Page 1: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

The Evergreen 3

Project

Railway Civil Engineers’ Association

26th January 2012

Allan Dare

Strategic Development Manager

Chiltern Railways

Page 2: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

Chiltern Railways

2

London

Virgin West Coast

First Great Western

M40

Birmingham

Solihull

Warwick Parkway

Banbury

Bicester Aylesbury

Chiltern Railways

Oxford

Milton Keynes

• Linking London and Birmingham

• England’s first and second cities

• Prosperous part of middle England

• Competes with parallel M40 motorway, GWML and WCML

• Chiltern has built significant market share, much of it new to rail

Page 3: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

The railway that almost died

• 1910-1966: The best way from Birmingham to London

• 1970s: Increasingly rundown – a “duplicate route”

• 1980s: Marylebone to be closed and made into a bus station

• 1990s: Total Route Modernisation by NSE - but only as a low-

density commuter line

• 1997 on: Chiltern Railways invest over £500m to recreate a

profitable main line

Page 4: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

Investment in infrastructure

Evergreen 1 – track doubling

Evergreen 2 – extra line capacity and platforms

Page 5: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

Investment in the fleet

Class 168 – first new

trains to be ordered by a

privatised TOC

Class 172 -

high

acceleration

DMUs to

increase line

capacity

Wembley LMD

Page 6: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

Investment in access to the railway

New Parkway stationsNew car parks and bus interchanges

Page 7: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

Investment in the timetable

Trains to London each weekday

0

10

20

30

40

50

60

70

80

90

100

Solihull Leamington Spa Banbury Bicester High Wycombe

1987

1993

2012

Page 8: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

The results to date

• More traffic

• Better performance

• Taxpayer subsidy eliminated

• A more useful railway

• For the passenger

• For the nation

90

100

110

120

130

140

150

160

170

180

190

2000/1 2001/2 2002/3 2003/4 2004/5 2005/6 2006/7 2007/8 2008/9 2009/10 2010-11

Jo

urn

eys p

.a., in

dexed

Year

Passenger journeys

Chiltern

National rail

-10000

-5000

0

5000

10000

15000

20000

25000

30000

35000

2003 2004 2005 2006 2007 2008 2009 2010 2011

£m p.a.

Chiltern subsidy/premium at 2011 prices

Page 9: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

Evergreen 3:

The project

• £250m investment project

• Phase 1: Chiltern Main Line

• Phase 2: A new route to Oxford

• Financial close with DfT January 2010

• Secures franchise through to 2021

Page 10: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

Evergreen 3:

Development and funding

• Chiltern undertake specification and outline design

• Chiltern take the risk on project development and statutory

authorisation

• Asset Protection arrangement with Network Rail

• Chiltern appoint contractors

• Output sold to Network Rail at agreed milestones

• Completed works then form part of Network Rail’s RAB

• Chiltern pay higher track access fees, earned by carrying more

passengers

Page 11: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

Phase 1: Objectives

• Faster journeys

• 90 minutes London Birmingham

• Most journey times reduced by 20%

• Better rolling stock utilisation

• Reduced speed differentials

• Loco-hauled trains can run as fast as DMUs

• Loops for overtaking

• 7-day railway

• Full bi-directional working

75

100

Page 12: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

1

Phase 1: Linespeed improvements

Page 13: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

1

• 38 new sets of points

• Platform works at 14 stations

• 2 new underbridges

• 3 new footbridges replacing at-grade crossings

• 87 new signals installed

• 91 signs erected

• Cost of around £120m

Phase 1: Scope

Page 14: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

1

• Financial Close: January 2010

• Work commenced: March 2010

• Construction strategy based around a large number of weekend

possessions

• Some late-night midweek working with last trains curtailed

• Culminated in a 2 week blockade in August 2011

• First week to remodel Neasden Junction, with Marylebone closed

• Second week to install and commission new signalling

• Work complete end of August 2011

• New timetable launched 5 September 2011

Phase 1: Programme

Page 15: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

1

• 2 Chiltern trains each hour diverted to Paddington

• Excellent co-operation from FGW to free up paths

• Extra Chiltern staff at Paddington to help passengers

The blockade: partnership

Page 16: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

Neasden South Jnc.

Previous layout – Aylesbury

line is “main”

New layout – Birmingham line is

“main” at 75mph

To / From

Harrow-on-the-Hill

To Neasden Junction

Down sidings

Freight

Terminal To / From

Birmingham

To / From

Marylebone

60 60

40

40

15

60 60

75

75

75

60

75

60

60

To / From

Harrow-on-the-Hill

To Neasden Junction

Down sidings

Freight Terminal

To / From

Birmingham

To / From

Marylebone

Page 17: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

1

Neasden South Jnc. remodelling

Page 18: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

1

Higher line speeds Neasden to Ruislip

• 100mph now attained very shortly

after leaving London

• Cab view shows 97mph passing

through Sudbury & Harrow Road

(previously 60mph)

Page 19: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

Northolt Junction

• New Down line created

• Original down line retained as loop

• Linespeed increased from 50mph to 100mph

• New facing crossover at West Ruislip for

West Waste access and Bi-di working

South

Ruislip

station

Great Central

Avenue

Rabournmead

Drive

Victoria

Road

Sainsbury’s

West Waste

Central Line to

Greenford

Existing

Down line –

70% fewer

trains in

future

New Down Main

line – most

westbound trains

will use this line in

future

Existing

Up Main

line

Page 20: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

Bucks footbridges

•5 foot crossings replaced with new bridges and/or footpath diversions

•Complex planning issues due to rights of way, Chilterns AONB and site

access

Page 21: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

Princes Risborough

New “Up Through” line with 85mph line speed;

old Up line retained as platform loop

Down line

installed in

1999

Page 22: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

Chiltern’s investment at Princes Risborough

Banbury

Aylesbury

Aylesbury

Banbury

London MaryleboneLondon Marylebone

Banbury

London Marylebone

Aylesbury

1992 1999 2011

Page 23: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

Bicester North

Old layout – Up line has 25mph

restriction

New layout – platform built out, and Up

line has 100mph line speed

Page 24: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

Aynho Junction

• Junction of Chiltern and Didcot-

Chester lines, south of Banbury

• Chiltern line speed raised from 65

to 90mph (Up) and 40 to 85mph

(Down)

• Additional crossover to enable full

bi-di working on both Chiltern

tracks

New 90mph turnout

Page 25: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

Birmingham Moor Street

• Closed in 1987 and left derelict

• Buildings restored 2003

• New “GW-retro” style footbridge and through platform canopies 2006

• Terminal platforms reinstated 2010

• England’s second city now has a first-class station

Page 26: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

Silver service

• Refurbished Mk3 coaches

• Power-operated doors and retention toilets being fitted

• Still the best vehicles in the UK!

Page 27: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

Chiltern Main Line is here

• “Great British Railway Journeys” presenter Michael Portillo

helped launch Chiltern Mainline on 5th September

Page 28: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

To/from London Marylebone Previous

regular best

(mins)

Sept 2011

Evergreen 3

(mins)

Beaconsfield 31 23

High Wycombe 37 27

Bicester North 50 41

Banbury 67 51

Warwick Parkway 92 71

Birmingham Moor Street 119 90

•Banbury – Marylebone is now quicker than Oxford -Paddington

•Birmingham Moor St.-Marylebone is only 8 minutes slower than New St.-Euston

•and half the price!

•395 Chiltern trains each day – more than ever before

•24% business increase since timetable launch

Faster journeys,

more trains

Page 29: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

Phase 2: Chiltern to Oxford

•New Marylebone-Oxford route

•Relieves crowding on the fast-

growing Thames Valley line

•New north Oxford railhead at Water

Eaton Parkway

•Greatly enhanced Bicester-Oxford

commuter service

•Direct rail link to Bicester Village

fashion centre

•Oxford-High Wycombe link for first

time since 1964

•Facilitates East-West Rail

To London Marylebone -

66 miles

Bicester

To Banbury &

Birming

ham

To Claydon LNE

Junction

– future EWR route to

Milton Keynes

To London Paddington –

64 miles

To

Worc

ester

Oxford

Islip

Water Eaton Parkway

M4

0

A4

1A3

4

A4

0

A40

A4

4

A3

4

A426

0

A442

1

Express bus

route

s

Page 30: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

Phase 2: Train services

FR Yugoslavia

• 2 Chiltern trains each hour Oxford-Marylebone

• 66 minutes Oxford-Marylebone

• 58 minutes Water Eaton Parkway-Marylebone

• 38 minutes Oxford-High Wycombe

• Chiltern Class 168 “Clubman” DMUs

• East-West Rail will bring extra passenger and

freight services

Page 31: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

Phase 2: Oxford line

works

•New chord line at Bicester

•Bicester Town – Oxford North Junction line completely rebuilt

•37 level crossings abolished

•Bicester Town and Islip stations rebuilt

•New station at Water Eaton Parkway

•Wolvercot tunnel gauge enhancement

•Additional line capacity Oxford North Junction - Oxford

•Extra platforms at Oxford station

Page 32: The Evergreen 3 Project - RCEA · Evergreen 3 (mins) Beaconsfield 31 23 High Wycombe 37 27 Bicester North 50 41 Banbury 67 51 Warwick Parkway 92 71 Birmingham Moor Street 119 90 •Banbury

To

Marylebone

Bicester chord

FR Yugoslavia

Bicester North

station

Bicester Town

station

Proposed chord line

and safeguarded land

Development

land

To Oxford

London Road level crossing

Bicester Village

retail mall

To

Claydon

LNE

Junction

To

Birmingham