the vision to build a staircase to european excellence in food safety research programming through...
TRANSCRIPT
The visionThe vision
To build a staircase to European excellence in To build a staircase to European excellence in food safety research programming food safety research programming
through trust and mutual understandingthrough trust and mutual understanding
Building the staircaseBuilding the staircase
• by stimulating European countries to develop food safety by stimulating European countries to develop food safety research programmes with transnational activitiesresearch programmes with transnational activities
• by balancing the need for research and funding at by balancing the need for research and funding at national, regional and European level national, regional and European level
• by stimulating open communications between authorities by stimulating open communications between authorities (EFSA, regional/national), industries, consumers and (EFSA, regional/national), industries, consumers and scientists based on scientific knowledgescientists based on scientific knowledge
20032003 ERA-NET ERA-NETPROFORSAFEPROFORSAFE
20022002 NRA-NET NRA-NETProcessing for Processing for
food safetyfood safety
19931993 NRA-NET NRA-NET “ “NordFood”NordFood”
The Background of The Background of the Staircasethe Staircase
20032003 ERA-NET ERA-NETPPERIAPTERIAPT
20042004 ERA-NET ERA-NETSAFEFOODERASAFEFOODERA
Project title:Project title:
Food Safety - Forming a European platform for Food Safety - Forming a European platform for protecting consumers against health risksprotecting consumers against health risks
20200808 “A European platform“A European platformfor protecting consumers for protecting consumers against food health risks”against food health risks”
The Staircase to The Staircase to the Futurethe Future
Information ExchangeInformation Exchange External External communicationcommunication
Strategic ActivitiesStrategic Activities
Joint ActivitiesJoint Activities
Transnational Transnational ActivitiesActivities
External External communicationcommunication
External External communicationcommunication
External External communicationcommunication
20042004 ERA-NET ERA-NETSAFEFOODERASAFEFOODERA
The primary objective (1)The primary objective (1)
is to establish a European platform for protecting consumers is to establish a European platform for protecting consumers against health risks from the consumption of food through a against health risks from the consumption of food through a
co-ordination action ERA-NET of 15 Member States, 3 co-ordination action ERA-NET of 15 Member States, 3 Associated Countries and 2 regional organisations Associated Countries and 2 regional organisations representing in total 480 million European citizensrepresenting in total 480 million European citizens
The primary objective (2)The primary objective (2)
From each country one representative from a public From each country one representative from a public body responsible for financing or managing research body responsible for financing or managing research
activities on food safety issues carried out at national or activities on food safety issues carried out at national or regional level is appointed to the European Steering regional level is appointed to the European Steering
Committee (ESC), which will have the overall Committee (ESC), which will have the overall responsibility for directing and managing the work. responsibility for directing and managing the work.
The primary objective (3)The primary objective (3)
One representative with high standards of scientific One representative with high standards of scientific excellence will be appointed to the European Expert excellence will be appointed to the European Expert
Advisory Group (EEAG), providing scientific and Advisory Group (EEAG), providing scientific and technical support technical support when requested by when requested by the ESC. the ESC.
The primary objective (4)The primary objective (4)
The ESC and the project management will work closely The ESC and the project management will work closely together to compare ongoing and proposed activities in the together to compare ongoing and proposed activities in the
national food safety research programmes of the national food safety research programmes of the participating countries, and to investigate the scope for participating countries, and to investigate the scope for
strategic co-operation, harmonisation and development of strategic co-operation, harmonisation and development of joint programmes of activity. joint programmes of activity.
The benefitsThe benefits
Short termShort term: Learning from each other : Learning from each other
(Best Practice – 0 -1 year).(Best Practice – 0 -1 year).
Long term:Long term: Lasting transnational research within food Lasting transnational research within food safety topics of key safety topics of key importance to importance to European European
consumers, authorities and consumers, authorities and industry industry
Y0 Y4Y3Y1 Y2
WP 6 External Communication
WP 5 Transnational Activities
WP 2 Information Exchange
WP 1 Management Framework
WP 4 Joint Activities
WP 3 Strategic Activities
SAFEFOODERA - Graphical presentation SAFEFOODERA - Graphical presentation Y0-Y4 = Year from project startY0-Y4 = Year from project start
WorkpackagesWorkpackages WP1 Management FrameworkWP1 Management Framework
WP2 Information ExchangeWP2 Information Exchange
WP3 Strategic ActivitiesWP3 Strategic Activities
WP4 Joint ActivitiesWP4 Joint Activities
WP5 Transnationally ActivitiesWP5 Transnationally Activities
The objective of the workpackage isThe objective of the workpackage is::
the overall follow up on co-ordination andthe overall follow up on co-ordination and management, including the organisationalmanagement, including the organisational and financial responsibility for theand financial responsibility for the implementation of the ERA-NET.implementation of the ERA-NET.
WP6 External CommunicationWP6 External Communication
WorkpackagesWorkpackages WP1 Management FrameworkWP1 Management Framework
The PThe Project roject CCoordinator (PC)oordinator (PC) will call will call the the ESC meetingsESC meetings. . The agenda will includeThe agenda will include::
scientific and technical objectives of thescientific and technical objectives of the project,project, including including work plan of each WP work plan of each WP
technical deliverables technical deliverables
external communicationexternal communication, including , including reports toreports to be publishebe publishedd
ffinancialinancial status status and administrative matters and administrative matters
WP2 Information ExchangeWP2 Information Exchange
WP3 Strategic ActivitiesWP3 Strategic Activities
WP4 Joint ActivitiesWP4 Joint Activities
WP5 Transnationally ActivitiesWP5 Transnationally Activities
WP6 External CommunicationWP6 External Communication
WorkpackagesWorkpackages WP1 Management FrameworkWP1 Management Framework
All the ESC members must participateAll the ESC members must participate actively in and between the meetings by:actively in and between the meetings by:
providing all information needed to performproviding all information needed to perform the various tasks in the agreed timeframe. the various tasks in the agreed timeframe.
make every effort to maximise exploitation ofmake every effort to maximise exploitation of the results obtained. the results obtained.
disseminate the work and outcome bydisseminate the work and outcome by informing appropriate national bodies ininforming appropriate national bodies in your country. your country.
WP2 Information ExchangeWP2 Information Exchange
WP3 Strategic ActivitiesWP3 Strategic Activities
WP4 Joint ActivitiesWP4 Joint Activities
WP5 Transnational ActivitiesWP5 Transnational Activities
WP6 External CommunicationWP6 External Communication
European Steering Committee (ESC)European Steering Committee (ESC)Network Coordinator Network Coordinator JohsJohs. . KjosbakkenKjosbakken, RCN, RCN
WP1 Management FrameworkWP1 Management FrameworkProject Coordinator Project Coordinator OddurOddur MMáár r GunnarssonGunnarsson, , NICeNICe
Strategic Strategic CoordinatorCoordinator
Liisa RosiLiisa Rosi, , Tekes Tekes
Communication Communication CoordinatorCoordinator
Ola EideOla Eide, , NICeNICe
WP4WP4JointJoint
Activities Activities AlisdairAlisdair
WotherspoonWotherspoon,,FSA UKFSA UK
WP5WP5TransnationalTransnational
ActivitiesActivitiesPhilippe Philippe Verger,Verger,MNRTMNRT
WP2WP2Information Information
ExchangeExchangeOla Ola EideEide,,NICeNICe
WP6WP6ExternalExternal
CommunicationCommunicationOla Ola EideEide,,NICeNICe
TopicsTopicsCoordinatorCoordinator
HubertHubert P.J.M.P.J.M.NotebornNoteborn,,VWA VWA
WP3WP3StrategicStrategicActivitiesActivities
Liisa Liisa RosiRosi, , Tekes Tekes
Project Project management group management group (PMG)(PMG)
WorkpackagesWorkpackages WP1 Management FrameworkWP1 Management Framework
The The PMGPMG will meet regularly, at least every will meet regularly, at least every 33 months months. The tasks will be to:. The tasks will be to:
pprepare the next ESC meeting as directed byrepare the next ESC meeting as directed by ESCESC..
discuss all strategic and administrative issuesdiscuss all strategic and administrative issues to be presented and decided by the ESC.to be presented and decided by the ESC.
On request from ESC or the PC, “ad hoc”On request from ESC or the PC, “ad hoc” meetings will be organized when needed. meetings will be organized when needed.
WP2 Information ExchangeWP2 Information Exchange
WP3 Strategic ActivitiesWP3 Strategic Activities
WP4 Joint ActivitiesWP4 Joint Activities
WP5 Transnational ActivitiesWP5 Transnational Activities
WP6 External CommunicationWP6 External Communication
WorkpackagesWorkpackages WP1 Management FrameworkWP1 Management Framework
The The PMG PMG will oversee and steer the co- will oversee and steer the co- ordination activities in the six workpackagesordination activities in the six workpackages..
TThe workpackage task facilitators (WPTFs)he workpackage task facilitators (WPTFs) will organise and manage the work in allwill organise and manage the work in all participating countries. participating countries.
The The PMG PMG will ensure progress inwill ensure progress in line with line with stipulated milestones andstipulated milestones and deliverables. deliverables.
WP2 Information ExchangeWP2 Information Exchange
WP3 Strategic ActivitiesWP3 Strategic Activities
WP4 Joint ActivitiesWP4 Joint Activities
WP5 Transnational ActivitiesWP5 Transnational Activities
WP6 External CommunicationWP6 External Communication
WorkpackagesWorkpackages
WP2 Information ExchangeWP2 Information Exchange
WP1 Management FrameworkWP1 Management FrameworkMilestones and deliverablesMilestones and deliverables
WP3 Strategic ActivitiesWP3 Strategic Activities
WP6 External CommunicationWP6 External Communication
M1 - M1 - 11stst ESC meeting, month 1 ESC meeting, month 1
M5 - 2M5 - 2ndnd ESC meeting, month 12 ESC meeting, month 12
M13 - 3M13 - 3rdrd ESC meeting, month 18 ESC meeting, month 18
D6D6 - 1- 1stst annual report to the Commission, month 18 annual report to the Commission, month 18
M26 - 4M26 - 4thth ESC meeting, month 36 ESC meeting, month 36
WP4 Joint ActivitiesWP4 Joint Activities
WP5 Transnational ActivitiesWP5 Transnational Activities
WorkpackagesWorkpackages
WP2 Information ExchangeWP2 Information Exchange
WP1 Management FrameworkWP1 Management FrameworkMilestones and deliverablesMilestones and deliverables
WP3 Strategic ActivitiesWP3 Strategic Activities
WP6 External CommunicationWP6 External Communication
D9D9 - 2- 2ndnd annual report to the Commission, annual report to the Commission, month 36month 36
M33 - 5M33 - 5thth ESC meeting and the final project ESC meeting and the final project meeting,meeting, month 48month 48
D21 - 3D21 - 3rdrd annual report to the Commission, annual report to the Commission, month 48month 48
D29 - 6D29 - 6thth project newsletter & Final report of project newsletter & Final report of SAFEFOODERA,SAFEFOODERA, month 48month 48
WP4 Joint ActivitiesWP4 Joint Activities
WP5 Transnational ActivitiesWP5 Transnational Activities
Y0 Y4Y3Y1 Y2
WP 6 External Communication
WP 5 Transnational Activities
WP 2 Information Exchange
WP 1 Management Framework
WP 4 Joint Activities
WP 3 Strategic Activities
SAFEFOODERA - Graphical presentation SAFEFOODERA - Graphical presentation Y0-Y4 = Year from project startY0-Y4 = Year from project start
Provisional strategic topics
MManagement ofanagement of programmes programmes and evaluation practicesand evaluation practices
WP2 Information Exchange
1. Emerging risks1. Emerging risks
2. Risk analysis2. Risk analysis
3. Process induced risk3. Process induced risk
4. Traceability4. Traceability
5. Campylobacter5. Campylobacter
? To be selected? To be selected
The The participants will participants will work closely together to:work closely together to:
compare compare practicepracticess in programme andin programme and project project evaluation, management andevaluation, management and analysis/communication proceduresanalysis/communication procedures
compare ongoing and compare ongoing and fundedfunded activities inactivities in the national foodthe national food safetysafety researchresearch programmesprogrammes
The objectivesThe objectives TTo define best practice and too define best practice and to develop develop hharmonised evaluation,armonised evaluation, management management andand analysisanalysis//communication procedurescommunication procedures
Milestones and deliverablesMilestones and deliverablesM4 - Comparison of evaluation criteria for M4 - Comparison of evaluation criteria for project funding, month 12project funding, month 12
M10 - Comparison of practices in programme M10 - Comparison of practices in programme management, month 18management, month 18
1. Emerging risks1. Emerging risks
2. Risk analysis2. Risk analysis
3. Process induced risk3. Process induced risk
4. Traceability4. Traceability
5. Campylobacter5. Campylobacter
? To be selected? To be selected
WP2 Information ExchangeWP2 Information ExchangeProvisional strategic topics
MManagement ofanagement of programmes programmes and evaluation practicesand evaluation practices
The objectivesThe objectives To iTo identify a procedure or dentify a procedure or a a systemsystem to to proactively describe new or re-emergingproactively describe new or re-emerging chemical and/or microbial riskschemical and/or microbial risks Milestones and deliverablesMilestones and deliverables
M3 - M3 - Identification of best practice (scientific Identification of best practice (scientific criteria) in programming concepts on criteria) in programming concepts on researchresearch onon emerging risks, month 12emerging risks, month 12
1. Emerging risks1. Emerging risks
2. Risk analysis2. Risk analysis
3. Process induced risk3. Process induced risk
4. Traceability4. Traceability
5. Campylobacter5. Campylobacter
? To be selected? To be selected
WP2 Information ExchangeWP2 Information ExchangeProvisional strategic topics
MManagement ofanagement of programmes programmes and evaluation practicesand evaluation practices
The objectivesThe objectives 1. To identify complementarities between topics in ongoing or funded national or regional programmes Milestones and deliverablesMilestones and deliverables M2M2 -- Comparison of national/regional Comparison of national/regional food safety researchfood safety research programmes programmes, , month 9month 9
1. Emerging risks1. Emerging risks
2. Risk analysis2. Risk analysis
3. Process induced risk3. Process induced risk
4. Traceability4. Traceability
5. Campylobacter5. Campylobacter
? To be selected? To be selected
WP2 Information ExchangeWP2 Information ExchangeProvisional strategic topics
MManagement ofanagement of programmes programmes and evaluation practicesand evaluation practices
The objectivesThe objectives 2. Clustering of projects and the exchange of information on project goals in overlapping or complementary areas Milestones and deliverablesMilestones and deliverables
M11 - A M11 - A posteriori posteriori clustering of research clustering of research projects, month 18projects, month 18
D3 D3 - - Report on the a Report on the a posteriori posteriori clustering clustering of research projects, month 18of research projects, month 18
1. Emerging risks1. Emerging risks
2. Risk analysis2. Risk analysis
3. Process induced risk3. Process induced risk
4. Traceability4. Traceability
5. Campylobacter5. Campylobacter
? To be selected? To be selected
WP2 Information ExchangeWP2 Information ExchangeProvisional strategic topics
MManagement ofanagement of programmes programmes and evaluation practicesand evaluation practices
Y0 Y4Y3Y1 Y2
WP 6 External Communication
WP 5 Transnational Activities
WP 2 Information Exchange
WP 1 Management Framework
WP 4 Joint Activities
WP 3 Strategic Activities
SAFEFOODERA - Graphical presentation SAFEFOODERA - Graphical presentation Y0-Y4 = Year from project startY0-Y4 = Year from project start
WP 3: Strategic ActivitiesWP 3: Strategic Activities
General objectiveGeneral objective: based on the information from WP2, PERIAPT : based on the information from WP2, PERIAPT and PROFORSAFEand PROFORSAFE
1)1) to identify the most important complementarities between to identify the most important complementarities between ongoing national and regional programmes and the most ongoing national and regional programmes and the most important research topicsimportant research topics
2)2) to identify the organisational barriers hindering transnational to identify the organisational barriers hindering transnational research co-operationresearch co-operation
““Emerging risks”:Emerging risks”: to identify and create a network of key sources, to identify and create a network of key sources, resources and instruments to support the identification of new- resources and instruments to support the identification of new- or re-emerging food- and feed related risks.or re-emerging food- and feed related risks.
WP 3: Strategic ActivitiesWP 3: Strategic Activities
WP 3 aims at developing strategic cooperation between the WP 3 aims at developing strategic cooperation between the national research programmes and projects dealing with national research programmes and projects dealing with food safety.food safety.
WP 3: Strategic ActivitiesWP 3: Strategic Activities
Focus:Focus:
• How to deal with the different types of How to deal with the different types of barriersbarriers
• ContractsContracts
• FinancesFinances
• EthicsEthics
• LegalLegal
• To find strategic researchTo find strategic research topics topics of common interest and to of common interest and to further develop the selected topicsfurther develop the selected topics
WP 3: Strategic ActivitiesWP 3: Strategic Activities
Expected results:Expected results:
• Identification of best practice inIdentification of best practice in
• programming concepts (on emerging risks)programming concepts (on emerging risks)
• project evaluation and managementproject evaluation and management
• Selection of joint strategic research topicsSelection of joint strategic research topics
• Identification of barriers hindering co-operationIdentification of barriers hindering co-operation
• Identification of new possibilities and gaps in transnational Identification of new possibilities and gaps in transnational researchresearch
WP 3.4Selection of joint strategic research
topics
WP 3.5Identification of new possibilities
and gaps in transnational
research
WP 3.2Identification
of barriers hindering
cooperationWP 3.1
Complementarities between
national food safety programmes
WP 3.3Dealing with
barriers hindering
cooperation
WP 2WP 2
WP 2WP 2
WP 5WP 5
WP 4WP 4
WP 3: Strategic ActivitiesWP 3: Strategic Activities
WP 4 & WP 5 are based on WP 3WP 4 & WP 5 are based on WP 3
Quality of information from all participating countries Quality of information from all participating countries is highly important!!!!!is highly important!!!!!
Please, note deadlines!!!Please, note deadlines!!!
Y0 Y4Y3Y1 Y2
WP 6 External Communication
WP 5 Transnational Activities
WP 2 Information Exchange
WP 1 Management Framework
WP 4 Joint Activities
WP 3 Strategic Activities
SAFEFOODERA - Graphical presentation SAFEFOODERA - Graphical presentation Y0-Y4 = Year from project startY0-Y4 = Year from project start
WP4: Joint ActivitiesWP4: Joint Activities
General objective:General objective: develop a joint action plan on new opportunities and develop a joint action plan on new opportunities and gaps identified from WP3, including, where appropriate, training activities and gaps identified from WP3, including, where appropriate, training activities and
cooperative networks of key actors.cooperative networks of key actors.
WP Facilitator: Alisdair WotherspoonWP Facilitator: Alisdair Wotherspoon
WP4: Joint ActivitiesWP4: Joint Activities
•Commences month 15 of project - October 2005Commences month 15 of project - October 2005
Key relationship to outputs of WP3 (and WP2) if to start well/on Key relationship to outputs of WP3 (and WP2) if to start well/on time - therefore need to be involved closely in earlier worktime - therefore need to be involved closely in earlier work
• Main deliverablesMain deliverables
- report on joint action plan in food safety by August 2006- report on joint action plan in food safety by August 2006
- - report on joint “networks of excellence” in food safety by July 2007report on joint “networks of excellence” in food safety by July 2007
WP4: Joint ActivitiesWP4: Joint Activities
Work that can be usefully done before month 15Work that can be usefully done before month 15
- better understanding of Nordic model - as basis for solving challenges- better understanding of Nordic model - as basis for solving challenges
- planning for workshop in month 20 - planning for workshop in month 20
- discuss and agree objectives- discuss and agree objectives
- who to involve and the process- who to involve and the process
- gather information on established “networks of excellence” - how?, what? - gather information on established “networks of excellence” - how?, what?
WP4: Joint ActivitiesWP4: Joint Activities
Workshop on joint training activitiesWorkshop on joint training activities
- to build on outputs from WP3 of identified gaps and opportunities- to build on outputs from WP3 of identified gaps and opportunities
- not necessarily to initiate training activities but to develop an action plan of - not necessarily to initiate training activities but to develop an action plan of how these might be determined and planned ie concentrate on process, how these might be determined and planned ie concentrate on process, mechanismsmechanisms
- perhaps look at some examples of how others have tackled similar situations- perhaps look at some examples of how others have tackled similar situations
- use facilitators to focus discussions and maximise chance of achieving - use facilitators to focus discussions and maximise chance of achieving objectivesobjectives
WP4: Joint ActivitiesWP4: Joint Activities
- elaboration of joint “networks of excellence”- elaboration of joint “networks of excellence”
- avoid confusion with FP NoEs (though may include these?)- avoid confusion with FP NoEs (though may include these?)
- criteria to define “excellence”, how to gather and assess - criteria to define “excellence”, how to gather and assess information, mechanisms to promote formation, development of information, mechanisms to promote formation, development of networksnetworks
- to include possibility of setting up networks of national - to include possibility of setting up networks of national programme managers - how would these work, training programme managers - how would these work, training exchanges?exchanges?
WP4: Joint ActivitiesWP4: Joint Activities
Task managementTask management
- need early discussions in ESC and management group to agree particular aims - need early discussions in ESC and management group to agree particular aims and objectives eg of workshop and so factor in earlier work where it is most and objectives eg of workshop and so factor in earlier work where it is most efficientefficient
- possible role for EEAG in work to deliver WP, what might this be?- possible role for EEAG in work to deliver WP, what might this be?
- possibly set up a sub-group of partners to help drive forward the more detailed - possibly set up a sub-group of partners to help drive forward the more detailed workwork
Y0 Y4Y3Y1 Y2
WP 6 External Communication
WP 5 Transnational Activities
WP 2 Information Exchange
WP 1 Management Framework
WP 4 Joint Activities
WP 3 Strategic Activities
SAFEFOODERA - Graphical presentation SAFEFOODERA - Graphical presentation Y0-Y4 = Year from project startY0-Y4 = Year from project start
WP 5: Transnational activities
General objective: to use the information from
WP 2, 3 & 4 to build a transnational research programme to be included in participants’ national food safety
programmes
WP 5: Transnational activities
• Major steps in a call for research programme– Elaboration of the call for proposal– Dissemination of the call for proposal– Selection procedure for the submitted projects– Management of selected projects *– Dissemination of results of funded projects
* this step could be difficult to harmonised
WP 5: Transnational activities
• Objective 1: to build a common research programme in agreement with the ESC
• Objective 2: to disseminate the call to the adequate researchers across partners’ countries
• Objective 3: to build a common accepted and efficient selection procedure for the projects
• Objective 4: to disseminate efficiently the results of research funded
• Objective 5: to evaluate the quality of the call
Objective 1: to build a common research programme in agreement with the ESC
• The call should be realistic in order to allow to conduct an evaluation procedure i.e. « first call » rather than « pilot call »
• Several strategic topic (s) should have been selected from WP 3 & 4
• Several members of the ERA net should be involved• Validation of the transnational call by the ESC
Objective 2: to disseminate the call to the adequate researchers across partners’ countries
• Establishment of a procedure for the dissemination of a European call across countries
• Establishment of indicators of success to be used for objective 5– Global response rate– Distribution of response rates by country– Quality of respondents– Adequation of responses with the topic (s)– …………
Objective 3: to build a common accepted and efficient selection procedure for the projects
• Compilation of evaluation procedures in recent calls at national level in the field of food safety
• Interviews with programme managers to analyse the key points in the selection criterias
• Establishment of a draft protocole• Validation of the draft protocole by the ESC
Objective 4: to disseminate efficiently the results of research funded
• Establishment of a procedure for the dissemination of results across countries– Scientific journal vs report– Paper vs web site– Workshops…
• Establishment of indicators of success to be used for objective 5– Questionnaire for researchers– ………..
Objective 5: to evaluate the quality of the call
• Assessment of the efficiency of each phase in relation with previously elaborated indicators– With national programme managers (ESC) for objectives 1 & 3– With researchers for objectives 2 & 4
• Identification and correction of the gaps• Production of guidelines for future transnational calls (final
report)
Y0 Y4Y3Y1 Y2
WP 6 External Communication
WP 5 Transnational Activities
WP 2 Information Exchange
WP 1 Management Framework
WP 4 Joint Activities
WP 3 Strategic Activities
SAFEFOODERA - Graphical presentation SAFEFOODERA - Graphical presentation Y0-Y4 = Year from project startY0-Y4 = Year from project start
WorkpackagesWorkpackages
WP1 Management FrameworkWP1 Management Framework
WP6 External CommunicationWP6 External Communication
WP2 Information exchangeWP2 Information exchange
WP3 Strategic activitiesWP3 Strategic activities
WP4 Joint activitiesWP4 Joint activities
WP5 Transnationally activitiesWP5 Transnationally activities
The The participants participants of the participating countriesof the participating countries will work will work closely together to:closely together to:
To To establish links to consumer groups, industry, establish links to consumer groups, industry, authorities, the scientific community and non-participatingauthorities, the scientific community and non-participating Member States to promote their involvement in foodMember States to promote their involvement in food safety. safety.
TThe set up and maintenance of the project’s web site that he set up and maintenance of the project’s web site that is to be used for most of the communication and for theis to be used for most of the communication and for the exchange and dissemination of information throughout exchange and dissemination of information throughout the duration of the projectthe duration of the project
WorkpackagesWorkpackages
WP1 Management FrameworkWP1 Management Framework
WP6 External CommunicationWP6 External CommunicationThe tasks objectivesThe tasks objectives
WP2 Information exchangeWP2 Information exchange
WP3 Strategic activitiesWP3 Strategic activities
WP4 Joint activitiesWP4 Joint activities
WP5 Transnationally activitiesWP5 Transnationally activities
The objective is to establish links with stakeholders The objective is to establish links with stakeholders to facilitate pan-European dissemination and to facilitate pan-European dissemination and exploitation of project results, including the exploitation of project results, including the execution of common plans for dissemination. It execution of common plans for dissemination. It will also ensure early engagement with other will also ensure early engagement with other eligible funding bodies in Europe to maximise the eligible funding bodies in Europe to maximise the potential for a wider network.potential for a wider network.
WorkpackagesWorkpackages
WP1 Management FrameworkWP1 Management Framework
WP6 External CommunicationWP6 External CommunicationMilestones and deliverablesMilestones and deliverables
WP2 Information exchangeWP2 Information exchange
WP3 Strategic activitiesWP3 Strategic activities
WP4 Joint activitiesWP4 Joint activities
WP5 Transnationally activitiesWP5 Transnationally activities
D7 - Flyers about the 1D7 - Flyers about the 1stst Seminar with 1) consumer groups and industry, Seminar with 1) consumer groups and industry, 2) authorities & 3) representatives from non-participating member2) authorities & 3) representatives from non-participating member States & 1States & 1stst project newsletter, month 22 project newsletter, month 22
M17 - 1M17 - 1stst Seminar with authorities, month 24 Seminar with authorities, month 24
M18 - 1M18 - 1stst Seminar with non-participating member States, month 24 Seminar with non-participating member States, month 24
M19 - 1M19 - 1stst Seminar with consumer groups and industry, month 24 Seminar with consumer groups and industry, month 24
D13 - Proceedings for the 1D13 - Proceedings for the 1stst Seminar with consumer groups and Seminar with consumer groups and industry, authorities & representatives from non-participatingindustry, authorities & representatives from non-participating member States & 2member States & 2ndnd project newsletter, month 25 project newsletter, month 25
WorkpackagesWorkpackages
WP1 Management FrameworkWP1 Management Framework
WP6 External CommunicationWP6 External CommunicationMilestones and deliverablesMilestones and deliverables
WP2 Information exchangeWP2 Information exchange
WP3 Strategic activitiesWP3 Strategic activities
WP4 Joint activitiesWP4 Joint activities
WP5 Transnationally activitiesWP5 Transnationally activities
D14 - Flyers about the 1D14 - Flyers about the 1stst Seminar with the scientific community Seminar with the scientific community & 3& 3rdrd project newsletter, month 26 project newsletter, month 26
M22 - 1M22 - 1stst Seminar with the scientific community, month 28 Seminar with the scientific community, month 28
D16 - Proceedings for 1D16 - Proceedings for 1stst Seminar with the scientific community, month 29 Seminar with the scientific community, month 29
WorkpackagesWorkpackages
WP1 Management FrameworkWP1 Management Framework
WP6 External CommunicationWP6 External CommunicationMilestones and deliverablesMilestones and deliverables
WP2 Information exchangeWP2 Information exchange
WP3 Strategic activitiesWP3 Strategic activities
WP4 Joint activitiesWP4 Joint activities
WP5 Transnationally activitiesWP5 Transnationally activities
D22 - Flyers about the 2D22 - Flyers about the 2ndnd Seminar with 1) consumer groups and industry, Seminar with 1) consumer groups and industry, 2) authorities & 3) representatives from non-participating member2) authorities & 3) representatives from non-participating member States & 4States & 4thth project newsletter, month 40 project newsletter, month 40
M29 - 2M29 - 2ndnd Seminar with authorities, month 42 Seminar with authorities, month 42
M30 - 2M30 - 2ndnd Seminar with non-participating member States, month 42 Seminar with non-participating member States, month 42
M31 - 2M31 - 2ndnd Seminar with consumer groups and industry, month 42 Seminar with consumer groups and industry, month 42
D25 - Proceedings for the 2D25 - Proceedings for the 2ndnd Seminar with consumer groups and industry, Seminar with consumer groups and industry, authorities & representatives from non-participating member States,authorities & representatives from non-participating member States, month 43month 43
WorkpackagesWorkpackages
WP1 Management FrameworkWP1 Management Framework
WP6 External CommunicationWP6 External CommunicationMilestones and deliverablesMilestones and deliverables
WP2 Information exchangeWP2 Information exchange
WP3 Strategic activitiesWP3 Strategic activities
WP4 Joint activitiesWP4 Joint activities
WP5 Transnationally activitiesWP5 Transnationally activities
D26 - Flyers about the 2D26 - Flyers about the 2ndnd Seminar with the scientific community & 5 Seminar with the scientific community & 5 thth
project newsletter, month 44project newsletter, month 44
M32 - 2M32 - 2nd nd Seminar with the scientific community, month 46Seminar with the scientific community, month 46
D28 - Proceedings for 2D28 - Proceedings for 2ndnd Seminar with the scientific community, month 47 Seminar with the scientific community, month 47