Technology Department -Control side on platform above ELENA ring on four consecutive racks -Two generators per crate (PCU and HVPS), 5 crates + 1 for potential future transfer lines… -Three PXI systems (1 system can control up to four generators) -One touch panel for local control for all generators -One rack for PDC -One front-end computer ELENA Fast Deflector control side 3/11

TRANSCRIPT

Page 1: Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11

Technology Department

1

ELENAFast Deflectors status

Nicolas Voumard,Jan SchipperTE/ABT/EC

TCM17/11/2015

1/11

Page 2: Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11

Technology Department ELENA Fast Deflectors control overview

FDGFast Deflector Generator

Fast pickupHV2

Fast pickup

Behlke Triggers

FEC/Ethernet

FDTElectrostatic

Fast DeflectorTank

230 VAC from PDC

PU analog Signals

Slow pickupAnalog Driver Unit

Timing verification

StatusBEHLKEs FaultTiming Fault

Earth ing SwitchEarth ing Switches s tatus

Doors and cable presence

INTERLOCKS To PXI

RS23

2

OASIS

Slow

Fast

CAPA 21uF / 10kV

Power Supply5V 12V -12V

HV1 (+/-)

CAPA Earthing switch

HV2 (+/-)

FDC8 x Fast Deflector Controller

PXI crate NI-PXIe

RT NI PXIe-8100

2 x RIO FPGA PXI-7854 (4xFDG)

2 x PXI-5105 8 Ch. 60Ms/s 12bit (4xFDG)

PXI-8430/8 RS-232 (8xFDG)

HVDPS High Voltage Dual Power Supply

CAEN N1470A

Power Control Unit (PCU)

Analog Receiver Unit

8kV - 3mA HV1 (+/-)8kV - 3mA HV2 (+/-)

BEHLKE 1HTS111-13-

HB-B-C

BEHLKE 2HTS111-13-

HB-B-C

Fast pickupHV1

CAPA 11uF / 10kV

24VDC

EIS

Emergency stop

Timing

Emergency Interlock System

Analog Receiver Unit (ARU)

PXIINTERFACE

ON/OFF PCURESETLOCAL/REMOTE

TRIG

GER

S

+/-1

2V

INTE

RLOC

KS F

ROM

FDG

TRIG

GER

S

24V FDG

24V ROSS

2/11

Page 3: Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11

Technology Department

- Control side on platform above ELENA ring on four consecutive racks

- Two generators per crate (PCU and HVPS), 5 crates + 1 for potential future transfer lines…

- Three PXI systems (1 system can control up to four generators)

- One touch panel for local control for all generators- One rack for PDC- One front-end computer

ELENA Fast Deflector control side

HVPS ARU

1 2 3 4 5 6 7 8 9 10 11 12 13 14 16 17 18 20 21 22 23 2415 19 25

CH0

CH1

CAEN

PCU & HVPS Crate Organization

HVPSPCU ARU

CH0

CH1

CAE N

PCU EIU

EISB

EIS

VETO A

VETO B

SAFE

UNSAF E

+24V

TEST

EIS A

POSITIVE

INPUT

PXI OUT

OASI SOUT

FAST PICKUP

PXI OUT

OASI SOUT

INPUT

CAPA VOLT

NEG ATIVE

INPUT

PXI OUT

OASI SOUT

PXI OUT

OASI SOUT

INPUT

CAPA VOLT

POSITIVE

INPUT

PXI OUT

OASI SOUT

FAST PICKUP

PXI OUT

OASI SOUT

INPUT

CAPA VOLT

NEG ATIVE

INPUT

PXI OUT

OASI SOUT

PXI OUT

OASI SOUT

INPUT

CAPA VOLT

EIU(FAKE)

LOC REM

ON/OFF

+24V

+12V

-12V

+5V

CTRL

FDGCONTROL

RST

EIS B

DOORS

SW FLT

SW FLT

INTERLO CKS

PW FLT

PW FLT

CABLE

POS

NEG

GEN

PCU

EIS A

PRES

LOC REM

ON/OFF

+24V

+12V

-12V

+5V

CTRL

FDGCONTROL

RST

EIS B

DOORS

SW FLT

SW FLT

INTERLO CKS

PW FLT

PW FLT

CABLE

POS

NEG

GEN

PCU

EIS A

PRES

Platform Control Racks Front View

IYI00=193 IYI01=193 IYI02=193

0

5

10

15

20

25

30

35

40

45

0

5

10

15

20

25

30

35

40

45

PCU & HVPS 9 (&10)

TIMING Interface

PCU & HVPS 7 & 8

PCU & HVPS 5 & 6

PCU & HVPS 3 & 4

PDC

PCU & HVPS 1 & 2

PXI 2

Front-end PC

PXI 3

REGLETTE 230V

TABLE

SCOPE

Patch PanelPXI 1

IYI03=193

REGLETTE 230V

PXI Interface 1

PXI Interface

PXI Interface

Operator PanelNI

(RESERVE)

3/11

Page 4: Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11

Technology Department

- Fast deflector generator

- 1: 1.2 uF high voltage storage capacitors OK- 2: 11kV Behlke switches push-pull OK (pos and neg @ 6.5kV)- 3: CAEN bipolar 8kV HVPS TBT in remote with PXI- 4: 12kV earthing switches OK- 5: Generator controller Partially tested- 6: Pickups New version TBD

To be tested connected to the tank ASAP with actual pickups,And by mid december with new pickups version.

ELENA Fast Deflector Generator HV circuit overview

Rs

Rs

Rdis

Sw3a

Sw1

Rs

Rs

Rdis

Sw2b

Sw2

A

B

A

B

Deflector tank

t

U

t

URch Rch

Cbuf Cbuf

HVPSpos

HVPSneg

Slow

Pic

kup

Fast

Pic

kup

Fast

Pic

kup Sl

ow P

icku

p

1 1 1 1

1

2 2

4 4

2 2 13 3

6 6

6 6

4 46

6 6 6

4/11

5

Page 5: Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11

Technology Department ELENA Fast Deflector control side, PXI Controller

96 programmable I/O lines

ADC

FPGA Core(NI-PXI7841R)

PXIe

-Bus

8 Channel Digitizer(NI-PXI5105)

4 x RS232 Communication(NI PXI-8430)

Power Control Timing

Interlock Status

Fast DeflectorPlate Voltage4x POS4x NEG

Capa Bank Voltage4 x POS4 x NEG

CPU(NI-PXI8100)

4 x HV Dual PS CAEN

5/11

Page 6: Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11

Technology Department ELENA Fast Deflector : elements production and testing

ELEMENT STATUS DONE TO BE DONE DUE

Generator Box OngoingCabled, TBT by end november

Base plate mounted with HV switches, capacitors, resistors and relays. HV Cables with SHV-20

New Pickups, Controller board mounted (TBT)

End of November

Mid DecemberWith new pickups

PXI Controller Components to be ordered Software mainly done by JS

Jan did already most of the control and LabView implementation

Validation, testing…HVPS control to be testedFront-end computer architecture TBD

February 2016

Cabling from platform to generators

Ongoing Cables pulled by EN-EL and connectors on the control side mounted

Connectors on generator side to be mounted.

Mid February 2016

Generator Controller

Ongoing - EIS interface done (TBT)- Analog Receiver done (TBT)- Caen HVPS tested

- Power Control Unit -> finish schematic and routing, - Control crate cabling- Three crates to be assembled

Mid January 2016

Power Distribution Controller

Nothing done (AA)

March 2016

PXI interface Ongoing Based on existing design (HG)

Cabling to be defined. February 2016

Comissioning with beam scheduled for July 2016

6/11

Page 7: Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11

Technology Department

ELENA Fast Deflector : safety concerns and commisionning

- EIS- Prepare safety documentation - Define tests to be done (lab and on-site)- Define clearly which and how much fast deflectors to be

connected to EIS- Safety discharge switches tested (Ross relays)- Prepare interlocks test procedure

- Correct reaction of the system to every interlockEIS Interface card

Based on BE-PO design

- Commisionning / Installation- Prepare commisionning plan and strategy- Installation should be ready by April-May 2016 for the two

ELENA ring extractions- Beam comissioning expected for July 2016

- Transfer lines fast deflectors planed for 2017

7/11

Page 8: Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11

Technology Department ELENA Fast Deflector : high voltage pickups

There is still work to be done to get a precise high voltage pickup as requested for this application to avoid oscillations. (flattop and platbottom stability at 0.1%)A new pickup design has been already designed, on the base of the North Star high voltage probe, including a 50 Ohms series resistor to adapt to the cable impedance, reorganization of the components in «star topology», ground plane on low voltage side, removed adjustable capacitor.

OLD DESIGN NEW DESIGN8/11

Page 9: Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11

Technology Department ELENA Fast Deflector : measurements @ +6kV

OLD DESIGN

North StarPVM-12

Cable reflexion due to pickup position

9/11

Page 10: Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11

Technology Department ELENA Fast Deflector : measurements @ -6kV

OLD DESIGN

North StarPVM-12

Cable reflexion due to pickup position

10/11

Page 11: Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11

Technology Department ELENA Fast Deflector

QUESTIONS ?