PRESENTATION ON TOTAL STATION
BYAshish pandey(civil)
BBS college of engineering& technology
-
AIM
Collecting of Digitally survey data by total station for designing by advance software for achieving higher accuracy in short time.
-
1. Total Station includes Theodolite, Electronicdistance measurement (EDM) & data recorders.
2. We collect vertical & horizontal data in a singleoperation. Data recorder can record information inthe field to take back to the office forprocessing.
3. Data recorders can also be used to downloadpreviously determined data at the office for use inthe field to stake out or to locate constructioncontrol points & boundaries.
4. We can also designed traditionally(manually),data collected by the Total station in data recorders.
INTRODUCTION
-
Role of Total Station in Preparation of Highway DPR
In Highway Detail Project Report (DPR)preparation. Total Station is used forcollection of all Survey data digitally.
Digitally collected survey Data furthertransferred to a computer to create Digitaldesign model by any designing software.
Designed Data up loaded in Total Stationfor further staking out on ground.
-
Electronic Total Station DTM-552/652 Series (Face 2/Right)
-
Face Left & Face Right
-
DISPLAY BOARD
-
How Total Station works
Total Station collects all ground data in Three Dimensional
Format (Co-ordinate system).
Prior to collection of data, it requires at least two known points
(co-ordinates known), to set up the station.
After setting up the station it gives / collects the details of
points w.r.t. the two known points from the Station.
Total Station measures horizontal angles in WCB system
automatically from the assumed Meridian as worked in Station
set up and the Vertical angles from the Horizontal axis of the
instrument [above (+), below (-)].
. As this instrument gives all the engineering details of a station
/ point , the instruments has been named as Total Station.
-
Setting up the TripodOpen the tripod legs enough to for the instrument
to stable.
Locate the tripod directly over the station point. To the check tripod position look through the center hole in the tripod head.
Firmly press the tripod ferrules into the ground.
Level the top surface of the tripod head.
Securely faster the thumb screws on the tripod legs.
Place the Base plate on the tripod head
Tighten the tripod mounting screw.
-
LEVELING
Firstly level the base plate level by tripod legs slide
Place the instrument on the base plate and fixed by leveling base plate clamp
Loose the upper horizontal movement plate clamp
Level by THREE LEGS METHOD
-
CREATING JOB
BMS Screen Press Menu
Select Job & ENT
Press MSR1 Key & ENT
-
CREATING JOB..(CONT)
Press ENT for Setting
Creating Job
BMS Screen
Feed Job Name & ENT
-
Station Setup by one station & one bearing
BMS Screen press STN Key Select Known & ENT Feed ST. No.
After ST Press ENT Feed NEZ Feed Code & ENT
Feed HI After HI press ENT Select Angle & ENT
-
.Turn to Face 2 Sight same point on F2 Press ENT
Press ENT for record Recording Station Come back to BMS
Station Setup by one station & one bearingCONT
Asking Bearing Feed Bearing & ENT Sight BS & MSR 1 or ANG
-
Station Setup by Resection
BMS Screen press STN Key Select Resection & ENT Feed 1st PT No.
After No. Press ENT Feed HT After HT Press ENT
Sight 1st PT & MSR 1 Press ENT Feed 2nd PT No.
-
Station Setup by Resection Method CONT.
Feed HT for 2nd PT Sight PT2 & MSR 1 Press ENT
Press ANG or ENT Calculating the coordinate
Of Station PT.
Come back to the BMS
-
Measurement of Side Shots
Sight Prism & Press
MSR1 & ENTAfter ENT asking code
Press ANG Key for Stack
Select the code &ENT
Code appear Press ENT Recording the Point After recording go to the next NO.
-
DOWN LOAD DATA FROM DTM -500/502/552
1. PWR on DTM
2. Open menu
3. Open job manager
4. Select open job & click
5. Your job is opened & System return back to BMS
6. Menu key than No 5 key for Communication click
7. (1) No key Down Load
8. Type of Data : Raw Data
9. Enter
10. Ready to send Data it will appear how much data lines
are going to transfer to you computer.
-
GO TO COMPUTER
1. Start computer & go to All Program
2. Transit
3. Transit (Transit window open )
4. Transfer
5. Data Recorder to PC (window open data recorder to PC)
6. Data Recorder: DTM -500/502/552
7. Data format: Nikon Raw
(Directories selected) Example : C / program / Nikon/
Transit/ Down load
-
8. Job n(name : abcd
9. OK (message window appears)
10. OK (You will get data Receiving Box & its waiting for data)
11. Return back to DTM(Total Station)-500/502/552
12. (Press)Enter in DTM-500/502/552
13. Start Data Transfer Show on window
Transfer Complete (message appears)
14. OK (click on)
GO TO COMPUTER .Cont
-
15. Select or(click on) Keep All Old Coordinates ,Discard all
new coordinates
16. OK
Note : Data Export in ASCII Coordinate or Raw Data format
GO TO COMPUTER .Cont
-
STAKE OUT1. First setup the tripod on station and complete the leveling as per procedure.
2. Open the Job (Menu Job Highlight the job and Enter.)
3. Station Setup(7 No. Key (STN) Known (1 No. Key) ST input number input NEZ HI input Back Sight Select Coordinate BS input number NEZ HT input
sight the
Back sight and press MSR1 key
4. (for accuracy work press ANG for face 2 measurement and sight the same point on
face 2 and press MSR 1)
5. Press enter to record
6. Press S-O key (8 No. Key)
7 Select XYZ
8. Feed the Number if available in the job instrument will take auto otherwise feed theNEZ
9. Now instrument will guide you. Rotate the angle and sight the prism and measure.
Now instrument will guide Left/right in/out cut/fill.
-
Conclusion Every engineering project, surveying isthe first step of the execution of the success ofany engineering project. And it is based uponthe accurate and complete survey work prior tocommencement of project as well as duringexecution and after completion.
Hence the survey by TOTAL STATION ismost important for accurate estimate in lesstime and execution of work.