Challenges Facing Challenges Facing Challenges Facing Challenges Facing The North Harris The North Harris County Regional County Regional County Regional County Regional Water Authority Water Authority Presented to Presented to Southeast Chapter of Texas AWWA Southeast Chapter of Texas AWWA March 8, 2010 March 8, 2010

Upload: southeast-chapter-of-texas-awwa

Post on 11-May-2015

499 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Tom 030810 Setawwa

Challenges FacingChallenges FacingChallenges Facing Challenges Facing The North Harris The North Harris County RegionalCounty RegionalCounty Regional County Regional Water AuthorityWater Authority

Presented to Presented to Southeast Chapter of Texas AWWA Southeast Chapter of Texas AWWA 

March 8, 2010March 8, 2010

Page 2: Tom 030810 Setawwa

What is the NHCRWA?What is the NHCRWA?(the “Authority”)(the “Authority”)(the  Authority )              (the  Authority )              

• Created in 1999 by HB 2965 tomanage the conversion to surfacemanage the conversion to surfacewater for 160 utility districts with450+ regulated groundwater wells450+ regulated groundwater wells 

• 350 square miles, approximately350 square miles, approximately475,000 residents

Page 3: Tom 030810 Setawwa

NHCRWA BOUNDARY MAPNHCRWA BOUNDARY MAPNHCRWA BOUNDARY MAPNHCRWA BOUNDARY MAP

Page 4: Tom 030810 Setawwa

Challenges facing NHCRWA?Challenges facing NHCRWA?(the “Authority”)(the “Authority”)

• Secure a Source of Surface Water

(the  Authority )              (the  Authority )              

Secure a Source of Surface Water• Develop a Groundwater Reduction  Plan (“GRP”)Plan ( GRP )

• Groundwater Transfer Program• Provide the InfrastructureProvide the Infrastructure• Implementation• Pay for the SystemPay for the System• Communication• 2020 System2020 System 

Page 5: Tom 030810 Setawwa

What WATER supply options did the What WATER supply options did the Authority consider ?Authority consider ?yy

Remote GroundwaterRiver Authorities & Water Rights

Remote GroundwaterResources

City of Houston Cost Effective & Fair

Page 6: Tom 030810 Setawwa

Challenges facing NHCRWA?Challenges facing NHCRWA?(the “Authority”)(the “Authority”)

Secure a Source of Secure a Source of Surface WaterSurface Water

• In December 2003 entered into a

(the  Authority )              (the  Authority )              Surface WaterSurface Water

In December 2003 entered into a long term contract  with the City   of Houston to provide treatedof Houston to provide treated   surface water

• Purchased 31 MGD of treatmentPurchased 31 MGD of treatment plant and transmission line capacitycapacity 

• Pay proportionate share of raw water facilities remaining debtwater facilities remaining debt

Page 7: Tom 030810 Setawwa

Challenges facing NHCRWA?Challenges facing NHCRWA?(the “Authority”)(the “Authority”)

Secure a Source of Secure a Source of Surface WaterSurface Water

• Pay portion of O&M for treatment   facilities raw water facilities and

(the  Authority )              (the  Authority )              Surface WaterSurface Water

facilities, raw water facilities and  transmission line 

• Provides mechanism for• Provides mechanism for purchasing additional capacity 

• In January 2009 effectively• In January 2009 effectively exercised that option by entering   into a supplement to the originalinto a supplement to the originalcontract to construct the LuceBayou Interbasin Transfer ProjectBayou Interbasin Transfer Project

Page 8: Tom 030810 Setawwa

Challenges facing NHCRWA?Challenges facing NHCRWA?(the “Authority”)(the “Authority”)

Secure a Source of Secure a Source of Surface WaterSurface Water

• Anticipate further supplements to 

(the  Authority )              (the  Authority )              Surface WaterSurface Water

the original contract to provide for  additional treatment capacity and transmission line capacity

Page 9: Tom 030810 Setawwa

Develop GRPDevelop GRP

• Detailed how the Authority         would meet the Houston‐Galveston Subsidence District (“HGSD”) conversion mandates‐ 30% conversion in 2010‐ 70% conversion in 2020‐ 80% conversion in 2030

C li hil h• Compliance philosophy‐ Impractical to deliver surfacewater to all districtswater to all districts

‐ Address known areas of waterquality and quantity issues

Page 10: Tom 030810 Setawwa

Develop GRPDevelop GRP

• Compliance philosophy (cont.)‐ Serve a core compact areaServe a core, compact area,   some 48 districts, in 2010

‐ Phase in additional districts in2020 d 20302020 and 2030

‐ Build a technically sound,practical and economicalpractical and economical system to meet HGSD requirementsI l f i i i li‐ Implement a fair pricing policy  to pay for the system

• Authority’s GRP certified by• Authority s GRP certified byHGSD – 6/11/03

Page 11: Tom 030810 Setawwa

Authority’s GRP called for its Authority’s GRP called for its system to be built in phases system to be built in phases and would  consist of:and would  consist of:• Approximately 38 miles of transmission line

• Approximately 126 miles of distribution line

• 3 Pump Stations• 4 Regional Water Plants• 32 Regional Wells• Estimated $1 billion program

Page 12: Tom 030810 Setawwa

Groundwater Transfer Groundwater Transfer ProgramProgram

• In developing the GRP it became 

ProgramProgram

p gclear that some districts had water quality/quantity problems, declining water levels in theirdeclining water levels in their well(s), aging infrastructure and/or growth issues which had to be gaddressed before 2010

THE SOLUTIONTHE SOLUTIONTHE SOLUTION…THE SOLUTION…The Groundwater Transfer PlanThe Groundwater Transfer Plan

Th “GTP”Th “GTP”The “GTP”The “GTP”

Page 13: Tom 030810 Setawwa

Q: Q: What is the Groundwater Transfer ProgramWhat is the Groundwater Transfer Program

• Districts with excess capacity sold water to Authoritywater to Authority

• Districts that needed water bought water from Authoritybought water from Authority

• Authority made up supply deficitsusing its wellsusing its wells

• System to convey the water consisted of components of theconsisted of components of  the Authority’s proposed 2010 Distribution SystemDistribution System

Page 14: Tom 030810 Setawwa

Benefits of the GTPBenefits of the GTP• Addressed immediate and short‐term needsneeds

• Maximized investment in existing district infrastructure

• Minimized investment in new  district infrastructure which would have less than optimal usage

• Minimized number of new wells• Primary system components consistent with ultimate Authority system

Page 15: Tom 030810 Setawwa

GTP in Operation…GTP in Operation…

• GTP began operating inJ 2006January 2006

• Three separate GTP systems25 di i i i d i h• 25 districts participated in the GTP D li d f• Delivered an average of approximately 4.35 MGD toB di i d i 2009Buyer districts during 2009

Page 16: Tom 030810 Setawwa

Provide the InfrastructureProvide the Infrastructure

• Line Alignment D i C it i• Design Criteria

• Real Estate AcquisitionC tit t F i dl D i• Constituent Friendly Design

• ScheduleR l t A I• Regulatory Agency Issues

• Mid Course Adjustment

Page 17: Tom 030810 Setawwa

Line AlignmentLine Alignment

• Traditional approach unacceptable • Alignment preference

Page 18: Tom 030810 Setawwa

Alignment PreferenceAlignment Preference

• Authority purchased easementHCFCD• HCFCD easement

• Neighborhood streetsTh hf ROW• Thoroughfare street ROW behind curbTh hf ROW• Thoroughfare street ROW in medianTh hf ROW d• Thoroughfare street ROW underpavement

Page 19: Tom 030810 Setawwa

Line AlignmentLine Alignment

• Traditional approach unacceptable • Alignment preference• Alignment alternatives

Page 20: Tom 030810 Setawwa

Alignment AlternativesAlignment Alternatives

• Street ROW potential use must pbe approved in advance

• Minimum of two alternatives if street ROW use proposed

• At least one alternative must notbe in street ROW

Page 21: Tom 030810 Setawwa

Line AlignmentLine Alignment

• Traditional approach unacceptable Ali f• Alignment preference

• Alignment alternativesN di i l l i• Non‐traditional alternatives utilized

Page 22: Tom 030810 Setawwa

NonNon‐‐traditional Alternatives Utilizedtraditional Alternatives Utilized

Pi li id• Pipeline corridors• CenterPoint corridorsHCFCD id• HCFCD corridors

Page 23: Tom 030810 Setawwa

Line AlignmentLine Alignment

• Traditional approach unacceptable Ali f• Alignment preference

• Alignment alternativesN di i l l i• Non‐traditional alternatives utilizedS l d li• Selected alignments

Page 24: Tom 030810 Setawwa

Selected AlignmentsSelected Alignments

•• Used preferred and  non‐traditional corridors

• Mix of corridor types variedfrom project to project

Page 25: Tom 030810 Setawwa

Design CriteriaDesign Criteria

• Harris County’s standard design y gcriteria didn’t address large diameter water lines

• In cooperation with Harris County Public Infrastructure staff and West Harris County Regional Water Authority’s consultant, y ,developed design criteria for large diameter water lines in County yROW and easements

Page 26: Tom 030810 Setawwa

Real Estate AcquisitionReal Estate Acquisition

• System installed in a rapidly y p ychanging area

• Used non‐standard “integrated gapproach” due to the tight time schedule/alignment preferences/ g p

• Utilized team consisting of very experienced land “men”, p ,appraisers and attorneys

Page 27: Tom 030810 Setawwa

Real Estate AcquisitionReal Estate Acquisition

• Team worked in close consort with design engineers – new for both groupsg p

• Integrated real estate considerations into design g

• Used condemnation only where necessary and as a last resorty

Page 28: Tom 030810 Setawwa

ConstituentConstituent‐‐Friendly DesignFriendly Design• Reroute if necessary where 

practicalpractical• Tunnel to save large specimen 

treestrees• Locate above ground structures 

to minimize inconvenience toto minimize inconvenience to development

• Schedule construction to minimizeSchedule construction to minimize impact on schools, use of private yards wildlife and livestockyards, wildlife and livestock management, etc.

Page 29: Tom 030810 Setawwa

ScheduleSchedule

• Design began in mid 2003C i h d b i i i d• Construction had to be initiated by end of 2003H d l G d• Had to place Groundwater Transfer Program systems in 

i i J 2006service in January 2006• Had to have Authority’s system 

d id f bready to provide surface water by the last quarter of 2009 – less th ithan six years

Page 30: Tom 030810 Setawwa

Provide the InfrastructureProvide the Infrastructure

• Line alignment • Design Criteria• Real Estate Acquisition• Constituent friendly design• Schedule• Regulatory agency issues• Mid course adjustment

Page 31: Tom 030810 Setawwa

Provide the InfrastructureProvide the Infrastructure

• Line alignment• Line alignment • Design Criteria• Real Estate Acquisitionq• Constituent friendly design• Schedule• Regulatory agency issues• Regulatory agency issues• Mid course adjustment

Page 32: Tom 030810 Setawwa

Mid Course AdjustmentMid Course Adjustment

• In 2007 the Authority received yupdated population and water demand projections  which p jindicated a 21% increase in water use in 2010 

• In response to the projected increase in water use, the 2010 ,surface water conversion goal increased from 23.9 to 29 million gallons per day

Page 33: Tom 030810 Setawwa

Mid Course AdjustmentMid Course Adjustment

• New demand projections for surface t i d th b fwater increased the number of 

districts to be served from 48 to 60• Increased size of the distribution• Increased size of the distribution 

system by approximately 24% • Method of delivery to districtsMethod of delivery to districts 

changed from direct connect to delivery at the ground storage tankdelivery at the ground storage tank using an air gap 

Page 34: Tom 030810 Setawwa

34

Page 35: Tom 030810 Setawwa

The 2010 system will enable thef f b 60use of surface water by 60

public water systems,  and consists of:

• Approximately 72 miles of various• Approximately 72 miles of various type and size water line ranging in size from 12‐inch to 60‐inch in diametersize from 12 inch to 60 inch in diameter

• 1 Regional Pump Station• 1 Regional Water Plant• 3 Regional Wells

Page 36: Tom 030810 Setawwa

ImplementationImplementation

• The Authority advised convertingThe Authority advised converting districts ‐ 60 in number ‐ that the  phase‐in of surface water deliveryphase in of surface water delivery  would begin in the last quarter of 2009

• Districts had to convert to use of   chloramines disinfection in order to  use the surface water the Authority would provide 

Page 37: Tom 030810 Setawwa

ImplementationImplementation

• Districts have had varying levels of i ti l ti ti thsuccess in timely negotiating the 

regulatory requirements to use chloramines disinfection buildingchloramines disinfection, building their chloramination systems and placing them in serviceplacing them in service

To Our Customers...We’re Changing OurWater Disinfection

Method

Page 38: Tom 030810 Setawwa

ImplementationImplementation

• The delayed ability of districts to use y ysurface water, the physical location and size of those districts that are ready, and the need to provide groundwater to GTP participants that aren’t ready to receive surface water has delayed  the conversion to 

fsurface water 

Page 39: Tom 030810 Setawwa

ImplementationImplementation

• The conversion has become more challenging than originally envisioned and ‐‐ despite the delay and resultant 

l it f th i thcomplexity  of the conversion ‐‐ the Authority remains optimistic and committed to meeting the 30%committed to meeting the 30% conversion goal set by the HGSD

Page 40: Tom 030810 Setawwa

Paying for the System

• NHCRWA has no taxing authorityR i f d h h• Raises funds through pumpage fees and the sale of waterC i d A h i• Constituents urged Authority tokeep pumpage fees as low as

ibl l iblpossible…as long as possible• Board of Directors commitment

i bl fto equitable fee system

Page 41: Tom 030810 Setawwa

Paying for the System

• Pumpage fee was initially set at $0 12 in 2000 has increased seven$0.12 in 2000, has increased seven times and as of January 1, 2010        fees are  

$1 /1 000 ll f‐ $1.75/1,000 gallons for groundwater 

‐ $2.20/1 000 gallons for$2.20/1,000 gallons for surface water

• $457 million in revenue bonds h b ldhave been sold  

Page 42: Tom 030810 Setawwa

CommunicationCommunication

• Given the scope of the program, ff i i i i heffective communication with    both districts and residents was i iimperative

• Difficult to get people’s attentioni h ’ h ion a topic that wasn’t on their

‘radar’

Page 43: Tom 030810 Setawwa

CommunicationCommunication• The Authority used a multifaceted outreach program featuring:p g g‐ Direct communication with districts‐ Active web page with separateconstruction page 

‐ Periodic newsletters to residentsTown hall/neighborhood meetings‐ Town hall/neighborhood  meetings

‐ Neighborhood specific flyers onpending constructionpending construction

‐ Extremely active public educationprogram

‐ Speakers bureau‐ Water Users Advisory Group

Page 44: Tom 030810 Setawwa

2020 System2020 System

• Timely and effectively construct the 2020 t hi h i l t t i2020 system, which is almost twice the size of the 2010 system

• Continue to search out ways to build• Continue to search out ways to build the 2020 system as cost effectively as possible and thereby keep theas possible…and thereby keep the cost of water as low as practical

• Apply lessons learned duringApply lessons learned during development and implementation of the 2010 system to the 2020 systemy y

Page 45: Tom 030810 Setawwa

Q ti ?Questions?

Page 46: Tom 030810 Setawwa

3648 FM 1960 West3648 FM 1960 West3648 FM 1960 West3648 FM 1960 WestSuite 110Suite 110

Houston, TX 77068Houston, TX 77068281281‐‐440440‐‐39243924

www.nhcrwa.comwww.nhcrwa.comSt Th DSt Th Dwww.StopTheDrop.orgwww.StopTheDrop.org