Through Life Obsolescence Cost Modelling T45 Destroyer
David Williams
Director Through Life Support Ltd
Obsolescence Management | Integrated Logistic Support | Training
Through Life Support Ltd
• Founded in 2011 by: – David Williams – Stuart Kelly
• Capability – All Aspects of Through Life Capability Management – Specialising
• Obsolescence Management
• Customer Base – Aerospace and Defence, Energy, Transportation – International customer base For more go to: www.throughlifesupport.com
Obsolescence Management | Integrated Logistic Support | Training
Through Life Obsolescence Management for the T45 Destroyer
• Background – Phase 1 2013
• 11 major systems, an assessment of Obsolescence and costs for a 10 year span
– Phase 2 2015 • BAE Systems engage TLS to review the 2013 assessment and re-valuate
– TLS provided a significant reduction in 2013 cost predictions
• TLS were also tasked to analyse the planned spares procurement parts (c5,000 items) with AVCOM and then cost model the obsolescence using the TLS TOCET cost modelling Tool
– Phase 3 2016 • BAE Systems engage TLS to extend the 2015 list with a further 21 systems with analysis based
on: – Supplier Assessments – Equipment Parts lists analysed with AVCOM and cost modelled with TOCET
• Report issued November 2015
Obsolescence Management | Integrated Logistic Support | Training
Scope of this Paper
• Phase 4 Requirements 2017
• BAE Systems End Customer Requirements
• Approach Taken by TLS to meet requirements
• Risk Management for Prioritisation
• Sources of Information to meet the requirements
• Results and Analysis
• Reporting Dashboard(BAE Systems Development)
• Summary
Obsolescence Management | Integrated Logistic Support | Training
Phase 4 Requirements 2017 • The Issue
– Previous phases whilst they met the requirements and provided a summary of the predicted/forecast costs of obsolescence over the agreed period would benefit from a further task with greater granularity:
– Expanding on • Limited Phasing throughout the period
• Some resolutions identified and reported
• Limited tracking of actions and agreed resolutions
– Extending to cover • Prioritising of the obsolescence issues
• Alignment to maintenance schedules
Obsolescence Management | Integrated Logistic Support | Training
BAE Systems End Customer Requirements
• BAE Systems – MOD Quarterly Review February 2017
– MOD Requested that the previously (2016 and 2015) information be extended to meet the following requirements
• Risk and Vulnerability assessment to place the predicted / forecast costs and any identified resolutions under the classification of Fight, Move, Float and Safety(FMFS)
• Prioritise in line with Op-defect (1 to 3 –with 1 being high)
• Schedule Predicted/forecast costs over the period 2018 to 2028
• Plan Obsolescence resolutions(mitigations) in line with the maintenance schedule identified in LTOS
Obsolescence Management | Integrated Logistic Support | Training
TLS Approach to meeting the Requirements
• Developed an Excel workbook to manage and capture key data – FAC (Fleet Area Code) Dependency Matrix
– FAC Risk level FMFS • Used the T45 Digest data to define impacts
• Supplier Risk notifications
– TLS 12 level Risk Model
– Risk Calculator
– Progress and status tracking
– Systems that are to be modelled for cost and phasing
Obsolescence Management | Integrated Logistic Support | Training
Risk Management for Prioritisation
Requirements to meet FMFS
• TLS 12 level Risk Model – Redundancy
– Combat Critical
– Mission Critical
– Operation Critical
– Platform Safety Critical
– Health and Safety
– Has Commercial Operating System
– Supplier Business Continuity
– Supply Chain Risk
– Obsolescence Risk
– Implementation Difficulty
Obsolescence Management | Integrated Logistic Support | Training
Risk Aspect Weighting
• To provide a Risk Priority each of the 12 Risk assessed areas were given a weighting – Weightings were different dependent on the aspect
– Some weighting were 0 or 1 if the answer was yes/ no
– Weightings table applied to each aspect
– Weightings were totalled to provide an overall score • Lower number the higher the priority
• Risk Model presented and submitted to both BAE Systems and the MOD OM lead and fully adopted
Obsolescence Management | Integrated Logistic Support | Training
Information Sources
• Supplier Assessments – Key system suppliers meetings and discussions – Recording and agreeing OM actions and costs
• Parts list for modelling from the Parent Child Relationship
– AVCOM OM Status analysis – TLS TOCET Modelling
• Electronic • Non-electronic
• Multiple other documents/data sources such as lower level parts suppliers
Obsolescence Management | Integrated Logistic Support | Training
Results and Analysis Recording Data
TLS Risk levels
Redundancy
Combat critical
Mission Critical
Operational Critical
Propulsion Critical
Platform Safety Critical
Health and safety
Contains commercial operating software
Supplier Business Continuity
Supply Chain risk
Obsolescence Risk
Implementation
Based on Digest or Supplier Yes or No
Based on qualification from appropriate source
Based on Digest or Supplier
Based on Digest and RR/GE
Based on Digest or supplier/customer/BAES
Based on assessment
From Assessments yes/no
From Assessments
From assessments
Assessment and AVCOM reports
From suppliers
FAC Descripti
on Supplier
Comments
Lead time
Risk Number
Obsolescence Management | Integrated Logistic Support | Training
Supplier System Review Reports
• Reviews undertaken in TLS’s proven Format identifying
– Obsolescence Risk
– Cost of Risk Mitigation
– Timeline
– Design Refresh/Technology upgrade
– Agreement with supplier on reported results
– Data entered in the Risk Calculation worksheet
– Data used to populate the OM Dash Board
Obsolescence Management | Integrated Logistic Support | Training
TOCET Modelled Systems
• For those system that were modelled then the process used was:
Load Parts in AVCOM
Part Type identified
(18) TOCET Costs
Data Modelled
Part Type Life Cycle
Part Type Count
Phased Costs
Obsolescence Management | Integrated Logistic Support | Training
Cost Curve Model
FAC Code DescriptionParts quantityPart Type
Life Cycle
Factor Qty Part Type
Weightin
gs
Frequenc
y
Weightin
g Factor
in
managed
period
Factor
Total
Number
to use
per cost %
FAC Total
Cost
Percenta
ge Costs
Life Cycle
Factor
Cost in
years
K
BHC Transmission 125,000
163 System 0.0 0.0
Box 0.0 0.0
Board 0.0 0.0
Assembly 5 0.0 0.0 0.0
Chemical 5 0.0 0.0 0.0
Electrical 13 0.0 0.0 0.0
Electronic 4 0.0 0.0 0.0
Explosives 0.0 0.0
Hardware 62 0.0 0.0 0.0
Mechanical 13 0.0 0.0 0.0
MISC 0.0 0.0 0.0
Non
Electric 17 0.0 0.0 0.0
Optical 0.0 0.0 0.0
Organic 0.0 0.0 0.0
Software 0.0 0.0 0.0
Structual 39 0.0 0.0 0.0
Undertimed 4 0.0 0.0 0.0
COTS 1 0.0 0.0 0.0
Obsolescence Management | Integrated Logistic Support | Training
Summary
• Both BAE Systems and TLS had recognised in December 2016 – The requirement to phase the costs over the reported period – The need to add risk and priority to the analysis
• Each Phase has added granularity and accuracy to the predicted costs – Costs are now refined and each phase has shown a reduction
• A significant level of equipment and systems design are now in the region of 20 years old and the tasks have enabled the raising of the options to maintain Through Life Capability
• Contracting effectively is still an issue