The Parts of a Wind turbine, Construction and Integration . Dr. Péter Kádár Óbuda University, Power System Department , Hungary kadar.peter@kvk . uni-obuda.hu. Draft. The elements of a wind turbine The construction of the wind power plant The building procedure - PowerPoint PPT PresentationTRANSCRIPT
Óbuda UniversityPower System Department
The Parts of a Wind turbine, Construction and Integration
Dr. Péter KádárÓbuda University, Power System Department, Hungary
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Draft
• The elements of a wind turbine• The construction of the wind power plant• The building procedure• Integration of wind energy into bulk power
systems
2
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Growing unit performance
Today:120-160 m 3,5-5 MW
3
Óbuda UniversityPower System Department
Limits: the sky
Wind Turbine Construction - Wind energy integration - Patra, 2012
4
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Parts of a wind turbine
5
Low-med. volt. transformer
cable
steel tower
power electronics
gearbox
rotorblades
anemometer
generator
turning generator house
grid
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Foundation
6
Óbuda UniversityPower System Department
Transportation
Wind Turbine Construction - Wind energy integration - Patra, 2012
7
Óbuda UniversityPower System Department
Transportation
Wind Turbine Construction - Wind energy integration - Patra, 2012
8
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Craning
9
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Nacelle
10
Óbuda UniversityPower System Department
Trends
Wind Turbine Construction - Wind energy integration - Patra, 2012
11
traditional up-to-date
Tower steel concrete
Height low high
Rpmsemi fixed
speedvariable speed
Cut in 3m/s 2,5m/s
Óbuda UniversityPower System Department
E-40 – E-82
Wind Turbine Construction - Wind energy integration - Patra, 2012
12
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
New control paradigm: wind priority
Traditional control: Load demand -> generation control on the base of the demand
Wind priority: we let generate all the wind plant, and we produce some more by the request
Future: intelligent generation and load harmonisation (Demand Side Management)
13
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
New control paradigm: wind priority
Traditional:Control by the demand• E.g. steam
generation• Turbine• Generator
Wind:Control by the wind
speed and demand• rotor blades• generator
14
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Indirect and direct driving
15
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Connection of the generator to the grid
30 Hz 50 Hz
20 Hz 50 Hz
Appr. RPM900-1000changing
Fixed frequency (RPM)
16
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Control: pitch, P,Q
17
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Electrical connection: compact substation
18
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Connection to 20 kV
19
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Single line scheme
20
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
More details…
21
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Protection, measurements, settling, RTU
22
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Connection between the tower and the compact substation
23
Óbuda UniversityPower System Department
Power, voltage level and topology
• 1 unit: cca. 2 MW (0,8 – 3,5 MW)• 20 kV for transmission 3-8 MW• Wind park: 20-30 units -> 110/120 kV• Special topologies: ring, tree, quadratic, meshed, etc.• Security – geography – economy – ecology
Wind Turbine Construction - Wind energy integration - Patra, 2012
24
Óbuda UniversityPower System Department
Wind speed changesby Jensen
Wind Turbine Construction - Wind energy integration - Patra, 2012
25
Óbuda UniversityPower System Department
„Wind shadow” – Wake effect decreasig speed – decreasing energy
(work of Javier Serrano)
Wind Turbine Construction - Wind energy integration - Patra, 2012
26
Óbuda UniversityPower System Department
Micrositing - optimisation(work of Javier Serrano)
Wind Turbine Construction - Wind energy integration - Patra, 2012
27
Óbuda UniversityPower System Department
Quadratic displacement, Burgenland, Austria
Wind Turbine Construction - Wind energy integration - Patra, 2012
28
Óbuda UniversityPower System Department
Line on the hill edge
Wind Turbine Construction - Wind energy integration - Patra, 2012
29
Óbuda UniversityPower System Department
Molina moderna de Aragón
Wind Turbine Construction - Wind energy integration - Patra, 2012
30
Óbuda UniversityPower System Department
Wind metering tower
Wind Turbine Construction - Wind energy integration - Patra, 2012
31
Óbuda UniversityPower System Department
Atienza, Spain
Wind Turbine Construction - Wind energy integration - Patra, 2012
32
Óbuda UniversityPower System Department
Near Calatayud, Spain
Wind Turbine Construction - Wind energy integration - Patra, 2012
33
Óbuda UniversityPower System Department
Near Calatayud, Spain
Wind Turbine Construction - Wind energy integration - Patra, 2012
34
Óbuda UniversityPower System Department
Near Calatayud, Spain150 towers on this picture!
Wind Turbine Construction - Wind energy integration - Patra, 2012
35
Óbuda UniversityPower System Department
Kefalonia, Greece
Wind Turbine Construction - Wind energy integration - Patra, 2012
36
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
MeasurementsCharacteristics, RPM, output power
Szélerőmű karakterisztika - induló szakasz
0
50
100
150
200
0 1 2 3 4 5 6 7
szélsebesség m/s
kW Szélerőmű kiadott teljesítménye
0
50
100
150
200
14:03:50 14:06:43 14:09:36 14:12:29 14:15:22 14:18:14 14:21:07
időkW
A szabályozott rotor fordulatszám
0
2
4
6
8
10
12
14
0 50 100 150 200
kiadott teljesítmény kW
n / p
erc
37
Cut in
RPM
Power out
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Niederland , Cabo Verde, Burgenland (A), Portugal
38
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Windpower plants in Hungary, 2006
39
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
V90
40
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Characteristics
41
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Rotor blade
V90 (~44 m) MD 77 (37,5 m)6,5 t!
Glassfiber – epoxiGrafit fiber
42
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
FL MD77
43
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
MD 77
44
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
E 48
45
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
E 48
46
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
E82
47
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Characteristics measurements
48
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
„Storm control”
49
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Comparison
50
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Bükkaranyos
51
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Erk
52
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Inota
53
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Kulcs
54
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Mezőtúr
55
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Mosonmagyaróvár -Levél
56
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Mosonszolnok
57
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Szápár
58
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Törökszentmiklós
59
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
System load <–> wind production
A hazai villamosenergia-rendszer terhelése 2005.12.14.
01000200030004000500060007000
1 3 5 7 9 11 13 15 17 19 21 23
óra
MW
Szélerőmű kiadott teljesítménye
0
50
100
150
200
14:03:50 14:06:43 14:09:36 14:12:29 14:15:22 14:18:14 14:21:07
idő
kW
60
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Balancing with CO2
61
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Feel the measure!
V27 – 225 kW E-40 600 kW E-48 800 kW
62
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Feel the measure!
MD-77 1,5 MW V-90 1,8 MW E-70 2 MW 63
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
How many tower represents 1000 MW?
• V27 225 kW 4444 pcs• E-40 600 kW 1666 pcs• E-48 800 kW 1250 pcs• MD-77 1,5 MW 666 pcs• V-90 1,8 MW 555 pcs• E-70 2 MW 500 pcs
A lot.
64
Óbuda UniversityPower System Department
Wind energy integration
Wind Turbine Construction - Wind energy integration - Patra, 2012
65
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Energy production calculation
• If 1000 MW built in capacity operates in 1 year with 20 % usage ratio
• 365 days x 24 hours x 1000 MW x 0,2 % = 1.752.000 [MWh] = 1,752 TWh
• In Hungary it is only 4,47 % of the total consumption
• Not too much
66
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Power ratio
It is much!Forrás: A magyar villamosenergia-rendszer 2005. évi statisztikai adatai, MVM Zrt., 2006
67
Óbuda UniversityPower System Department
How the wind blows
• BEWAG experiences: gradient 60 MW/h• 3 areas - 3 different wind blows• Local autobalancing in the windpark• Balancing between different areas
Wind Turbine Construction - Wind energy integration - Patra, 2012
68
A kimenő teljesítmény 10 perc múlva történő megváltozásának napi maximuma 330 MW beépített szélerőmű teljesítmény esetén
0
20
40
60
80
100
120
140
218 200 182 163 145 127 109 91 73 54 36 18 0
MW
Napo
k sz
áma
(éve
nte)
Koncentrált
Szétszórt
http://www.vrbpower.com/
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
69
Sudden stop of wind power plants
• Too strong wind (over 25-30 m/s)• Network faults• Frequency problems
Is it really problem to loose 200 MW? – daily eventsThe network flexibility must be raised!
• Diversification• Forecast
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
70
• Fault in Spain
• 2006.11.04.
• Storm in Denmark
Óbuda UniversityPower System Department
2008. 04.01. operation - BEWAG
Wind Turbine Construction - Wind energy integration - Patra, 2012 71
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
72
The UTSIRA project
Óbuda UniversityPower System Department
73
Hydrogen generation
On-site hidrogén előállító eszköz
Szélerőmű
Közlekedési felhasználás
Hidrogén kút
On-site hidrogén előállító eszköz
Szélerőmű
Szállítás
Szállítás
Wind Turbine Construction - Wind energy integration - Patra, 2012
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
74
Központi hidrogén előállító eszköz
Szélerőműpark
Szélerőmű
KÖF eloszt
ó hálóza
t
120 kV-os főelos
ztó hálóza
t Rendszerirányítói
szabályozás
Rendszerirányítói szabályozás
-4-3-2-10123456
1 3 5 7 9 11 13 15 17 19 21
Szél össztermelés
Rendszerirányítói többlet =Hidrogén átalakító fogyasztása
Hidrogén kút
Közlekedési felhasználás
Central hydrogen generation – system operatior control
Rendszerirányítói szabályozás
-4-3-2-10123456
1 3 5 7 9 11 13 15 17 19 21
Szél össztermelés
Rendszerirányítói többlet =Hidrogén átalakító fogyasztása
Óbuda UniversityPower System Department
Where to find the control capacities?
Wind Turbine Construction - Wind energy integration - Patra, 2012
75Hotel Benczúr 2008.04.02.
Unused controllable capacities
Uncontrolled gas fired capacities
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
76
Co-control of gas engines and wind turbines
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
77
Wind generation + gas engine generation + balancing
Szélerőmű + gázmotor + tervezett kiegyenlítés
0
500
1000
1500
2000
2500
1 3 5 7 9 11 13 15 17 19 21 23
óra
kW
Előrejelzett szél termelésTényleges széltermelésTervezett kiegyenlítésGázmotor kiegyenlítésTermelési összeg
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
78
Load of the gas engine
A gázmotor terhelése
-20-10
0102030405060708090
1 3 5 7 9 11 13 15 17 19 21 23
óra
%
Csoport hiba %Gázmotor eltérés %Gázmotor tervezett % Gázmotor tényleges %
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
79
Control Center for Renewable Energy (CORE)
• Iberdrola• Toledo, Spain• Virtual power plant• Connection to the ISO• On-line control of the wind towers • Maitenance control
Óbuda UniversityPower System Department
What helps the integration?
• Control of the windpark output• Diversification• Local control centers• Intraday power exchange
Wind Turbine Construction - Wind energy integration - Patra, 2012
81Szélenergia integrálás - aukciós szempontokGKM konzultáció 2008.04.16.
Óbuda UniversityPower System Department
American plans…
Wind Turbine Construction - Wind energy integration - Patra, 2012
82
source: Ed DeMeo, Renewable Energy Consulting Services, Inc. UWIG techn. Workshop, 24 July, 2007, Anchorage, Alaska
Óbuda UniversityPower System Department
Conclusion
• The wind technology is cleared, this is the high time of the application
• The hot topics are the off shore plants• The integration of the wind energy is the question of
decision• The present network structures was not planned and
implemented for the trade and renewable generation
Have a good work!
Wind Turbine Construction - Wind energy integration - Patra, 2012
83
Óbuda UniversityPower System Department
Wind Turbine Construction - Wind energy integration - Patra, 2012
Thanks for the attention!
84