ACTIVITY PIC DELIVERABLE TIMEFRAME

13 14 15 17  18  19  20  21  22  24  25  26  27  28  29  30 31 

PHASE 1 – PROJECT ASSESSMENT & FUNCTIONAL ANALYSIS

                                     

1. Meeting with the design team

                                 

2. Contingency for clarificatory meetings

                                     

3. Desktop analysis and report writing

                                     

Page 2: time frame (DRAFT).docx

ACTIVITY PIC DELIVERABLE                                                      

PHASE 2 : RISK ASSESSMENT

     31

1  2 3 4  5  7  8  9  10  11  12  14  14  15  16  17  18  19 21  22  23  24  25  26  28  30 

1. Pre – work                                                          

2. Research and Data – Gathering

                                                         

3. Data Processing and Report Writing

                                                         

SEPTEMBER

Page 3: time frame (DRAFT).docx

OCTOBER                                                           

PHASE 2: RISK ASSESSMENT

 1 2  3 5 6  7  8  9  10  12  13  14  15  16  17  19  20  21  22 23  24  26  27  28  29  30  31 

1. Pre – work                                                          2. Research

and Data – Gathering

                                                         

3. Data Processing and Report Writing

                                                         

Page 4: time frame (DRAFT).docx

 OCTOBER                                                          

PHASE 3 – DETAILED PROJECT SECURITY SYSTEM DESIGN

1 2 3 5 6 7 8 9 10

12

13

14

15

16

17

19

20

21 22 23 24 26 27 28 29 30 31

1. Design concept and guidelines

                                                         

2. Design of detailed project security plan

                                                         

3. Presentation and discussion

                                                         

4. Contingency for revisions

Page 5: time frame (DRAFT).docx

NOVEMBERPHASE 3 : DETAILED PROJECT SECURITY SYSTEM DESIGN

 2 3  4 5 6  7  9  10

 11

12 13   14

 16

 17

 18

 19

20   21 23 24   25  26 27 28  30 

1. Design concept and guidelines

                                                     

2. Design of detailed project security plan

                                                     

3. Presentation and discussion

                                                     

4. Contingency for revisions

Page 6: time frame (DRAFT).docx

 DECEMBER                                                          

PHASE 3 – RISK ASSESSMENT

    1 2 3 4 5 7 8 9 10 11 12 14 15 16 17 18 19 21 22 23 24 25 26 28 29 30 31

1. Design concept and guidelines

   

2. Design of detailed project security plan

                                                         

3. Presentation and discussion

                                                         

4. Contingency for revisions

Page 7: time frame (DRAFT).docx

 JANUARY                                                      

  PHASE 4 – SECURITY AND MANAGEMENT PLAN

     4 5  6  7  8  9  11  12  13  14  15  16  18  19  20  21  22  23  25  26  27  28  29  30  31 

1. Development of Security Mngt Plan

                                                     

2. Contingency for revisions

                                                     

Page 8: time frame (DRAFT).docx

 FEBRUARY                                                      

  PHASE 4 : SECURITY MANAGEMENT PLAN

     1 2  3  4  5  6  8  9  10  11  12  13  15  16  17  18  19  20  22  23  24  25  26  27  29 

1. Development of Security Mngt Plan

                                                     

2. Contingency for revisions

                                                     

Page 9: time frame (DRAFT).docx

 MARCH                                                          

  PHASE 4: SECURITY MANAGEMENT PLAN

    1 2 3 4 5 7 8 9 10 11 12 14 15 16 17 18 19 21 22 23 24 25 26 28 29 30 31

1. Development of Security Mngt Plan

                                                         

PHASE 5 : CONSULTATION FINE TUNING AND ADJUSTMENTS OF DESIGNS

1. Site Walk thru and inspection

                                                         

2. Evaluation report