transforming census bureau operations meeting on the management of statistical information systems...

18
Transforming Census Bureau Operations Meeting on the Management of Statistical Information Systems (MSIS 2012) Streamlining Statistical Production

Upload: leonard-park

Post on 29-Jan-2016

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Transforming Census Bureau Operations Meeting on the Management of Statistical Information Systems (MSIS 2012) Streamlining Statistical Production

Transforming Census Bureau Operations

Meeting on the Management of Statistical Information Systems

(MSIS 2012)Streamlining Statistical Production

Page 2: Transforming Census Bureau Operations Meeting on the Management of Statistical Information Systems (MSIS 2012) Streamlining Statistical Production

Today’s Agenda

• Challenge: Better Meet Our Clients’ Needs

• What Have We Done? – In the Regions

– At Headquarters

• Lessons Learned

• The Road Ahead

2

Page 3: Transforming Census Bureau Operations Meeting on the Management of Statistical Information Systems (MSIS 2012) Streamlining Statistical Production

Future Success Demands Change

• Our society has changed since our basic survey designs were constructed.

• Our past success offers no guarantee of future success.• Like all successful organizations, we must innovate,

become more efficient, flexible, and responsive to our customers.

• Data‐driven management demands a new mindset along with new technologies and systems.

• We have all the capabilities to succeed in this future.

3

Page 4: Transforming Census Bureau Operations Meeting on the Management of Statistical Information Systems (MSIS 2012) Streamlining Statistical Production

Serving our Client Needs

• They want:– visible cost controls and cost predictability– us to proactively identify ways to improve their

surveys based on examining paradata and response data

– clear roles of accountability and responsibility

4

Page 5: Transforming Census Bureau Operations Meeting on the Management of Statistical Information Systems (MSIS 2012) Streamlining Statistical Production

Regional Office Realignment

• Announced in June 2011

• Implementation Began in January 2012

• Finished by November 2012

• Estimated Savings of $15-18 Million per year

• Two key elements– Reduction in Offices

– Field Management Changes

5

Page 6: Transforming Census Bureau Operations Meeting on the Management of Statistical Information Systems (MSIS 2012) Streamlining Statistical Production

6

Page 7: Transforming Census Bureau Operations Meeting on the Management of Statistical Information Systems (MSIS 2012) Streamlining Statistical Production

7

Page 8: Transforming Census Bureau Operations Meeting on the Management of Statistical Information Systems (MSIS 2012) Streamlining Statistical Production

8

Program Coordinator

Survey Supervisor (CE)

Field Rep (CE, CPS) Field Rep (CE, ACS) Field Rep (CE)

Senior Field Rep (CE, CPS) Other Survey

Supervisors/Senior Field Reps

Example Pathways of Communication

CEQ/CEDCPSACS

Page 9: Transforming Census Bureau Operations Meeting on the Management of Statistical Information Systems (MSIS 2012) Streamlining Statistical Production

9

New RO Organization ChartData Collection

Regional Director

Assistant Regional Director

Coordinator A

Survey Statisticians (Field)

Field Supervisors

Field Representatives

Coordinator B

Survey Statisticians (Office)

Assistant Regional Director

Coordinator C

Survey Statisticians (Field)

Field Supervisors

Field Representatives

Coordinator D

AdministrationAutomationRecruiting GeographyPartnership

Page 10: Transforming Census Bureau Operations Meeting on the Management of Statistical Information Systems (MSIS 2012) Streamlining Statistical Production

Headquarters Realignment

• For Reimbursable Demographic Surveys:– Complement the Regional Office Realignment

– Leverage Efficiency and Streamline HQ Operations

10

Page 11: Transforming Census Bureau Operations Meeting on the Management of Statistical Information Systems (MSIS 2012) Streamlining Statistical Production

Key Dimensions on Which HQ Options Vary

• Project authority and resource control.• Team composition.• Business Process Standards, Protocols

and Integration Dimension.

11

Page 12: Transforming Census Bureau Operations Meeting on the Management of Statistical Information Systems (MSIS 2012) Streamlining Statistical Production

HQ Options’ Team Activities • Reviewed our current processes

• Developed options for improvements

• Solicited input from all managers and staff

• Solicited input from our clients

12

Page 13: Transforming Census Bureau Operations Meeting on the Management of Statistical Information Systems (MSIS 2012) Streamlining Statistical Production

The New HQ Look

13

Survey Sponsor

Survey Director

Survey Team

Service Provider

Service Provider

Service Provider

Service Provider

Service Provider

Service Provider

Service Provider

Service Provider

Regional Office Survey

Statistician Office

Service Provider

Page 14: Transforming Census Bureau Operations Meeting on the Management of Statistical Information Systems (MSIS 2012) Streamlining Statistical Production

HQ Service Providers

14

Stat MethodsFrame Development

Sample Design

Data Collection Automation

UTS/Data RepositoryCATI/CAPI Quest. Develop.

Case Management

Data Processing, Editing

Sample SelectionEditing Execution

Imputation Execution

Cost Estimation, Analysis and

ModelingStandard Cost Controls

Develop Cost modelAnalyze Historical Data

Data CollectionCoordinating Functions

Field TrainingNPC Functions

Subject Matter Questionnaire Content

Data AnalysisDissemination

Survey AnalyticsImprove AnalyticsAnalyze paradataExpand Metrics

Interagency Agreements,

Processing and Approval

Coordinate Standard Templates

Track all Agreements

Project Management Business Analysis

SupportDefine Governance

Structure

Page 15: Transforming Census Bureau Operations Meeting on the Management of Statistical Information Systems (MSIS 2012) Streamlining Statistical Production

Survey Team• Survey Director • Project Manager provides project management support

for the entire lifecycle of the survey.• Survey Design Members

– Questionnaire Design/Development/Edits– Sample Design/Estimation– Data Analysis– Cost Estimation

• Survey Operations Members– Data Collection – Production analytics– Field Procedures; Training– Data Processing

**This team does NOT necessarily have data tabulation and dissemination expertise (depends on sponsor).

15

Page 16: Transforming Census Bureau Operations Meeting on the Management of Statistical Information Systems (MSIS 2012) Streamlining Statistical Production

Survey Director• Fully credible authority for all survey decisions: budget,

design, methods, innovation.

• Serves as the central point of contact to the sponsor for entire survey activities and products.

• Engages sponsors in serving program needs.

• Anticipates upcoming issues within the survey lifecycle and pro-actively suggests solutions.

16

Page 17: Transforming Census Bureau Operations Meeting on the Management of Statistical Information Systems (MSIS 2012) Streamlining Statistical Production

Shared Lessons Learned

1. Senior Leadership

2. Communication

3. Staff Engagement

4. Real time Monitoring of Effects of Change

17

Page 18: Transforming Census Bureau Operations Meeting on the Management of Statistical Information Systems (MSIS 2012) Streamlining Statistical Production

The Road Ahead

1. Transition of Field Regional Offices

2. Survey Analytics

3. Reimbursable Surveys

18