The Secret of Energy Efficient
FA˙ ADES
fenestra.com.my
![Page 2: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/2.jpg)
DEFINITION OF A GREEN BUILDING
A building that meets codes and saves ENERGY
![Page 3: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/3.jpg)
Source : Architecture 2030
U.S. Energy Consumption by Sector
![Page 4: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/4.jpg)
Source : Architecture 2030
Architecture is the big Consumer
![Page 5: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/5.jpg)
![Page 6: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/6.jpg)
![Page 7: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/7.jpg)
ü PROPER COMMISSIONING
![Page 8: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/8.jpg)
Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices
![Page 9: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/9.jpg)
1ST LAW OF THERMODYNAMICSenergy is neither created nor destroyed
![Page 10: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/10.jpg)
Air conditioning load is due to lighting, equipment, peopleand heat gained through the facade
people
FACADE
equipment
lighting
![Page 11: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/11.jpg)
Sources of Building Heat Load
7.3%5.5%
9.1%
10.9%
21.8%
45.5%
Fan energy
Misc loads
ventilation
Plug load
Lighting
façade
![Page 12: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/12.jpg)
The biggest cost items are typically SUPERSTRUCTURE, FACADES and MEP SERVICES
![Page 13: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/13.jpg)
USELESSGLASS !
J ☺
![Page 14: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/14.jpg)
ü LIMIT THE GLAZING AREA TO 30 35%ü USE HIGH PERFORMANCE GLASS
![Page 15: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/15.jpg)
How efficient is your façade?
![Page 16: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/16.jpg)
OTTVOverall Thermal Transfer Value
WATTS PER M2
![Page 17: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/17.jpg)
OTTV x skin area =
HEAT (Watts)
![Page 18: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/18.jpg)
glass conduction
wall conduction
glasssolar
5%
10% -20%80%
![Page 19: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/19.jpg)
α (1 WWR)Uw + (WWR)Uf + ( x CF x WWR x SC)15 6 194
OTTV Simplified Formula
WALL WINDOW SOLAR GAIN THROUGH GLASS
![Page 20: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/20.jpg)
Orientation of Buildings
![Page 21: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/21.jpg)
α (1 WWR)Uw + (WWR)Uf + ( x CF x WWR x SC)15 6 194
OTTV Simplified Formula
WALL WINDOW SOLAR GAIN THROUGH GLASS
![Page 22: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/22.jpg)
The Window Wall Ratio
![Page 23: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/23.jpg)
Window WallRatio
FacadeArea
![Page 24: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/24.jpg)
WWR - Window / Wall Ratio (%)11 13 15 17 19 21 23 25 27 29
OTTV 36 39 44 47 51 55 59 63 67 71
![Page 25: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/25.jpg)
RNC
OTTV vs WWR and SC
Window / Wall Ratio (%)11 13 15 17 19 21 23 25 27 29
OTTV 36 39 44 47 51 55 59 63 67 71
Glass Shading Coefficient0.35 0.45 0.55 0.65 0.70 0.75 0.80 0.85 0.90 0.95
OTTV 37 42 48 53 55 58 60 63 66 68
Design Assumptions
WWR = 25 %Glazing SC = 0.85Glazing U-Value = 5.7 W/m2 KWall U-Value = 3.2 W/m2 KOTTV = 63 W/m2
Target OTTV2
![Page 26: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/26.jpg)
RNC EE CRITERIA Points
EE1 : Minimum EE PerformanceEE2 : Renewable EnergyEE3 : Advanced EE Performance
based on OTTV + RTTVEE4 : Home Office + ConnectivityEE5 : Sustainable Maintenance
35
10
23
![Page 27: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/27.jpg)
RNC
EE1 : MINIMUM EEPERFORMANCE
INTENT
Establishing minimum EE performance to reduce energy consumption in buildings, thus reducing carbon dioxide emission to the atmosphere.
REQUIREMENT Points
Meet MS 1525:2007 specifications: § OTTV 2
§ RTTV 2
AND§ Roof U values
2K for lightweight roofs2K for heavyweight roofs
3
ROOF WEIGHT GROUPlightweight roof = < 50 kg/m2
heavyweight roof = > 50 kg/m2
![Page 28: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/28.jpg)
RNC
EE3 : ADVANCED EE PERFORMANCE
INTENT
Enhance building to provide thermally comfortable environment to reduce the use of air-conditioning
REQUIREMENT Points
§ OTTV 2, Roof U values 2K (lightwt), 2K (heavywt)
§ OTTV 2, Roof U values2K (lightwt), 2K (heavywt)
§ OTTV 2, Roof U values 2K (lightwt), 2K (heavywt)
§ OTTV 2, Roof U values 2K (lightwt), 2K (heavywt)
§ OTTV 2, Roof U values 2K (lightwt), 2K
(heavywt)
2
4
6
8
10
![Page 29: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/29.jpg)
RNC
EE3 : ADVANCED EE PERFORMANCE
Window / Wall Ratio (%)11 13 15 17 19 21 23 25 27 29
OTTV 36 39 44 47 51 55 59 63 67 71
Glass Shading Coefficient0.35 0.45 0.55 0.65 0.70 0.75 0.80 0.85 0.90 0.95
OTTV 37 42 48 53 55 58 60 63 66 68
Design to MS 1525:2007
WWR = 25 %Glazing SC = 0.60Glazing U-Value = 5.7 W/m2 KWall U-Value = 3.2 W/m2 KOTTV = 50 W/m2
Target OTTV2 - 2 points2 - 4 points2 - 6 points2 - 8 points2 - 10 points
![Page 30: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/30.jpg)
RNC
EE1 : MINIMUM EE PERFORMANCE
ROOF U VALUE CALCULATIONS
123
4,5
6
123
4
Target Roof U Value2K
![Page 31: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/31.jpg)
RNC
EE3 : ADVANCED EEPERFORMANCE
ROOF U VALUE CALCULATIONS+2
points
+6points
+10 points
+4 points
+8 points
![Page 32: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/32.jpg)
![Page 33: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/33.jpg)
Sound insulation does not work when the air gap is small, say 6 mm
Increase air gap = 20 to 100 mm
DGUdouble glazed unit
![Page 34: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/34.jpg)
COST OF OPERATING AN OFFICE BUILDING
Element RM per m2
Construction Cost
Retrofit of the building - every 10 years
Electricity
Maintenance
Opex (Insurance/rates/ etc)
Salaries
Total
![Page 35: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/35.jpg)
COST OF OPERATING AN OFFICE BUILDING
Element RM per m2
Construction Cost 3,850Retrofit of the building - every 10 years
Electricity
Maintenance
Opex (Insurance/rates/ etc)
Salaries
Total
![Page 36: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/36.jpg)
COST OF OPERATING AN OFFICE BUILDING
Element RM per m2
Construction Cost 3,850Retrofit of the building - every 10 years 550Electricity
Maintenance
Opex (Insurance/rates/ etc)
Salaries
Total
![Page 37: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/37.jpg)
COST OF OPERATING AN OFFICE BUILDING
Element RM per m2
Construction Cost 3,850Retrofit of the building - every 10 years 550Electricity - 250 kwhr/m2-year @ RM 0.39 98Maintenance
Opex (Insurance/rates/ etc)
Salaries
Total
![Page 38: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/38.jpg)
COST OF OPERATING AN OFFICE BUILDING
Element RM per m2
Construction Cost 3,850Retrofit of the building - every 10 years 550Electricity - 250 kwhr/m2-year @ RM 0.39 98Maintenance 75Opex (Insurance/rates/ etc)
Salaries
Total
![Page 39: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/39.jpg)
COST OF OPERATING AN OFFICE BUILDING
Element RM per m2
Construction Cost 3,850Retrofit of the building - every 10 years 550Electricity - 250 kwhr/m2-year @ RM 0.39 98Maintenance 75Opex (Insurance/rates/ etc) 120Salaries
Total
![Page 40: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/40.jpg)
COST OF OPERATING AN OFFICE BUILDING
Element RM per m2
Construction Cost 3,850Retrofit of the building - every 10 years 550Electricity - 250 kwhr/m2-year @ RM 0.39 98Maintenance 75Opex (Insurance/rates/ etc) 120
SalariesAverage salary say RM 3,500 per month
Average salary per annum RM 42,000
Occupancy 1 person per 10 m2
Total
![Page 41: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/41.jpg)
COST OF OPERATING AN OFFICE BUILDING
Element RM per m2
Construction Cost 3,850Retrofit of the building - every 10 years 550Electricity - 250 kwhr/m2-year @ RM 0.39 98Maintenance 75Opex (Insurance/rates/ etc) 120
SalariesAverage salary say RM 3,500 per month
Average salary per annum RM 42,000
Occupancy 1 person per 10 m2
4,200
Total
![Page 42: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/42.jpg)
COST OF OPERATING AN OFFICE BUILDING
Element RM per m2
Construction Cost 3,850Retrofit of the building - every 10 years 550Electricity - 250 kwhr/m2-year @ RM 0.39 98Maintenance 75Opex (Insurance/rates/ etc) 120
SalariesAverage salary say RM 3,500 per month
Average salary per annum RM 42,000
Occupancy 1 person per 10 m2
4,200
Total 8,893
![Page 43: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/43.jpg)
COST OF OPERATING AN OFFICE BUILDING
Element RM per m2
Construction Cost 3,850Retrofit of the building - every 10 years 550Electricity - 250 kwhr/m2-year @ RM 0.39 98Maintenance 75Opex (Insurance/rates/ etc) 120
SalariesAverage salary say RM 3,500 per month
Average salary per annum RM 42,000
Occupancy 1 person per 10 m2
4,200
Total 8,893
Assume inflation at 2.5% per annum
![Page 44: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/44.jpg)
50 YEAR LIFE CYCLE COST OF OFFICE BUILDING
![Page 45: The Secret of EE Facades - ksg.com.my · üPROPER COMMISSIONING. Source : UK Energy Efficiency Best Practice Program Energy Consumption Guide 19: Energy Use in Offices. ... RNC …](https://reader033.vdocuments.net/reader033/viewer/2022051802/5af92ce97f8b9a19548c456f/html5/thumbnails/45.jpg)