itschncr/ *Stoddart

--·--- · ~--..-----

20 "!led Devil" *Col.lins · ·.:. type local ---=. -----­fUtration

2

- ·;-

B-2

A-2

B-2

systems on order to control welding f~es.

Plant staff fol :!.owing.

In progress.

Price proposal being assessed versus decon. schedule of Aux. Bldg.

Identified 4 s.1oples. agreed on 3 . Agreement reached on usin& previously taken

• samples from sump and bleed tllnks; additional sae~ples to be taken.

Kraft/ Arthur/

*C:.ralin.:J.

Pastor/ Edwards/

*Yeller/ *Collins

Kraft/ Lutz/ ~StoddArt

P<1sse-ll/ Yilliams/

*Collins

~ () Q.) 3 0'

' .

Page 15: TECHNICAL WORKlNC CROUP 1300 S/10/79 4. S.1979-05-10) 1300 hrs... · TECHNICAL WORKlNC CROUP 1300 S/10/79 1. Agenda, 1300, ... A-1 A-1 A-1 A-2 ... LS.2 Tech. Spec. 4nd Surveill~nce

T.uk

L-29

L-33

Desc'!'!~tfon

I:westigaee re~orted 'lat~r collection in tho "S" F ..... pool, obtain samples and ~~ke plans for disposition. Also investi­gate the prec~erational condition of the fuel pool from a leakage standpoint.

Develop a plan for tying in the tank fa~ to EPICOR_2.--_- .-- ----

L-35 Investigate the need for a desig~ and construction task to erect a barrie= bet~een the

• Unit l and Unit 2 Fuel Handling !ld~. to enable Un!e 1 opera­tions vieh Unit 2 in processing Mode.

L-37

G-7

Develop a plan for recoving all radioactive gases froa the systeas in the A3 and FRB.

Condenser vacu~ p~~ discharge filter systu.

P::-io'!'itv I B-2

B-2 ·- -·­---- -

B-2

A-2

~30 Reactor Purge Systea Charcoal A-2 Filter Saople.

G-33 Desensiti ze AB and cd3 Filter A-2 ~lonitors.

* NRC contact

E:~~ecte~ C~::::-l~t!on

_ :._ __ _ - - -- ··-··­·-- -- . -~ . -

-.-

lJOO 5/l'J/79

Stnt~s

\.'ater fro::2 Unit 2 const. Sa~~~p~e needed .

-- .. . . -Systetl criteria .. nt to B&R on ­S/1/79.

Altern&te design U~t 1 side to be sub::2itted 4/27/79.

Requires coo-pletion of L-14. . Filter opera-tioc.11l. Inves-tigating opera-ting criteria. Will evaluate DF.

Radiation sur-vey requested • .

Preliairuary investiga t ion -desensitization infeasible •

.

'i'a$k Coord.

Willia::ss/ *~rreet

iei~nn/ · Snider/ · *Weller/ *Collins

McConnell/ "'illia1:1s/

*Sarrett

.&Connell I *ColU.ns

. Robia~n/ Montgo::~er y

*Collins

McConnell I *Collins

Sicg/ *Stoddart

... nO ) . 02

I •

Page 16: TECHNICAL WORKlNC CROUP 1300 S/10/79 4. S.1979-05-10) 1300 hrs... · TECHNICAL WORKlNC CROUP 1300 S/10/79 1. Agenda, 1300, ... A-1 A-1 A-1 A-2 ... LS.2 Tech. Spec. 4nd Surveill~nce

T.uk I G-39

··--·­- · -- -

C- 41

G-42

:

\lAST£ l>!Ml.\C~I!:rr CROUP

Desc:.-!'lt!on

De•1elop :snd asses~ ba;:k-u;s g:ss fi~tr~tion scha~a to cross­con~ect the Auxiliary Building filters to the iB purge filters.

--------. .:=-~--=-==--:..··=---·

Develop filter managecent st:'a : egy.

Develop a prograa to assess and oonitor I release sources ,

* !~RC contac:.

Pr!or!:•, I B-2

· .. -=:..·~

B-2

B-2

Ex?.ac:a~ Co:::')l'!:!on

-.~

1300 S/10/79

Status

B~R has devel­oped a concept. Second astic&te scheduled shows 14 day+ schedule. Heisoan Co. has developed drav­ings. · • E.xposure1 sch11c!ule cost appears too high. Con­ti::ge~cy plan is to ope~ roughing filter :nan~o·ay if emer­gency ventila­tion of Au>dliar:r Building is needed .

Plannin:; startec •

!our-part approach:

l. B&R to com-plate revie~ of release candidates.

2. Pursue a tracer prograa to find leak. Pursue an air moni-

3.

torins ;sro­gram vith SAI/EPR! to plot I levels. Revie~ local ventilation cor.ditions to verify no~ distri butions .

T~slc. Coot'd.

HcConnell/ *Lae

·-·-···-····-

Horton/ Clure/

*liland . tic Connell I l>zthur/ Hontgomer Y.

*Bland

.

~no'. :so 3

I '

Page 17: TECHNICAL WORKlNC CROUP 1300 S/10/79 4. S.1979-05-10) 1300 hrs... · TECHNICAL WORKlNC CROUP 1300 S/10/79 1. Agenda, 1300, ... A-1 A-1 A-1 A-2 ... LS.2 Tech. Spec. 4nd Surveill~nce

~ . "Page 7 of 7

t .

Tas~ I Descr!:~t!on £:<pect.ec!

Prior!:·r Cc~oh:ion

L-ll Investig3te/develop process for eliai~ting Un!t 2.vater in RC3T's. Process planning for Units l and 2. Design (con­ce?tually) a vaste processing systL~ for Unit 2 High Level Liquid Wastes. -·· - -- - ~--~--~-~-~!.~- '~-----~--~~-~-~------

n-3

- _...,..... ... .. ...,r

L-16 Low level vast• (p3per, rags, !-3 vood, etc.) disposal.

L-17 Oe~elop CA?-CU~ 3 Syst~. B-3

L-20 Obtai~ a level me3sure=e~t a~ B-3 a sa~ple of vater froo t.he R3 su::p a.nd base::e:~.t.

L-22 Develop a plan for long-tero !-3 cleacup to provide access to Auxiliary Bldz. for restor3tion activities.

L-30 Deveiop plan for radiation survey in Auxilury and Fuel Handling Bldg.

G-15 Ecerge:~.c:y R3 Cas Purte Cle3nup Syste::.

c- 29 FH! Airlock.

• ~"ltC contae t

A- 3

!-3

. . . -· . - . . .. - --

--·

1300 S/l'J/79

Status

Proposal to be received fro:s che:t-nuelur S/4/79.

·-· -··- ---·· --

In progress; seco:1:! coa-pactor ordered.

I:U.t!al pbr:.nic only. Deti!.!l des!J::l sche:!ul~d to star: 4/25/7 fJ .

~as~:re::e:~.t using H,eise. gage beicg explored. .

On hold ; no pla:~. to ir:~ple:~e:~.t .

Airlock unnecessary at this t i.r:le .

' .

Tas~ Coorc!.

Snider/ "'lieller

--- ---~- ~ ... - .... -- ..

'ECOJarc!s/ *Yeller/ *Collins

Snider/ *:.Tdle.r/ *Collins

RIJss/ '*C:~alina

Open/ *Collins

Open/ *Stoddart

Open/ *Collins

Iructive/ *Barrett