Propriety

111/26/2008 Confidential – For Internal Use Only

기술자료2

JINSUNG ENGNEERING

Update Presentation Name or Confidentiality Status Under Footer Menu September 2, 2014

Introduction

Propriety

311/26/2008 Confidential – For Internal Use Only

A global leader in heat management solutions

Well positioned in large, fragmented industries

Supplier of Floor Heating, Specialty Heaters, Fire-Rated Wiring, Temperature Measurement and Leak Detection Products

A portfolio of trusted brands

Global presence with local expertise

Geographic diversity – 80% of revenue outside the U.S.

End market diversity– serve a broad range of industries and customers

More than 2200 employees in 56 locations Headquarters – Houston, TX

2010 Revenue of $600M

Tyco Thermal Controls At A Glance

Presenter
Presentation Notes
ADD Pic of Building ADD TTC Brands Good geographic reach Diversity of revenue base

Propriety

411/26/2008 Confidential – For Internal Use Only

Heat Management System:A Complete System

Self-regulating, Power-limiting, Series Resistance heating cables, tank pad heaters

Mineral Insulated cables for heating, and fire rated wiring

Heat-tracing Control, Monitoring and Power Distribution Systems

Turnkey EPC Services for Heat Management Systems, and a full line of engineered products

Presenter
Presentation Notes
HMS is not just EHT… A successful system begins with engineering When you need heat tracing…you need more than a piece of heater cable! It all starts with sound engineering Why? Heat tracing is a system of independent components designed to work together to provide a temperature solution. Be certain to evaluate the complete system needs. Whether for freeze protection or temperature maintenance, all heat tracing systems require: Cables (often a variety of cables and technologies are used on one project) Components (power, splice, end terminations) Power distribution (power supply, ground fault equipment protection devices) Controls (self-regulating, thermostats, control and monitoring systems – on/off, proportional control, PASC) Accessories (glass banding tape)

Propriety

511/26/2008 Confidential – For Internal Use Only

Heat tracing application for off-shore

1. Icing Prevention(enable safe operation for most severe low temperature/high wind and humidity environmental circumstances) for:• Escape ways • Hand Railing• Stairs• Helicopter deck• Prevention for ice-peak breaking and hurting of people• Freeze protection of water systems.

2. Process tracing:• Facilitating process condition of media like fuel gas, Hydro carbons, etc.

Propriety

611/26/2008 Confidential – For Internal Use Only

Icing prevention can be realized by • Anti-Icing (prevent ice formation); • De-Icing (remove ice).

With safety and reliability feature, self-regulating electrical heat tracing is widely adopted in the icing prevention applications.

The design maintenance temperature of 0℃to +2℃ is usually specified even though sea water freezes between -2.8℃ to 0℃.

Icing Prevention

Propriety

711/26/2008 Confidential – For Internal Use Only

1. Pipe freeze protection • Seawater pipe system;• Fresh water pipe system (source water, injection water, living water, fire water);• Closed drainage system;• Boiler feed pipes;• Dosage and brocading water treatment;• Compressed air anti condensation;• Well work over mud pipe;• Pressure instrument, flow transmitter equipment etc.;

2. Process temperature maintenance• Oil production tube;• Oil separating and dehydration process;• Heat exchange and measurement;• Export pump and pipe

Process Tracing

Propriety

811/26/2008 Confidential – For Internal Use Only

Heat tracing application for off-shore

Propriety

911/26/2008 Confidential – For Internal Use Only9

Offshore solutions summaryApplication Drilling module Processing

moduleUtilities module Accommodation

moduleStorage& Transport

TTC Offering

Freeze protection Drilling water pipe, Mud pump pipe, Kill and choke lines

Production water, Source water, Injection water, Gas pipe,Process valve, instrument, transducer

Fire hydrant, Boiler pipe, Oil hydraulic unit, Fresh water, Sea water, Compressed air,Deck wash water,Ballast water

Potable water, Waste water, Refrigerator hatches

Export pipe Heat tracing(Self-Regulating, MI heating,)

Process temperature maintain

Downhole oil production tube, Crude oil

Diesel pipe, Lubricant pipe

Cargo cleaning, Oil cargo,Oil flowlines, subsea pipeline

Heat tracing(Self-Regulating, MI, STS, DHSX)

Snow meltingAnti-icingDe-icing

Escape passage, Doors/hatches, Walking deck, Helipad, Staircase, Handrail, GPS antenna

Heat tracing(Self-Regulating, MI heating)

Floor heating;Hot water maintenance

Central room floor warming

Cabin/canting floor warming, Bath and laundry hot water

Comfort (HWAT, T2)

Safety leak detection

Crude oil pipe Refrigerator water pipe

Fresh water pipe Oil pipeline Leak Detection(TraceTek)

Instrument winterization

Offline instrument/analyzer

Offline instrument/analyzer

O’brien (Tubing bundle)

High temperature wiring

Flare stack wiring Industrial Wiring(Alloy 825)

Fire emergency circuit integrity

Emergency block valve

Fire pump wiring, emergency lighting

Emergency lighting,Fire alarm

Emergency block valve

Update Presentation Name or Confidentiality Status Under Footer Menu September 2, 2014

Project Execution Plan

Propriety

1111/26/2008 Confidential – For Internal Use Only

Project Organization ;Preliminary

Project Manager

Design Manager

Tech. Consultant

Fabrication Manager Construction Manager Project Admin.

Project Consultant(Europe)

• Heater Calculation• ISO Drawing• Wiring Diagram• General

Arrangement Drawing

• Pipe Plan for EHT

• Bed Case Fabrication

• Handrail Fabrication

• Stair Fabrication

• Heater Installation• Bed Case

Installation• Insulation Work• Electrical Work • Quality Test

• Order entry• Local Buyout• Import / Export

Matters

• Interface with ShipOwner

Propriety

1211/26/2008 Confidential – For Internal Use Only

Clearly understand & implement Contracts or POs from commercial and technical

Ensure fully implement Risk Management ;

Overall EPC project execution accountability for EHS policy, Quality Management,

Project Controls, etc.;

Primary interface with customer & conduct project meeting during the execution stage;

Overall contracting & resources coordination with internal functional departments;

Plan, organize, direct and control all project phases, responsible for day-to-day

execution;

Prepare and submit project reports, approve regular document;

Change management, payment collection and project close-out;

Roles and Responsibilities: Project Manager

Propriety

1311/26/2008 Confidential – For Internal Use Only

Roles and Responsibilities: Design Manager

○ Overall technical accountability for project execution;

○ Engineering Resources & Design Schedule compliance with project master schedule &

customer’s expectations;

○ Coordinate with related technical professionals & conduct related meeting;

○ Make Design Changes per site actual conditions & its approval coordination;

○ Review project design data & specifications provided by customer;

○ Prepare Design Guide / Design Summary;

○ Plan, manage engineering design day-to-day quality works within budget and on

schedule;

○Review and approve Drawings & Technical Documentation and submit periodic report

to PM;

○ Ensure to prepare and archive document following document control system;

Propriety

1411/26/2008 Confidential – For Internal Use Only

Roles and Responsibilities: Construction Manager

○ Overall accountability for site activities with compliance of TTC EHS & QA/QC policies,

ensure Zero Harm and acceptable quality;

○ Overall and day-to day plan and manage site works with all related resource within

budgetary and meet schedule requirement.

○ Coordinate with client’s site representative and 3rd parties for all site activities, i.e.

inspection, permits/approvals, etc.

○ Prepare and submit periodic Site Progress Report to PM internally;

○ Review and approve site instructions and other document;

○ Ensure to prepare and archive site document following document control system ;

Propriety

1511/26/2008 Confidential – For Internal Use Only

• Basic Engineering Reviews (FEED)

• Specification Development

• HMS Optimization Studies:

○ Thermal Reviews

○ Control & Power Distribution Reviews

○ Heat Tracing Technology Analyses

○ Alternative Technology Analyses

○ P&ID and HAZOP Reviews

Full Service… from FEED to Installation to Maintenance Programs

• Engineering & Design Services

• Procurement Services

• Project & Construction Management

• Construction Execution

• QA/QC Services

• Pre-Commissioning Services

• Maintenance

A complete range of site-based services are available, creating more opportunity for value

Presenter
Presentation Notes
Important to note the broad range of site-based services that can be provided; focus on FEED, Engineering & Design and Construction Execution.

Propriety

1611/26/2008 Confidential – For Internal Use Only

The Heat Management System is complex in that its design and, therefore, its cost and reliability, are influenced by a multitude of engineering disciplines:

Process

Mechanical

Electrical

Instrumentation

Piping

TTC bridges across these disciplines, delivering the right

expertise to design, build, operate, and maintain the safest,

most reliable, and lowest total cost heating system.

The Role of the HMS Integrator Bridging the Project Disciplines

Propriety

1711/26/2008 Confidential – For Internal Use Only

Differentiates #1: FEED / Basin Design

Primary Definition of Winterization

Input Data :-General Arrangement Drawing- Environment Specification- Winterization Philosophy or specification-By EHT Supplier(Experience and Knowhow Required )

Finalize the Winterization Area

Activity:- Several Times of Revision- WorkshopBy - Marine 3rd Party (e.g. DNV)- Ship Owner(Safety, Operation, Maintenance) - Ship Builder- EHT Supplier

MTO / RFQGeneration

By -3D Modeling - Cad Design- Typical installation Drawing

Begin Detail Design

Propriety

1811/26/2008 Confidential – For Internal Use Only

Differentiates #2: FEED / Basin Design

Propriety

1911/26/2008 Confidential – For Internal Use Only

Differentiates #2: FEED / Basin Design

Propriety

2011/26/2008 Confidential – For Internal Use Only

Differentiates #3: Test Lab. for winterization application

The North Pole ChamberTemp’ Mini. : -50℃Wind Speed : 10m/s

Propriety

2111/26/2008 Confidential – For Internal Use Only

Differentiates #4: European Involvement

Propriety

2211/26/2008 Confidential – For Internal Use Only

Differentiates #5: Norsok Experience

1. Understanding of Norsok• E001 Electrical Systems• IFEA• C002 Living Quarters Area(e.g. coating method)• S001 Technical Safety• P100 Process System

2. Optimum Design• Total Power Load(e.g. ELCB Capacity)• 3D Modeling

3. Best Installation method to prevent heater damage• Cable entry kit for gutter, drain box• Cable protection between steps

4. Can advise the boundary of heat tracing area(including vendor package)

Propriety

2311/26/2008 Confidential – For Internal Use Only

Project DeliverablesRequired Data (Basic)

• Project Standards and Specifications• P&ID’s• Pipe Isometric Drawing• Line Lists or Line Designation Tables with

necessary temperature data to select and design tracing and insulation type and thicknesses

• Plot Plan• Room Detail Drawing• General Arrangement Drawing

Propriety

2411/26/2008 Confidential – For Internal Use Only

Project DeliverablesDeliverable Data (Basic)

• Design & Calculation Sheet• Bill of Material• EHT Isometric Drawing• Single Line or Block Diagram• Power Kit Location Drawing• Installation Typical Drawing• Installation Detail Drawing• Cable Schedule• Wiring diagram• Installation Manual• Catalogue & Data sheet• Control Panel Drawing & Data

Propriety

2511/26/2008 Confidential – For Internal Use Only

Project DeliverablesCheck Point of Ship Builder

• Power Load• Calculation Result• Process Zone (T-Rating, Hazardous)• Location of Control Panel• Location of Power Kit(Junction Box)• Compliance of Specification