“Setting the course”
PIANC – EnviCom report 2013/2014CEDA-PIANC YP Event, 17th October 2014, Brussels
PIANCPIANC
Environmental Commission - EnviCom
Harald Köthechairman
Overview of the activities
The World Association for
Waterborne Transport Infrastructure
“Setting the course”
PIANC – EnviCom report 2013/2014CEDA-PIANC YP Event, 17th October 2014, Brussels
Mission
PIANC is “THE global organisation providing guidance for sustainable waterborne transport, ports and waterways”.
UN Millennium Development Goal No.7:
ensure environmental sustainability
Sustainable means:“… meeting the needs of the present without compromising the
ability of future generations to meet their own needs.”
• Promote the development and improvement of global
waterborne transport infrastructure and enhancement of
its economic, environmental and social benefits
• Be proactive in dealing with the impact of climate change
• Promote the philosophy of ‘Working with Nature’
PIANC Strategic Plan 2010-2014 Goals
“Setting the course”
PIANC – EnviCom report 2013/2014CEDA-PIANC YP Event, 17th October 2014, Brussels 3
The Changing Environment:e.g. River Fragmentation and Flow Regulation(UNEP-Study, 2000)
227 rivers worldwide investigated:37% heavily modified23% modified40% unaffected
~ 90% fresh water volume affectedbigger dams: > 45.000 (22.100 in China)modified for navigation:
by 1900: < 9000 kmby 1997: > 500.000 km
Significant decrease of ecosystems in size and function!
“Setting the course”
PIANC – EnviCom report 2013/2014CEDA-PIANC YP Event, 17th October 2014, Brussels 4
Highly Increased Awareness
about importance of the environment and its natural resources for the life on earth within the last decades
New Environmental Regulationscame into force, that directly or indirectly applies for the navigation sector, e.g. in Europe
Birds Directive (European Union, 1979)Habitats Directive (European Union, 1992) NATURA 2000: network of over 26,000 protected areascovering all EU Member States and 20 % of its territory
Environmental Impact Assessment (EIA) Directive (EU, 1997)Water Framework Directive - WFD (EU, 2000) Marine Strategy Framework Directive (EU, 2008)
“Setting the course”
PIANC – EnviCom report 2013/2014CEDA-PIANC YP Event, 17th October 2014, Brussels 5
• Founded as new commission within PIANC in 1992
• 2 meetings every year (February and Sept./Oct.)
• 41 meetings (last in Helsinki 17./18. Sept. 2014)
• Supporting the mission of PIANC in a changing world and a changing environment
PIANC is “THE global organisation providing guidance for sustainable waterborne transport,
ports and waterways”.
“Setting the course”
PIANC – EnviCom report 2013/2014CEDA-PIANC YP Event, 17th October 2014, Brussels
Member situation
countriesAustraliaAustria new member!
BelgiumFranceFinland GermanyIndia
partnersCCNRCEDA ESPOEUDAIAPHIADCINE
OSPARPorts Australia
currently 15 nations and 9 associated partners
good participation: 15 – 20 participants per meeting
Iran new member!
Japan
The NetherlandsNorwaySpain + YP
South-Korea UKUSA + YP
fruitful contribution by partner organizations !
nominated: Columbia, Philippines
wanted: Italy, China, Brazil, Argentina
“Setting the course”
PIANC – EnviCom report 2013/2014
Meetings 2013/2014
No. 39 Sydney, AUS, 06./07. Sept. 2013Host: Sydney Ports Corporation
No. 38 Brussels, Belgium, 29./30 Jan. 2013
No. 40 Brussels, Belgium, 04./05. Feb. 2014next: No. 41 Helsinki, Finland, 17./18. Sept. 2014
+ Workshop in St. Petersburg, Russia, 19.Sept.No. 42 Brussels, Belgium, Feb. 2015No. 43 Savannah, USA, Oct. 2015
Technical Visit: Port Botany Expansion
“Setting the course”
PIANC – EnviCom report 2013/2014CEDA-PIANC YP Event, 17th October 2014, Brussels
Working and Task Group Reports
Ongoing enlargement of PIANC DM guidance for environmental sensitive areas:
� Good progress of WG 157:
“Environmental Aspects of Dredging around coastal vegetation”New Chair: Paul Erftemeijer (NL), Publication in 2015
� Successful kick off of WG 170
on 06./07.Feb. 2014“Good dredging practice around sea wildlife”Chair: Chris McDougal (UK)
Dredged material management
“Setting the course”
PIANC – EnviCom report 2013/2014CEDA-PIANC YP Event, 17th October 2014, Brussels
Working and Task Group Reports
� WG 150: “A practical guide for a sustainable (sea-)port “(“Green Port”)
- PIANC-led joint PIANC/IAPH WG - Chair Tiedo Vellinga (NL), co-chair Kris de Crane (IAPH)- Goal: Criteria what a Green Ports really is- published in May 2014
Ports
� new WG 174 “Sustainability reporting for ports“- IAPH-led joint IAPH/PIANC WG- Chair: Kris de Craene (IAPH)- Kick off in preparation, - still some experts from PIANC wanted
“Setting the course”
PIANC – EnviCom report 2013/2014CEDA-PIANC YP Event, 17th October 2014, Brussels
� WG 136 ”Recommendations for Sustainable Maritime
Navigation”
- Chair Jacques Paul (F)
- published in July 2013
� WG 143: “Initial Assessment of Environmental Effects of Navigation and Infrastructure Projects”
- chair Burton Suedel (USA)- published in April 2014
� New ways involving external experts for special issues:- Successful PIANC Workshop on 20th November 2013 at HQ“Dredging and port construction and their interaction withfeatures of archaeological or heritage interest”
- Chaired by new PIANC member Euan McNeill (UK)
� - Results from participating experts will be put in a report published by PIANC
Working and Task Group Reports
Navigation/Waterways
“Setting the course”
PIANC – EnviCom report 2013/2014CEDA-PIANC YP Event, 17th October 2014, Brussels
� several WwN presentations from EnviCom worldwide
� WwN Position Paper available in many languages
� WwN online database collection and certification
procedure successfully established since Feb. 2013
� 18 international projects submitted, 9 acknowledged in 3
categories: 1. Certificate of recognition (7),
2. Candidate for certificate of recognition (1),
3. Supporter of WwN (1)
� Commission-cross cutting WwN jury well established
with online workflow in hidden part of WwN database
Elmar Fuchs/EnviCom (chair), Luc van Damme/MarCom,
Yves Morin/InCom, Màrius Tomé I Covelo/RecCom,
Hartmut Brühl/CoCom, Pablo Arreco/YPCom)
–
Strategic Initiatives (1)
Working with Nature – WwN
“Setting the course”
PIANC – EnviCom report 2013/2014CEDA-PIANC YP Event, 17th October 2014, Brussels
Three projects in final competition:
– Flood Spillway Rees/River Rhine
– 3 Meter Navigation Channel Middle Mississippi
– New tidal Area Kreetsand/River Elbe
Working with Nature
First WwN Award on PIANC Congress 2014
on 5th June closing ceremony
WwN 2014 Congress booth with banner, flyer and project booklet, WwN short course and WwN session
New WG 176 on WwN: further PIANC guidancePlatforms for Exchange: WwN database and
LinkedIn-Group
“Setting the course”
PIANC – EnviCom report 2013/2014CEDA-PIANC YP Event, 17th October 2014, Brussels
Permanent Task Group on Climate Change (PTGCC)since 2009
– Filters and packages current CC knowledge for navigation
community (e.g. new IPCC report - AR5)
– produces guidance and write-ups (make use! see thematic PIANC
website)
– Chair Todd Bridges & Secretary Sandra Brasfield since
January 2013
Strategic Initiatives (2)
� Meetings in conjunction with EnviCom meetings:No. 9 in Brussels, Belgium, 28. Jan. 2013No.10 in Brussels, Belgium, 03./04.Feb 2014
next: No.11 in Helsinki, Finland, 16.Sept. 2014
No.12 in Brussels, Belgium, Feb. 2015
+ Telecons
further members wanted
“Setting the course”
PIANC – EnviCom report 2013/2014CEDA-PIANC YP Event, 17th October 2014, Brussels
Permanent Task Group on Climate Change (PTGCC)
� International development to increase the resilience of
transport infrastructure is progressing
(e.g. OECD/ITF, UNECE, EU, regional, national)
� common ground needed to integrate suitable climate
adaptation methods and data in the waterborne
infrastructure planning and decision-making
� Two new TORs from PTGCC for approval:
- Guidance on climate change adaptation
- Guidance on carbon balancing (in prep.)
Strategic Initiatives (2)
“Setting the course”
PIANC – EnviCom report 2013/2014CEDA-PIANC YP Event, 17th October 2014, Brussels
Strategic Initiatives (2)
EU WFD Navigation Task Force
� continuation of very fruitful cooperation of navigation
stakeholder (organizations), increased to 14 partners
now! PIANC lead: chair Jan Brooke (UK)
� close interaction and connection with EU COM in the
WFD implementation process with MS by supporting
guidance for navigation (e.g. river basin management
plans, water services, e-flows, interactions with MSFD)
� 2 meetings per year in preparation to relevant EU COM
meetings (2013: March 26, Oct. 29; 2014: April 1)
� very good recognition and reputation of PIANC
informative website: http://www.pianc.org/euwfd.php
“Setting the course”
PIANC – EnviCom report 2013/2014CEDA-PIANC YP Event, 17th October 2014, Brussels
Networking
� Joint PIANC/CEDA participation in review of Specific Guidelines for
Assessment of Dredged Material; new guidelines approved in Oct.13
(see article in PIANC newsletter Oct.13). Important message: “dredged
sediments are a natural resource and not waste per se”
� Ongoing participation in SG meetings (May 2013, May 2014), submission
of new EnviCom reports to the SG of LC
IMO, Scientific Group of the London Convention
OSPAR, Environmental Impact of Human Activities (EIHA)
� review of Specific Guidelines for Assessment of Dredged Material,
� joint effort with CEDA , participation in EIHA meetings
EU guidelines: navigation + nature protection
� Ongoing observation and case by case
involvement by EnviCom members
“Setting the course”
PIANC – EnviCom report 2013/2014CEDA-PIANC YP Event, 17th October 2014, Brussels
• Promote the development and improvement of
global waterborne transport infrastructure and
enhancement of its economic, environmental
and social benefits
• Be proactive in dealing with the impact of
climate change
• Promote the philosophy of ‘Working with Nature’
EnviCom continues to implementing the existing goalsPIANC Strategic Plan further on in 2014-2018:
“Setting the course”
PIANC – EnviCom report 2013/2014CEDA-PIANC YP Event, 17th October 2014, Brussels
Additional and new goal in the EnviCom Action Plan 2014-2018
Promote the concept of “Sustainable, Integrated and Resilient Management (SIRM) of Navigation Assets and Natural Resources”
What does this mean?
“Setting the course”
PIANC – EnviCom report 2013/2014CEDA-PIANC YP Event, 17th October 2014, Brussels 19
Sustainable, Integrated, Resilient Management - SIRM
Capability and resources to continue life-cycle management according to project objectives (economic, environmental, social)
“Setting the course”
PIANC – EnviCom report 2013/2014CEDA-PIANC YP Event, 17th October 2014, Brussels 20
Sustainable, Integrated, Resilient Management - SIRM
Through Integrated Water Resources Management a balance can be achieved
between protecting and enhancing the water ecosystems
and all other water uses including navigation
“Setting the course”
PIANC – EnviCom report 2013/2014CEDA-PIANC YP Event, 17th October 2014, Brussels 21
Sustainable, Integrated, Resilient Management - SIRM
Enhance the resilience of navigation and waterborne infrastructure to the impacts of climate variability/ change. Strengthen the ability of the infrastructure and the transport operations to handle adverse effects of climate variability/change
Enhancing the resilience to the impacts of climate variability/change also means the chance to invest in a low-carbon economy, for instance, by promoting
energy efficiency and the uptake of green products.
“Setting the course”
PIANC – EnviCom report 2013/2014CEDA-PIANC YP Event, 17th October 2014, Brussels 22
EnviCom task 2014 -2018:
• Define SIRM and provide implementation guidance and recommendations
• Include and combine guidance from e.g. − Working with Nature (WwN), − Ecosystem Goods and Services (EGS), − Climate Change Adaptation, − safety, hazard and environmental risk
management,− Green developments
“Setting the course”
PIANC – EnviCom report 2013/2014CEDA-PIANC YP Event, 17th October 2014, Brussels 23
New EnviCom activities
Parallel interrelated activities starting in 2014/2015:
• kick off new WG 175 “A Practical Guide to Environmental Risk Management (ERM) for Navigation Infrastructure Projects“kick off: 5./6. Feb. 2015, Brussels
• kick off new WG 176 “A Guide for applying Working with Nature (WwN) to Navigation Infrastructure Projects".Kick off: 5./6. Feb. 2015, Brussels
• expert seminar on Ecosystems Goods and Services (EGS)
in 2015
• New WG ”A guidance on climate change adaptation for navigation infrastructure projects” – elaborated by PTGCC
new WG 174 “Sustainability reporting for ports“- IAPH-led joint IAPH/PIANC WG
kick off: 08./9. Oct. 2014 in Antwerp
“Setting the course”
PIANC – EnviCom report 2013/2014CEDA-PIANC YP Event, 17th October 2014, Brussels 24
“Setting the course”
PIANC – EnviCom report 2013/2014CEDA-PIANC YP Event, 17th October 2014, Brussels
Visit EnviCom
personally and on the website:
http://www.pianc.org/envicom.php
+ Thematic Webpages on
WFD, WwN, CC
“Setting the course”
PIANC – EnviCom report 2013/2014CEDA-PIANC YP Event, 17th October 2014, Brussels 26
Thank you for listening !
Harald Köthe
Chairman PIANC EnviCom