MnDOT TP-02264-07 (3/13) TYPE: COUNTY: DIST.: (lbs.) ABUTMENT: (ft.lbs.) PIER NO.: INSP BY: PER FOOT PENET IN LAST 10 (inches) PER FOOT PENET IN LAST 10 (inches) FORMULA USED MPF12 AUTHORIZED PILE LENGTHS DISTANCE BELOW CUT-OFF (feet) BEARING IN TONS R n (tons) BLOWS REMARKS ON DRIVING CONDITIONS, PRE-BORING, ETC. (IDENTIFY BY PENET. DISTANCE.) DROP OF HAMMER OR RAM (feet) ENERGY PER BLOW (ft. lbs.) DATE: SETUP INCREASE (%) START DRIVING TIME: END DRIVING TIME: DOWN TIME: TOTAL DRIVING TIME: MIN. TIP ELEVATION INSPECTOR SIGNATURE PROJECT ENGINEER SIGNATURE BRIDGE OFFICE (Initial and Date) Minnesota Department of Transportation - Bridge Office TEST PILE REPORT (MPF12) PILE HAMMER DATA TEST PILE NO.: BRIDGE NO.: SINGLE ACTING (Power) SELECT A SIZE SIZE: SELECT A COUNTY SELECT A DISTRICT BEARING IN TONS DISTANCE BELOW CUT-OFF (feet) DROP OF HAMMER OR RAM (feet) SUBSTRUCTURE CONTRACTOR: CUT-OFF ELEV. (FT): WT. RAM (PISTON): MAX. RATED ENERGY: S.P. (OR S.A.P.) NO.: SEE INSTRUCTIONS ON OTHER SIDE PROJECT DESCRIPTION PILE DATA BLOWS MAKE: MODEL: INSP. PHONE NO: SELECT A PILE TEST PILE TYPE: LENGTH IN LEADS (FT): PENET. PER BLOW (inches) ENERGY PER BLOW (ft. lbs.) PENET. PER BLOW (inches)

Upload: geoda1

Post on 20-Nov-2015

212 views

Category:

Documents


0 download

DESCRIPTION

vcxc

TRANSCRIPT

  • MnDOT TP-02264-07 (3/13)

    TYPE:

    COUNTY:DIST.:

    (lbs.) ABUTMENT:(ft.lbs.) PIER NO.:

    INSP BY:

    PER FOOT

    PENET IN LAST

    10 (inches)

    PER FOOT

    PENET IN LAST

    10 (inches)

    FORMULA USEDMPF12 AUTHORIZED PILE LENGTHS

    DISTANCEBELOW

    CUT-OFF(feet)

    BEARINGIN TONS

    Rn (tons)

    BLOWS

    REMARKS ON DRIVING CONDITIONS, PRE-BORING, ETC. (IDENTIFY BY PENET. DISTANCE.)

    DROP OFHAMMEROR RAM

    (feet)

    ENERGYPER

    BLOW(ft. lbs.)

    DATE:SETUP INCREASE (%)START DRIVING TIME:

    END DRIVING TIME:DOWN TIME:

    TOTAL DRIVING TIME:MIN. TIP ELEVATION

    INSPECTOR SIGNATURE PROJECT ENGINEER SIGNATURE BRIDGE OFFICE (Initial and Date)

    Minnesota Department of Transportation - Bridge Office

    TEST PILE REPORT(MPF12)

    PILE HAMMER DATATEST PILE NO.: BRIDGE NO.:

    SINGLE ACTING (Power)

    SELECT A SIZESIZE: SELECT A COUNTYSELECT A DISTRICT

    BEARINGIN TONS

    DISTANCEBELOW

    CUT-OFF(feet)

    DROP OFHAMMEROR RAM

    (feet)

    SUBSTRUCTURE

    CONTRACTOR:

    CUT-OFF ELEV. (FT):WT. RAM (PISTON):MAX. RATED ENERGY:

    S.P. (OR S.A.P.) NO.:

    SEE INSTRUCTIONS ON OTHER SIDE

    PROJECT DESCRIPTIONPILE DATA

    BLOWS

    MAKE:

    MODEL:

    INSP. PHONE NO:

    SELECT A PILE TEST PILE TYPE:

    LENGTH IN LEADS (FT):

    PENET.PER

    BLOW(inches)

    ENERGYPER

    BLOW(ft. lbs.)

    PENET.PER

    BLOW(inches)

  • MnDOT TP-02264-07 (3/13)

    Pile Data:

    2. Show Size of pile; when using timber pile show butt and tip size to the nearest one-half inch. Be certain that

    Original: County or Municipal EngineerCounty or Municipal Projects:

    FOR ALL PROJECTS:Copy: Project Engineer

    SHOW SKETCH BELOWShow sketch indicating location of test pile. Show North arrow.

    DISTRIBUTION:State Projects:Original: Bridge Const. & Maint. Engineer (MS 610)

    5. ENERGY PER BLOW (ft. lbs.) is equal to WH, for single acting power-driven hammers. 6. PENET. PER BLOW (inches) may be based on blows per foot or on a measured penetration for a given number

    INSTRUCTIONS FOR COMPLETING

    of blows, and should be calculated in inches and decimals of inches.

    4. INSP. BY should be the pile driving inspector (print or type name).

    Column Tabulation:

    3. Length in Leads should be total length in leads in feet.

    TEST PILE REPORT

    7. BEARING IN TONS should be shown to the nearest ton.

    Copy: Railroad

    1. Select type of pile as CIP, H-Pile, Treated Timber, Precast Concrete, etc.

    diameters comply with the specifications. Butt diameters should be measured 3 feet from the butt end.

    MPF12