the ats tunnel design & construction · short course 2015 program day 3 friday 9th october 2015...

5
& CONSTRUCTION TUNNEL DESIGN THE ATS SHORT COURSE 2015 Short Course 7-8 October 2015, Marriott Hotel, Brisbane, Australia Tunnelling Applications Workshop 9 October 2015, Mount Coot-tha Quarry, Brisbane Program For further information visit: www.engineersaustralia.org.au/ats2015 For registration to the short course please visit https://events.engineersaustralia.org.au/ei/getdemo.ei?id=2655&s=_9900S9AFY

Upload: others

Post on 26-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: THE ATS TUNNEL DESIGN & CONSTRUCTION · SHORT COURSE 2015 PROGRAM Day 3 Friday 9th October 2015 Mount Coot-tha Quarry ATS DESIGN AND CONSTRUCTION WORKSHOP Friday 9th October 2015

& CONSTRUCTIONTUNNEL DESIGNTHE ATS

SHORT COURSE 2015

Short Course7-8 October 2015, Marriott Hotel, Brisbane, Australia

Tunnelling Applications Workshop9 October 2015, Mount Coot-tha Quarry, Brisbane

ProgramFor further information visit: www.engineersaustralia.org.au/ats2015For registration to the short course please visit https://events.engineersaustralia.org.au/ei/getdemo.ei?id=2655&s=_9900S9AFY

Page 2: THE ATS TUNNEL DESIGN & CONSTRUCTION · SHORT COURSE 2015 PROGRAM Day 3 Friday 9th October 2015 Mount Coot-tha Quarry ATS DESIGN AND CONSTRUCTION WORKSHOP Friday 9th October 2015

& CONSTRUCTIONTUNNEL DESIGNTHE ATS

SHORT COURSE 2015

PROGRAM

Day 1 Wednesday 7th October 2015

0830-0900 Arrival and Registration, coffee

0900-0915Introduction – Welcome AddressChair: Dr Harry Asche, Aurecon

0915-1000Excavation by Roadheader Thomas Peinsitt, Sandvik

1000-1045Managing Risk in ConstructionSteve Wille, Leighton Contractors

1045-1100 Q&A

1100-1115 Morning tea

1115-1215Geotechnical Models and Interpretation for Tunnel ProjectsIan Shipway

1215-1230 Q&A

1230-1315 Lunch

1315-1345Tunnel Design OverviewMatthew Norbert GHD

1345-1430Design of Rock TunnelsRob Bertuzzi

1430-1445 Q&A

1445-1500 Afternoon Tea

1500-1545Design of Precast Segmental Tunnel LiningsOwen Francis, Arup

1545-1630State of the art Vertical Development - Civil ProjectsChris Hill, Skarpa

1630-1645 Q&A

1645-1700Day 1 Close Chair: Dr Harry Asche, Aurecon

1800-1930Networking drinks and young engineer project poster session

Social DelegatesTickets: $40 per head for non delegates

Page 3: THE ATS TUNNEL DESIGN & CONSTRUCTION · SHORT COURSE 2015 PROGRAM Day 3 Friday 9th October 2015 Mount Coot-tha Quarry ATS DESIGN AND CONSTRUCTION WORKSHOP Friday 9th October 2015

& CONSTRUCTIONTUNNEL DESIGNTHE ATS

SHORT COURSE 2015

PROGRAM

Day 2 Thursday 8th October 2015

0830-0900 Arrival, coffee

0900-0945Management of Geotechnical Risks Associated with Tunnel Boring Machine Tunnelling in Urban AreasBrendan Henry, GHD

0945-1015 Comparative Australian Procurement Models for Tunnel Projects Charles MacDonald

1015-1030 Q&A

1030-1100 Morning tea

1100-1145Testing, Exercising and Operational Readiness Conrad Stacey

1145-1230Fire Life Safety in Tunnels Prof Jose Torero, University of Queensland

1230-1245 Q&A

1245-1330 Lunch

1330-1415Mine Support Design and ImplementationProfessor Ismet, Canbulat

1415-1500Building Settlement, Instrumentation and MonitoringTim Thompson, Arup

1500-1515 Q&A

1515-1530 Afternoon Tea

1530-1615Microtunnelling & HDD MethodsBen Crosby, Bamser

1615-1700Groundwater ControlDr Harry Asche, Aurecon

1700-1715 Q&A

1715-1730Day 2 Close Chair: Dr Harry Asche, Aurecon

1730-1800 Pre Technical Session Networking and Project Poster Viewing

1800-1900ATS Technical Session North West Rail LinkGrant Andersen, John Holland

1900-2100 Networking drinks and nibbles

ATS Members : FreeNon members: $40 per head. Registration essential

Page 4: THE ATS TUNNEL DESIGN & CONSTRUCTION · SHORT COURSE 2015 PROGRAM Day 3 Friday 9th October 2015 Mount Coot-tha Quarry ATS DESIGN AND CONSTRUCTION WORKSHOP Friday 9th October 2015

& CONSTRUCTIONTUNNEL DESIGNTHE ATS

SHORT COURSE 2015

PROGRAM

Day 3 Friday 9th October 2015 Mount Coot-tha Quarry

ATS DESIGN AND CONSTRUCTION WORKSHOPFriday 9th October 2015

Site visit Mount Coot-tha Quarry

The tour will commence with coffee provided.

Technical experts from industry, designers, constructors and suppliers will provide practical demonstrations in a live project environment at the Mount Coot-tha Quarry. The workshop will provide delegates an opportunity to view the Mount Coot-tha Quarry and Legacy Way conveyor tunnel and participate in the practical workshop of a number of tunnelling applications that will be discussed during the short course program.

As part of the Brisbane Legacy Way Tunnel project, an underground conveyor was used to transport spoil from tunnel excavation underneath the Brisbane Botanic Gardens and through to the Mount Coot-tha Quarry. The conveyor tunnel was excavated using drill and blast construction methods. The construction of the spoil conveyer enabled spoil removal 24 hours a day, seven days a week in line with tunnel boring machine (TBM) operations. This spoil conveyor eliminated the need for 96,000 truck movements on surrounding roads.

Buses will depart from the Brisbane CBD to the Quarry. Buses will return to Brisbane CBD or to Brisbane Domestic airport

All delegates will be required to wear long pants, closed toe safety boots and a long sleeve shirtReasonable fitness and mobility is required as the tour involves walking through a working quarry.

0800 Buses A and B arrive at Mt Coot-tha

0800-0900Bus A travels to 30mRL bench to view site displays and Geotechnical overview of portal Bus B travels to quarry benches and TBM spoil

0900-1000 Bus B travels to 30mRL bench to view site displays and Geotechnical overview of portal Bus A travels to view quarry benches and TBM spoil

1000 -1015 Buses relocate to Botanical Gardens

1015-1045 Morning tea

1045-1100 Introduction and Discussion on Tunnelling-Quarrying Interface

1100-1125 Geotechnical Features and Challenges of the Brisbane Neranleigh Fernvale Group

1125-1150 The Potential for Future Tunnel Excavation Projects in Australia Involving Spoil Placement in Quarries

1150-1215 Development of the Automated Corbel Drilling System by Hilti and Herrenknecht

1215 Close and exit on buses to City and Airport (buses leave 1230)

Page 5: THE ATS TUNNEL DESIGN & CONSTRUCTION · SHORT COURSE 2015 PROGRAM Day 3 Friday 9th October 2015 Mount Coot-tha Quarry ATS DESIGN AND CONSTRUCTION WORKSHOP Friday 9th October 2015

& CONSTRUCTIONTUNNEL DESIGNTHE ATS

SHORT COURSE 2015

Short Course7-8 October 2015, Marriott Hotel, Brisbane, Australia

Tunnelling Applications Workshop9 October 2015, Mount Coot-tha Quarry, Brisbane

www.engineersaustralia.org.au/ats2015