Project Introduction Welcome to our Open House. a joint venture between Graymont Western Canada Inc. & Lehigh Hanson Materials Limited Parsons Creek Aggregates Limited is a Joint Venture of Graymont Western Canada Inc. and Lehigh Cement Limited. Both partners are leaders in the production of rock and stone products throughout North America. Parsons Creek Aggregates is a proposed limestone quarry to be located 800 metres north of the Fort McMurray Urban Service Area boundary on Alberta Metallic and Industrial Minerals Lease #9404120901. The lease site contains a unique limestone deposit that can supply “close to market” aggregates in support of local infrastructure projects and the Fort McMurray economy. Crushed limestone from the Project would be used in road construction and as an aggregate in concrete. A second potential market in the future is to provide crushed limestone for environmental uses such as scrubbing sulphur from air emissions, repairing soil acidification and treating wastewater. 881 63 69 a c s a b a h t A . L Athabasca River Clearwater River r e v i R a c s a b a h t A Saprae Creek Draper 63 PARSONS CREEK SITE FORT MCMURRAY HIGHWAY 63 ATHABASCA RIVER Quarry Project Area 1 NOVEMBER 9, 2010 OPEN HOUSE

Upload: others

Post on 16-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: th 2010 PM - PM Tuesday, November 9...Extraction will start in the next block while reclamation is occurring in preceding blocks. ... Reclamation Plan The project will use proven quarry

Project Introduction

Welcome to our Open House.

a joint venture between Graymont Western Canada Inc. & Lehigh Hanson Materials Limited

Parsons Creek Aggregates Limited is a Joint Venture of Graymont Western Canada Inc. and Lehigh Cement Limited. Both partners are leaders in the production of rock and stone products throughout North America.

Parsons Creek Aggregates is a proposed limestone quarry to be located 800 metres north of the Fort McMurray Urban Service Area boundary on Alberta Metallic and Industrial Minerals Lease #9404120901.

The lease site contains a unique limestone deposit that can supply “close to market” aggregates in support of local infrastructure projects and the Fort McMurray economy.

Crushed limestone from the Project would be used in road construction and as an aggregate in concrete. A second potential market in the future is to provide crushed limestone for environmental uses such as scrubbing sulphur from air emissions, repairing soil acidi�cation and treating wastewater.

881

63

69

acsabahtA .L

A t h a b a s c a R i v e rC l e a r w a t e r R i v e r

re

viR

acsa

ba

htA

Saprae CreekDraper

63

PARSONS CREEKSITE

PUBLIC OPEN HOUSE

The Sawridge Hotel, Timberline “B” Room, 530 MacKenzie BoulevardTuesday, November 9th, 2010 4PM - 8PM

The proposed Parsons Creek Aggregates limestone quarry will provide high-quality limestone aggregate products to Fort McMurray and the surrounding region.

The Project will be fully reclaimed to create recreation and natural park areas using proven reclamation techniques.

Parsons Creek Aggregates has submitted an Environmental Impact Assessment application to Alberta Environment.

Please attend our Open House or visit www.parsonscreekresources.com to learn more. For further information please call Ron or Liisa at 1-866-404-4763 (toll free) or 403-692-4544 (direct line).

FORTMCMURRAY

HIG

HW

AY

63

ATH

ABA

SCA

RIV

ER

Quarry Project Area

Parsons Creek Aggregates

1 NOVEMBER 9, 2010

OPEN HOUSE

Page 2: th 2010 PM - PM Tuesday, November 9...Extraction will start in the next block while reclamation is occurring in preceding blocks. ... Reclamation Plan The project will use proven quarry

Stakeholder Concerns

LEGEND:METALLI

MINING BLOCK AREA

C AND INDUSTRIAL MINERALS LEASE #9404120901

a joint venture between Graymont Western Canada Inc. & Lehigh Hanson Materials Limited

Aggregates

Noise Parsons Creek Aggregates is located close to future Fort McMurray urban and industrial growth corridors.

During peak production, noise levels at the nearest planned residential areas (North Parsons Creek) will be below Energy Resource and Conservation Board (ERCB) permitted levels.

Best practices for noise control will be implemented as required to meet ERCB noise standards. These may include the use of an enclosed crusher, improved exhaust silencers and onsite berming.

Air QualityOur air quality study shows that project air emissions will be less than the Alberta Ambient Air Quality Objectives. This indicates that emissions from the project will not have an adverse e�ect on the environment or human health.

Dust from the project will be controlled by a dust suppression system for the crusher, watering of haul roads and seeded stockpiles.

A closer source of aggregate material to Fort McMurray markets is expected to result in lower overall air emissions related to aggregate hauling within the region and reduce truck mileage on Highway 63.

Visual ImpactsThe project will be setback 45m from Highway 63 and 150m from the Athabasca River to help reduce the visibility of project operations and protect riverbank habitat.

Highway 63Access to the project from Highway 63 will be taken from the existing intersection at the north end of the project. Permanent project access will be taken from the interchange to be built by Alberta Transportation at the south end of the lease.

Athabasca RiverThe project will use a small quantity of water from the river for aggregate washing. Sediment in the water used for washing limestone will be allowed to settle, and clean water will be returned back to the river. Surface drainage will be diverted around the operation.

Any release to the river will be carefully monitored to protect water quality.

Planned Future Interchange by Alberta Transportation

Truck Turnout By Alberta Transportation

Existing Sand and Gravel Pit

3 NOVEMBER 9, 2010

OPEN HOUSE

Page 3: th 2010 PM - PM Tuesday, November 9...Extraction will start in the next block while reclamation is occurring in preceding blocks. ... Reclamation Plan The project will use proven quarry

a joint venture between Graymont Western Canada Inc. & Lehigh Hanson Materials Limited

3A

3B

3C

2B

3D

2A

1C

1B

1A

Ft McMurray Urban Service Area

��

63

R 10 R 9 W4Tp 91

Tp 90

Highw

ay access

87

3231

20

1718

36

19

30 29

12

13

24

25

150m

50m each side

of Parsons Ck

Top of

limes tone a t

river elevation (238m)

45m from

pond 1

Unnamed Creek 5

Pond 1

Parsons Creek

Unnamed Creek 3

Unnamed Creek 4

Pond 3

Pond 2

Unnamed Creek 6

Pond 4

PHASE 1

Highway Realignment &Interchange Project

(completion 2014)

Highway Setback

River & Creek Natural Area

(150m min.)

Possible 3rd Phase Expansion (subject to �nal

interchange design)

Athabasca R

iver

HIG

HW

AY 63

Future North Parsons Creek Residential Area

N

PHASE 2

Quarry Project Area The Project Area has been reduced to 391 hectares (966 acres) and setback at least 800 metres from the Fort McMurray Urban Services Boundary. This will ensure the project is integrated with Alberta Transportation’s new “North Parsons Creek” interchange and highway realignment project.

LifespanThe quarry lifespan would be about 40 years based on anticipated product demand.

DepthFinal quarry depth would be 24m below grade (approximately 15m below the normal Athabasca River level).

Operations Operations will involve drilling, blasting, hauling, crushing, screening, washing, stockpiling, loading and shipping of limestone aggregate.

The quarry is expected to operate up to eight months of the year. Initially, the project would operate10 to 12 hours per day. At peak demand, the project would operate 24 hours per day up to 7 days per week.

A temporary asphalt plant (operated by others) may be located onsite from time to time for speci�c highway or road paving projects.

ReclamationQuarry mining and reclamation will advance sequentially from block to block. Extraction will start in the next block while reclamation is occurring in preceding blocks.

Operations

2 NOVEMBER 9, 2010

OPEN HOUSE

Page 4: th 2010 PM - PM Tuesday, November 9...Extraction will start in the next block while reclamation is occurring in preceding blocks. ... Reclamation Plan The project will use proven quarry

Reclamation Plan

The project will use proven quarry reclamation techniques. Salvage and replacement of topsoil will support revegetation. Large freshwater quarry lakes could provide improved habitat for �sh.

Our proposed end-use and reclamation plans are based on input received from the Municipality, aboriginal groups, regulatory agencies and other local stakeholders.

The RMWB has designated the entire property for future parks and recreation uses. Aboriginal groups would like to see the north end of the site reclaimed as natural areas.

The proposed reclamation planincludes quarry lakes, wetlands areas,meadows and forest.

The reclamation goal is to protect and reconstruct transitional natural areas adjacent to the City.

Northern areas of the site could remain as reconstructed natural areas for traditional hunting and  shing uses and/or extensive recreational uses (e.g. hiking and cross-country skiing).

Southern parts of the site could be suitable for more intensive uses such as riverbank pathways, picnic areas, boating, rowing, sports  elds, etc.

Opportunities for speci c recreational uses will be determined by the Regional Municipality and ASRD in consultation with other stakeholders.

a joint venture between Graymont Western Canada Inc. & Lehigh Hanson Materials Limited

Ft McMurray Urban Service Area

��

63

R 10 R 9 W4

87

3231

20

1718

36

19

30 29

12

13

24

25

Unnamed Creek 5

Pond 1

Parsons Creek

Unnamed Creek 3

Unnamed Creek 6

A thabasca R iver

240250

260

2 70280

290

300

246

310

24 4

320

330

238

248

242

340

236

350

2 42

340

244

240

350

270

240

240

240

248

238

236

240

290

236

250

238

250

244

2 44

2382 38

240

2 40

3 30

242

240

240

300

31 0

240

320

248

260

260

238

280

2 38

240

238

236

QUARRY LAKE

WETLAND

GRASS/MEADOW

POPLAR / SPRUCE

FOREST

HIG

HW

AY 63

Future North Parsons Creek

Residential Area

Highway and

Interchange Project

(completion 2014)

4 NOVEMBER 9, 2010

OPEN HOUSE

Page 5: th 2010 PM - PM Tuesday, November 9...Extraction will start in the next block while reclamation is occurring in preceding blocks. ... Reclamation Plan The project will use proven quarry

Environmental Commitmenta joint venture between Graymont Western Canada Inc. & Lehigh Hanson Materials Limited

Parsons Creek Resources is working to minimize the impact of the project through a number of environmental commitments.

1. Natural bu�ers will be retained Bu�ers will protect important natural features, preserve natural habitat along the river, and reduce the visual impact of the Project from the Athabasca River and Highway 63. • 150 metre setback from the Athabasca River • 45 metre setback from the Highway 63 road allowance • 30 to 50 metre setback from important creeks and ponds

2. Reclamation plans are designed to reconstruct natural areas adjacent to the city for traditional uses and to enhance the long-term recreational value of the riverbank.

The proposed end-use and reclamation plans are based on input received from the Municipality, aboriginal groups, regulatory agencies and other local stakeholders. These plans will continue to be refined through ongoing consultation with stakeholders.

3. Reclamation will be progressive and ongoing throughout the project. Project reclamation will be phased with a maximum of 400 acres of land open at any one time.

4. The project will reuse aggregate wash water and will use only a small quantity of water from the River. Water removed from the River will be used for aggregate washing and for lake evaporation. Sediment in the water used for washing limestone will be allowed to settle and clean water will be returned back to the River.

5. Best practices for noise and dust control will be implemented to ensure that local air quality and noise regulatory standards are met or exceeded with respect to nearby land uses.Noise and air emission studies have been submitted to Alberta Environment with our Environmental Impact Assessment application. These studies show that air and noise levels at nearby receptors will be within ERCB and AENV guidelines.

5 NOVEMBER 9, 2010

OPEN HOUSE

Page 6: th 2010 PM - PM Tuesday, November 9...Extraction will start in the next block while reclamation is occurring in preceding blocks. ... Reclamation Plan The project will use proven quarry

a joint venture between Graymont Western Canada Inc. & Lehigh Hanson Materials Limited

EIA Process & Consultation

An Environmental Impact Assessment application and associated applications under the Environmental Protection and Enhancement Act and Water Act were submitted to Alberta Environment and the Natural Resources Conservation Board in June 2010.

Feedback from stakeholders has recognized there is a need for a “close to market” supply of high quality aggregate material to support a�ordable infrastructure projects in the Fort McMurray area. Stakeholders also understand the potential for quarry reclamation to create a mix of replanted natural areas and recreation areas that will complement the natural riverbank environment.

We have established ongoing consultation relationships with �ve aboriginal groups and the Regional Municipality of Wood Bu�alo. We will continue to work closely with our stakeholder partners throughout the project design and operations phases to address concerns and identify opportunities for working together.

Thank you for attending our open house.

Please pick up a newsletter or comment sheet from the front desk and let us know if you want to be added to our mailing list for information about the project in the future.

6 NOVEMBER 9, 2010

OPEN HOUSE