Page 1: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

TERRAMIN AUSTRALIA LimitedTERRAMIN AUSTRALIA Limited

Angas Zinc Angas Zinc ProjectProject

Page 2: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

Tailings Storage Facility Tailings Storage Facility Overview Overview

• Long presentation – may of necessity be a bit technical• Why we need a Tailings Storage Facility (TSF)• The Design Process

– Requirements– Guidelines– Testwork

• Tailings Handling method• Water management• Design selection• Closure• Location – Flood Plain

Page 3: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

Angas Zinc Project: Angas Zinc Project: Tailings storageTailings storage

• Mining & processing ore creates non-saleable by-products

• “Tailings”- fine sand of the waste rock

• Often combined with water

• Stored close to site of processing

• About 40% goes back underground as “cemented backfill”

• However, need to design for “worst case”

Page 4: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

THE TSF DESIGN PROCESS

Page 5: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

TSF GuidelinesTSF Guidelines

• ANCOLD Guidelines used, no current Guidelines in SA. ANCOLD draws substantially from WA “Guidelines on the Safe Design & Operation Standards for Tailings Storage” but goes further in the area of dam design

• PIRSA -EPA “Guidelines for the Management of Tailings” at the proposed Angas Zinc Project, Strathalbyn, SA

Page 6: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

TSF - designTSF - design

• Australian Tailings Consultants

• TSF objective:

– No contamination of natural water drainage systems, ground water, land and soils either on or off site during operation and indefinitely post closure caused by mine ore or waste material.

Page 7: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

TSF -TSF -The TestworkThe Testwork

• Test pits • In-situ permeability testing.• Lab. testing of soils.• Geochemical & geotechnical testing of simulated

tailings.• Impoundment layout & bank design - modeling.• Seepage analyses, assessment of groundwater

impact & design of proposed mitigating measures.• Location, design & installation of groundwater

monitoring bores.• Water mgt. both process & rainfall.• Proposals for TSF closure & rehabilitation***

Page 8: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

TSF - TSF - Tailings Handling OptionsTailings Handling Options

Two Options:

• Un-thickened tailings– Majority of TSF in Australia

• Thickened tailings– Few places in the World using very high

density tails deposition – used when water is scarce, ease of closure***

Page 9: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

Advantages of thickened tailingsAdvantages of thickened tailings

• Low water demand• No water pond to attract birds• Tailing surface crust stops dusting• Beach area dries rapidly allows early

access.

• Allows for progressive closure

Page 10: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

TSF - Thickened tailingsTSF - Thickened tailings

• Wheaton River’s, Peak Mine - Cobar

Page 11: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

Thickened tailingsThickened tailings

• Wheaton River’s, Peak Mine - Cobar

Page 12: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

Water management

Page 13: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

TSF - Water TSF - Water ManagementManagement

Page 14: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

TSF - Water management: TSF - Water management: Water from TSF to PlantWater from TSF to Plant

Page 15: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

TSF - Water managementTSF - Water management

Summary

• Divert all surface flows from surrounding area around the TSF

• Dam design allows for the catchment of a 1:100yr 5 day storm event

• No water pond on TSF

Page 16: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

The TSF Design Selection

Page 17: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

TSF DesignTSF Design

Page 18: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

Risk Analysis

Page 19: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

TSF-Risk AnalysisTSF-Risk Analysis

Page 20: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

TSF location & detailTSF location & detail

QuickTime™ and aTIFF (LZW) decompressor

are needed to see this picture.

Page 21: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

TSF construction: base layerTSF construction: base layer

Page 22: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

TSF options- detailTSF options- detail

• Proposed Design Option: Decant well

Page 23: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

TSF DesignTSF Design

Design Summary: • HDPE liner (base and cap)• Thickened tailings

• Liner ensures TSF design requirement

• Placement: beyond 1:100 ARI flood level

• Footprint:15ha

• World’s Best Practice

Page 24: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

TSF Closure

Page 25: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

TSF Closure: capping layersTSF Closure: capping layers

Page 26: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

TSF ClosureTSF Closure

Page 27: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

TSF ClosureTSF Closure

• Closure is important aspect for the longer term environmental considerations

• Impervious cover liner

• Earthworks – reshaping, topsoil

• Rapid revegetation

• Risk based closure plan used

Page 28: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

Flood Plain ModellingFlood Plain Modelling

Page 29: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

TSF placement to meet outcomesTSF placement to meet outcomes

• 100m from 1:100 ARI flood plain

• Flood modelling

• Tonkin- Chris Purton: Senior Meteorologist

Page 30: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

Historic Rainstorms and Floods at Strathalbyn

• The largest rainfall event in 145 years was the three day rainstorm ending 9am, 26 January 1941 – 217mm

• The December 1992 monthly rainfall was 171.2 mm, which was the second highest monthly rainfall on record. The two-day total of 116 mm and the three-day total of 124 mm both had an ARI of just under 100 years

Page 31: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

Historic Rainstorms and Floods at Strathalbyn

Page 32: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

1:100yr ARI Flood Plain

Page 33: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

1:100yr ARI Flood Plain

• Conclusion

• Since the terrain rises steeply from the maximum indicated floodplain extent (without a bund) towards the proposed Tailing Storage Facility site, it is certain that the floodplain extent will not extend any further into the mining lease site than is shown in Figure 1.3

Page 34: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Tailings Storage Facility Overview Long presentation – may of necessity be a bit technical Why we need

Tailings Storage Facility Tailings Storage Facility SummarySummary

• Every TSF design has some unique issues• To design a TSF you must do a lot of standard tests to;

– Tails characterisation ,sg, sizings, settling rates geochem., etc.– Soil characterisation geotechnical stability, permeability, etc– Seismic susceptibility

• There is nothing out of the ordinary in the testwork required in the design for the TSF – follow the relevant codes

• What is required is the first of its kind in the world