tin can hill trail proposed improvements - yellowknife

1
N Date: December 2013 Project: 138344 Scale: 1:2,000 Tin Can Hill Trail Proposed Improvements Panel 2 S c h o o l D r a w Aven u e 48 Street 4 8 S tre et 54 Avenue 54 Avenue Site Furnishings Waste Receptacles Trail Head and Directional Signs Main Entrance to Park Interpretive Sign Concept potential to be adapted for alternate trail location Dog Waste Receptacles Seating Opportunities Existing Natural Rock and Boulder/Armourstone Seating Formalized parking - Opportunities for permeable paving, bumper curbs and signage Potential future trail marker Potential future trail marker Boardwalks In strategic locations to improve accessibility peat bog pond/marsh Main Entrance to Park - See Image Below Potential future trail marker 52nd Street connection improvements - see below 52nd Street Entrance Improvements See Panel 1 for enlargement Trail regraded and replace entrance gate Wood boardwalk Natural Rock Trail Marker Concept Dog Waste Receptacles kT il M k C t 5 4 A v e v v n u e 5 4 A LEGEND G R E A T S L A V E L A K E R A T L A K E Existing Gravel Trail (3.6 - 4m wide) Existing Foot Path Trail Community Connection Key Scenic Lookout Short Trail Loop Long Trail Loop Trail Head Directional Sign Waste and Dog Waste Receptacles Scale 1:4,000

Upload: others

Post on 30-Dec-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Tin Can Hill Trail Proposed Improvements - Yellowknife

PRELIMINARY DESIGNPROPOSED TRAILS

CITY OF YELLOWKNIFETIN CAN HILL TRAIL DEVELOPMENT

LOOKOUT

PARKING

MAIN TRAIL ENTRANCE

BOARDWALK

CULVERT

TRAIL MARKER

TRASH/DOG WASTE RECEPTACLE

NATURAL ROCK STAIRS

SLAVE LAKE WINTER CROSSING

MAP/DRAWING INFORMATIONData source, reference, footnote, credits, limitations, etc.Drawing information, drawing information. Drawinginformation, drawing information.

CREATED BY:CHECKED BY:

PROJECT: 13 8344 STATUS: DRAFT DATE: 10/25/13

400m200

SCALE 1:4,000

0 100

ROCK BOLLARD PROPOSED TRAIL EXISTING TRAIL SYSTEM

VEHICLE GATE POND/MARSH AREA NATURAL STAIRS

+XING

N

Date: December 2013 Project: 138344

Scale: 1:2,000

Tin Can Hill TrailProposed Improvements

Panel 2

Scho

ol Draw Ave

nu

e

48 Street 48 Street

54 A

venu

e

54 Avenue Site Furnishings

Waste Receptacles

Trail Head and Directional Signs

Main Entrance to Park Interpretive Sign Conceptpotential to be adapted for alternate trail location

Dog Waste Receptacles

Seating Opportunities

Existing Natural Rock and Boulder/Armourstone Seating

Formalized parking -Opportunities for permeable paving, bumper curbs and signage

Potential future trail marker

Potential future trail marker

Boardwalks

In strategic locations to improve accessibility

peat bog

pond/marsh

Main Entrance to Park - See Image Below

Potential future trail marker

52nd Street connection improvements - see below

52nd Street Entrance Improvements

See Panel 1 for enlargement

Trail regraded and replace entrance gate

Wood boardwalk

Natural Rock Trail Marker Concept

Dog Waste Receptacles

k T il M k C t

54Av

evvnu

e

54 A

LEGEND

G R E A T S L A V E

L A K E

R A T L A K E

Existing Gravel Trail (3.6 - 4m wide)

Existing Foot Path Trail

Community Connection

Key Scenic Lookout

Short Trail Loop

Long Trail Loop

Trail Head

Directional Sign

Waste and Dog Waste Receptacles

Scale 1:4,000