1 © 2009 TOCICO. All rights reserved. TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

Upload: others

Post on 14-Aug-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

1© 2009 TOCICO. All rights reserved.

TOCICO 2011 Conference

ToC Tapped to Accelerate Gulf of Mexico Cleanup

Page 2: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

2© 2011 TOCICO. All rights reserved.

TOCICO 2011 ConferenceApril 20, 2010

Page 3: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

3© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Page 4: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

4© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Page 5: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

5© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

June 13, 2010

Page 6: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

6© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

June, 2010 – Stage 1

• Rapidly Improve Supply Chain performance• Marathon across the US and Europe• Doubling, Tripling (decupling?) output of key suppliers

− Boom− Skimmers− Absorbents

• Never starved the effort

6

Page 7: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

7© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

August, 2010 – Stage 2

• 14,000 Vessels on the payroll• Daily spend exceeding $35M• No facilities• Grew a Fortune 500 company then shrank it in 4 months• Saved $700M

Page 8: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

8© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Stage I Holy Cow, we don’t have enough!

• BP cornered the world market inside 30 days− Boom− Skimmers− Tyvec suits

• Still not enough for projected demand• How to get more?

8

Page 9: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

9© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Absorbent Products

9

• Absorbent Boom• 5” dia x 10-20 ft long• “Poly” net casing• Hydrophobic, hydraphilic filler • One Houston supplier increased

production from one truck a day to 10 per day

Absorbent “pom-pom” Boom• Polypropylene fibers spun around 50 ft line •New Orleans supplier went from 2,000 to 80,000 ft per day by expansion• Increased to 120,000 ft/day by implementing TOC focused Lean

Page 10: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

10© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Boom

10

Fire Boom• Used to contain oil while burning in open water• Above Water: Inconel/Ceramic woven fabric• High temp foam floats protected by stainless steel shells

Containment Boom• Used in contain oil near shore •18” high x 100 ft long• Manufacturers takt time ranged from 30 minutes to 6 minutes

Page 11: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

11© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Containment Boom in Action

Page 12: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

12© 2011 TOCICO. All rights reserved.

TOCICO 2011 ConferenceHigh Tech Absorbents

12

• High Tech Absorbent Pad• High loft polypropylene blend

absorbs 50 times its weight in oil• Fabric manufactured on high

volume mattress pad lines• Each line can produce 2,500,000 ft2

weekly

High Tech Absorbent Mops• Proprietary foam absorbs very high ratio of oil while rejecting all water• Can be cut into mops, booms or wipes• Production capacity 115 miles per week• Highly durable on shoreline

Mops deployed15 minutes apart

Page 13: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

13© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Skimmers

• Drums, Discs, or Brushes rotate through oily water, oil is combed off and pumped away

• Diesel Power Packs provide hydraulic pressure to rotate drum and pump oil

13

Page 14: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

14© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Vessels and Storage

Storage Bladders • Specialty Vessels

• Used to temporarily store oil after skimming

• 10m3 to 25m3 Capacity• Having problems emptying

thick oil from bladders, want more barges

• Skimmers and barges• One supplier was at 1

vessel per week, now at 1 per day

14

Page 15: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

15© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Our Mission

• Assess high level quality and plant safety• Determine if supplier can do what they have already

committed to do• Identify opportunities to increase production

15

Increase production by a at least 3 to 5 times current output in the

next 30 days

Page 16: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

16© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Suppliers Visited – usually 1 day

16

Page 17: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

17© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Methodology

• Define the system• ToC Focus

− Identify the constraint− Exploit the constraint− Subordinate non-constraints to support the constraint− Elevate Constraint− Restudy

• Rapid lean tool implementation− Rapid reduction of key wastes at the constraint

• Time frame = NOW (30 day max)• BP - “Don’t let money hold you back, but don’t waste our

money”

17

Page 18: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

18© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Defined the system

• Quick walk to get overall flow –flow diagram of each supplier

18

Weld Cable pocket             

<6 min/sec

Weld Chain Pocket          

5.75 min/sec

Fabric(pre cut to width)

Prestige – “High Volume” Line Flow

Constraint

Reusable pull rope

Measurement Table(manual)

RF Weld Float Pocket Sections               1 mach 4 streams 

<<6 min/sec

Manual Connectors

Manual Assemble4th table being 

installed10 min/section

Pallatize

ConnectorsChain

Applied Fabric Technologies, Inc  AFTI Supply Chain Current State Production

Fire Boom

Other Raw MaterialsBelow water fabric, floats, chain, 

connectors, nuts, bolts

Stainless Sheets

AFTI ‐ Orchard Park, NY

Engineering/ Sales / HQ

Fabrication30,000 sq ft

Internal Constraint:Current:  140 ft/dayFuture: 400 ft/day

30 day future: 1000 ft/day

Coating1000ft/day

SpinnerFloat Shells400 ft/day

Constraint

Ship

Warehouse 3,000 sq ft

Weaver600 ft/day

InconelWire

Ceramic Fiber

Above Water Fabric

Constraint

Constraint

American IWERGreensboro, SC

Metal Spinners, IncTX & OH

Page 19: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

19© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Identify the Constraint

• Internal or External - Not the market!• Policies• Capacity

− Manpower− Methods/Processes− Time− Machines− Facilities

• No data collection other than what we did on initial visit –Relied on our experience and asked the right questions to the right people

19

Page 20: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

20© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Policies: a few examples of many

• BP Payment Terms− Contracted weekly invoicing/payments

• Eliminate Over-Processing− Stop epoxy painting aluminum skimmers and boats

− “We need 10 Chevrolets instead of 1 Cadillac”

• Off-loading work− Kvichak subcontracted to Trinity Yachts who had skill set and

capacity to fabricate and assemble− Aqua-Guard/Rainer – Divest containment boom business to focus

bottleneck recourses on towable bladders

20

Page 21: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

21© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Sorbent Examples

• External supply constraint of polypropylene scrap− Facilitated approval for alternate cellulose material

• 20’ lengths vs standard 10’ lengths− Eliminated 1.5’ overlap every 10’, 15% more linear boom

21

Shredder Blower Stuffing

Page 22: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

22© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Skimmer Example

• Get all less than 6 min cycle time to achieve 6 min takt

22

Weld Cable pocket             

<6 min/sec

Weld Chain Pocket          

5.75 min/sec

Fabric(pre cut to width)

Constraint

Reusable pull rope

Measurement Table(manual)

RF Weld Float Pocket Sections               1 mach 4 streams 

<<6 min/sec

Manual Connectors

Manual Assemble4th table being 

installed10 min/section

Pallatize

ConnectorsChain

Page 23: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

23© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Supply Chain Results

• Weekly Production and Improvement Factors

Product BP Production

Total Production

AdditionalProd <30 days Gain

Absorbent Boom (ft) 150,000 150,000 500,000 3.3 timesAbsorbent Pads (ft) 0 80,000 160,000 2.0Absorbent Pom-Poms (ft) 80.000 80.000 180.000 2.0Absorbent Blocks (ft) 30,000 126,000 604,800 4.8Containment Boom (ft) 128,400 208,400 416,850 2.0Fire Boom 1,980 1,980 2,400 1.2Skimmers (units) 35 47 96 2.0Skimmer Vessels (units) 2 2.5 7.5 3.0Bladders 0 3 20 6.7

Page 24: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

24© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Part 2 – “We have a fleet and don’t need it.”

• Decontamination - “Clean-up of the clean-up”

• Over 14,000 vessels plus major pieces of equipment

• All MC-252 product had to be removed and properly disposed

• USCG – “Vessels must not cause sheen

• Daily spend >$25M• No facilities, no people, no

process

Page 25: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

25© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Our Mission

• Build the process• Measure progress• Integrate the supplier• Coordinate the work• Stay out of the way!

Remove vessels from the payroll as quickly as possible

Page 26: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

26© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

How We Did It

• Created structured process for the entire Demobilization process design

− Designed in the drum− Performance criteria

• Established Site Performance Management processes to support ongoing improvement at Decon & Dry Dock sites

• Created standard work − At the sites for decon− At the UAC for demobilization

• Provide ongoing support to drive best practices and consistency in execution

• Contractor Management / Supplier Performance Management effort to apply standard practices

Page 27: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

27© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Part 2 – Grow Pinnacle Strategies in 30 days

• Pinnacle Strategies team sized to expanded roles: − From 5 to 30 consultants in a month− On-boarding, integration, training− Geographically dispersed− Spread best practices

27

Page 28: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

28© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Pinnacle Team supporting DeconKurt Golser

Project Lead / PMO

Decon OperationsWill Hoefle

FourchonMark Rader

Jim Hill

Steve Sadler

Kevin Evans

Lake CharlesEd Kincer

Brian Andreichuk

Carlos Duran

SignalGlenn Hagan

John Holbrook

Carlos Duran

Tampa

Kevin Ford

Dennis Marshall

Transitional

Bart Penrod (Pascagoula)

Brian Andreichuk

(Amelia)

Bard Cartier / Dennis Marshall

(Texas City)

Luis OlaguibelLaRose

Supplier Quality

Glenn Hagan

Demobilization Process

Process Integration

Mike Cline

Holly Plaga

Commercial Process

Michael James

Will HoefleDeputy Project

Lead

28

Page 29: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

29© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Sites to be Managed - 20

Page 30: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

30© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Our Roles

• Command center support− Develop standard work – goal to safely demob as quickly as

reasonable – rapid continuous improvement− Create & maintain decon metrics− Share learnings among sites− Rapid communications among business functions and sites− Maintain system focus

• Decon on-site support− Early site life: Aim to safely and rapidly increase decon/demob

throughput to full rate− Mid site life: Sustain gains and lead continuous improvement efforts

for safety and throughput− Late site life sustain safety and throughput metrics while rapidly

ramping down to demob status

30

Page 31: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

31© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Boom Decon – Theodore, AL

All that boom we made earlier was used and now had to be decontaminated

31

Mostly biological growth

Page 32: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

32© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Boom Decon – CI

• Semi-automatic boom cleaner – 10x throughput with same size crew – idea sparked by Pinnacle Strategies on Friday, built by Monday, and running on Tuesday

32

Page 33: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

33© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Ship Decon

Page 34: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

34© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Ship Decon - Exploitation

https://dl.dropboxusercontent.com/u/78737571/Video/Pascagula%20Decon.m4v

Page 35: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

35© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Demob/Decon Process Mapping

• Process maps created to identify opportunity for system improvementt and to illustrate individual roles and responsibility

35

Page 36: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

36© 2011 TOCICO. All rights reserved.

TOCICO 2011 ConferenceDeveloped Decon Standard Work

36

Deck and Board Cleaning Process:Boards Removed From Vessel

Sill 1Sill 2Sill 3Sill 4

Ready fornew

 boards

Drying andInspection

Cleaning

Boards beingRem

oved to dock

Deck Status

Workflow

Boards enter physical inspection 

bay in groups corresponding to deck position

Rejected boards retained for 

potential resizing and use

Board placed on decon rack

Soak boards in 10% AccellSolution

Pressure wash boards over soak  

bin

Rinse boards in rinse bin

(look for sheen)

PhysicalInspection

PASS

FAIL

Clean Board Storage (ready for 

installation)

ContaminationInspection

PASS

FAIL

Third Failure?

By: Scott Schipske10‐13‐2010

Waste Disposal

Bow

Standard Process for decontaminating wooden deck boards

Page 37: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

37© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

KPI Categories

• Dock Utilization • Throughput – Vessel Feet Processed• First Time Quality• Total Recordable Safety Incidents (near misses, too)• Productivity – Lost Time

37

Page 38: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

38© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Decon Site Weekly KPIs – w/e 11/5

Throughput: Total Vessel Feet Processed

0

500

1000

1500

2000

2500

3000

3500

4000

Oct 1 Oct 8 Oct 15 Oct 22 Oct 29 Nov 5

Week Ending

Feet

Pro

cess

ed

AL State DocksGISPascagoulaTheodoreAmeliaOSSC-Port

First Time Quality

0%

20%

40%

60%

80%

100%

Oct 1 Oct 8 Oct 15 Oct 22 Oct 29 Nov 5

Week Ending

Vess

els

Pass

ing

Insp

ectio

n

(18/18) (29/29) (22/22) (14/14) (7/7) (18/18)

Dock Utilization & Throughput Ratio

0%

20%

40%

60%

80%

100%

120%

140%

Oct 1 Oct 8 Oct 15 Oct 22 Oct 29 Nov 5

Week Ending

Avg. Dock Util.Throughput Ratio

Total Recordable Incidents Rate

0

0.05

0.1

0.15

0.2

0.25

0.3

0.35

Oct 1 Oct 8 Oct 15 Oct 22 Oct 29 Nov 5

Week Ending

Inci

dent

s Ra

te

AL State DockGISPascagoulaTheodoreAmeliaOSSC-Port

Page 39: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

39© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Developed & Maintained Metrics

• Each site monitored and reported on safety and throughput metrics

39

Daily Vessel feet processed (last 16 days) Lake Charles

0.0

140.7 17

8.090

.0

70.0

280.0

143.7

84.4

208.5

69.6 89

.4

223.5

153.0

260.6

411.3

104.0

0

100

200

300

400

500

11/25

11/26

11/27

11/28

11/29

11/30 12

/112

/212

/312

/412

/512

/612

/712

/812

/912

/10

Date

Daily Vessel feet processed (last 16 days) Lake Charles

0.0

140.7 17

8.090

.0

70.0

280.0

143.7

84.4

208.5

69.6 89

.4

223.5

153.0

260.6

411.3

104.0

0

100

200

300

400

500

11/25

11/26

11/27

11/28

11/29

11/30 12

/112

/212

/312

/412

/512

/612

/712

/812

/912

/10

Date

Cumulative Planned vs. Unplanned

Insp 6.5%

Vessel Decon69.0%

Equip Decon /

Inspection

1.8%

Lost Time23.3%

Cumulative Planned vs. Unplanned

Insp 6.5%

Vessel Decon69.0%

Equip Decon /

Inspection

1.8%

Lost Time23.3%

Cumulative Lost Time

Materials22%

Marine Chemist6%

Pump truck4%

Confined Space Permit

2%

Confined Crews2%

Repair/ Replacement

9%Safety20%

Unload/load Crane3%

Dock Assessment4%

Uncontrol1%

Tug1%

Vessel Idle25%

Vessel Traffic1%

`

Cumulative Lost Time

Materials22%

Marine Chemist6%

Pump truck4%

Confined Space Permit

2%

Confined Crews2%

Repair/ Replacement

9%Safety20%

Unload/load Crane3%

Dock Assessment4%

Uncontrol1%

Tug1%

Vessel Idle25%

Vessel Traffic1%

`

Page 40: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

40© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Dry Dock CI

40

Blocking time reduced from 72 hour average to 8-24 hours • Added Block Building Resources to night shift• Synchronized (Staggered) schedule to avoid resource contention• Scheduled vessel sequence according to hull geometry - reduced NVA

blocking time by reuse of existing blocks

Page 41: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

41© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Lessons Learned

• Drivers of Success:− Identify and communicate key success factors

− Focus of operations and organization to support those objectives − Identify relevant productivity metrics for key activities, measure and act on the

information, e.g. Non-productive time, identify improvement opportunities and share learning through short interval reports and changes in practices

• Battle Rhythm − Daily operations with fact based review of work schedule and status against

plan; operational issues raised and resolved transparently; decisions taken − Daily leadership meetings to challenge activities, reinforce policy; facilitate

timely decisions based on facts and input from leadership team− Objective weekly performance reporting laterally and upward to highlight areas

of focus− Communication upward in weekly report to stakeholders (UAC and GC IMT)

41

Page 42: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

42© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Part I – Make More Now

42

Absorbent Boom – Houston, New Orleans, New York, North Carolina, Mexico

Skimmers – Vancouver, New Orleans, Norway, England, & Illinois Skimmer Vessels – Seattle & Gulfport

Page 43: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

43© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Part II – Decon/Demob Quickly

43

Graving Dry Dock - Tampa Equipment- PascagoulaVessel Decon - Theodore

Receiving Boom - Biloxi Decon Pool – C-Port Lifting Dry Dock - Fourchon

Page 44: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

44© 2011 TOCICO. All rights reserved.

TOCICO 2011 Conference

Q & A

44

Page 45: ToC Tapped to Accelerate Gulf of Mexico Cleanup€¦ · © 2009 TOCICO. All rights reserved. 1 TOCICO 2011 Conference ToC Tapped to Accelerate Gulf of Mexico Cleanup

45© 2009 TOCICO. All rights reserved.

TOCICO 2011 Conference

ToC Tapped to Accelerate Gulf of Mexico Cleanupwww.pinnacle-strategies.com