Page 1: The Paks case: e-bus procurement Paks Transport Ltd. (PTO

Balázs Kiss External expert - Paks Transportation Ltd.

[email protected]

The Paks case: e-bus procurement –Paks Transport Ltd. (PTO of Paks)

16.09.2021. eBussed - ‘Procurement and Tendering of Electric Buses’

Page 2: The Paks case: e-bus procurement Paks Transport Ltd. (PTO

Basic data

• 18,788 (2018) inhabitants;• 154,08 km2;• Several peripherial parts of communes (Dunakömlőd, Biritó-

puszta, Csámpa-puszta, Gyapa, etc.); • Adjacent to the river Danube, has a port for inland freight

transport• Around 1500 local businesses, the biggest is by far the

Nuclear Power Plant• „Socialist industrial city”• Wealthy and ageing population (2nd wealthiest in Hungary)

Page 3: The Paks case: e-bus procurement Paks Transport Ltd. (PTO

Baseline

• Already above average motorization rate• Road infrastructure does not keep up,

including• Roads• Parking spaces

• Decreasing usage of public transport• High traffic going through the city• Bottlenecks

• Projects to mitigate these issues• SUMP (2018)• Transport Action Plan (2018, updated

continuously)

Page 4: The Paks case: e-bus procurement Paks Transport Ltd. (PTO

Planning ahead

• Construction of a newnuclear power plant – butalso developing a local smartgrid (Protheus Holding Plc. -> Paks Transportation Ltd.)

• Increased population, increased traffic

• Regional approach todevelopments

Initiated by the Municipality of Paks:• Involvement of ELENA-funding as part

of a bigger smart-grid project• Protheus Holding Plc. and later the

Paks Transportation Ltd.• SUMP & Transportation Intervention

Plan outlining main activities• In anticipation of the new Nuclear

Power Plant, therefore:• New roads• New buses & routes• Facilities, bycicle roads, parking

spaces, traffic management in thecity centre, bottlenecks, etc.

• Accounting for around roughly 15 million EUR

Page 5: The Paks case: e-bus procurement Paks Transport Ltd. (PTO

Implementing the Plan

Creating a newnetwork

The Municipality of Paks ordered a concept from theInsitute for TransportScience to recreate and refresh the publictransportation system

Page 6: The Paks case: e-bus procurement Paks Transport Ltd. (PTO

Implementing the Plan

Creating a newcompany

The Municipality and theTransportation Ltd. signeda contract for perfomingpublic services in terms of public transportmanagement and supplyinglocal public transportation

• As planned in the ELENA application, a separate entity manages local publictransportation

• Procurement processes are handled bythe Municipality

Page 7: The Paks case: e-bus procurement Paks Transport Ltd. (PTO

Procurement

• Tendering: Municipality as Beneficiaryin the frame of an Integrated TransportOP call for applications (1,7 billion HUF ~ 5 million EUR)

• Investment included 10 buses, trainingon handling, maintenance and repairs

• charging infrastructure and supportingfacilities (in a separate procurement)

• Call published on the 27th of December 2018

• Not included: passenger informationsystem

Two offers received (BYD, Solaris)

Page 8: The Paks case: e-bus procurement Paks Transport Ltd. (PTO

Further along the way

The public transport service was launchedon the 1st of February, 2021

• 200km with one charge• Driver are happy, buses are easy to

drive• Number of passengers is hard to tell

due to lockdown• User are generally happy, clock-face

scheduling makes planning easier, thenew network is more usable

• Unexpected criticism: families with 2 ormore cars don’t see why this is useful

Source: Paks II

Page 9: The Paks case: e-bus procurement Paks Transport Ltd. (PTO

COVID-19 repercussions

• Legal responsibilities (mask)• Mobil ticket as a preferred method• Entry at the first door, protective

equpment (medical gloves, disinfectants), daily disinfection

• No infections among the drivers• Opportunities offered to vaccinate, but

not mandatory• Test opportunities provided• Due to the service was only launched on

the 1st of February, 2021, the impactcan’t be assessed

Page 10: The Paks case: e-bus procurement Paks Transport Ltd. (PTO

Upscaling,future plans

• On the long run, restrictive measureswould contribute to rising passengernumbers

• In the frame of the Municipality• Other modes and solutions• DRT system in the outer areas (with a

mobile application) – taxi in case of toofew passengers

• In the frame of the Protheus-project• The Nuclear Power Plant needs

frequent and steady service (servicecontract)

• Other modes (ferry, bycicle, scooter)• Smart passenger stations

Page 11: The Paks case: e-bus procurement Paks Transport Ltd. (PTO

Project smedia

Thank you!

Questions are welcome!https://www.interregeurope.eu/e-mob