toc tapped to accelerate gulf of mexico cleanup€¦ · © 2009 tocico. all rights reserved. 1...
TRANSCRIPT
1© 2009 TOCICO. All rights reserved.
TOCICO 2011 Conference
ToC Tapped to Accelerate Gulf of Mexico Cleanup
2© 2011 TOCICO. All rights reserved.
TOCICO 2011 ConferenceApril 20, 2010
3© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
4© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
5© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
June 13, 2010
6© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
June, 2010 – Stage 1
• Rapidly Improve Supply Chain performance• Marathon across the US and Europe• Doubling, Tripling (decupling?) output of key suppliers
− Boom− Skimmers− Absorbents
• Never starved the effort
6
7© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
August, 2010 – Stage 2
• 14,000 Vessels on the payroll• Daily spend exceeding $35M• No facilities• Grew a Fortune 500 company then shrank it in 4 months• Saved $700M
8© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Stage I Holy Cow, we don’t have enough!
• BP cornered the world market inside 30 days− Boom− Skimmers− Tyvec suits
• Still not enough for projected demand• How to get more?
8
9© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Absorbent Products
9
• Absorbent Boom• 5” dia x 10-20 ft long• “Poly” net casing• Hydrophobic, hydraphilic filler • One Houston supplier increased
production from one truck a day to 10 per day
Absorbent “pom-pom” Boom• Polypropylene fibers spun around 50 ft line •New Orleans supplier went from 2,000 to 80,000 ft per day by expansion• Increased to 120,000 ft/day by implementing TOC focused Lean
10© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Boom
10
Fire Boom• Used to contain oil while burning in open water• Above Water: Inconel/Ceramic woven fabric• High temp foam floats protected by stainless steel shells
Containment Boom• Used in contain oil near shore •18” high x 100 ft long• Manufacturers takt time ranged from 30 minutes to 6 minutes
11© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Containment Boom in Action
12© 2011 TOCICO. All rights reserved.
TOCICO 2011 ConferenceHigh Tech Absorbents
12
• High Tech Absorbent Pad• High loft polypropylene blend
absorbs 50 times its weight in oil• Fabric manufactured on high
volume mattress pad lines• Each line can produce 2,500,000 ft2
weekly
High Tech Absorbent Mops• Proprietary foam absorbs very high ratio of oil while rejecting all water• Can be cut into mops, booms or wipes• Production capacity 115 miles per week• Highly durable on shoreline
Mops deployed15 minutes apart
13© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Skimmers
• Drums, Discs, or Brushes rotate through oily water, oil is combed off and pumped away
• Diesel Power Packs provide hydraulic pressure to rotate drum and pump oil
13
14© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Vessels and Storage
Storage Bladders • Specialty Vessels
• Used to temporarily store oil after skimming
• 10m3 to 25m3 Capacity• Having problems emptying
thick oil from bladders, want more barges
• Skimmers and barges• One supplier was at 1
vessel per week, now at 1 per day
14
15© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Our Mission
• Assess high level quality and plant safety• Determine if supplier can do what they have already
committed to do• Identify opportunities to increase production
15
Increase production by a at least 3 to 5 times current output in the
next 30 days
16© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Suppliers Visited – usually 1 day
16
17© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Methodology
• Define the system• ToC Focus
− Identify the constraint− Exploit the constraint− Subordinate non-constraints to support the constraint− Elevate Constraint− Restudy
• Rapid lean tool implementation− Rapid reduction of key wastes at the constraint
• Time frame = NOW (30 day max)• BP - “Don’t let money hold you back, but don’t waste our
money”
17
18© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Defined the system
• Quick walk to get overall flow –flow diagram of each supplier
18
Weld Cable pocket
<6 min/sec
Weld Chain Pocket
5.75 min/sec
Fabric(pre cut to width)
Prestige – “High Volume” Line Flow
Constraint
Reusable pull rope
Measurement Table(manual)
RF Weld Float Pocket Sections 1 mach 4 streams
<<6 min/sec
Manual Connectors
Manual Assemble4th table being
installed10 min/section
Pallatize
ConnectorsChain
Applied Fabric Technologies, Inc AFTI Supply Chain Current State Production
Fire Boom
Other Raw MaterialsBelow water fabric, floats, chain,
connectors, nuts, bolts
Stainless Sheets
AFTI ‐ Orchard Park, NY
Engineering/ Sales / HQ
Fabrication30,000 sq ft
Internal Constraint:Current: 140 ft/dayFuture: 400 ft/day
30 day future: 1000 ft/day
Coating1000ft/day
SpinnerFloat Shells400 ft/day
Constraint
Ship
Warehouse 3,000 sq ft
Weaver600 ft/day
InconelWire
Ceramic Fiber
Above Water Fabric
Constraint
Constraint
American IWERGreensboro, SC
Metal Spinners, IncTX & OH
19© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Identify the Constraint
• Internal or External - Not the market!• Policies• Capacity
− Manpower− Methods/Processes− Time− Machines− Facilities
• No data collection other than what we did on initial visit –Relied on our experience and asked the right questions to the right people
19
20© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Policies: a few examples of many
• BP Payment Terms− Contracted weekly invoicing/payments
• Eliminate Over-Processing− Stop epoxy painting aluminum skimmers and boats
− “We need 10 Chevrolets instead of 1 Cadillac”
• Off-loading work− Kvichak subcontracted to Trinity Yachts who had skill set and
capacity to fabricate and assemble− Aqua-Guard/Rainer – Divest containment boom business to focus
bottleneck recourses on towable bladders
20
21© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Sorbent Examples
• External supply constraint of polypropylene scrap− Facilitated approval for alternate cellulose material
• 20’ lengths vs standard 10’ lengths− Eliminated 1.5’ overlap every 10’, 15% more linear boom
21
Shredder Blower Stuffing
22© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Skimmer Example
• Get all less than 6 min cycle time to achieve 6 min takt
22
Weld Cable pocket
<6 min/sec
Weld Chain Pocket
5.75 min/sec
Fabric(pre cut to width)
Constraint
Reusable pull rope
Measurement Table(manual)
RF Weld Float Pocket Sections 1 mach 4 streams
<<6 min/sec
Manual Connectors
Manual Assemble4th table being
installed10 min/section
Pallatize
ConnectorsChain
23© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Supply Chain Results
• Weekly Production and Improvement Factors
Product BP Production
Total Production
AdditionalProd <30 days Gain
Absorbent Boom (ft) 150,000 150,000 500,000 3.3 timesAbsorbent Pads (ft) 0 80,000 160,000 2.0Absorbent Pom-Poms (ft) 80.000 80.000 180.000 2.0Absorbent Blocks (ft) 30,000 126,000 604,800 4.8Containment Boom (ft) 128,400 208,400 416,850 2.0Fire Boom 1,980 1,980 2,400 1.2Skimmers (units) 35 47 96 2.0Skimmer Vessels (units) 2 2.5 7.5 3.0Bladders 0 3 20 6.7
24© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Part 2 – “We have a fleet and don’t need it.”
• Decontamination - “Clean-up of the clean-up”
• Over 14,000 vessels plus major pieces of equipment
• All MC-252 product had to be removed and properly disposed
• USCG – “Vessels must not cause sheen
• Daily spend >$25M• No facilities, no people, no
process
25© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Our Mission
• Build the process• Measure progress• Integrate the supplier• Coordinate the work• Stay out of the way!
Remove vessels from the payroll as quickly as possible
26© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
How We Did It
• Created structured process for the entire Demobilization process design
− Designed in the drum− Performance criteria
• Established Site Performance Management processes to support ongoing improvement at Decon & Dry Dock sites
• Created standard work − At the sites for decon− At the UAC for demobilization
• Provide ongoing support to drive best practices and consistency in execution
• Contractor Management / Supplier Performance Management effort to apply standard practices
27© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Part 2 – Grow Pinnacle Strategies in 30 days
• Pinnacle Strategies team sized to expanded roles: − From 5 to 30 consultants in a month− On-boarding, integration, training− Geographically dispersed− Spread best practices
27
28© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Pinnacle Team supporting DeconKurt Golser
Project Lead / PMO
Decon OperationsWill Hoefle
FourchonMark Rader
Jim Hill
Steve Sadler
Kevin Evans
Lake CharlesEd Kincer
Brian Andreichuk
Carlos Duran
SignalGlenn Hagan
John Holbrook
Carlos Duran
Tampa
Kevin Ford
Dennis Marshall
Transitional
Bart Penrod (Pascagoula)
Brian Andreichuk
(Amelia)
Bard Cartier / Dennis Marshall
(Texas City)
Luis OlaguibelLaRose
Supplier Quality
Glenn Hagan
Demobilization Process
Process Integration
Mike Cline
Holly Plaga
Commercial Process
Michael James
Will HoefleDeputy Project
Lead
28
29© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Sites to be Managed - 20
30© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Our Roles
• Command center support− Develop standard work – goal to safely demob as quickly as
reasonable – rapid continuous improvement− Create & maintain decon metrics− Share learnings among sites− Rapid communications among business functions and sites− Maintain system focus
• Decon on-site support− Early site life: Aim to safely and rapidly increase decon/demob
throughput to full rate− Mid site life: Sustain gains and lead continuous improvement efforts
for safety and throughput− Late site life sustain safety and throughput metrics while rapidly
ramping down to demob status
30
31© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Boom Decon – Theodore, AL
All that boom we made earlier was used and now had to be decontaminated
31
Mostly biological growth
32© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Boom Decon – CI
• Semi-automatic boom cleaner – 10x throughput with same size crew – idea sparked by Pinnacle Strategies on Friday, built by Monday, and running on Tuesday
32
33© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Ship Decon
34© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Ship Decon - Exploitation
https://dl.dropboxusercontent.com/u/78737571/Video/Pascagula%20Decon.m4v
35© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Demob/Decon Process Mapping
• Process maps created to identify opportunity for system improvementt and to illustrate individual roles and responsibility
35
36© 2011 TOCICO. All rights reserved.
TOCICO 2011 ConferenceDeveloped Decon Standard Work
36
Deck and Board Cleaning Process:Boards Removed From Vessel
Sill 1Sill 2Sill 3Sill 4
Ready fornew
boards
Drying andInspection
Cleaning
Boards beingRem
oved to dock
Deck Status
Workflow
Boards enter physical inspection
bay in groups corresponding to deck position
Rejected boards retained for
potential resizing and use
Board placed on decon rack
Soak boards in 10% AccellSolution
Pressure wash boards over soak
bin
Rinse boards in rinse bin
(look for sheen)
PhysicalInspection
PASS
FAIL
Clean Board Storage (ready for
installation)
ContaminationInspection
PASS
FAIL
Third Failure?
By: Scott Schipske10‐13‐2010
Waste Disposal
Bow
Standard Process for decontaminating wooden deck boards
37© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
KPI Categories
• Dock Utilization • Throughput – Vessel Feet Processed• First Time Quality• Total Recordable Safety Incidents (near misses, too)• Productivity – Lost Time
37
38© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Decon Site Weekly KPIs – w/e 11/5
Throughput: Total Vessel Feet Processed
0
500
1000
1500
2000
2500
3000
3500
4000
Oct 1 Oct 8 Oct 15 Oct 22 Oct 29 Nov 5
Week Ending
Feet
Pro
cess
ed
AL State DocksGISPascagoulaTheodoreAmeliaOSSC-Port
First Time Quality
0%
20%
40%
60%
80%
100%
Oct 1 Oct 8 Oct 15 Oct 22 Oct 29 Nov 5
Week Ending
Vess
els
Pass
ing
Insp
ectio
n
(18/18) (29/29) (22/22) (14/14) (7/7) (18/18)
Dock Utilization & Throughput Ratio
0%
20%
40%
60%
80%
100%
120%
140%
Oct 1 Oct 8 Oct 15 Oct 22 Oct 29 Nov 5
Week Ending
Avg. Dock Util.Throughput Ratio
Total Recordable Incidents Rate
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
Oct 1 Oct 8 Oct 15 Oct 22 Oct 29 Nov 5
Week Ending
Inci
dent
s Ra
te
AL State DockGISPascagoulaTheodoreAmeliaOSSC-Port
39© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Developed & Maintained Metrics
• Each site monitored and reported on safety and throughput metrics
39
Daily Vessel feet processed (last 16 days) Lake Charles
0.0
140.7 17
8.090
.0
70.0
280.0
143.7
84.4
208.5
69.6 89
.4
223.5
153.0
260.6
411.3
104.0
0
100
200
300
400
500
11/25
11/26
11/27
11/28
11/29
11/30 12
/112
/212
/312
/412
/512
/612
/712
/812
/912
/10
Date
Daily Vessel feet processed (last 16 days) Lake Charles
0.0
140.7 17
8.090
.0
70.0
280.0
143.7
84.4
208.5
69.6 89
.4
223.5
153.0
260.6
411.3
104.0
0
100
200
300
400
500
11/25
11/26
11/27
11/28
11/29
11/30 12
/112
/212
/312
/412
/512
/612
/712
/812
/912
/10
Date
Cumulative Planned vs. Unplanned
Insp 6.5%
Vessel Decon69.0%
Equip Decon /
Inspection
1.8%
Lost Time23.3%
Cumulative Planned vs. Unplanned
Insp 6.5%
Vessel Decon69.0%
Equip Decon /
Inspection
1.8%
Lost Time23.3%
Cumulative Lost Time
Materials22%
Marine Chemist6%
Pump truck4%
Confined Space Permit
2%
Confined Crews2%
Repair/ Replacement
9%Safety20%
Unload/load Crane3%
Dock Assessment4%
Uncontrol1%
Tug1%
Vessel Idle25%
Vessel Traffic1%
`
Cumulative Lost Time
Materials22%
Marine Chemist6%
Pump truck4%
Confined Space Permit
2%
Confined Crews2%
Repair/ Replacement
9%Safety20%
Unload/load Crane3%
Dock Assessment4%
Uncontrol1%
Tug1%
Vessel Idle25%
Vessel Traffic1%
`
40© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Dry Dock CI
40
Blocking time reduced from 72 hour average to 8-24 hours • Added Block Building Resources to night shift• Synchronized (Staggered) schedule to avoid resource contention• Scheduled vessel sequence according to hull geometry - reduced NVA
blocking time by reuse of existing blocks
41© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Lessons Learned
• Drivers of Success:− Identify and communicate key success factors
− Focus of operations and organization to support those objectives − Identify relevant productivity metrics for key activities, measure and act on the
information, e.g. Non-productive time, identify improvement opportunities and share learning through short interval reports and changes in practices
• Battle Rhythm − Daily operations with fact based review of work schedule and status against
plan; operational issues raised and resolved transparently; decisions taken − Daily leadership meetings to challenge activities, reinforce policy; facilitate
timely decisions based on facts and input from leadership team− Objective weekly performance reporting laterally and upward to highlight areas
of focus− Communication upward in weekly report to stakeholders (UAC and GC IMT)
41
42© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Part I – Make More Now
42
Absorbent Boom – Houston, New Orleans, New York, North Carolina, Mexico
Skimmers – Vancouver, New Orleans, Norway, England, & Illinois Skimmer Vessels – Seattle & Gulfport
43© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Part II – Decon/Demob Quickly
43
Graving Dry Dock - Tampa Equipment- PascagoulaVessel Decon - Theodore
Receiving Boom - Biloxi Decon Pool – C-Port Lifting Dry Dock - Fourchon
44© 2011 TOCICO. All rights reserved.
TOCICO 2011 Conference
Q & A
44
45© 2009 TOCICO. All rights reserved.
TOCICO 2011 Conference
ToC Tapped to Accelerate Gulf of Mexico Cleanupwww.pinnacle-strategies.com