thomas r. bane p.e. 605 suwannee street mail-station 32 tallahassee florida 32399 (850) 414-4379...

22
Thomas R. Bane P.E. 605 Suwannee Street Mail-station 32 Tallahassee Florida 32399 (850) 414-4379 [email protected].fl.us Roadside - Benefit – Cost assessment See credit below: Thomas Bane

Upload: benjamin-tyler

Post on 29-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

Thomas R. Bane P.E. 605 Suwannee StreetMail-station 32Tallahassee Florida 32399(850) [email protected]

Roadside - Benefit – Cost assessment

See credit below: Thomas Bane

Reduction in Accident Costs

Increase in Construction& Maintenance Costs

R(b/c) =

Benefit / Cost Ratio

Roadside Guide

Design

Technical Advisory

RS5.0

Non-Restricted Roadways

Roadside Guide

DesignNCHRP

RSAP

ROADSIDE5.0

Technical Advisory

Societal Costs/Severity Level

C:> _roadside.exe

Roadside Program is a DOS based program – Get acquainted with thisType of message!

DO YOU WISH TO ENABLE THE PRINTER (Y/N)?

Y

GLOBAL PARAMETER VALUES

1. FATAL ACCIDENT COST = $ 1,000,000 2. SEVERE INJURY ACCIDENT COST = $ 200,000 3. MODERATE INJURY ACCIDENT COST = $ 12,500 4. SLIGHT INJURY ACCIDENT COST = $ 3,750 5. PDO LEVEL 2 ACCIDENT COST = $ 3,125 6. PDO LEVEL 1 ACCIDENT COST = $ 625 7. ENCROACHMENT RATE = 0.0003000 ENCROACHMENTS/km/YR/VPD 8. 50 km/h DES SPEED ENC ANGLE = 13.0 DEG AND TRAF VOL CAP = 24000 VPD/LANE 9. 60 km/h DES SPEED ENC ANGLE = 12.8 DEG AND TRAF VOL CAP = 23900 VPD/LANE 10. 70 km/h DES SPEED ENC ANGLE = 12.4 DEG AND TRAF VOL CAP = 23700 VPD/LANE 11. 80 km/h DES SPEED ENC ANGLE = 12.0 DEG AND TRAF VOL CAP = 23300 VPD/LANE 12. 90 km/h DES SPEED ENC ANGLE = 11.6 DEG AND TRAF VOL CAP = 22800 VPD/LANE 13. 100 km/h DES SPEED ENC ANGLE = 11.1 DEG AND TRAF VOL CAP = 22000 VPD/LANE 14. 110 km/h DES SPEED ENC ANGLE = 10.7 DEG AND TRAF VOL CAP = 21000 VPD/LANE 15. 120 km/h DES SPEED ENC ANGLE = 10.3 DEG AND TRAF VOL CAP = 20000 VPD/LANE 16. SWATH WIDTH = 3.600 m 17. RESET ALL GLOBALS TO DEFAULT STARTUP VALUES.

DO YOU WISH TO CHANGE A PARAMETER VALUE (Y/N)?

Technical Advisory

Y

GLOBAL PARAMETER VALUES

1. FATAL ACCIDENT COST = $ 2,600,000 2. SEVERE INJURY ACCIDENT COST = $ 505,000 3. MODERATE INJURY ACCIDENT COST = $ 165,000 4. SLIGHT INJURY ACCIDENT COST = $ 36,167 5. PDO LEVEL 2 ACCIDENT COST = $ 10,469 6. PDO LEVEL 1 ACCIDENT COST = $ 2,000 7. ENCROACHMENT RATE = 0.0003000 ENCROACHMENTS/km/YR/VPD 8. 50 km/h DES SPEED ENC ANGLE = 13.0 DEG AND TRAF VOL CAP = 24000 VPD/LANE 9. 60 km/h DES SPEED ENC ANGLE = 12.8 DEG AND TRAF VOL CAP = 23900 VPD/LANE 10. 70 km/h DES SPEED ENC ANGLE = 12.4 DEG AND TRAF VOL CAP = 23700 VPD/LANE 11. 80 km/h DES SPEED ENC ANGLE = 12.0 DEG AND TRAF VOL CAP = 23300 VPD/LANE 12. 90 km/h DES SPEED ENC ANGLE = 11.6 DEG AND TRAF VOL CAP = 22800 VPD/LANE 13. 100 km/h DES SPEED ENC ANGLE = 11.1 DEG AND TRAF VOL CAP = 22000 VPD/LANE 14. 110 km/h DES SPEED ENC ANGLE = 10.7 DEG AND TRAF VOL CAP = 21000 VPD/LANE 15. 120 km/h DES SPEED ENC ANGLE = 10.3 DEG AND TRAF VOL CAP = 20000 VPD/LANE 16. SWATH WIDTH = 3.600 m 17. RESET ALL GLOBALS TO DEFAULT STARTUP VALUES.

DO YOU WISH TO CHANGE A PARAMETER VALUE (Y/N)? N

CURRENT SEVERITY INDEX versus COST RELATIONSHIP

SEVERITY INDEX COST

0.0 $ 0 0.5 $ 2,000 1.0 $ 10,250 2.0 $ 26,940 3.0 $ 82,498 4.0 $ 170,041 5.0 $ 342,277 6.0 $ 639,870 7.0 $ 981,526 8.0 $ 1,469,147 9.0 $ 2,052,450 10.0 $ 2,600,000

PRESS ENTER TO CONTINUE

$0.00

$200,000.00

$400,000.00

$600,000.00

$800,000.00

$1,000,000.00

$1,200,000.00

$1,400,000.00

$1,600,000.00

$1,800,000.00

$2,000,000.00

$2,200,000.00

$2,400,000.00

$2,600,000.00

0 1 2 3 4 5 6 7 8 9 10

Severity Index

So

ciet

al C

ost

s

$981,562.00

SI=7.0

0

10

20

30

40

50

60

70

80

90

100

0 1 2 3 4 5 6 7 8 9 10

Severity Index

% A

ccid

ents

Property Damage Only

Fatalities

Non-Fatal Injuries

1. TITLE:2. TRAFFIC VOLUME = 38,900 VPD - TRAFFIC GROWTH RATE = 0.650 % PER YEAR3. DIVIDED HIGHWAY TOTAL LANE(S) = 6 LANE WIDTH = 3.300 m4. CURVATURE (RADIUS IN METERS) = %999,999 GRADE (PERCENT) = 0.05. EFFECTIVE BASELINE CURVATURE GRADE USER TOTAL TRAFFIC VPD ENC/km/YR FACTOR FACTOR FACTOR ENC/km/YR ADJACENT 19,450 5.8350 1.00 1.00 1.00 5.8350 OPPOSING 19,450 0.0000 1.00 1.00 1.00 0.00006. DESIGN SPEED = 70 km/h ENC ANGLE = 12.4 DEG ADT CAP = 23,700 VPD/LANE7. OFFSET (A) = 3.020 m LENGTH (L) = 0.500 m WIDTH (W) = 0.500 m8. INITIAL COLLISION FREQUENCY = 0.02615 IMPACTS/YEAR ADJACENT CFTA = 0.0261 CFSU = 0.0018 CFCU = 0.0233 CFFA = 0.0011 OPPOSING CFTO = 0.0000 CFSD = 0.0000 CFCD = 0.0000 CFFO = 0.00009. SEVERITY INDEX = SU= 4.40 SD= 2.00 CU= 4.40 CD= 1.00 FACE= 2.20 ACCIDENT COST $ 238,935 $ 26,940 $ 238,935 $ 10,250 $ 38,0510. PROJECT LIFE = 13 YR DISCOUNT RATE = 7.000 %/YR TRAFFIC CUTOFF YR = 200 CRF = 0.11965 KC = 8.66693 KT = 8.35765 KJ = 0.414961. INSTALLATION COST = $ 35,000 SALVAGE VALUE = $ 02. REPAIR COST/ACC $ SU= 2000 SD= 1000 CU= 2000 CD= 1000 F= 10003. MAINTENANCE COST/YR = $ 1004. PRESENT WORTH = $ 88,590 ANNUALIZED $ 10,600 ACCIDENT COST = $ 52,310 ANNUALIZED $ 6,259 HIGHWAY DEPT. COST = $ 36,280 ANNUALIZED $ 4,341O CHANGE OR ACCESS: INPUT ITEM NUM. OR FUNCTION KEY (SEE BELOW) PLUS ENTER.PRINT STORE RECALL HELP GLOBAL SI v $ DIR SI DEF GRAPH QUIT

Actual Horizontal Offset

Actual Horizontal Offset

Effective Offset

Frnd = 1+ slope

Efficiency Factors:

Es = 1+ slope/0.4

Dslope-brake = -17.34 m (slope)

Slope =>

Vaulting =>

1. TITLE:2. TRAFFIC VOLUME = 38,900 VPD - TRAFFIC GROWTH RATE = 0.650 % PER YEAR3. DIVIDED HIGHWAY TOTAL LANE(S) = 6 LANE WIDTH = 3.300 m4. CURVATURE (RADIUS IN METERS) = %999,999 GRADE (PERCENT) = 0.05. EFFECTIVE BASELINE CURVATURE GRADE USER TOTAL TRAFFIC VPD ENC/km/YR FACTOR FACTOR FACTOR ENC/km/YR ADJACENT 19,450 5.8350 1.00 1.00 1.00 5.8350 OPPOSING 19,450 0.0000 1.00 1.00 1.00 0.00006. DESIGN SPEED = 70 km/h ENC ANGLE = 12.4 DEG ADT CAP = 23,700 VPD/LANE7. OFFSET (A) = 3.020 m LENGTH (L) = 0.500 m WIDTH (W) = 0.500 m8. INITIAL COLLISION FREQUENCY = 0.02615 IMPACTS/YEAR ADJACENT CFTA = 0.0261 CFSU = 0.0018 CFCU = 0.0233 CFFA = 0.0011 OPPOSING CFTO = 0.0000 CFSD = 0.0000 CFCD = 0.0000 CFFO = 0.00009. SEVERITY INDEX = SU= 4.40 SD= 2.00 CU= 4.40 CD= 1.00 FACE= 2.20 ACCIDENT COST $ 238,935 $ 26,940 $ 238,935 $ 10,250 $ 38,0510. PROJECT LIFE = 13 YR DISCOUNT RATE = 7.000 %/YR TRAFFIC CUTOFF YR = 200 CRF = 0.11965 KC = 8.66693 KT = 8.35765 KJ = 0.414961. INSTALLATION COST = $ 35,000 SALVAGE VALUE = $ 02. REPAIR COST/ACC $ SU= 2000 SD= 1000 CU= 2000 CD= 1000 F= 10003. MAINTENANCE COST/YR = $ 1004. PRESENT WORTH = $ 88,590 ANNUALIZED $ 10,600 ACCIDENT COST = $ 52,310 ANNUALIZED $ 6,259 HIGHWAY DEPT. COST = $ 36,280 ANNUALIZED $ 4,341O CHANGE OR ACCESS: INPUT ITEM NUM. OR FUNCTION KEY (SEE BELOW) PLUS ENTER.PRINT STORE RECALL HELP GLOBAL SI v $ DIR SI DEF GRAPH QUIT

1. TITLE:2. TRAFFIC VOLUME = 38,900 VPD - TRAFFIC GROWTH RATE = 0.650 % PER YEAR3. DIVIDED HIGHWAY TOTAL LANE(S) = 6 LANE WIDTH = 3.300 m4. CURVATURE (RADIUS IN METERS) = %999,999 GRADE (PERCENT) = 0.05. EFFECTIVE BASELINE CURVATURE GRADE USER TOTAL TRAFFIC VPD ENC/km/YR FACTOR FACTOR FACTOR ENC/km/YR ADJACENT 19,450 5.8350 1.00 1.00 1.00 5.8350 OPPOSING 19,450 0.0000 1.00 1.00 1.00 0.00006. DESIGN SPEED = 70 km/h ENC ANGLE = 12.4 DEG ADT CAP = 23,700 VPD/LANE7. OFFSET (A) = 3.020 m LENGTH (L) = 0.500 m WIDTH (W) = 0.500 m8. INITIAL COLLISION FREQUENCY = 0.02615 IMPACTS/YEAR ADJACENT CFTA = 0.0261 CFSU = 0.0018 CFCU = 0.0233 CFFA = 0.0011 OPPOSING CFTO = 0.0000 CFSD = 0.0000 CFCD = 0.0000 CFFO = 0.00009. SEVERITY INDEX = SU= 4.40 SD= 2.00 CU= 4.40 CD= 1.00 FACE= 2.20 ACCIDENT COST $ 238,935 $ 26,940 $ 238,935 $ 10,250 $ 38,0510. PROJECT LIFE = 13 YR DISCOUNT RATE = 7.000 %/YR TRAFFIC CUTOFF YR = 200 CRF = 0.11965 KC = 8.66693 KT = 8.35765 KJ = 0.414961. INSTALLATION COST = $ 35,000 SALVAGE VALUE = $ 02. REPAIR COST/ACC $ SU= 2000 SD= 1000 CU= 2000 CD= 1000 F= 10003. MAINTENANCE COST/YR = $ 1004. PRESENT WORTH = $ 88,590 ANNUALIZED $ 10,600 ACCIDENT COST = $ 52,310 ANNUALIZED $ 6,259 HIGHWAY DEPT. COST = $ 36,280 ANNUALIZED $ 4,341O CHANGE OR ACCESS: INPUT ITEM NUM. OR FUNCTION KEY (SEE BELOW) PLUS ENTER.PRINT STORE RECALL HELP GLOBAL SI v $ DIR SI DEF GRAPH QUIT

1. TITLE:2. TRAFFIC VOLUME = 38,900 VPD - TRAFFIC GROWTH RATE = 0.650 % PER YEAR3. DIVIDED HIGHWAY TOTAL LANE(S) = 6 LANE WIDTH = 3.300 m4. CURVATURE (RADIUS IN METERS) = %999,999 GRADE (PERCENT) = 0.05. EFFECTIVE BASELINE CURVATURE GRADE USER TOTAL TRAFFIC VPD ENC/km/YR FACTOR FACTOR FACTOR ENC/km/YR ADJACENT 19,450 5.8350 1.00 1.00 1.00 5.8350 OPPOSING 19,450 0.0000 1.00 1.00 1.00 0.00006. DESIGN SPEED = 70 km/h ENC ANGLE = 12.4 DEG ADT CAP = 23,700 VPD/LANE7. OFFSET (A) = 3.020 m LENGTH (L) = 0.500 m WIDTH (W) = 0.500 m8. INITIAL COLLISION FREQUENCY = 0.02615 IMPACTS/YEAR ADJACENT CFTA = 0.0261 CFSU = 0.0018 CFCU = 0.0233 CFFA = 0.0011 OPPOSING CFTO = 0.0000 CFSD = 0.0000 CFCD = 0.0000 CFFO = 0.00009. SEVERITY INDEX = SU= 4.40 SD= 2.00 CU= 4.40 CD= 1.00 FACE= 2.20 ACCIDENT COST $ 238,935 $ 26,940 $ 238,935 $ 10,250 $ 38,0510. PROJECT LIFE = 13 YR DISCOUNT RATE = 7.000 %/YR TRAFFIC CUTOFF YR = 200 CRF = 0.11965 KC = 8.66693 KT = 8.35765 KJ = 0.414961. INSTALLATION COST = $ 35,000 SALVAGE VALUE = $ 02. REPAIR COST/ACC $ SU= 2000 SD= 1000 CU= 2000 CD= 1000 F= 10003. MAINTENANCE COST/YR = $ 1004. PRESENT WORTH = $ 88,590 ANNUALIZED $ 10,600 ACCIDENT COST = $ 52,310 ANNUALIZED $ 6,259 HIGHWAY DEPT. COST = $ 36,280 ANNUALIZED $ 4,341O CHANGE OR ACCESS: INPUT ITEM NUM. OR FUNCTION KEY (SEE BELOW) PLUS ENTER.PRINT STORE RECALL HELP GLOBAL SI v $ DIR SI DEF GRAPH QUIT

ROADSIDE5.0

Condition1

Acc. Costs 1

Acc. Costs 2

Reduction in Accident Costs

Condition 2

Reduction in Accident Costs