Page 1: The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team

The Joint COntrols Project Framework

Manuel Gonzalez Berges on behalf of the JCOP FW Team

Page 2: The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team

27/03/03 M. Gonzalez Berges / JCOP FW team 2

Contents

Overview Deliverables Who is using it? Development Process Current Status Summary

Page 3: The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team

27/03/03 M. Gonzalez Berges / JCOP FW team 3

The Joint COntrols Project

Set up in 1998 as a collaboration between the four LHC experiments and CERN as equal partners

Project mandate:“To develop a common Framework and components for

detector control of the LHC experiments and to define the required long-term support.“

JCOP comprises many activities Evaluation of different technologies Main subprojects

Framework Detector Safety System (DSS) Gas Systems

And others

Page 4: The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team

27/03/03 M. Gonzalez Berges / JCOP FW team 4

The JCOP Framework

Project established in May 2000 Use Architecture WG Framework Design Proposal as

starting point Aims

Reduce the development effort Reuse of components Hide complexity Help in the learning process

Facilitate the integration Reduce resources needed afterwards

Homogeneous control system Operation Maintenance

Page 5: The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team

27/03/03 M. Gonzalez Berges / JCOP FW team 5

Approach Followed

Provide a higher layer of abstraction reduce knowledge of tools interface for non experts

Customize & Extend industrial components Modular/Extensible

core mix & match components

As intuitive as possible Global rather than local optimization

Not a complete control system!

Page 6: The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team

27/03/03 M. Gonzalez Berges / JCOP FW team 6

Types of Users

Component Developer Extends the Framework

System Developer Develops a controls application using the Framework

System Integrator Puts together systems developed separately

End Users Domain Expert (e.g. gas, high voltage)

Page 7: The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team

27/03/03 M. Gonzalez Berges / JCOP FW team 7

DCS Development

Architecture Working Group

ExperimentControl System

ExperimentFramework

Control SystemFramework

SCADA/FSMAnd other tools

FrameworkDesign

JCOP Framework Team

Experiment Team

Experiment Sub-detector Teams

Users

Page 8: The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team

27/03/03 M. Gonzalez Berges / JCOP FW team 8

SCADA (PVSS)

JCOP FW (Supervisory)

Supervisory Application

FSM, DB, Web,etc.

Supervision

Front-end

PLC

UNICOS FWFE Application

Communication

PC (Windows, Linux)

Other Systems

Commercial Devices

Device DriverFE Application

OPC, PVSS Comms, DIM, DIPOPC, PVSS Comms, DIM, DIP

Architecture

Page 9: The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team

27/03/03 M. Gonzalez Berges / JCOP FW team 9

Framework Deliverables

Guidelines document Devices Tools Libraries Examples Tutorial & training

Page 10: The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team

27/03/03 M. Gonzalez Berges / JCOP FW team 10

Guidelines and Conventions

Guidelines to produce a coherent control system Look and feel

e.g. colours, fonts, layout Alarm classes Naming convention Exception handling File organization and so on

Page 11: The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team

27/03/03 M. Gonzalez Berges / JCOP FW team 11

Devices

Representation of real-world device or logical entity Device consists of

Supervisory Data Point Type(s) Library Panels

Front-end object Commercial Custom made

Page 12: The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team

27/03/03 M. Gonzalez Berges / JCOP FW team 12

Supported Devices

Generic Analog-Digital devices CAEN power supplies Wiener power supplies Wiener Fan Tray (crate control) PS and SPS machine data server ELMB Logical Node/View Device Support Extension

Page 13: The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team

27/03/03 M. Gonzalez Berges / JCOP FW team 13

Tools (I)

Device Editor/Navigator Main interface to the Framework System management: installation, login, etc Configuration and operation of devices

Controls Hierarchy High level view and behaviour of experiment Includes Finite State Machines (based on SMI++) Provides predefined behaviour (partitioning rules)

External Alarm Handler Receive alarms in PVSS from a external system

Trending Simplify & extend PVSS trends Pages of predefined plots, templates, tree

Page 14: The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team

27/03/03 M. Gonzalez Berges / JCOP FW team 14

Tools (II)

Generic External Handler To incorporate C++ code to panels and ctrl manager Easier to use than standard PVSS C++

Mass Configuration Initial release including creation and deletion Manipulation of device sets coming

Component Installation

Page 15: The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team

27/03/03 M. Gonzalez Berges / JCOP FW team 15

Supervisory Application

Event Manager

Data Manager

OPC client OPC client OPC client

OPC serverOPC server OPC server

FW Custom FE

Device Editor Navigator

Controls Hierarchy

C/C++ code GEH

EAHExternal System

FW Custom FE

Devices

User specific FE

UserFrameworkPVSSCommercial

Equipment

OPC, DIM, PVSS comms

Framework Components

Page 16: The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team

27/03/03 M. Gonzalez Berges / JCOP FW team 16

Other deliverables

Libraries Setting of address, alerts, archiving, etc List manipulation Exception handling

Examples Panels Buttons Scripts

Tutorial Use of several FW tools Available as a one day course from the CERN Training Service Can be run in our lab with real hardware or in user’s own lab with

simulator

Page 17: The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team

27/03/03 M. Gonzalez Berges / JCOP FW team 17

Who is using it?

Fixed target experiments COMPASS HARP NA60

LHC experiments & testbeams ALICE / HMPID, TPC ATLAS / Muon Chambers, Inner Detectors integration CMS / Muon DT LHCb / Velo, Muon

Gamma Irradiation Facility (GIF) Experiments’ Gas Control Systems LHC Accelerator UNICOS Framework

Cryogenics Vacuum

Page 18: The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team

27/03/03 M. Gonzalez Berges / JCOP FW team 18

Development Process

Driven by the Framework Working Group Meetings every two weeks Identify new components and set priorities (planning) Review requirements Review implementation proposals Forum for exchanging ideas Members

Representatives from each of the LHC experiments FW core team

Agreed development process Iterative, lightweight

Configuration Management

Page 19: The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team

27/03/03 M. Gonzalez Berges / JCOP FW team 19

Short requirements doc

Implementation Proposal

Implementation

Test

Documentation

FW WG Review

FW WG Review

Development Process

Information Management

Configuration Management

Page 20: The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team

27/03/03 M. Gonzalez Berges / JCOP FW team 20

Status

Three major releases since June 2001 Increasing functionality Incorporating feedback

Current work Simplification of the integration of new device types Configuration from an external database Data Storage and Retrieval

CASTOR Conditions Database

ISEG power supplies Access Control Scalability tests

Page 21: The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team

27/03/03 M. Gonzalez Berges / JCOP FW team 21

Summary

Successful collaboration Development process

Framework WG Feedback from users

Deliverables in production Overhead of consultancy and support Useful feedback from users

Recent external JCOP Review Approach adopted was supported Framework identified as one of the key elements of JCOP Good support for common devices Databases an important issue to be followed

Page 22: The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team

27/03/03 M. Gonzalez Berges / JCOP FW team 22

Pointers

JOint Controls Project http://cern.ch/itco/Projects-Services/JCOP

External JCOP Review http://cern.ch/itco/Projects-Services/JCOP/ExternalReview

JCOP Framework: http://cern.ch/itcobe/Projects/Framework