thermal testing of tob/tec hybrids at ucsb
DESCRIPTION
Thermal Testing of TOB/TEC Hybrids at UCSB. Why Thermal Test?. The CMS detector will run at –20 C in order to lessen radiation damage to the silicon. Why Thermal Test Hybrids?. Some Hybrids fail at –20 C APVs do not output Hybrid fails to initialize - PowerPoint PPT PresentationTRANSCRIPT
-
Thermal Testing of TOB/TEC Hybrids at UCSB
-
The CMS detector will run at 20 C in order to lessen radiation damage to the siliconWhy Thermal Test?
-
Why Thermal Test Hybrids?Some Hybrids fail at 20 CAPVs do not outputHybrid fails to initializeNoise increases in cold (peltier current?) APV: Analog Pipeline Voltage Mode Chip
-
The 4 Hybrid Cold BoxCold box design and photo courtesy of:Bruno Wittmer and Giacomo Squazzoni @ CERNHow to thermally test hybrids?4 at a time.
-
The Set-up at CERNPicture courtesy of CERN
-
The Set-up at CERN
-
A question at Tracker week
-
Conclusion
Hey folks, is there someone willing to test hybrids on a large scale?!?!
G.Sguazzoni
-
Building our own Construction
&
Repair
-
Slow ControlFirst order of business: hooking things up 5 temperature sensors 1 humidity sensor
1 Water Flow Sensor 1 Air Flow Sensor
-
Interfacing to a PC: ACDC
-
Cooling DownCooling Mechanism: Peltier UnitSupercool Peltier:Voltage = 28 V Current = 13 A Power = 350 W
-
Cooling DownHow long should/does it take to get to 20?Cold chamberPeltier + PlateChillerAir Air Flow(0.05 L/min)Water Flow (14 L/min)
-
Simplifying thingsS= surface area of enclosure (m )k=thermal conductivity of walls (W/m C)h=convection factor (W/m C) x=thickness of walls (m)
-
Simplifying thingsAssumptions:
Most of the heat transferred to the system goes into cooling the aluminum peltier plate (specific heat of aluminum is much greater than that of air)m= 2.0 kgc= 910 J/kg C
-
Simplifying thingsAssumptions2) The convection factor can be calculated by waiting until the system comes to equilibrium
Temp at equilibrium
-
Simplifying thingsWaiting (I was too impatient to wait for t )h= 7.55 (W/m C)
-
Calculating time to -20First order linear differential equation:Solution: (T(t=0)=295K)
-
Not quiteCalculation says that plate should reach 20 in ~14 minutes.
Actual time: ~21 minutes
Possible problems: Unaccounted heat influx through leaks or grounding strips connecting plate to outside assumptions made are flawed Missing term in differential equation
-
-20 Reached: On to Testing Set-up in Clean RoomChillerCold BoxPC for Monitoring+ ControllingElectronicsGas/Water Flow Control
-
Testing Software: ARCSAPV Readout Control SoftwareCommunicatesWith ACDC via TCP/UDP
-
G.Sguazzoni
-
What are we testing for?Shorted channels: On each clock, charge injected into every 8th channel. Shorted channels share, ADC amplitude is diminished.128 Channels per APV-6 APV hybrids: 768-4 APV hybrids: 512
-
What are we testing for?Open Channels:Inject charge throughCapacitive coupling of pitch adapter to antenna carrying TTL PulseAntennaPitch Adapter
-
Easier said than doneSlide courtesy of G.Squazzoni
-
ARC
NIMpulser
trigger
NIMtoTTL
start
out
50W
antenna very close (~1mm) to the bond pads
Peak - InvOFF
Pulser ONPeak ModeOptimal latency
OPENS
G.Sguazzoni
-
We thought it was the pulserARC BoardLVDSNIM LogicNIMTTL
-
LVDS Signal?ARC Boards with functioning External BusSer 29Ser 31
ARC Boards with non-functioning External BusSer 56Ser 57Ser 59
LVDS SignalNoise
-
ARC Controller Problem
Bad Batch of ARC BOARDS: LVDS Driver and LVDS Receiver U32 and U33 were switched during board assembly. Problem was never discovered.
External Buss connector and associated ICs on lower left of photo. U32
-
With Pulser OperationalOpens detectable in Scope Mode Intentionally Plucked Bonds Show up in Pedestal Profile
-
With Pulser Operational.Opens are also detectable in Pedestal & Noise Test Plucked Bonds
-
Grounding IssuesSame Problem CERN was having.Huge spikes in noise at APV edges
-
GroundingFerrite Ring around Coax G10/copper strips connect peltier plate to front end ground
-
Much BetterOld GroundingNew Grounding
-
Thermal Cycle TestOne Button test
Three Sets of Tests:Pedestal & NoisePulserShort Detection
-
Automated Test ResultsFinal Report After Thermal Cycle Test:Lists -Shorts -Opens -Noisy Channels
-
The testing goes onSo far, about 100 hybrids have been thermal cycled.
At maximum capacity: ~28 per day
And the cycling will continue