towards a social history of nuclear plants: garigliano ... convegno/corbisiero_zaccaria... ·...
TRANSCRIPT
International Conference Social Aspects of Energetic Issues
Sustainable Development, social organization and acceptance of alternative energetic sources Chieti (Italy), 26th, 27th May 2011
Towards a Social History of Nuclear Plants: Garigliano decommissioning
Fabio Corbisiero and Anna Maria Zaccaria
University of Naples “Federico II”
Historical excursus1954 ‐ Eisenhower signs the Atomic Energy Act "Atoms for Peace“
1955 ‐ Conference in Geneva marks the start of the final nuclear engineering incivil
1956 ‐ Built at Sellafield (UK) the first commercial nuclear power station in the
world: Calder Hall
1957‐Birth of the International Atomic Energy Agency‐IAEA. Task: regular reportsof activity at the UN Security Council and UN General Assembly
’60s ‐ Achievements of the first generation nuclear reactors
’70s and ’80s ‐ Second generation of nuclear power ‐ Increased power and size ofreactors and power plants (Oil crisis of 1973).
France ranks among the largest producers.
1979 ‐ Three Mile Island
1986 ‐ Chernobyl
The reactors and nuclear power plants undergo a review, aimed at improving safety.
Planning and implementation of third‐generation reactors (EPR reactor inFrance).
France: 19 nuclear power stations in operation ‐ 58 operating reactors (78% of imported energy in Italy)
Germany: 12 nuclear power plants in operation ‐ 17 operating reactors.
Great Britain: 9 nuclear power plants in operation – 19 operating reactors
Spain: 6 nuclear power stations in operation ‐ 8 operating reactors.
In 2010 the European Union produces
27.8% of its overall electricity from nuclear power
Peculiar position of Italy:no active power but surrounded by a large number of nuclear
reactors, which can pose risks.
Italian scenario
1964 ‐ in Latina (Latium) the first nuclear power plant comes into operation
1964 ‐ nuclear power plant of Garigliano (Sessa Aurunca‐ Campania) comes into operation
1965 ‐ nuclear power plant of Trino (Piedmont) comes into operation
1981 ‐ nuclear power plant of Caorso (Emilia Romagna) comes into operation
1987 – referendum (to repeal the law):
80% of voters were favorable to stopping the production of nuclear energy
1988‐90 ‐ Three still functioning nuclear plants close (Latina, Trino, Caorso)
Decommissioning starts Sessa Aurunca: already off for failures in 1978
SOGIN the only enterprise to decommission the four Italian nuclear power plants withina decade
Radioactive waste still in place
Garigliano Nuclear Power Plant
(Sessa Aurunca‐ Caserta)
• june 1964 – comes into operation
• 1976 – water from Garigliano river reaches the plants underground where nuclear wast lies
Over 1million liter contaminated water into sea and fields
Ill formed animals and children are born, abortions, leuckemia and cancer cases rise
“there was a Chernobyl in Italy too”(QEW Int.)
1978 – Garigliano nuclear plant stopped due to failure of one of the secondary steam generators.
1980 ‐ Irpinia earthquake: the Security Authority requiresmore maintenance and engineering work.
ENEL decides to stop the plant because of the high cost ofoperations.
1982 – CIPE (government) ultimately closes the plant
Decommissioning operations start (350 Ml euro)
By 2019: decommissioning and waste conditioning
Ministero dello Sviluppo economico
Ministero dell’Ambiente
Ministero dellaSalute
Ministero dell’Interno
Ministero del
Lavoro
Ministero del
WelfareRegione
Provincia
Comune
Prefettura
Autorità di bacino
Decommissioning: stakeholders
SOGINNuclear Plant Management Company
Private
PUBLIC
Radioactive legacy• 3,000 cubic meters of highly radioactive waste buried on
location
• 2005 ‐ Risk waste from other plants Municipality of SessaAurunca denies SOGIN for permission to build a “radioactivewarehouse”.
• Lack of a national warehouse for local recovery; 700 drumssealed in barrels of cement
• Difficulty of finding waste stored underground
• High costs to implement all operations
Green field is still too far!!!
T‐Lab
Environmental and
Urban SociologyDipartimento di Sociologia
Napoli Federico II
Renewable energy
Photovoltaic energy
Eolic Parks
(Bisaccia AV)
Nuclear energy
Decommissioning
(Sessa Aurunca CE)
Garbagemanagement plans
Processing and recycling (NA)
Garbage recycling
Incinerator of Acerra(NA)
T‐Lab
FRAMEWORK
Sustainabilitydevelopment
(Anand and Sen 2000; Partridge2005)
Citizen Participation
and Accountability
(Olson 1983; Tarrow 1996; Bobbio and Zeppetella1999)
Network governance
(Bogason and Zolner, 2006)
Policy Implications
( March e Olsen,1988; Neveu 2000; Lewanski
1997, 2004)
Policy Network
(Giuliani 1996; Osti 2002)
Fieldwork
Aims
• Explore the impact of decommissioning :• on the social representation of environmental risk• On the social perception of external diseconomy• On the policy action
Methodology
• Fieldwork (stakeholders and citizens)• QEW interviews• Survey• Direct Observation
Datain progress
Sample
Genere %
Maschio 53
Femmina 47
Totale 100
Titolo di studio %
Fino a Licenza media 12
Diploma superiore 63
Laurea 25
Totale 100
Età %giovani 37
adulti 63
Totale 100
Awareness of nuclear risk
sa che esiste un sito nucleare nel suo territorio? %
si 100
Totale 100
sa quali sono i rischi e i vantaggi della presenza di questo sito nucleare? %
si 95,7
no 4,3
Totale 100
è favorevole o contrario all'eventualità che venga ripristinata la centrale del garigliano? %
incerto 4,3
abbastanza favorevole 5,7
poco favorevole 21,4
per niente favorevole 68,6
Totale 100
Adavantages and disadvantages (in the past)
Quali sono stati i vantaggi derivati dalla presenza della centrale del Garigliano, durante gli anni del suo funzionamento? %
risparmio in bolletta 7,1%
nessuno 8,6%
aumento valore case 10%
non so 14,3%
alti profitti per alberghi commercianti 18,6%
interesse dei media e dei politici 22,9%
riqualificazione del territorio 30%
posti di lavoro 90%
Quali sono stati gli svantaggi derivati dalla presenza della centrale del Garigliano, durante gli anni del suo funzionamento? %
animali malformati 2,9%
terre contaminate 7,1%
piene del fiume 8,6%
licenziamenti 8,6%
ha prodotto poca energia 12,9%
non so 12,9%
molti guasti 25,7%
nessuno 45,7%
Adavantages and disadvantages (at the moment)
Attualmente quali sono i vantaggi della presenza di una centrale nucleare in fase di smantellamento nel suo comune? %
interesse dei media 0,3%
costo basso delle case/terreni 4,0%
nessuno 95,7%
Attualmente quali sono glisvantaggi della presenza di unacentrale nucleare in fase dismantellamento nel suocomune? %
terrorismo 1,4%
non so 1,4%
nessuno 1,4%
non dà lavoro 2,9%
costoso 4,3%
criminalità organizzata 8,6%
chiusura aziende alimentari e allevamenti 10,0%
terre e fiume contaminati 14,3%
emigrazione e abbandono terre 17,1%
calamità naturali 20,0%
calo valore case/terre 27,1%
malattie uomo/animali 31,4%
scorie e struttura decadente 37,1%
calo genuinità e vendita prodotti alimentari 65,7%
Risk perceptioncon quale frequenza consuma
acqua del rubinetto %
spesso 2,9
sempre 5,7
raramente 18,5
mai 73,0
Totale 100
per quale motivo non cunsuma acqua del rubinetto %
preferisco acqua confezionata per motivi legati alla salute 10,9
altro 15,6
preferisco acqua confezionata perchè mi piace di più 31,3
ho paura che sia contaminata 42,2
Totale 100
indichi se, nelle zone limitrofe la centrale nucleare in fase di smantellamento conosce casi di persone che hanno sofferto di qualche tipo di malattia %
si 60
no 40
Totale 100
Protest actions
27,3
32,7
25,5
14,5
0
5
10
15
20
25
30
35
Poco elevata Elevata Abbastanza elevata
Molto elevata
Intensity
0 20 40
Per niente efficaci
Poco efficaci
Efficaci
Abbastanza efficaci
Molto efficaci
18,2
30,9
34,5
14,5
1,8
Effectiveness
Opinion about Referendum and Government plans
51,448,6
si
no
è conoscenza del referendum del 12 e 13 giugno?
conosce la posizione dell'attuale governo su tale questione?
92,9
7,1
l' attauale governo è favorevole
non so
Further research steps
Survey (citizen, opinion leaders, stakeholders, public actors
Decommissioning social network
Local context “re-appropriation”
Green field : empty box?