Page 1: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4.0

Page 2: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Strictly Confidential

Page 3: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Strictly Confidential

IP’s O&M of Power Plant in Indonesia

Page 4: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

IP’s Business Challenges Year in 2020-2024

3. Komposisi Pembangkit EBT 20251.Penataan Ulang PortofolioBisnis AP PLN GroupAdanya penataan ulang (alignment & parenting strategy) atas portofoliobisnis dan penajaman peran anak-anak perusahaan di PLN Group.

2. RUPTL 2019-2028Adanya pembaruan asumsiberdasarkan RUPTL Tahun2019–2028.

Peningkatan komposisi

pembangkit EBT pada tahun

2025 menjadi 23%

merupakan peluang untuk

tumbuh dan sustain bagi

Perusahaan (RUKN 2015-

2034).

4. Teknologi DisruptifPerkembangan teknologi atau disruptive technology di bidang ketenagalistrikan

yang mempengaruhi model bisnis ketenagalistrikan saat ini, terutama teknologi

yang dapat menghasilkan listrik secara mandiri tanpa membeli melalui PLN dengan

harga yang semakin ekonomis, menyebabkan perlu penajaman strategi dan

initiative strategis dan penyiapan second curve bisnis Perusahaan.

Page 5: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Today’s Discussion…

What is Industry 4.0

Industry 4.0 in Energy Industry

Industry 4.0 and Profession

Industry 4.0 and its implication

Page 6: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Strictly Confidential

Five keys of Industry 4.0 Technology

Page 7: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Strictly Confidential

Teknologi Disruptif di Dunia Pembangkitan Listrik

Page 8: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Strictly Confidential

Digitalisasi Di Dunia Pembangkit

Penggunaan Drone

Penggunaan Robot

Artificial Intelligence untuk Pemeliharaan

Metal 3D Printing

VR Untuk Operational Excellence

Page 9: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Strictly Confidential

Big

Data

An

aly

sis

Identities Business Process

Enabler Business Process

Review and Improvement

Business Process

Benchmark and Feedback

Pro

du

cts &

Serv

ices

IP’s Framework in Industry 4.0

Page 10: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Big

Data

An

aly

sis

Identities Business Process

Enabler Business Process

Review and Improvement

Business Process

Benchmark and Feedback

Pro

du

cts &

Serv

ices

IP’s Framework in Industry 4.0

Page 11: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Strictly Confidential

Big

Data

An

aly

sis

Identities Business Process

Enabler Business Process

Review and Improvement

Business Process

Benchmark and Feedback

Pro

du

cts &

Serv

ices

IP’s Framework in Industry 4.0

MAXIMO

ERP AP

EPE

ECM

Inovasi

KM

ProPMO

ProREOC

JTF

Package

Application

Tailor Made

Application

Under Development

Planned Development

Digimon

Page 12: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Strictly Confidential

Big

Data

An

aly

sis

Identities Business Process

Enabler Business Process

Review and Improvement

Business Process

Benchmark and Feedback

Pro

du

cts &

Serv

ices

IP’s Framework in Industry 4.0

ERP SCM

ERP FIN

InPact

Website

ERM

CMoM

Help desk

ProLAK

KC

Package

Application

Tailor Made

Application

Planned

Development

ERP HCM

ProGCG

ProDIN

ProECO

Nearmiss

Page 13: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Strictly Confidential

Big

Data

An

aly

sis

Identities Business Process

Enabler Business Process

Review and Improvement

Business Process

Benchmark and Feedback

Pro

du

cts &

Serv

ices

IP’s Framework in Industry 4.0

ProRBA ProREN Tailor Made

Application

Page 14: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Strictly Confidential

Big

Data

An

aly

sis

Identities Business Process

Enabler Business Process

Review and Improvement

Business Process

Benchmark and Feedback

Pro

du

cts &

Serv

ices

IP’s Framework in Industry 4.0

Assessment Tailor Made

Application

BI Package

Application

Page 15: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Strictly Confidential

Big

Data

An

aly

sis

Identities Business Process

Enabler Business Process

Review and Improvement

Business Process

Benchmark and Feedback

Pro

du

cts &

Serv

ices

IP’s Framework in Industry 4.0

PRONIA Tailor Made

Application

Page 16: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Strictly Confidential

IP’s Application Program in Industry 4.0

Page 17: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Strictly Confidential

IP’s Digital Road Map in Industry 4.0

Page 18: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

www.indonesiapower.co.id I Strictly confidential

1. MANAJEMEN ASET : TRANSAKSI ANTAR BIDANG

DIGI PROC.. Light House

Page 19: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Strictly Confidential

Page 20: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

www.indonesiapower.co.id I Strictly confidential

2. SMART WORK EXECUTION MANAGEMENT SYSTEM (SWEMS)

Kok feedback log nya gini aja?

Wah, lupa belum di WDONE !!

LEADING & SEQUENTIAL

PROCESS

AWARENESS &

RESPONSIBILITY

REAL TIME

MONITORING

ANYWHERE

ANYTIME

DATA

INTEGRITY

IP-DIGIMON X (Digitalized Mobile On Work Execution) merupakan add-on pada CMMS Maximo

(ProHAR) dalam bentuk mobile application untuk mendukung pilar Work Planning and Control

(WPC) pada Asset Management khususnya saat Work Order Execution dimulai dari penunjukan

lead, teknisi, permintaan work permit, pengisian actual WO, hingga perubahan status WO

menjadi WDONE

K3 OPERA

TOR

HAR

PHOTO

REVIEW &

APPROVAL

MAXIMO

WO sudah sampai mana ya?

Hari ini ada kerjaan apa

ya?

Kerja dulu atau urus izin kerja dulu ya?

Pekerjaan saya aman ga ya?

Data nya valid ga

ya?

Sudah bener dikerjain apa belum ya?

Yang kerja siapa ya?

Yah kertas kerjanya ketinggalan,,

Wah, lagi diluar kota nih,,

Page 21: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

www.indonesiapower.co.id I Strictly confidential

3. ROAD MAP Smart Work Execution Management System

- Identifications

issues and

needs

- Prepare the

resources

- Develop

strategies and

methods

20182019

2020 2021

Phase 1

Phase 2 FINAL

- Realtime work monitoring

- Traceable work flow

- Efficiency process

approval

- Data integrity (photo and

feedback)

- Increasing personal

awareness and

responsibility

- Integration with Smart

Inventory Management

System (IP-ProInventory)

- Smoothing process

of Phase 1

- Dashboard KPI

monitoring

- Increase database

information related

the job task

- Manual book

synchronization, etc

- Digitalized tagging

system

- Smoothing

process of Phase 2

- Fully integration

database Asset

Management

Develoving

Page 22: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

www.indonesiapower.co.id I Strictly confidential

Page 23: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

www.indonesiapower.co.id I Strictly confidential

Page 24: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Strictly Confidential

Reliability Efficiency Optimization Center (REOC) Framework

Page 25: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Strictly Confidential

➢Planning (PM)➢ Reliability(MTBF,)➢ Work order PM,CM➢ Asset ➢ LCM

REOC Framework

➢ Analysis of Next Overhaul Period

➢ Real time analysis of Equipment

lifecycle

➢ Plant Operation StatusManagement

➢ Plant Operation IndexManagement

➢ Real-time Efficiency PerformanceManagement

➢ Equipment Performance Management

➢ Outage Maintenance Optimization

Maintenance period analysis

➢ MTBF, EPRI DB Analysis

Plant Management Plant Performance

Powerplant

CMMS (Maximo)

➢ Predictive Analytic for Condition

Equipment

➢ Precautions for Failure

➢ Reliability provide PdM

Plant Information

Early Fault Detection System

Reliability Prognostic & Diagnostic

Boiler In-Depth Analysis

POWER PLANT

DCS, SCADA, PLC, INTRUMENTATION, ETC

● Executive Information● Asset Optimization● Strategic Analysis● Expert System

Support Executive Decision

REOC

WAR

ROOM

KANTOR

PUSAT

Page 26: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Strictly Confidential

REOC Level 1 : Plant Monitoring

Page 27: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Strictly Confidential

REOC Level 2 : Realtime/Periodic Performance

Page 28: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Strictly Confidential

REOC Level 3 : Early Fault Detection, Prognostic & Diagnostic untuk Plant Health Management (PHM)

Page 29: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Strictly Confidential

REOC Level 3 : Early Fault Detection, Prognostic & Diagnostic untuk Plant Health Management (PHM)

Page 30: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Strictly Confidential

REOC Level 3 : Early Fault Detection, Prognostic & Diagnostic untuk Plant Health Management (PHM)

Page 31: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Strictly Confidential

Diagnostics: Fault detection and classificationPrognostics: Lifetime estimation

Page 32: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Strictly Confidential

REOC Level 4 : Realtime Business & Strategic Decision Dashboard

Page 33: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Strictly Confidential

IP’s Human Capital Transformation for Industry 4.0

33

transform

mindset

transform

capability

transform

culture

1. Membangun Budaya Digital

“Budaya Ceria”

2. Change Agent & Change

Sponsor untuk mendorong

transformasi

3. Membangun Infrastuktur Digital

HR (Talent Management, Talent

Successor, HR Artificial

Intelligent dll)

1. Kapabilitas Digital Leadeship (EDP, JEDP &

YLDP)

2. Kapabilitas Digital Expertise (XDP)

3. Kapabilitas Staff (Akselerasi Kompetensi &

Development Program)

Terciptanya Expert dan Leader

yang kompetitif didukung

oleh budaya pemenang dan

sistem pengambilan

keputusan berbasis Artificial

Intelligent.

Page 34: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Strictly Confidential

Sumber Data (Data Terstruktur)

TAP PLN

• IP Academy

• Learning Mgmt System

• Knowledge Management

• Talent Management

• Succesion Planning

SIMKPAnalisisHCM

Datamart

Terintegrasi

secara

otomatis

Grand Design HCM Data dan Analytics memanfaatkan sumber data yang tersebar di berbagai sistem

Employee Care

Center (ECC)

Artificial Intelligence

Oracle ERP

Employee Master

Data

Oracle ERP

Organization Mgmt

Oracle ERP

•Employee Master Data

•Time Management

•Payroll

Email Catatan Penting Sosial MediaImpact & ECC

Data Tidak Terstruktur

Holistic View of

Workforce

Training & Dev.

Forecasting

Talent

Forecasting

Engagement

Analytics

Productivity

Analytics

Aplikasi Sudah Tersedia

Rencana Pengembangan

Legend :

Connected ke Core HCM

Hanya koneksi 1 arah

Page 35: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Strictly Confidential

IP is on going forward to Industry 4.0 & Society 5.0

Sudah dikembangkan dengan

platform Map-R, Tableau, KNIME

dan visualisasi lewat REOC

Sudah dikembangkan high

fidelity simulator untuk

pelatihan PLTU

Sudah dikembangkan

integrasi & visualisasi lewat

REOC

Akan dikembangkan untuk

mendukung Learning & KM

Akan dikembangkan untuk

mendukung O&M Excellence

Telah dikembangkan di

aplikasi korporat & Office 365 Telah diterapkan standar

tinggi Cybersecurity

Akan dikembangkan untuk

mendukung O&M Excellence

Society

5.0

Page 36: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

Strictly Confidential

SummaryMight meant for you:

1. New way to support and improve service in power system.

2. New ways to manage assets.

3. New requirements for designing and building facilities and assets.

4. Different sourcing mechanisms and procedures.

5. New practices, techniques, tools, procedures and metrics.

6. New players and rules in organization.

7. Disruption in organization: change, innovation, people, management.

8. A decision need for faster and more responsive action.

Page 37: THE CHALLENGES OF POWER SYSTEM IN THE ERA OF INDUSTRY 4 · 2019-10-11 · IP’s Business Challenges Year in 2020-2024 1.Penataan Ulang Portofolio 3. Komposisi Pembangkit EBT 2025

TerimaKasih