the challenges of power system in the era of industry 4 · 2019-10-11 · ip’s business...
TRANSCRIPT
![Page 1: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/1.jpg)
THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4.0
![Page 2: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/2.jpg)
Strictly Confidential
![Page 3: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/3.jpg)
Strictly Confidential
IP’s O&M of Power Plant in Indonesia
![Page 4: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/4.jpg)
IP’s Business Challenges Year in 2020-2024
3. Komposisi Pembangkit EBT 20251.Penataan Ulang PortofolioBisnis AP PLN GroupAdanya penataan ulang (alignment & parenting strategy) atas portofoliobisnis dan penajaman peran anak-anak perusahaan di PLN Group.
2. RUPTL 2019-2028Adanya pembaruan asumsiberdasarkan RUPTL Tahun2019–2028.
Peningkatan komposisi
pembangkit EBT pada tahun
2025 menjadi 23%
merupakan peluang untuk
tumbuh dan sustain bagi
Perusahaan (RUKN 2015-
2034).
4. Teknologi DisruptifPerkembangan teknologi atau disruptive technology di bidang ketenagalistrikan
yang mempengaruhi model bisnis ketenagalistrikan saat ini, terutama teknologi
yang dapat menghasilkan listrik secara mandiri tanpa membeli melalui PLN dengan
harga yang semakin ekonomis, menyebabkan perlu penajaman strategi dan
initiative strategis dan penyiapan second curve bisnis Perusahaan.
![Page 5: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/5.jpg)
Today’s Discussion…
What is Industry 4.0
Industry 4.0 in Energy Industry
Industry 4.0 and Profession
Industry 4.0 and its implication
![Page 6: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/6.jpg)
Strictly Confidential
Five keys of Industry 4.0 Technology
![Page 7: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/7.jpg)
Strictly Confidential
Teknologi Disruptif di Dunia Pembangkitan Listrik
![Page 8: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/8.jpg)
Strictly Confidential
Digitalisasi Di Dunia Pembangkit
Penggunaan Drone
Penggunaan Robot
Artificial Intelligence untuk Pemeliharaan
Metal 3D Printing
VR Untuk Operational Excellence
![Page 9: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/9.jpg)
Strictly Confidential
Big
Data
An
aly
sis
Identities Business Process
Enabler Business Process
Review and Improvement
Business Process
Benchmark and Feedback
Pro
du
cts &
Serv
ices
IP’s Framework in Industry 4.0
![Page 10: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/10.jpg)
Big
Data
An
aly
sis
Identities Business Process
Enabler Business Process
Review and Improvement
Business Process
Benchmark and Feedback
Pro
du
cts &
Serv
ices
IP’s Framework in Industry 4.0
![Page 11: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/11.jpg)
Strictly Confidential
Big
Data
An
aly
sis
Identities Business Process
Enabler Business Process
Review and Improvement
Business Process
Benchmark and Feedback
Pro
du
cts &
Serv
ices
IP’s Framework in Industry 4.0
MAXIMO
ERP AP
EPE
ECM
Inovasi
KM
ProPMO
ProREOC
JTF
Package
Application
Tailor Made
Application
Under Development
Planned Development
Digimon
![Page 12: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/12.jpg)
Strictly Confidential
Big
Data
An
aly
sis
Identities Business Process
Enabler Business Process
Review and Improvement
Business Process
Benchmark and Feedback
Pro
du
cts &
Serv
ices
IP’s Framework in Industry 4.0
ERP SCM
ERP FIN
InPact
Website
ERM
CMoM
Help desk
ProLAK
KC
Package
Application
Tailor Made
Application
Planned
Development
ERP HCM
ProGCG
ProDIN
ProECO
Nearmiss
![Page 13: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/13.jpg)
Strictly Confidential
Big
Data
An
aly
sis
Identities Business Process
Enabler Business Process
Review and Improvement
Business Process
Benchmark and Feedback
Pro
du
cts &
Serv
ices
IP’s Framework in Industry 4.0
ProRBA ProREN Tailor Made
Application
![Page 14: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/14.jpg)
Strictly Confidential
Big
Data
An
aly
sis
Identities Business Process
Enabler Business Process
Review and Improvement
Business Process
Benchmark and Feedback
Pro
du
cts &
Serv
ices
IP’s Framework in Industry 4.0
Assessment Tailor Made
Application
BI Package
Application
![Page 15: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/15.jpg)
Strictly Confidential
Big
Data
An
aly
sis
Identities Business Process
Enabler Business Process
Review and Improvement
Business Process
Benchmark and Feedback
Pro
du
cts &
Serv
ices
IP’s Framework in Industry 4.0
PRONIA Tailor Made
Application
![Page 16: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/16.jpg)
Strictly Confidential
IP’s Application Program in Industry 4.0
![Page 17: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/17.jpg)
Strictly Confidential
IP’s Digital Road Map in Industry 4.0
![Page 18: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/18.jpg)
www.indonesiapower.co.id I Strictly confidential
1. MANAJEMEN ASET : TRANSAKSI ANTAR BIDANG
DIGI PROC.. Light House
![Page 19: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/19.jpg)
Strictly Confidential
![Page 20: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/20.jpg)
www.indonesiapower.co.id I Strictly confidential
2. SMART WORK EXECUTION MANAGEMENT SYSTEM (SWEMS)
Kok feedback log nya gini aja?
Wah, lupa belum di WDONE !!
LEADING & SEQUENTIAL
PROCESS
AWARENESS &
RESPONSIBILITY
REAL TIME
MONITORING
ANYWHERE
ANYTIME
DATA
INTEGRITY
IP-DIGIMON X (Digitalized Mobile On Work Execution) merupakan add-on pada CMMS Maximo
(ProHAR) dalam bentuk mobile application untuk mendukung pilar Work Planning and Control
(WPC) pada Asset Management khususnya saat Work Order Execution dimulai dari penunjukan
lead, teknisi, permintaan work permit, pengisian actual WO, hingga perubahan status WO
menjadi WDONE
K3 OPERA
TOR
HAR
PHOTO
REVIEW &
APPROVAL
MAXIMO
WO sudah sampai mana ya?
Hari ini ada kerjaan apa
ya?
Kerja dulu atau urus izin kerja dulu ya?
Pekerjaan saya aman ga ya?
Data nya valid ga
ya?
Sudah bener dikerjain apa belum ya?
Yang kerja siapa ya?
Yah kertas kerjanya ketinggalan,,
Wah, lagi diluar kota nih,,
![Page 21: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/21.jpg)
www.indonesiapower.co.id I Strictly confidential
3. ROAD MAP Smart Work Execution Management System
- Identifications
issues and
needs
- Prepare the
resources
- Develop
strategies and
methods
20182019
2020 2021
Phase 1
Phase 2 FINAL
- Realtime work monitoring
- Traceable work flow
- Efficiency process
approval
- Data integrity (photo and
feedback)
- Increasing personal
awareness and
responsibility
- Integration with Smart
Inventory Management
System (IP-ProInventory)
- Smoothing process
of Phase 1
- Dashboard KPI
monitoring
- Increase database
information related
the job task
- Manual book
synchronization, etc
- Digitalized tagging
system
- Smoothing
process of Phase 2
- Fully integration
database Asset
Management
Develoving
![Page 22: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/22.jpg)
www.indonesiapower.co.id I Strictly confidential
![Page 23: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/23.jpg)
www.indonesiapower.co.id I Strictly confidential
![Page 24: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/24.jpg)
Strictly Confidential
Reliability Efficiency Optimization Center (REOC) Framework
![Page 25: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/25.jpg)
Strictly Confidential
➢Planning (PM)➢ Reliability(MTBF,)➢ Work order PM,CM➢ Asset ➢ LCM
REOC Framework
➢ Analysis of Next Overhaul Period
➢ Real time analysis of Equipment
lifecycle
➢ Plant Operation StatusManagement
➢ Plant Operation IndexManagement
➢ Real-time Efficiency PerformanceManagement
➢ Equipment Performance Management
➢ Outage Maintenance Optimization
Maintenance period analysis
➢ MTBF, EPRI DB Analysis
Plant Management Plant Performance
Powerplant
CMMS (Maximo)
➢ Predictive Analytic for Condition
Equipment
➢ Precautions for Failure
➢ Reliability provide PdM
Plant Information
Early Fault Detection System
Reliability Prognostic & Diagnostic
Boiler In-Depth Analysis
POWER PLANT
DCS, SCADA, PLC, INTRUMENTATION, ETC
● Executive Information● Asset Optimization● Strategic Analysis● Expert System
Support Executive Decision
REOC
WAR
ROOM
KANTOR
PUSAT
![Page 26: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/26.jpg)
Strictly Confidential
REOC Level 1 : Plant Monitoring
![Page 27: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/27.jpg)
Strictly Confidential
REOC Level 2 : Realtime/Periodic Performance
![Page 28: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/28.jpg)
Strictly Confidential
REOC Level 3 : Early Fault Detection, Prognostic & Diagnostic untuk Plant Health Management (PHM)
![Page 29: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/29.jpg)
Strictly Confidential
REOC Level 3 : Early Fault Detection, Prognostic & Diagnostic untuk Plant Health Management (PHM)
![Page 30: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/30.jpg)
Strictly Confidential
REOC Level 3 : Early Fault Detection, Prognostic & Diagnostic untuk Plant Health Management (PHM)
![Page 31: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/31.jpg)
Strictly Confidential
Diagnostics: Fault detection and classificationPrognostics: Lifetime estimation
![Page 32: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/32.jpg)
Strictly Confidential
REOC Level 4 : Realtime Business & Strategic Decision Dashboard
![Page 33: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/33.jpg)
Strictly Confidential
IP’s Human Capital Transformation for Industry 4.0
33
transform
mindset
transform
capability
transform
culture
1. Membangun Budaya Digital
“Budaya Ceria”
2. Change Agent & Change
Sponsor untuk mendorong
transformasi
3. Membangun Infrastuktur Digital
HR (Talent Management, Talent
Successor, HR Artificial
Intelligent dll)
1. Kapabilitas Digital Leadeship (EDP, JEDP &
YLDP)
2. Kapabilitas Digital Expertise (XDP)
3. Kapabilitas Staff (Akselerasi Kompetensi &
Development Program)
Terciptanya Expert dan Leader
yang kompetitif didukung
oleh budaya pemenang dan
sistem pengambilan
keputusan berbasis Artificial
Intelligent.
![Page 34: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/34.jpg)
Strictly Confidential
Sumber Data (Data Terstruktur)
TAP PLN
• IP Academy
• Learning Mgmt System
• Knowledge Management
• Talent Management
• Succesion Planning
SIMKPAnalisisHCM
Datamart
Terintegrasi
secara
otomatis
Grand Design HCM Data dan Analytics memanfaatkan sumber data yang tersebar di berbagai sistem
Employee Care
Center (ECC)
Artificial Intelligence
Oracle ERP
Employee Master
Data
Oracle ERP
Organization Mgmt
Oracle ERP
•Employee Master Data
•Time Management
•Payroll
Email Catatan Penting Sosial MediaImpact & ECC
Data Tidak Terstruktur
Holistic View of
Workforce
Training & Dev.
Forecasting
Talent
Forecasting
Engagement
Analytics
Productivity
Analytics
Aplikasi Sudah Tersedia
Rencana Pengembangan
Legend :
Connected ke Core HCM
Hanya koneksi 1 arah
![Page 35: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/35.jpg)
Strictly Confidential
IP is on going forward to Industry 4.0 & Society 5.0
Sudah dikembangkan dengan
platform Map-R, Tableau, KNIME
dan visualisasi lewat REOC
Sudah dikembangkan high
fidelity simulator untuk
pelatihan PLTU
Sudah dikembangkan
integrasi & visualisasi lewat
REOC
Akan dikembangkan untuk
mendukung Learning & KM
Akan dikembangkan untuk
mendukung O&M Excellence
Telah dikembangkan di
aplikasi korporat & Office 365 Telah diterapkan standar
tinggi Cybersecurity
Akan dikembangkan untuk
mendukung O&M Excellence
Society
5.0
![Page 36: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025](https://reader033.vdocuments.net/reader033/viewer/2022041804/5e537d89ba71a240a47e3ffd/html5/thumbnails/36.jpg)
Strictly Confidential
SummaryMight meant for you:
1. New way to support and improve service in power system.
2. New ways to manage assets.
3. New requirements for designing and building facilities and assets.
4. Different sourcing mechanisms and procedures.
5. New practices, techniques, tools, procedures and metrics.
6. New players and rules in organization.
7. Disruption in organization: change, innovation, people, management.
8. A decision need for faster and more responsive action.