the lean enterprise vsm symbols vsm symbols lean foundations continuous improvement training lean...
TRANSCRIPT
The Lean EnterpriseThe Lean EnterpriseThe Lean EnterpriseThe Lean Enterprise VSM SymbolsVSM Symbols
Lean Foundations
Continuous Improvement Training
Lean Foundations
Continuous Improvement Training
Value Stream Symbols Value Stream Symbols and Definitionsand Definitions
Addendum
to Value Stream Mapping
Value Stream Symbols Value Stream Symbols and Definitionsand Definitions
Addendum
to Value Stream Mapping
Manufacturing Process
Process Data Box
I
Truck Shipment
Inventory
Material Icons Represents Notes
Outside Sources
One box equals an area of continuousflow. All processes should be labeled.Box also used to identify departmentssuch as production control.
Used to show customers, suppliersand outside manufacturing processes.
WELDING
ABCCOMPANY
C/T=120 sec.C/O=22 min.
3 SHIFTS
3% SCRAPW/T=20 hrs Used to record information concerning
a manufacturing process, department,etc.
Count and time should be noted.225 pieces 1.5 days
Tuesday+ Thurs Note the frequency of shipments.
Material Icons Represents Notes
FIFO
Air Shipment
Movement of prod’nmaterial by PUSH
Movement of finishedgoods to the customer
Supermarket
Physical pull
Transfer of controlledquantities of material between processes in afirst in first out seq.
Create rail or other icons as needed.
Identifies material movements that arepushed by producer, not pulled by the customer ( the following process ).
Also shows movement of raw materialand components from suppliers ifthey are not pushed.
Pull of materials from a supermarket.
Indicates a device to limit quantityand ensure FIFO flow of materialbetween processes.
Information Icons Represents Notes
Manual flow ofinformation
Electronic flow ofinformation
For example: production schedule shipping schedule
For example: EDI, Fax, etc.
OXOX Load leveling
Sequence-Pull Ball
Tool to level the volume and mixof Kanban over a specific periodof time.
Gives permission to produce apredetermined type and quantity.
WeeklySchedule
Information Describes an information flow.
Information Icons Represents Notes
20 Production Kanban
Withdrawal Kanban
Signal Kanban
Kanban post
Tells a process how many of whatcan be produced and gives permissionto do so.
Production instruction that ordersproduction from a batch process,eg: stamping.
Place where Kanban are collectedand held for conveyance .
Tells a process how many of whatcan be withdrawn and gives permissionto do so.
LatheChangeover
General Icons Represents Notes
Kaizen lightning burst
Buffer or safety stock
Highlights critical improvement needsat specific processes. Can be used toplan Kaizen events.
“Buffer” or “Safety Stock” must benoted.
The Lean EnterpriseThe Lean EnterpriseThe Lean EnterpriseThe Lean Enterprise VSM SymbolsVSM Symbols
Lean Foundations
Continuous Improvement Training
Lean Foundations
Continuous Improvement Training