the maglev system transrapid - gem | epfl · will a new track bound transportation system – the...

19
Stefan Herzberg/14.10.2004/Presentation/Page 1 of 19 The Maglev System Transrapid Technology for the future A new track-bound transportation system

Upload: duonghanh

Post on 25-Aug-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Maglev System Transrapid - GEM | EPFL · Will a new track bound transportation system – the Maglev system Transrapid ... The Transrapid Maglev System fulfills with high

Stefan Herzberg/14.10.2004/Presentation/Page 1 of 19

The Maglev System TransrapidTechnology for the futureA new track-bound transportation system

Page 2: The Maglev System Transrapid - GEM | EPFL · Will a new track bound transportation system – the Maglev system Transrapid ... The Transrapid Maglev System fulfills with high

Stefan Herzberg/14.10.2004/Presentation/Page 2 of 19

Market Mobility – Actual Situation

High Growth High GrowthGrowth

Less Growth

Ground Air

Long distance flights

Road traffic (cars – buses)

Domestic flights

Railway systemsPressure Pressure

In all industrial countries, in all growing national economies, the modal split should be changed in favour for track bound systems.

Competitive factors are therefore decisive such as

Attractiveness – Efficiency – Speed Environmental Friendliness – Safety

Will a new track bound transportation system – the Maglev system Transrapid –fulfill these requirements?

Page 3: The Maglev System Transrapid - GEM | EPFL · Will a new track bound transportation system – the Maglev system Transrapid ... The Transrapid Maglev System fulfills with high

Stefan Herzberg/14.10.2004/Presentation/Page 3 of 19

Fast Fastest ground transportation system

Attractive –Comfortable – Punctual „Flying at Ground Level“

Efficient Highest possible annual performance, low LCC

Light weight Low weight per seat

Energy efficient Favorable ratio “speed – energy consumption”

Quiet Favorable ratio “speed – noise”

Environmentally friendly Good Adaption to its surroundings

Safe Failure transparent and failure tolerant

1. The Transrapid Maglev System fulfills with high percentage the following requirements for High Speed Ground Transportation Systems:

2. The Transrapid fills the gap between railway systems and air trafficwill be a high efficient supplement between railway and airplanes

Page 4: The Maglev System Transrapid - GEM | EPFL · Will a new track bound transportation system – the Maglev system Transrapid ... The Transrapid Maglev System fulfills with high

Stefan Herzberg/14.10.2004/Presentation/Page 4 of 19

Comparison of Steel Wheel on Rail with Transrapid Maglev System

Spurkranz 30mm

Schienenkopf> 67 mm

Guidance

Guidance

Electromagnetic Levitation

Propulsion

Support

Wheel flange30 mm

PropulsionHead of rail

67 mm

Support

Large point stressabout 5000 – 8000 kg/cm² staticslip between wheel and railwear and tear

No point stress – only plane loadabout 0,7 kg/cm² staticno mechanical contactno wear and tear

Page 5: The Maglev System Transrapid - GEM | EPFL · Will a new track bound transportation system – the Maglev system Transrapid ... The Transrapid Maglev System fulfills with high

Stefan Herzberg/14.10.2004/Presentation/Page 5 of 19

System Overview –The Maglev System with its subsystems

Vehicle Propulsion / Energy supply

Operation control technique Guideway

Maglev System

Page 6: The Maglev System Transrapid - GEM | EPFL · Will a new track bound transportation system – the Maglev system Transrapid ... The Transrapid Maglev System fulfills with high

Stefan Herzberg/14.10.2004/Presentation/Page 6 of 19

System Overview –Vehicle

Carriage body

Maglev undercarriage

Page 7: The Maglev System Transrapid - GEM | EPFL · Will a new track bound transportation system – the Maglev system Transrapid ... The Transrapid Maglev System fulfills with high

Stefan Herzberg/14.10.2004/Presentation/Page 7 of 19

System Overview –Vehicle

Sub-floor structure

Magnet Module

Frame bracket

Guidance magnet

Support Magnet

Page 8: The Maglev System Transrapid - GEM | EPFL · Will a new track bound transportation system – the Maglev system Transrapid ... The Transrapid Maglev System fulfills with high

Stefan Herzberg/14.10.2004/Presentation/Page 8 of 19

System Overview –Propulsion system / Basic Structure

substation n substation n+1

Feeder cablesystem

Guideway section

Operations control

Propulsion block

Data transfer

Motor section control

Power supply

Drive control zone

Waysideswitchgear

Power section

ConverterControl (URS)

Converter unit (URE)

Transformers Switchgear

Cooling system

diagnosis

Switch station

Switch st. controlStator sections

Long stator

Power section

ConverterControl (URS)

Converter unit (URE)

Transformers Switchgear

Cooling system

Operations control

Propulsion block

Data transfer

Motor section control

Power supply

diagnosis

Page 9: The Maglev System Transrapid - GEM | EPFL · Will a new track bound transportation system – the Maglev system Transrapid ... The Transrapid Maglev System fulfills with high

Stefan Herzberg/14.10.2004/Presentation/Page 9 of 19

System Overview –Operation Control System / main tasks

Automatic Train Operation – ATO – driverless

according to predefined regular and back-up time tables

Automatic train protection and control to guarantee safe and efficient train operation

Manual train operation to handle disturbances and maintenance activities

Highest and most advanced automation level in High Speed Ground transportation systems

Page 10: The Maglev System Transrapid - GEM | EPFL · Will a new track bound transportation system – the Maglev system Transrapid ... The Transrapid Maglev System fulfills with high

Stefan Herzberg/14.10.2004/Presentation/Page 10 of 19

System Overview –Operation Control System (OCS)

Operation Control and Safety System - OCS

De-central - DCS Central - OCC Vehicle - VCS

DCS 2 DCS 1DCS XVCS 2 VCS 1

DCS 4 DCS 1

DCS 3

DCS 2

VCS 1VCS 2

Page 11: The Maglev System Transrapid - GEM | EPFL · Will a new track bound transportation system – the Maglev system Transrapid ... The Transrapid Maglev System fulfills with high

Stefan Herzberg/14.10.2004/Presentation/Page 11 of 19

System Overview –Operation Control System / Data Transfer

Infrastructure Control

CentralOperation Control

Operation Control Center

MaintenanceManagement

System

MaintenanceOperation Control

Diagnosis

Infrastructure

Track Side

WAN#2

MaintenanceCenter

Passenger Information Control

Central Radio Control

Diagnosis SecurityTranslator

Propulsion &

Power Supply System

DecentralizedOperation Control System

DPS Decentral

Radio Control

Substation n

WAN#1Only for defined user

Radio System (38 GHz)

MobileRadio Control

Vehicle System

Vehicle n

Vehicle Control System

LocationSensors

Interlockingbus

connects all safety related computers

Profibus PPEthernet PSOTN Link PP

Switch Station

n

Transformer Station

n

Guideway Switch

n

STATIO

NS

Page 12: The Maglev System Transrapid - GEM | EPFL · Will a new track bound transportation system – the Maglev system Transrapid ... The Transrapid Maglev System fulfills with high

Stefan Herzberg/14.10.2004/Presentation/Page 12 of 19

System Overview –Guideway

Slide Plane

Guidance Magnet

Guidance Rail

3-phase Motor Winding

Stator Pack

Support Magnet

Page 13: The Maglev System Transrapid - GEM | EPFL · Will a new track bound transportation system – the Maglev system Transrapid ... The Transrapid Maglev System fulfills with high

Stefan Herzberg/14.10.2004/Presentation/Page 13 of 19

System Overview –Guideway

At grade guideway Typ III

2,75 m

0,4 m6,19 m

24,76 m

1 m

12 m

Elevated guideway Typ II

Elevated guideway Typ I

49,536 m

2 m

25 m

2,5

– 10

m

< 3,

5 m

Page 14: The Maglev System Transrapid - GEM | EPFL · Will a new track bound transportation system – the Maglev system Transrapid ... The Transrapid Maglev System fulfills with high

Stefan Herzberg/14.10.2004/Presentation/Page 14 of 19

System Overview –Transrapid System Characteristics

Operational speed

Accelerationfrom 0 to 300 km/h

Grade climbing ability

Propulsion equipment

250 - 300 km/h

approx. 20 - 23 km

4 % maximally

Max. propulsion power must be carried on board

250 - 300 km/h

approx. 20 - 23 km

4 % maximally

Max. propulsion power must be carried on board

HS Railway

400 - 500 km/h,even with speeds under 400and 300 km/h favorable system characteristics, as there are low noise and low energy consumption.

approx. 5 km

10 %

Propulsion power tailored to the requirements of the track and the operation program

400 - 500 km/h,even with speeds under 400and 300 km/h favorable system characteristics, as there are low noise and low energy consumption.

approx. 5 km

10 %

Propulsion power tailored to the requirements of the track and the operation program

Transrapid

(only possible with distributed propulsion)

Page 15: The Maglev System Transrapid - GEM | EPFL · Will a new track bound transportation system – the Maglev system Transrapid ... The Transrapid Maglev System fulfills with high

Stefan Herzberg/14.10.2004/Presentation/Page 15 of 19

Benefits of the Maglev System:Operation Costs

Energy-consumption:At 300 km/h constant run Transrapid needs less power by 25 - 30 % in comparison with High Speed Rail Systems

Guideway maintenance costs independent of SpeedFully automated system less operation personal

Maintenance costs per place and kilometer:

100 %100 %

100 %

ca.40 % bis

45 %

ca.30 %

Wheel/railHigh Speed

TRTR

Vehicle Guideway

Wheel/railHigh Speed

The demonstration for the fulfillment of the values of TR still has to be done with the first commercial application.

Page 16: The Maglev System Transrapid - GEM | EPFL · Will a new track bound transportation system – the Maglev system Transrapid ... The Transrapid Maglev System fulfills with high

Stefan Herzberg/14.10.2004/Presentation/Page 16 of 19

Benefits of the Maglev System: Guideway Maintenance Costs

Comparison of Wheel-on-Rail and Transrapid SystemMaintenance Cost

(Index) %

100 200 300 400 500

Transrapid

High speed wheel-on-rail system

Mixed trafficwheel-on-rail system

420

300

200

100

50

Speedkm/h

Average approx. 30 % of

wheel-on-rail value

For wheel-on-rail systems, the track (guideway) maintenance costs increase with operating speed. For the Transrapid system, the guideway maintenance costs are independent of operating speed.

Page 17: The Maglev System Transrapid - GEM | EPFL · Will a new track bound transportation system – the Maglev system Transrapid ... The Transrapid Maglev System fulfills with high

Stefan Herzberg/14.10.2004/Presentation/Page 17 of 19

Benefits of the Maglev System: Environmentally Friendly

Transrapid Railroad

Curve:with 200 km/h: 705 m 1400 m with 300 km/h: 1590 m 3200 mwith 400 km/h: 2825 m -with 500 km/h: 4415 m -

Land Consumption:elevated approx. 2,1 m²/mat-grade approx. 12,0 m²/m 14 m²/m

Flexible alignment parameters with regard to gradients, curves, land consumption, route configuration

Good possibilities to collocate with highways and railroads

Noise emission(external)Same speed (200/300 km/h) of High Speed Rail and Transrapid:Transrapid has only half the noise of HS-Rail

The Transrapid fits well into the existing landscape / topography

Page 18: The Maglev System Transrapid - GEM | EPFL · Will a new track bound transportation system – the Maglev system Transrapid ... The Transrapid Maglev System fulfills with high

Stefan Herzberg/14.10.2004/Presentation/Page 18 of 19

Benefits of the Maglev System:Safety

Fully automatic transportation system

Current guideway inspection regarding geometrical deviations

Cross winds: to a high degree insensitive

Failure tolerant: Redundant concepts, to avoid safety critical conditionsFailure transparency for possible deviations of important system functions

Derailment

Page 19: The Maglev System Transrapid - GEM | EPFL · Will a new track bound transportation system – the Maglev system Transrapid ... The Transrapid Maglev System fulfills with high

Stefan Herzberg/14.10.2004/Presentation/Page 19 of 19

Program for the near and medium future

Technical and Economical Optimization of the Overall System

Vehicle

Technique

Guideway & Guideway equipment

Power Supply Propulsion System

Economy

Investment Costs

operationmaintenance costs

Operation ControlSystem

By means of:Further development by using new technical components and possibilitiesTechnical up-date by application of experience and knowledge gainedUse of components from other transportation and technical systemsConsistent application of the RAMS / LCC systematicStandardization and simplification wherever possible