Transforming Post 16 Education in Caerphilly
Executive Summary and DRAFT Strategic Outline Case (SOC)
Please note: The executive summary (Chapter 1) contains the final recommendations
of the SOC Focus group as agreed on September 15 2010.
The remainder of the document is still in draft form, and is distributed for review and
comment. There are still some gaps. Corrections or suggestions for improvement
may be incorporated at a later stage.
Prepared by: DE/AW
Version No: 1.5
Issue Date: 09/11/10
Version: 1.5 DE/AW Page 3 of 62
Date: 09/11/10
Foreword
The strategic outline case (SOC) is submitted on behalf of the Caerphilly 14-19 Learning
partnership Network. The SOC has been developed in conjunction with a focus group of
representatives from schools and colleges and David Eynon and Alan Whiteman from
Caerphilly CBC.
The SOC has been prepared using the agreed standards and format for business cases, as
set out by HM Treasury and Welsh Assembly Government. The approved format is the Five
Case Model, which comprises the following key components:
•••• The strategic case section. This sets out the strategic context and the case for change, together with the supporting investment objectives for the scheme.
•••• The economic case section. This demonstrates that the organisation has selected a preferred way forward, which best meets the existing and future needs of the service and is likely to optimise value for money (VFM).
•••• The commercial case section. This outlines what any potential deal might look like.
•••• The financial case section. This highlights likely funding and affordability issues and the potential balance sheet treatment of the scheme.
•••• The management case section. This demonstrates that the scheme is achievable and can be delivered successfully in accordance with accepted best practice.
Version: 1.5 DE/AW Page 4 of 62
Date: 09/11/10
Contents 1.0 EXECUTIVE SUMMARY ....................................................................................................................... 6
2.0 THE STRATEGIC CASE ..................................................................................................................... 12
3.0 THE ECONOMIC CASE ...................................................................................................................... 41
4.0 THE COMMERCIAL CASE ................................................................................................................ 53
5.0 THE FINANCIAL CASE ...................................................................................................................... 55
6.0 THE MANAGEMENT CASE ............................................................................................................... 58
Annexes
Annex A – Caerphilly’s current learning partnerships
Annex B – Travel times and distances between institutions
Annex C – A proposed model for partnership federation
Version: 1.5 DE/AW Page 5 of 62
Date: 09/11/10
Tables
Table 1: Business scope ....................................................................................................... 8
Table 2: Assessment of scoping options ............................................................................. 10
Table 3: Caerphilly Partnerships ......................................................................................... 13
Table 4: Budget for Education and Leisure for 2009/2010 ................................................... 19
Table 5: Projections for Student Places 2009 – 2017 .......................................................... 22
Table 6: Investment objectives, measures and targets ........................................................ 27
Table 7: School/Pupil Projections ........................................................................................ 29
Table 8: Investment objectives, current positions and business needs ................................ 31
Table 9: Business scope and key service requirements ...................................................... 34
Table 10: Investment objectives and benefit criteria ............................................................ 35
Table 11: Risks and counter measures ............................................................................... 38
Table 13: Summary assessment of service solutions options .............................................. 48
Table 14: Summary assessment of service delivery options ............................................... 49
Table 15: Summary assessment of implementation options ................................................ 50
Table 16: Summary of inclusions, exclusions and possible options ..................................... 51
Table 17: Assumptions on capital and revenue costs .......................................................... 56
Table 18: Milestones ........................................................................................................... 59
Figures
Figure 1: Geographical representation of Partnerships ....................................................... 14
Figure 2: Caerphilly Local Education Authority .................................................................... 17
Figure 3: Caerphilly Partners ............................................................................................... 18
Figure 4: Secondary School Catchment Areas .................................................................... 20
Figure 5: Secondary School Pupil Projections ..................................................................... 30
Version: 1.5 DE Page 6 of 62
Date: 09/11/10
1.0 Executive Summary
1.1 Introduction
This Strategic Outline Case (SOC) considers a range of alternative models for the future
delivery of secondary and post 16 education and training in Caerphilly County Borough
Council and evaluates the relative advantages, disadvantages and risks.
This business case sets out the current issues with provision and the strategy which has
been adopted to overcome them. It shows the alternative options which have been
considered in order to resolve these issues and the preferred way forward.
This SOC does not seek any monetary investment. Successfully implementing the preferred
option will require funding which will be requested from the Welsh Assembly Government
(WAG) through separate paths mentioned in the document.
1.2 Strategic case
Caerphilly’s mission of ‘promoting a culture of lifelong learning’ is paramount in bringing
about the change to increase the numbers of those in work and improve the skills and
knowledge of the young people and the current workforce.
Furthermore, to drive forward improvements in the education and training infrastructure,
consideration needs to be given as to how the efficiency, flexibility and effectiveness of both
providers and the network, as a whole, can be improved.
The core vision of the Caerphilly’s 14-19 Network is to create an efficient and effective 14-
19 Learning Network that provides all learners with a wide range of relevant, high
quality, learning opportunities that equip each individual with the skills, knowledge
and understanding necessary for them to achieve their full potential in society.
This will be facilitated by first class learner support and guidance that ensures that learner
participation, learner well being and learner outcomes are maximised.
The basis for the case for change is centred on the following key issues:
•••• Breadth of provision: An increasing need to roll out the Learning Pathways entitlement and improve opportunities for vocational and skills based provision.
•••• Collaboration: Addressing barriers to collaboration will lead to higher levels of
collaboration between providers and will extend choice and flexibility of provision.
•••• Value for Money: Efficiency and effectiveness savings are necessary to pay for the increase in participation and performance required to meet the WAG targets for 2010-2015.
Version: 1.5 DE Page 7 of 62
Date: 09/11/10
The six investment objectives underlying the case for change are listed below:
1. Maximise the local 14-16 and post 16 curricula including a wide range of vocational options at levels 2 and 3.
2. Deliver high quality provision and outcomes with a particular emphasis on basic skills.
3. Develop skills for the Welsh economy within the global market
4. Strengthen the Welsh culture and ethos across all providers
5. Increase the opportunity to follow courses through the medium of Welsh
6. Seek efficiency and, value for money
Our Transformation proposals need to be considered in the wider context of the current 21st Century Schools programme, which has identified the following 4 Key Principles following consultation with stakeholders: Principle 1: Develop buildings, facilities and environments that are fit for purpose for the 21st century Principle 2: Use integrated information communication technology (ICT) to transform learning experiences for children, young people and the community Principle 3: Organise schools more efficiently and cost effectively Principle 4: Continue 14-19 transformation These four principles are underpinned by the following core aims: • Raise standards and increase well being and opportunities for all learners.
• Meet demand for Welsh Medium and Faith provision.
• Explore the potential for different age ranges of schools.
• Explore the use of Federated and collaborative arrangements, particularly in smaller schools.
• Improve access to play, sport and leisure, thereby developing more healthy lifestyles.
• Achieve co-location of other services on school sites, thereby improving facilities for the wider community, in conjunction with the Community Focus schools and Healthy Schools’ strategies.
• Build on and develop good practice where it already exists.
• Reduce Council revenue costs through greater value for money and cost effectiveness.
Version: 1.5 DE Page 8 of 62
Date: 09/11/10
Fulfilling these core aims should result in: • Substantially reducing surplus school places
• Providing an ICT infrastructure to transform teaching and learning and thereby improve outcomes.
• Improving the condition of all school buildings and facilities to an A or B rating, to meet the needs of learners in the 21st century.
• Reviewing school catchment areas in line with school rationalisation. Where relevant and appropriate our Transformation proposals will align with 21st Century Schools aims and outcomes.
The business scope outlined in the table below provides the range within which options are
considered in the economic case. The proposed initiatives identified within this document will
seek to address all of these requirements.
Table 1: Business scope
Service
Requirements
Business Scope and Key Service Requirements
Core
(minimum)
•••• Improved outcomes for learners at Level 2 and Key Stage 4.
•••• Better participation rates post-16 in both schools and colleges.
•••• To meet the minimum requirements of the Learning & Skills measure by
further collaboration between the schools, FE colleges, work-based
providers and the voluntary
•••• More cost effective delivery.
•••• Expanded joint governance arrangements
•••• Alignment with 21st Century Schools strategy.
Desirable
(Intermediate)
•••• A common learner tracker system.
•••• Appointment of a Keeping In Touch (KIT) Coordinator
•••• Improved ICT provision for pupils, parents and the wider community
Optional
(Maximum)
•••• To develop all existing learning settings to create education and
community facilities that reflect the needs of education and training in
the 21st Century
Version: 1.5 DE Page 9 of 62
Date: 09/11/10
1.3 Economic case
To fulfil the business scope, the following options were considered:
Option 1: ‘Do Minimum’ - Maintain existing collaboration between schools and
colleges via joint timetabling
This option continues current “loose alliances” in the form of four existing partnerships (3
English medium, 1 Welsh medium). Two of the English medium partnerships involve 11-18
schools and the College, Ystrad Mynach, the third English medium partnership is a long
established tertiary system between 11-16 schools and Coleg Gwent Crosskeys, and the
Welsh medium partnership is a cross-border collaboration between two 11-18 schools. At
present the Welsh medium partnership has a formally constituted joint committee of
governance, and the English medium partnerships have regular management meetings and
agreed protocols. Existing collaborative arrangements in Caerphilly have been cited as an
example of good practice in school/college partnership through joint timetabling.
Option 2: ‘Intermediate’ - Establish “harder” federated arrangements based on
existing or revised partnerships
This would involve the setting up of a strategic management group for each partnership
including governor representatives from each of the partner institutions. These groups
would make strategic decisions relating to the future developments of the partnerships
including curriculum change, finance, transport, and could manage post 16 delegated
funding. More strategic governance would allow difficult issues such as curriculum
rationalisation to be addressed. This option does not preclude an eventual move towards a
fuller tertiary system
(Note: Earlier drafts of the SOC contained an extra option as Option 3, which included
proposals for Welsh Medium reorganisation to meet the forecast demand for additional
Welsh Medium places. As these proposals were rejected by WAG following a Tranche 3
bid, this option is now discounted, and has been incorporated into the 21st Century School
strategy currently under consultation.)
Option 3: ‘Intermediate’ - Full tertiary system in Islwyn. One sixth form centre in
Rhymney Valley/Caerphilly Basin
The tertiary system in Islwyn would be further developed. One sixth form centre would be
established in the Rhymney Valley/Caerphilly Basin (managed by joint governance –see
above). This would require either the re-designation of an existing school in the middle of
the valley or a new build in the same area, possibly on the college site.
Sixth form students are retained on their original school roll but the delivery of all general
subjects at level three would take place at the sixth form centre and all vocational subjects at
the College, Ystrad Mynach. Delivery would be by school and college staff.
Version: 1.5 DE Page 10 of 62
Date: 09/11/10
Option 4: ‘Maximum’ - Full tertiary across CCBC. Close all 6th forms. Increase FE
capacity with new build. Further school closures
This would establish a full tertiary system across the authority. This would involve the
closure of all schools’ sixth forms in Caerphilly with all post 16 students educated in Coleg
Gwent Crosskeys and an extended FE college at Ystrad Mynach.
The options were scored in a series of focus group workshops held with school and college
representatives from the Network wherein the investment objectives and critical success
factions were proposed and agreed. Members of the focus group scored the four options
independently, and the results were then collated as follows:
Table 2: Assessment of scoping options
Version: 1.5 DE Page 11 of 62
Date: 09/11/10
Following discussion and scoring of options on 15 September, the SOC focus group
proposed that the ‘preferred’ option should be either option 3 or option 4, and that
option 2 (‘federation’) should be implemented from September 2011 as a necessary
interim stage. Full implementation of the final preferred option by September 2014.
To successfully deliver the investment objectives and business needs the solution to deliver
the proposal will require 3 major changes:
i. Joint Governance to oversee future partnership and collaboration arrangements. This will be set up through developing the existing partnership arrangements into more formally constituted Partnership Federations. The detailed purpose, values, functions and strategic operational matters of these Federations are outlined in Annex C.
ii. ICT implementation In order to enhance existing facilities and make the future workforce ready for the 21st Century technology-rich teaching and learning environment, CCBC has developed a new ICT strategy. Implementation will be managed through the 21st Century Schools programme. Please refer to the ICT Learning Strategy document.
iii. Remodelling of learning settings; this will be delivered through the 21st Century schools programme and the Further Education Institutions (FEI) own modernisation and development programmes. Final details will depend on the outcomes of current consultations and further feasibility studies under the OBC.
1.4 Commercial Case
There will be no procurement progressed through this SOC. A robust management structure
to drive and implement the Federation is outlined in the management case.
1.5 Financial case
Costs involved in setting up and running Joint Governance will be met from CCBC’s 14-19
development revenue budget. .Please also refer to the ICT Learning Strategy document and
to the OBC for 21st Century School.
1.6 Management case
Joint Governance will be in place by September 2011 and will be the way forward from that
date. It will be driven forward and managed by CCBC’s current staff. The whole process will
be overseen by the Director of Education and Leisure.
Signed:
Date: 18 January 2011
Senior Responsible Owner
Project team
Version: 1.5 DE Page 12 of 62
Date: 09/11/10
2.0 The Strategic Case
2.1 Introduction
The purpose of this section is to explain and revisit how the scope of the proposed project by
Caerphilly Country Council fits within the existing business strategies of DCELLS and the
Welsh Assembly Government (WAG) and provides a compelling case for change, in terms of
the existing and future educational and operational needs of the post 16 education in
Caerphilly.
2.2 Part A: The strategic context
In considering local authority proposals to reorganise schools in a locality, WAG will give
priority to the best interests of learners and the wider community. The Learning Country:
Vision into Action made it clear that future decisions on the allocation of funding for capital
investment would increasingly require local authorities to plan strategically. The 21st Century
Schools programme is designed to support local authorities to develop new and innovative
approaches to school provision, which put the learner at the centre of development. This
SOC is in parallel to the 21st Century Schools programme and has strongly reinforced this
principle.
2.3 Organisational Overview
Caerphilly County Borough, the fifth largest unitary authority in Wales, is located in the mid
valleys corridor and has an increasingly strategic location between Wales’ dynamic capital
and the regenerating Heads of the Valleys area. The county is made up of 50 relatively
small, mainly former coal mining communities and characterised by small towns and villages
that are surrounded by an attractive backdrop of large open rural areas.
The Borough was formed as a Unitary Authority in April 1996 following the Local
Government Reorganisation in Wales. It represented an amalgamation of two district
councils - Islwyn and Rhymney Valley, and part of Gwent and Mid Glamorgan County
Councils.
The population of 171,300 is settled in and around these numerous towns and villages and
is typical of many valleys areas where the population trend of increasing numbers of pension
age and above and fewer children, is shaped through the region’s coal-mining and steel-
making history. Approximately 54,300 children and young people from birth up to the age of
24, live in the borough.
A particular challenge within Caerphilly borough is its physical geography, with some
localities finding access to services problematical due to poor transport links. The borough
has two colleges of Further Education, Ystrad Mynach and Coleg Gwent-Cross Keys
Campus and is supported by two Careers Wales Companies, Careers Mid-Glam and
Careers Gwent.
Version: 1.5 DE Page 13 of 62
Date: 09/11/10
As a result, collaborative working presents particular challenges and opportunities. Therefore
the Local Authority’s strategy has been to develop collaborative work through the
three existing area English-Medium partnerships (detailed in the table below) that came
into being several years ago, and a cross Local Authority (LA) border Welsh-Medium
partnership between Caerphilly and Torfaen. Central support for learner travel has been
a key feature in the success of collaborative working so far, and has significant financial
implications. All schools and colleges are active participants in partnership working.
Table 3: Caerphilly Partnerships
Mid and Upper
Rhymney Valley
Collegium
Islwyn Partnership:
Caerphilly Basin
Partnership
Welsh Medium
Partnership
Pre and Post 16
collaboration through
Common Timetabling
Pre collaboration through
Common Timetabling (from
2010)
Post 16 collaboration at
transition
Pre and Post 16
collaboration through
Common Timetabling
Pre and Post 16
collaboration
through jointly
employed
teaching staff
1. Lewis School
Pengam
2. Lewis Girls’ School
3. Heolddu
Comprehensive
School
4. Rhymney High
School
5. The College, Ystrad
Mynach
6. Ysgol Gyfun Cwm
Rhymni*
7. Trinity Fields***
8. Blackwood
Comprehensive School
9. Oakdale Comprehensive
School
10. Newbridge
Comprehensive School
11. Pontllanfraith
Comprehensive School
12. Risca Comprehensive
School
13. Cwmcarn High School*
14. Coleg Gwent Cross-keys
Campus
15. Trinity Fields***
16. Bedwas High School
17. St Cenydd
Community School
18. St Martins
Comprehensive
School
19. The College, Ystrad
Mynach
20. Trinity Fields***
21. Ysgol Gyfun Cwm
Rhymni*
22. Ysgol Gyfun
Cwm Rhymni
23. Ysgol Gyfun
Gwynlliw
(Torfaen
CCBC)
24. Trinity
Fields***
* Cwmcarn High (Foundation) School attends Headteacher meetings and DEPNET meetings with the
Islwyn Group
** Ysgol Gyfun Cwm Rhymni also works closely with both post-16 partnerships
*** Trinity Fields Special School works closely with all partnerships
Version: 1.5 DE Page 14 of 62
Date: 09/11/10
Figure 1 provides an overview of the partnership representing the three geographical areas
and the Welsh medium partnership.
Figure 1: Geographical representation of Partnerships
2.3.1 Strategic Aims and Objectives
Caerphilly’s heavy engineering industries provided employment for many past generations
and low technology manufacturing provided a suitable replacement in recent years.
However, Caerphilly, along with many other counties in the region, must now switch to high
value-added manufacturing and services. This will require a workforce with advanced skills
and a commitment to lifelong learning. Capitalising on its advantageous location within the
capital conurbation and other opportunities offered by the hardy rural setting will support the
county to achieve its high-value, high-growth ambitions.
To achieve these ambitions, many challenges lie ahead. None more so, than by reducing
the levels of deprivation and increasing social inclusion across the area. With deprivation
affecting relatively large numbers of wards, regeneration of these areas by improving
housing, health and providing better skills and jobs, will be essential to improve the
economic viability of the area. In order to bring about this turn around, it will be necessary to
raise the low economic activity rates, lower high long-term illness levels and reduce relatively
Version: 1.5 DE Page 15 of 62
Date: 09/11/10
high unemployment affecting the area. Improving employability skills and those specialist
skills required by local employers will effect this change.
Caerphilly’s mission of ‘promoting a culture of lifelong learning’ is paramount in bringing
about the change to increase the numbers of those in work and improve the skills and
knowledge of the young people and the current workforce.
Furthermore, to drive forward improvements in the education and training infrastructure,
consideration needs to be given as to how the efficiency, flexibility and effectiveness of both
providers and the network, as a whole, can be improved.
Caerphilly regularly reviews its learning network to ensure the provision of suitable education
and training for all learners. Reorganisation of the network in recent years has resulted in
the closure of two comprehensive schools, St Ilan (in July 2007), and Bedwellty (in July
2005), and the replacement of two existing comprehensive schools with new builds, Lewis
Pengam and Ysgol Gyfun Cwm Rhymni. This has led to an overall net loss of two
comprehensive schools in the county borough. Additionally, the 14-19 Network has been a
forerunner of collaborative consortia working, utilising joint timetabling across a number of
schools.
If the network is to continue to provide high quality relevant learning, further reviewing the
configuration of the providers and increasing levels of collaboration will be necessary.
Having taken account of the data for learning attainment in the Caerphilly LA and Wales,
international comparisons, through the Programme for International Student Assessment
(PISA) and evidence provided to Webb, Caerphilly County Borough Council is committed to
supporting the Welsh Assembly Government policy of establishing geographic Learning
Partnerships.
The Learning Partnerships plan to implement changes that are capable of supporting the
improvements outlined in the recent Evidence Based Review (EBR). These will include:
•••• Ensuring that partnership work is pivotal and that it drives the agenda;
•••• Ensuring that access is available to connected ‘Learning Places’ rather than just
schools;
•••• Raising aspirations and attainment;
•••• Providing relevant vocational training and post-16 education;
•••• Continuing the emphasis on basic skills development, including information and
communication technologies;
•••• Promoting lifelong learning and skills for all ages and groups;
•••• Providing the skills required for global business;
•••• Ensuring the provision of learning opportunities for disadvantaged groups; and
•••• Rationalisation of student transport.
Version: 1.5 DE Page 16 of 62
Date: 09/11/10
Specifically the objective of the council is to work with its partners to address the following
key indicators of performance:
•••• An improvement in levels of basic skills;
•••• An increase in the rate of 16-18 participation in education, training and employment;
•••• An increase in the rate of 19-24 participation in education, training and employment;
•••• An increase in overall learner success rates, reflecting higher levels of learner
completion as well as the achievement of qualification aims;
•••• An increase in Level 2 and 3 qualifications;
•••• An increase in Level 4 qualifications; and
•••• An increase in progression to higher level learning or higher level employment.
2.3.2 Current activities, service stakeholders and customers
14-19 education in Caerphilly is delivered to approximately 10,000 young people through:
• Seven 11-18 Community schools;
• One 11-18 Welsh medium school;
• One 11-18 Foundation school;
• Five 11-16 Community schools;
• Four smaller learning establishments;
• One Special School;
• Two Further Education colleges, and
• A variety of work based learning providers.
Version: 1.5 DE Page 17 of 62
Date: 09/11/10
Figure 2: Caerphilly Local Education Authority
Version: 1.5 DE Page 18 of 62
Date: 09/11/10
The 4 mainstream secondary schools within Caerphilly County Borough were attended by
12,513 young people in January 2008. Current demand for Welsh secondary places is met
by one secondary school, Ysgol Gyfun Cwm Rhymni. Roman Catholic secondary education
is provided by transfer from St. Helen’s RC Primary school to Cardinal Newman RC
Comprehensive School in Rhondda Cynon Taff LA.
Nine of the schools are 11-18 comprehensives, with sixth forms of varying sizes, located in
the Caerphilly Basin and Rhymney Valley (also including one based in the Islwyn valley).
The other five comprehensive schools are 11-16, with students wishing to continue study
post 16 transferring to one of the two FE colleges: the College, Ystrad Mynach; or Coleg
Gwent, Crosskeys Campus, or to an 11-18 school in the same area.
Collaborative working post 16 has been taking place for several years, with over 900 school
sixth form students in the Caerphilly Basin and Rhymney Valley currently offered level three
courses at other schools, and a smaller number of students in the Islwyn area accessing
courses post 16 via the well-established Crosskeys tertiary partnership.
The success of these arrangements was recognised in the WAG paper ‘Transforming
Education and Training in Wales’ and described as an example of good practice, and will be
underpin our proposals for the development and reconfiguration of the Caerphilly Learning
Partnership.
Figure 3: Caerphilly Partners
A number of link courses involving FE partners are already in place for pre -16 students; with
over 450 involved this year. All schools are involved in collaborative work with local
colleges, and are developing links with Work Based Learning (WBL) providers via the
network. Regular meetings of the Headteachers (Strategic) and the Curriculum Managers
Version: 1.5 DE Page 19 of 62
Date: 09/11/10
support the work of the three Area Partnerships. The Curriculum Managers also meet
collectively on a regular basis (DEPNET Group) to ensure that a consistent county-wide
approach is maintained. Representatives of both colleges play a full part in all discussions,
as they do in the meetings of the Caerphilly LAN. The readiness of all partners to play a
positive role in collaborative development has been a major factor in any successes so far;
and is a crucial element in future progress.
The LEA’s budget for 2009/2010 has been £121,756,054 (excluding grant income) and £130
million including grants. Budget for secondary schools is £50,569,000 (including DCELLS
post-16 grant and BSF fund).
Table 4: Budget for Education and Leisure for 2009/2010
Version: 1.5 DE Page 20 of 62
Date: 09/11/10
Figure 4: Secondary School Catchment Areas
Version: 1.5 DE Page 21 of 62
Date: 09/11/10
2.4 Business strategies
2.4.1 The National Context
The SOC is underpinned by the key policy and strategy themes of the Welsh Assembly
Government outlined below:
1. One Vision Wales with its focus on reaching learners, social justice, economic productivity and new technology.
2. The Learning Country which emphasised the importance of a continual focus on improving educational performance, the Welsh language, flexible learning pathways for young people aged 14-19, increasing participation rates at 19 plus and reducing the numbers who are not in employment, education or training between the ages of 16-18.
3. Welsh-medium Education Strategy establishing a holistic and sustainable infrastructure to support and develop Welsh-medium education and training, from nursery through to further and higher education.
4. Delivering Skills that Work for Wales making it clear that in Wales we need to work together to build the skills for a modern 21st century economy at 14-19, but also in our view with adult learners.
5. 14-19 Learning Pathways requiring the development of flexible pathways that provide relevant, interesting and purposeful education.
6. The Learning & Skills Measure (LSM) underpinning the 14-19 Learning Pathways with its focus on learning pathways that meet the needs of each learner, a wider choice and flexibility of programmes and ways of learning, a learning core from 14 to 19, learning coach support, personal support and impartial careers advice.
7. The National Basic Skills Strategy highlighting the challenges in Wales and, in particular, the impact this has on learners’ career options.
8. Transforming schools with ICT emphasising the role of technology in school-based learning.
9. The School Effectiveness Framework introducing a systemic approach to the relationship between the Welsh Assembly government, schools and councils and the core themes of systemic thinking, equality, being supportive and interdependent, a high performance culture and bilingualism.
10. Making the Connections requiring services to collaborate to bring a clearer focus upon the citizen and meeting his or her needs.
Version: 1.5 DE Page 22 of 62
Date: 09/11/10
11. Poverty an issue which ’Tackling Child Poverty in Wales’ (Child Poverty Network Cymru) report concluded has an impact on the vast majority of schools in Wales, but which the ‘Narrowing the Gap’ report also concluded does not necessarily lead to poor performance.
2.4.2 Population and Transport
Projections of the population within the borough show a slight increase but below the rate
projected for the whole of Wales. However there are changes within the overall population
as follows
•••• The total population of the county borough is projected to increase by 12,800 (7.5%) by 2030/31. This is below the average population growth (14.1%) projected to be seen across all Welsh local authorities.
•••• It is projected that more growth will be seen in the male population (8.9%) than the female population (6.1%).
•••• The most recent actual data show that births in the county borough have seen an upward trend since 2001/02. This trend is expected to continue in the initial years of the projection and births are expected to follow the general pattern seen across all local authorities in Wales.
Infrastructure has recently been improved with the building of new roads. There is better
transport for the community. This also provides students with the opportunity to take up
courses offered at various locations.
Projections illustrated in Table 5 for student places indicate that a rise in surplus secondary
school places in the borough will continue to 2017 (surplus of 24%).
Table 5: Projections for Student Places 2009 – 2017
Capacity
2009
Surplus Places/Excess Pupils Pupil
No.s in
2017
% Surplus
Places in
2017 2009 2013 2017
Caerphilly Basin 3,248 208 285 454 2,794 14%
Upper Rhymney Valley 4,406 716 919 1,335 3,071 30%
Islwyn 4,649 1,189 1,496 1,774 2,875 38%
Foundation School 949 48 170 197 752 21%
Welsh Medium School 1,448 153 (28) (289) 1,737 (20%)
Total Surplus Places 14,700 2,314 2,870 3,760 11,229 26%
Net Surplus Places 14,700 2,314 2,842 3,471 11,229 24%
Version: 1.5 DE Page 23 of 62
Date: 09/11/10
2.4.3 Education for Life
The Community Strategy clearly sets the council’s ‘Education for Life’ vision; the objectives
to realise this vision are:
•••• Develop learning opportunities for all ages and abilities with an emphasis on
community-based opportunities;
•••• Ensure children and young people have a foundation that enables them to take
advantage of all life opportunities;
•••• Enhance education and training opportunities for 14-19 year olds and improve
standards;
•••• Provide advice and information on all public and voluntary sector services;
•••• Raise awareness and use of the Welsh language;
•••• Increase appreciation of environmental assets and utilise their potential for enhanced
quality of life and sustainable tourism opportunities;
•••• Increase opportunities for and participation in leisure, sport, cultural and arts activities.
2.4.4 Children and Young People’s Plan (CYPP)
Caerphilly’s CYPP aims to ensure that all pupils and particularly those who are vulnerable,
have an education that enables them to achieve recognised qualifications in line with their
potential and national expectations.
•••• Core Aim 2: Have a comprehensive range of education and learning opportunities;
•••• Core Aim 3: To enjoy the best possible health and are free from abuse, victimisation
and exploitation;
•••• Core Aim 4: Have access to play, sport, leisure and cultural activities.
Based on the Core Aims above, the key issues to address in relation to the commissioning
and development of service in the future will be:
•••• School improvement – to expand partnership working and extend the work of area link
advisers;
•••• Investment in school buildings linked with planning and school places;
•••• Match supply of school places to the number of pupils in the locality taking account of
parental preference and pupil need, including preference for Welsh medium education;
•••• Synergy between education and training.
2.4.5 Improvement Plan
Building better communities, the targets for Caerphilly for 2009-2012 are:
•••• Increased numbers of children and young people have access to good quality support
for basic skills;
Version: 1.5 DE Page 24 of 62
Date: 09/11/10
•••• There will be greater availability and range of choices of learning offered to young
people;
•••• Learners at 16 achieve greater success;
•••• The percentage of 16/17 year old students continuing in full-time education, training or
employment increases year-on-year;
•••• All learning settings meet current and known future requirements to facilitate learning in
the 21st century.
2.4.6 14-19 Learning Pathways – 3 Year Strategy
The core vision of the Caerphilly’s 14-19 Network is to create an efficient and effective 14-
19 Learning Network that provides all learners with a wide range of relevant, high
quality, learning opportunities that equip each individual with the skills, knowledge
and understanding necessary for them to achieve their full potential in society.
This will be facilitated by first class learner support and guidance that ensures that learner
participation, learner well being and learner outcomes are maximised. Four objectives
underlying the strategy are:
1. An improvement in overall learner success rates at Key Stage 4 and post 16.
2. All schools and colleges to meet the requirements of the Learning and Skills Measure in
Key Stage 4 for students in Year 10 in September 2010, and for students in Year 12 in
September 2011.
3. To acquire, install and utilise Partnership Exchange in all partnership schools and
colleges by September 2012 or earlier if possible; To work with the CYPP and Careers
Wales to track learners more effectively through Keeping in Touch strategy and
coordination.
4. To continue the alignment and convergence of 14-19 activities with CYPP Core Aim 2
priorities and objectives.
The targets set out in the plan are:
1. The percentage of 15 year olds achieving the Level 2 threshold to reach 65% by 2013
(2009 baseline: 55%); The percentage of 17 year olds entering a volume equivalent to 2
A levels achieving the Level 3 Threshold to reach 98.5% by 2013 (2009 baseline:
97.5%).
2. All schools and colleges to offer a minimum of 30 level 2 courses, including at least 5
vocational ones, in KS4 for students in Year 10 in September 2010, and 30 Level 3
courses, including at least 5 vocational ones, for students in Year 12 in September
2011.
Version: 1.5 DE Page 25 of 62
Date: 09/11/10
3. Acquisition of a student tracking system in line with procurement regulations by January
2011; installation beginning in December 2010; Agreement of KIT Coordinator job
description by August 2010; appointment of KIT Coordinator by end of Deptember 2010.
4. Coordination of LAN and Core Aim 2 meetings, priorities and objectives by March 2010,
and ongoing thereafter. ‘Match’ between ANDP priorities and the next CYP Plan in
March 2011.
2.4.7 Caerphilly NEETS Strategy
THE NEET strategy has been created as a result of a series of working-party meetings
(Keeping in Touch strategy group) involving a wide range of staff across different agencies in
a multi-disciplinary approach in order to harmonise use of resources and maximise impact in
decreasing the number of NEETs in Caerphilly. The strategy in Caerphilly aims to address
the issue in two ways:
•••• By encouraging young people to remain in education or training through targeted
support and the offer of a suitable curriculum;
•••• By ensuring that when young people do become NEET they are tracked and supported
to become re-engaged; Caerphilly in the process of implementing a NEET tracking
system.
2.4.8 School Premises, Asset Management
In December 2009, ESTYN reported:
The local authority has a good track record in reducing its number of schools in order to manage its surplus places. However, there is still 20.4% surplus capacity in primary schools and 15% in secondary schools. The local authority has identified short-term priorities to address overcapacity but there is no mid to long-term whole-authority plan to address surplus places. The authority currently meets the demand for Welsh-medium provision. It has identified the future need for additional Welsh-medium provision in the secondary sector. It is currently considering options to address this need. The authority has up-to-date information on the condition of its school buildings, and is currently collecting information on suitability and sufficiency. However, as the authority’s information is not complete or fully up to date, it does not know the capital investment needed to meet its corporate commitment to bring all school buildings up
to standard by 2022.
Version: 1.5 DE Page 26 of 62
Date: 09/11/10
2.5 Part B: The case for change
The key indicators driving the case for change based on the recent Evidence Based Review
(EBR) are:
1. Indicator 1: Population and Educational Places
•••• The population of 14 – 19 year olds is set to decrease by 9.4% between the years
2007 and 2031;
•••• Utilised capacity within the schools sector is forecast to fall to around three quarters
by 2017 ie 84% of available capacity will be utilised in 2009 and this will fall to 76% by
2017;
•••• However, within Welsh medium schools, forecasts suggest a shortfall of 20% in the
number of places available by 2013.
2. Indicator 2: Net Migration and Indicator 3 – Learner Numbers and Cohort Size
•••• There is a negative net migration figure for the schools sector. Analysis suggests that
this is due to Caerphilly learners attending faith based and Welsh medium schools in
neighbouring authorities;
•••• Roughly 13% of all further education learning activities by Caerphilly domiciled
learners were undertaken at institutions outside the local authority area;
•••• There are more learning activities undertaken at further education institutions in
Caerphilly by learners not resident in the local authority than there were by Caerphilly
learners at institutions outside of their home county;
•••• The forecast shortage of Welsh medium provision in the county is being fully
addressed through proposals in the 21st Century Schools strategy.
3. Indicator 6 – Estate
o Data provided by Caerphilly County Borough Council indicates that 27% of the school
estate was in poor condition at the time of the last property survey.
Ensuring that partnership working drives the agenda, the Council’s strategy is to address
the key issues namely:
1. Provide relevant vocational training and post-16 education;
2. Continue the emphasis on basic skills development, including information and
communication technologies;
3. Address the potential shortage of Welsh-medium places;
4. Address surplus learning places.
Version: 1.5 DE Page 27 of 62
Date: 09/11/10
2.6 Investment objectives
The investment objectives for this project are illustrated in the tables below:
Table 6: Investment objectives, measures and targets
Investment Objective Measure Target
1. Maximise the local 14-16
and post 16 curricula
including a wide range of
vocational options at
levels 2 and 3.
i. The number and range of
level 2 and 3 courses
available in each
partnership area
i. All local curricula exceed
requirements of Learning
and Skills Measure (LSM)
by Sept 2011
ii. The participation rate and
pattern for the extended
provision
ii. Annual increase in
participation rate from level
established in Sept 2011
2. Deliver high quality
provision and outcomes
with a particular emphasis
on basic skills
i. The percentage of lesson
observations at KS 4 and
post 16 graded 1 or 2
i. All lessons to be graded
good or better by end
2011-2012 academic
year
ii. The percentage of 18
year olds achieving the
Level 3 threshold
ii. 97% of 17 year old pupils
entering a volume
equivalent to 2 A Levels
achieve the Level 3
threshold in 2011
iii. The percentage of work-
based learners
completing full
frameworks (apprentices)
iii. 80% full framework
completion by Aug 2012
iv. The percentage of WBL
Skill build learners
achieving an
NVQ/appropriate
progression
iv. 60% completion by Aug
2012
v. The percentage of 16
year olds achieving the
Level 2 threshold
v. 65% of 16 year olds
achieving the Level 2
threshold by 2013
vi. Results in Basic Skills
tests
vi. 60% of 16 year olds to
reach level 2 in Literacy
and Numeracy by 2016
Version: 1.5 DE Page 28 of 62
Date: 09/11/10
Investment Objective Measure Target
3. Develop skills for the
Welsh economy within the
global market
i. The percentage of young
people aged 16-17
becoming NEET
i. Reduced to 4% by 2012
ii. Progression rates from
level 1 to 2
ii.
iii. Progression rates from
level 2 to 3
iii. 70% by 2012
iv. Vocational courses
available at level 3 which
align with the Welsh
Assembly’s sector
economic priorities
iv. To offer at least one
Level 3 vocational course
in each of the sector
economic priorities within
the Caerphilly Network
v. Capacity to recruit
appropriately qualified
staff and retrain existing
staff
v. Sufficient staff to meet
the target above
4. Improve the Welsh culture
and ethos across all
providers
i. Providers’ self-evaluation
reports and CIF
outcomes for Key
Question 2, Quality
Indicator 2.1, aspect 3
i. No significant
shortcomings identified
ii. Availability of the Welsh
BAC qualification
ii. Available to all learners
at post 16
iii. Partnership approach to
the development of
Welsh culture and ethos
iii. At least one annual
partnership event by
2013
5. Increase the opportunity
to follow courses through
the medium of Welsh
i. Number of Welsh
medium places and
vocational pathways
i. 30 relevant Welsh
medium pathways both
pre and post 16,
including vocational
pathways
ii. The number of courses
delivered through the
medium of Welsh in FE
colleges
ii. A contribution by both
colleges to the targets in
the Welsh Medium
Education Strategy.
Version: 1.5 DE Page 29 of 62
Date: 09/11/10
Investment Objective Measure Target
6. Seek efficiency and value
for money and remove
unnecessary duplication
i. The number of surplus
places in Caerphilly
English medium
secondary schools.
i. Ref 21st Century Schools
outcomes
ii. Average post-16 group
size
ii. 18 by 2013
2.7 Existing Arrangements and Business Needs
2.7.1 Population Trends and Provision of the Service
Ongoing restrictions to secondary school budgets and falling school rolls have meant that
many schools have already reduced staff numbers to the minimum. The introduction of
more vocational courses has implications for staff re-training and redeployment. The
availability of staff able to teach vocational courses through the medium of Welsh is limited
particularly in the FE sector.
Table 7: School/Pupil Projections
SCHOOL 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 Capacity
Bedwas 836 849 826 814 811 800 795 804 830 825 814 1025
Blackwood 979 984 984 982 948 920 893 870 819 795 788 1002
Cwmcarn 951 954 931 898 851 829 797 766 762 774 787 949
Heolddu 760 774 774 770 756 740 736 704 680 683 680 934
Lewis Girls 1013 1020 1014 1013 1004 977 968 950 939 922 901 1194
Lewis School,
Pengam 1018 1008 980 957 924 881 852 823 804 778 770 1145
Newbridge less 21
SEN 836 835 834 836 825 808 797 797 809 798 777 1017
Oakdale 572 526 523 515 489 498 504 495 494 476 456 782
Pontllanfraith less 50
SEN 598 570 552 542 522 522 518 509 508 482 462 1010
Rhymney 939 933 909 899 857 820 774 750 739 832 744 1133
Risca less 14 SEN 484 453 434 419 386 379 379 367 364 355 351 838
St Cenydd less 24
SEN 1121 1134 1123 1098 1069 1065 1048 1039 1024 999 983 1163
St Martins 1081 1058 1024 1021 1018 1002 974 970 971 973 956 1060
Ysgol Gyfun Cwm
Rhymni 1341 1408 1458 1470 1519 1565 1680 1791 1934 2017 2134 1448
TOTAL 12529 12506 12366 12234 11979 11806 11715 11635 11677 11709 11603 14700
Version: 1.5 DE Page 30 of 62
Date: 09/11/10
Figure 5: Secondary School Pupil Projections
2.7.2 Configuration of estates
Changes in the local demography of the last 20 years and alterations to transport
infrastructure, together with legislation regarding access mean that not all existing schools
sites are suitable for development or reorganisation. The situation in Islwyn is complicated
by the presence of a foundation school outside local authority control and the fact that the
majority of surplus places are concentrated in this area. Current plans to refurbish and
modernise both college campuses are intended to modernise and upgrade existing facilities
and would not, in themselves, add significantly to post-16 capacity.
ALL SECONDARY SCHOOLS PUPIL PROJECTIONS
11000
11500
12000
12500
13000
13500
14000
14500
15000
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
YEAR
NUMBER O
N R
OLL
No. ON ROLL CAPACITY
Version: 1.5 DE Page 31 of 62
Date: 09/11/10
2.7.3 Gaps in Current Position and Business Needs
The table below outlines the current position and the corresponding business needs required
to achieve the investment objectives.
Table 8: Investment objectives, current positions and business needs
Investment
Objective
Current Position Business Need
1. Maximise the local 14-16 and post 16 curricula including a wide range of vocational options at levels 2 and 3
i. Caerphilly has 14 secondary
schools of which 9 are 11-18
comprehensives with sixth
forms of varying sizes.
Considerable progress has
already been made through
collaborative working and all
post 16 learners will have
access to the appropriate
number of level 3 courses,
including vocational options,
and thus meet the Post-16
Learning and Skills (Wales)
Measure from September
2011.
i. To continue to develop the
curriculum, offering courses at
both levels 2 and 3, in general
and vocational subjects which
match the needs of students
and the local economy.
ii. The current situation is
dependent on informal
partnership working, and on
central support for student
transport and coordination.
This is currently carried out by
a designated LA team who
meet regularly with senior
managers in partnership
schools and colleges. There is
currently no direct
school/college governor
involvement in decision
making.. Howvever, agreed
protocols are in place in all
partnerships.
ii. If the current partnerships are
to continue to develop there is
a need to make governance
arrangements in each
partnership more robust,
possibly by forming “joint
committees” consisting of
governors and senior
managers from all partners
area to ensure further, more
efficient and more resilient
collaboration. One such joint
committee is already in place in
the Welsh medium partnership.
2. Deliver high quality provision and
i. Caerphilly learners’ attainment
is improving at faster than the
national rate and performance
i. To increase participation by
offering a wider range of
vocational qualifications at
Version: 1.5 DE Page 32 of 62
Date: 09/11/10
Investment
Objective
Current Position Business Need
outcomes with a particular emphasis on basic skills
at the Level 3 threshold is
currently the fourth best in
Wales. The percentage gaining
the Level 2 threshold at 16 is
improving but is still below the
national average and expected
benchmarks. Recent
curriculum change at Key
Stage 4 has yet to impact on
performance outcomes. There
have been significant changes
to the Key Stage 4 curriculum
through collaborative working
and curriculum development
which as improved the range of
courses on offer, particularly
vocational.
ii. SEF????
iii. Basic Skills Strategy???
Level 2 and 3 by expanding the
curriculum and thus providing a
curriculum that better meets
the needs of learners. This will
be achieved by using
resources more efficiently to
secure cost effective
improvements in all 14-19
learning settings.
???
???
3. Develop skills for the Welsh economy within the global market
i. There are high levels of
economic inactivity in the county
borough and the percentage of
adults with no qualifications is
among the highest in Wales.
i. To provide more support for
basic skills, skills for working
life and strategy for prevention
of NEETs.
To provide more diverse
opportunities that will fit the
needs of a wider range of
learners.
i. To track learners more
effectively and put into place
strategies that will reduce the
numbers of learners who “drop
out” of the system.
4. Strengthen the Welsh culture and ethos across all providers
i. ????? ?????
5. Increase the opportunity to
Because of the success of existing i. To improve the range of
Version: 1.5 DE Page 33 of 62
Date: 09/11/10
Investment
Objective
Current Position Business Need
follow courses through the medium of Welsh
Welsh medium collaborative
arrangements 14-19 learners are
already able to access the range of
courses required by the LSM.
i. There is still a need however to
offer a wider range of vocational
courses at levels 2 and 3
through the medium of Welsh
ii. There is a lack of trainers who
are able to deliver vocational
subjects through the medium of
Welsh.
qualifications offered through
the medium of Welsh by
training suitable personnel.
This will require closer
collaboration between the
Welsh Medium school and FE
sector
6. Seek efficiency and value for money and remove unnecessary duplication
i. The average class size for post
16 learners in schools has
been increasing steadily – In
the last LA inspection of 14-19
provision post 16 provision
within the current partnerships
was described as “good value
for money”. However there is
still unnecessary duplication of
some courses.
i. To reduce surplus places in
line with WAG requirements.
ii. To target resources more
effectively, particularly at post-
16, through improved
governance at partnership
level.
Version: 1.5 DE Page 34 of 62
Date: 09/11/10
2.8 Potential business scope and key service requirements
This section describes the potential business scope and key service requirements for the
project in relation to the above business needs. The business scope and service
requirements identified within the two following tables provide the ranges within which
options are considered in the economic case. The proposed initiatives identified and short-
listed within this document will seek to address all of these requirements.
Table 9: Business scope and key service requirements
Service
Requirements
Business Scope and Key Service Requirements
Core
(minimum)
•••• Improved outcomes for learners at Level 2 and Key Stage 4.
•••• Better participation rates post-16 in both schools and colleges.
•••• To meet the minimum requirements of the Learning & Skills measure by
further collaboration between the schools, FE colleges, work-based
providers and the voluntary
•••• More cost effective delivery.
•••• Expanded joint governance arrangements
•••• Alignment with 21st Century Schools strategy.
Desirable
(Intermediate)
•••• A common learner tracker system.
•••• Appointment of a Keeping In Touch (KIT) Coordinator
•••• Improved ICT provision for pupils, parents and the wider community
Optional
(Maximum)
•••• To develop all existing learning settings to create education and
community facilities that reflect the needs of education and training in
the 21st Century
Version: 1.5 DE Page 35 of 62
Date: 09/11/10
2.9 Main benefits criteria
This section describes the main outcomes and benefits associated with the implementation
of the potential scope in relation to business needs.
Satisfying the potential scope for this investment will deliver the following high-level strategic
and operational benefits. The investment objectives, and the potential benefits to different
stakeholder groups, are included in the table below.
Benefits identified are classified as:
1. Quantifiable (QB);
2. Cash releasing (CRB);
3. Not cash releasing (Non CRB);
4. Non quantifiable (Non QB).
Table 10: Investment objectives and benefit criteria
Investment Objective Stakeholder
Group
Main Benefit criteria by Stakeholder
Group
i. Maximise the local 14-16
and post 16 curricula
including a wide range of
vocational options at
levels 2 and 3.
Learners QB - Minimum of 30 subject choices for all
students, 5 of which are vocational, by Sept
2011.
QB - Improvement in recruitment and
retention.
Non QB - Better alignment with career
opportunities.
QB - Able to mix vocational and academic
pathways.
QB - Better opportunities for NEETs.
QB - Raising educational attainment.
Non QB - Improved progression
opportunities
Staff Non QB - All buildings to be category A or B
by 2012 – Improved morale.
Employers QB - Increasing numbers in FE and HE.
Non QB - Better qualified pool of
employees.
Version: 1.5 DE Page 36 of 62
Date: 09/11/10
Investment Objective Stakeholder
Group
Main Benefit criteria by Stakeholder
Group
Wider
Community
Non QB - Social benefits of a better
educated population.
ii. Deliver high quality
provision and outcomes
with a particular
emphasis on basic skills
Learners QB - 97% of 17year old pupils entering a
volume equivalent to 2 A Levels achieve the
Level 3 threshold in 2011.
QB - 10% improvement by 2013 as
monitored by Careers Wales.
Staff Non QB - Improved morale due to raising
standards.
Employers Non QB - Better qualified workforce.
Wider
Community
Non QB - Economic regeneration.
iii. Develop skills for the
Welsh economy within
the global market
Learners QB - Greater efficiency savings enable
better variety of courses to be offered.
Staff CRB - Individual institutions no longer
burdened by uneconomic group sizes.
Employers QB - Improved local curriculum offer widens
local skills base.
Wider
Community
Non QB - Skills provision that can be
focused toward community need.
iv. Strengthen the Welsh
culture and ethos across
all providers
Learners
Staff
Employers
Wider
Community
v. Increase the opportunity
to follow courses through
the medium of Welsh
Learners QB – Learners who have followed a Welsh
medium education up to the age of 16 will
continue in this medium post 16.
Version: 1.5 DE Page 37 of 62
Date: 09/11/10
Investment Objective Stakeholder
Group
Main Benefit criteria by Stakeholder
Group
Staff Non QB - Maintaining job security in the
Welsh medium sector.
Employers QB - Larger and better qualified pool of
Welsh speaking employees.
Wider
Community
Non QB – Welsh speaking public able to
communicate through their chosen
language in the workplace.
vi. Seek efficiency and
value for money
Learners tba
Staff Non QB - Staff more able to teach within
their specialism
Employers Non QB - Stability of potential workforce
based on school sustainability
Wider
Community
CRB - More efficient use of resources
Version: 1.5 DE Page 38 of 62
Date: 09/11/10
2.10 Main risks
The main business and service risks associated with the potential scope for this project are
shown below, together with their counter measures.
Main risks
LEA inspection – asset mgt strategy
Partnership arrangement…
Political change – continuing dialog with politicians (counter measure)
Funding availability…
Table 11: Risks and counter measures
Main Risk Counter Measures
Business and Political Risks
1. Execution of strategic developments
planned to bring about the
Transformation requires amounts
greater than available WAG funding
Continued liaison with WAG to
understand the potential funding
envelope available.
2. Increased participation and broadening
of curriculum requires greater revenue
funding for post-16 in both school and
colleges.
Understand WAG funding intentions
and work within these potential
budgets.
3. The best possible transformation and
governance arrangement for each
partnership area is inhibited by political
issues.
To put more effort into political
persuasion between providers and
encourage providers to accept
compromise solutions.
4. Participation, NEETS and other
performance and investment objectives
are not achieved post implementation.
Formulate and implement a strong
benefits realisation plan with associated
investment objectives.
Service Risks
5. More choices including vocational
options may result in class sizes too
small to be financially viable.
Ensure weak areas (courses that may
not be financially viable) are eliminated
with effective curriculum planning.
6. Planning/provision of vocational
courses does not reflect demand for or
needs for vocational training.
Ensuring vocational courses offered are
discussed with potential employers and
closely aligned to market needs.
Version: 1.5 DE Page 39 of 62
Date: 09/11/10
Main Risk Counter Measures
7. Capital costs exceeded Competitive procurement and strong
cost control of subsequent capital
works must be established; set up form
of contract that puts onus upon
contractor.
8. National cut backs mean that
anticipated revenue funding streams
are not sustainable.
Must anticipate future funding levels
and budget accordingly.
9. Target implementation timescale are
too ambitious.
Regular monitoring and reviewing of
project plans must be set up by the
management team.
10. There may be insufficient teaching staff
with the right vocational skills to deliver
the planned curriculum; There may be
some amount of competition between
councils to recruit staff
Plan resource and training needs
assessment well in advance and
provide incentives for staff to select
Caerphilly as their preferred employer.
External Environmental Risks
11. Projections of numbers of learners and
reductions in surplus places have been
overstated because of the recession.
Continuously review pupil projections
and build flexibility to education
provision to tailor changing numbers.
12. Delay in WAG approval of SOC delays
delivery of transformation proposal
Liaison with WAG to progress SOC in
accordance with timetable.
13. A change in political climate at County
level
Mutual understanding at the local level
of political imperatives that impact upon
Transformation strategy
14. A change in political climate within
WAG
Contact with DCELLS representatives
to understand the implications of policy
shifts.
15. Local communities do not accept or
object to the planned strategy.
Ensure local politicians and
educationalists are supportive. Clear
communication in an understandable
form setting out the benefits of change.
Version: 1.5 DE Page 40 of 62
Date: 09/11/10
2.11 Constraints
The project is subject to the following constraints:
• WAG policy;
• County Council policy;
• Common agreement across Board of the Partnership in Caerphilly;
• Consultation process in new build/location of extra Welsh medium provision;
• Insufficient provision of teaching staff to support the provision of Welsh medium
education;
• Future legislation.
2.12 Dependencies
The project is subject to dependencies that will be managed carefully throughout the lifespan
of the scheme. These external factors need to be actively managed to ensure that any
issues can be identified early and resolved or mitigated to reduce the potential affect on the
overall success of the project.
The project dependencies are as follows:
• Availability of funding to conduct feasibility work to:
– Plan and implement vocational courses;
– Plan and implement the provision of higher education in Welsh medium;
• Completion of acceptable feasibility work that can move the project forward;
• Availability of capital funding;
• Transport infrastructure to support increased participation of 16+ - vocational courses .
• Business case approvals;
• Consultation outcomes;
• Ministerial approval of Authority proposals by WAG;
• Changes to educational and curricular policies;
• Changes to funding arrangements.
Version: 1.5 DE Page 41 of 62
Date: 09/11/10
3.0 The Economic Case
3.1 Introduction
In accordance with the Capital Investment Manual and requirements of HM Treasury’s
Green Book (A Guide to Investment Appraisal in the Public Sector), this section of the SOC
documents the wide range of options that have been considered in response to the potential
scope identified within the strategic case.
3.2 Critical Success Factors
The key Critical Success Factors (CSF)s for the project are listed below:
• CSF1: Business Needs
– The option must satisfy all of the 6 investment objectives and associated business
needs determined for the initiative.
– The option must also optimise compliance with these objectives throughout any
phased implementation.
– The option must be the best fit with the demands for skills of the business and
commercial communities within the area.
• CSF2: Strategic Fit
– The option must fit within and promote National and Regional strategies presented in
Business Strategies.
– The option must complement the transformation plans that Caerphilly County Council
have developed.
– The option must be the best fit with the strategies of the business and commercial
communities within the area.
– The option must fit with the Community Strategies for the area.
• CSF3: Benefits Optimisation
– Achieves an integrated service provision around pupils, families, parents/ carers, and
schools/learning settings.
– Sustainable model(s) of learning provision that meet the needs and aspirations of all
children and young people.
– Educational attainment levels raised to the targets expressed for investment
objectives.
– Operating costs for delivering learning are optimised at levels that achieve reductions.
Version: 1.5 DE Page 42 of 62
Date: 09/11/10
• CSF4: Potential Achievability
– The option needs to be accepted by learners, staff, employees and the wider
community.
– There must be the management capacity, skills and vision to deliver the
transformation, or must be aware of the need to recruit assistance.
– Innovative governance and management arrangements need to be deployed.
– Effective and efficient collaborative working for the longer term.
– Transferable ‘models’ and ‘processes’ for dissemination – for both service delivery
and Tri-Level reform.
• CSF5: Supply Side Capacity and Capability
– The new cluster configuration attracts staff of the highest quality to deliver courses to
learners.
• CSF6: Potential Affordability
– The required capital investment can be met from combining grants available from the
Welsh Assembly Government, contributions from the Learning Partnership and
realisations from land and property sales.
– Developments can be phased to match the funds available.
– The financial and non financial benefits must more than repay the investment.
These CSFs have been used alongside the investment objectives for the project to evaluate
the long list of possible options.
3.3 Scoping options
3.3.1 Introduction
The long list of options for this investment was been generated by the Learning Partnership
based upon sensible logistical, geographic and local acceptability criteria. This generated the
following options which are described along with their advantages and disadvantages.
Financial consequences are attributed where known but are only estimates at this stage and
exclude optimism bias within this section.
3.3.2 Option 1: ‘Do Minimum’ - Maintain existing collaboration between schools and
colleges via joint timetabling
This option continues current “loose alliances” in the form of four existing partnerships (3
English medium, 1 Welsh medium). Two of the English medium partnerships involve 11-18
schools and the College, Ystrad Mynach, the third English medium partnership is a long
established tertiary system between 11-16 schools and Coleg Gwent Crosskeys, and the
Welsh medium partnership is a cross-border collaboration between two 11-18 schools. At
Version: 1.5 DE Page 43 of 62
Date: 09/11/10
present the Welsh medium partnership has a formally constituted joint committee of
governance, and the English medium partnerships have regular management meetings and
agreed protocols. Existing collaborative arrangements in Caerphilly have been cited as an
example of good practice in school/college partnership through joint timetabling.
Advantages Existing collaborative arrangements in Caerphilly have been cited as an
example of good practice in school/college partnership.
•••• The range of subjects offered to all Caerphilly post-16 students (apart one sixth form) is
already well above the proposed Post-16 Learning and Skills threshold.
Disadvantages
•••• The lack of any firm governance arrangements other than agreements at headteacher
level.
•••• This is more of an operational arrangement than a strategic one.
•••• This is not sufficiently transformative
Financial Attributes
There will be revenue costs associated with managing the four current area partnerships and
transport arrangements. No capital spend required
3.3.3 Option 2: ‘Intermediate’ - Establish “harder” federated arrangements based on
existing or revised partnerships
This would involve the setting up of a strategic management group for each partnership
including governor representatives from each of the partner institutions. These groups
would make strategic decisions relating to the future developments of the partnerships
including curriculum change, finance, transport, and could manage post 16 delegated
funding.
Advantages
•••• The partnerships become more resilient.
•••• More strategic governance would allow difficult issues such as curriculum rationalisation
to be addressed.
•••• This option does not preclude an eventual move towards a fuller tertiary system
Disadvantages
•••• Governing bodies may perceive this as a threat to autonomy.
•••• Partnerships would be faced with more administrative responsibilities.
•••• The potential to create tensions between partnerships
Financial Attributes
No Capital spend required
Version: 1.5 DE Page 44 of 62
Date: 09/11/10
(Important note: Earlier drafts of the SOC contained an extra option as Option 3,
which included proposals for Welsh Medium reorganisation to meet the forecast
demand for additional Welsh Medium places. As these proposals were rejected by
WAG following a Tranche 3 bid, this option is now discounted, and has been
incorporated into the 21st Century School strategy currently under consultation.)
3.3.4 Option 3: ‘Intermediate’ - Full tertiary system in Islwyn. One sixth form centre in
Rhymney Valley/Caerphilly Basin
The tertiary system in Islwyn would be further developed. One sixth form centre would be
established in the Rhymney Valley/Caerphilly Basin (managed by joint governance –see
above). This would require either the re-designation of an existing school in the middle of
the valley or a new build in the same area, possibly on the college site.
Sixth form students are retained on their original school roll but the delivery of all general
subjects at level three would take place at the sixth form centre and all vocational subjects at
the College, Ystrad Mynach. Delivery would be by school and college staff.
Advantages
•••• student travel during the day would be greatly reduced.
•••• Improved choice and further reduction in duplication
•••• Some redundancies would be avoided
•••• Disadvantages
•••• Local opposition if site was current school.
•••• Net increase in travel for the majority of learners may be a barrier to access
•••• Potential issues relating to duty of care
Financial Attributes
This option would require some capital spending.
3.3.5 Option 4: ‘Maximum Scope’ - Full tertiary across CCBC. Close all 6th forms.
Increase FE capacity with new build. Further school closures
This would establish a full tertiary system across the authority. This would involve the
closure of all schools’ sixth forms in Caerphilly with all post 16 students educated in Coleg
Gwent Crosskeys and an extended FE college at Ystrad Mynach.
Advantages
•••• A consistent system of post 16 education across Caerphilly.
Version: 1.5 DE Page 45 of 62
Date: 09/11/10
•••• In line with WAG policy for the HOV area
•••• Economies of scale
•••• Disadvantages
•••• Possible staff redundancies or re-deployment
•••• Increase in school surplus places inevitably leading to more school closures.
•••• Local opposition to loss of sixth forms
Financial Attributes
This option would require capital spending
Version: 1.5 DE Page 46 of 62
Date: 09/11/10
3.4 Scoping options
3.4.1 Introduction
The options were scored in a series of focus group workshops held with school and college
representatives from the network where the investment objectives and critical success
factors were proposed and agreed.. Members of the focus group scored the four options
independently, and the results were collated. In accordance with the Treasury Green Book
the ‘do minimum’ option was considered as a benchmark for potential VFM.
3.4.2 Option Assessment
The table below summarises the assessment of each option scoped against the investment
objectives and CSFs.
Table 12: Assessment of scoping options
Version: 1.5 DE Page 47 of 62
Date: 09/11/10
3.4.3 Overall conclusion
Option 1: ‘Do Minimum’ - Maintain existing collaboration between schools and
colleges via joint timetabling
The chief advantage of this option is that it has already been shown to work in practice.
Collaborative arrangements that are already in place, together with agreed further joint
timetabling from September 2011 mean that all Caerphilly learning settings will be well
above the minimum requirements of the new Learning and Skills Measure. The lack of any
formal joint governance arrangements (other than in the Welsh Medium Partnership) might
jeopardise future sustainability, however, and inhibit the longer term strategic direction.
Discounted
Option 2: ‘Intermediate’ - Establish “harder” federated arrangements based on
existing or revised partnerships
This would achieve most, or possibly all, of the Transformation objectives in a ‘tried and
tested’ format. By itself, it would not fully align with some of the 21st Century Schools aims
and objectives. It could well represent an interim stage in the development of some form of
future tertiary system in which learning settings combine and integrate in new and
imaginative ways..
Possible, but only as an interim solution
(Important note: Earlier drafts of the SOC contained an extra option as Option 3,
which included proposals for Welsh Medium reorganisation to meet the forecast
demand for additional Welsh Medium places. As these proposals were rejected by
WAG following a Tranche 3 bid, this option is now discounted, and has been
incorporated into the 21st Century School strategy currently under consultation.)
Option 3: ‘Intermediate’ - Full tertiary system in Islwyn. One sixth form centre in
Rhymney Valley/Caerphilly Basin
This offers a development of the current system which would require a new kind of
partnership working between learning settings, which would jointly own and manage any
new facilities. It has the advantage of potential achievability in the local context, provided
that it is based firmly on the progress in collaborative working that has already taken place.
This option could align closely with 21st Century Schools proposals.
Preferred, but likely to involve a longer timecale because of potentially contentious
implications
Option 4: ‘Maximum’ - Full tertiary across CCBC. Close all 6th forms. Increase FE
capacity with new build. Further school closures
This would establish a full tertiary system across the authority. This would involve the
closure of all schools’ sixth forms in Caerphilly with all post 16 students educated in Coleg
Version: 1.5 DE Page 48 of 62
Date: 09/11/10
Gwent Crosskeys and an extended FE college at Ystrad Mynach. This is also potentially
contentious, and likely to be the most expensive option.
Alternative preference
Following discussion and scoring of options on 15 September, the SOC focus group
proposed that the ‘preferred’ option should be either option 3 or option 4, and that
option 2 (‘federation’) should be implemented from September 2011 as a necessary
interim stage. Full implementation of the final preferred option by September 2014.
3.5 Service solution options
(to be completed)
Table 12: Summary assessment of service solutions options
Reference to: Option 3 Option 4
Description of option:
Investment objectives
i.
ii.
iii.
iv.
v.
vi.
Critical Success Factors
Business need
Strategic fit
Benefits optimisation
Potential achievability
Supply-side capacity and capability
Potential affordability
Summary
Version: 1.5 DE Page 49 of 62
Date: 09/11/10
3.6 Service delivery options
3.6.1 Introduction
This range of options considers the options for service delivery in relation to the preferred
scope and potential solution. In reality Outsourcing and Strategic Partnerships were not seen
as viable alternatives and have been discounted in favour of in-house delivery. The in-house
choice includes members of the Caerphilly Learning Partnership led by the County Council.
3.6.2 Overall conclusion: service delivery options
The table below summarises the assessment of the in-house option against the investment
objectives and CSFs.
Table 13: Summary assessment of service delivery options
Reference to: Option
Description of options: In-house
Investment objectives
i. Maximise the local 14-16 and post 16 curricula including a wide range of vocational options at levels 2 and 3.
ii. Deliver high quality provision and
outcomes with a particular emphasis
on basic skills
iii. Develop skills for the Welsh economy
within the global market
iv. Strengthen the Welsh culture and ethos across all providers
v. Increase the opportunity to follow courses through the medium of Welsh
vi. Seek efficiency and value for money and remove unnecessary duplication
Critical success factors
Business need
Strategic fit
Benefits optimisation
Version: 1.5 DE Page 50 of 62
Date: 09/11/10
Reference to: Option
Description of options: In-house
Potential achievability
Supply-side capacity and capability
Potential affordability
Summary Only Choice
3.7 Implementation options
3.7.1 Introduction
This range of options considers the choices for implementation in relation to the preferred
scope, solution and method of service delivery.
‘Big Bang’ has been discounted as not being a practicable solution therefore a Phased
approach will be the one adopted.
3.7.2 Overall conclusion: implementation options
The table below summarises the assessment of the phased option against the investment
objectives and critical success factors.
Table 14: Summary assessment of implementation options
Reference to: Option
Description of options: phased
Investment objectives
i. Maximise the local 14-16 and post 16 curricula including a wide range of vocational options at levels 2 and 3.
ii. Deliver high quality provision and
outcomes with a particular emphasis on
basic skills
iii. Develop skills for the Welsh economy within the global market
iv. Strengthen the Welsh culture and ethos across all providers
v. Increase the opportunity to follow courses through the medium of Welsh
Version: 1.5 DE Page 51 of 62
Date: 09/11/10
Reference to: Option
Description of options: phased
vi. Seek efficiency and value for money and remove unnecessary duplication
Critical success factors
Business need
Strategic fit
Benefits optimisation
Potential achievability
Supply-side capacity and capability
Potential affordability
Summary Only Choice
3.8 Funding options
3.8.1 Introduction
It is anticipated that the preferred option will be funded solely from public sources.
Anticipated capital expenditure will come from WAG grants which will encompass 21st
century school funds and transformation funding.
Additional or continuing running costs requirements will be met from the Caerphilly CBC
schools budget. (Medium term financial plan under review because of public sector cuts)
3.9 The long list: inclusions and exclusions
Table 15: Summary of inclusions, exclusions and possible options
Options Finding
1.0 Scope
1 ‘Do Minimum’ Discounted as the option does not satisfy many of
the Investment Objectives or CSF criteria.
2 Federation Possible as an interim stage in the development
of a tertiary system; could meet most of the
Investment Objectives or CSF criteria.
3 URV 6th Form Centre / Tertiary in Preferred because the option meets all the
Version: 1.5 DE Page 52 of 62
Date: 09/11/10
Islwyn selection criteria and embodies a range of viable
service delivery approaches
4 Full Tertiary System Preferred because the option also meets all the
selection criteria and embodies a range of viable
service delivery approaches
2.0 Service solutions
2.1 Redevelopment of existing school
buildings
2.2 New build
3.0 Service delivery
3.1 In-house Preferred for new builds; this is the only option to enable
construction four community learning centres.
Preferred for setting up joint governance.
3.2 Outsource Discounted
3.3 Strategic partnership Preferred - for ICT implementation as permits
collaboration across councils and there widens
boundaries of provision.
4.0 Implementation
4.2 Big bang Preferred for setting up joint governance.
Preferred for ICT implementation.
4.3 Phased Only choice for new builds. Refer to OBC for 21st
Century schools
5.0 Funding
5.1 Private Funding Discounted
5.2 Public Funding Only choice
Version: 1.5 DE Page 53 of 62
Date: 09/11/10
4.0 The Commercial Case
4.1 Introduction
This section of the SOC outlines the proposed deal in relation to the preferred option
outlined in the economic case.
4.2 Required services
The exact service requirements are still to be fully defined but the ‘way ahead’ is outlined
below.
i. Joint governance will be in place by September 2011 and will be the way forward from that date. Joint governance is seen as an evolving process and will change according to the requirements of the Learning Partnership and Welsh Assembly Government.
ii. Please refer to the ICT Learning Strategy document. This will be submitted to WAG in December 2010.
iii. Please refer to the SOP for 21st Century Schools. Document (to be submitted to WAG in December 2010)
4.3 Potential for risk transfer
As there will be no procurement progressed through this SOC the only risks associated
would be the formation of Joint Governance.
4.4 Procurement strategy and implementation timescales
Caerphilly County Borough Council is a public sector body and as such governed by EU
Procurement Directives and the Council’s own Standing Orders. The procedure followed will
depend on the value of contract - levels and process are:
•••• Purchases of Goods and Services <£10K
Individual officers to obtain value for money and to be able to substantiate this process
by keeping appropriate records
•••• Purchases between £10,001 and £50,000
3 formal written quotations or 4 formal tenders
•••• Purchases between £50,001 and £156,442
Minimum of 5 formal tenders
•••• Purchases over £156,442
Formal tendering in line with EU directives (new consolidated directives).
Version: 1.5 DE Page 54 of 62
Date: 09/11/10
In addition, elements of the project can be procured through the authority’s (Caerphilly)
Framework agreements.
The management team have indicative timescales in mind for the procurement of capacity to
deliver the outcomes however these are to be developed in further detail at OBC stage.
It is possible that the eventually chosen option will drive the disposal of currently held assets.
In this circumstance the disposal will be managed and controlled as per the procedure within
the Council’s Standing Orders.
4.5 FRS 5 accountancy treatment
It is anticipated that any additional school related assets would form part of the balance
sheet of Caerphilly CBC. Any additions to the two colleges would form part of their own
asset portfolio.
Version: 1.5 DE Page 55 of 62
Date: 09/11/10
5.0 The Financial Case
5.1 Introduction
It is anticipated that the capital funding for the project, for both new buildings and
refurbishments will be provided by WAG through the Transformation and 21st Century
Schools funds. Discussions have yet to be held with WAG DCELLS to determine the
potential funding mix and timing.
In addition to the funding required for capital expenditure, funding will also be needed to
manage the consequences and management of change and the ongoing management of
the collaboration network. Operational running costs of new premises will be met from the
schools budget.
Please refer to the SOP for 21st Century Schools. Document will be submitted to WAG in
December 2010.
Please refer to the ICT Learning Strategy document produced by Caerphilly Borough
Council.
5.2 Impact on the organisation’s income and expenditure account
The anticipated payment stream for the project over its intended life span is not possible to
predict in a meaningful way with the financial data in its approximate state. This will be
properly developed at the next stage of the project.
5.3 Impact on the balance sheet
Capitalised refurbishment costs and newly built school premises will form part of the assets
of Caerphilly CBC. If required additions to either FE college would form part of the assets of
the respective institution.
5.4 Overall affordability
It is anticipated that the capital funding for the project, for both new buildings and
refurbishments will be provided by WAG through the Transformation and 21st Century
Schools funds. Discussions have yet to be held with WAG DCELLS to determine the
potential funding mix and timing. In addition to the funding required for capital expenditure,
funding will also be needed to manage the consequences and management of change and
the ongoing management of the collaboration network.
Version: 1.5 DE Page 56 of 62
Date: 09/11/10
Operational running costs of new premises will be met from the Caerphilly CBC schools
budget.
The table below sets out some of the financial assumptions which have been made about
the options considered.
Table17: Assumptions on capital and revenue costs
(all values are rough estimates which require refinement at OBC stage)
Option Assumptions
1 Loose Alliance –
Do minimum
Cost base stays as current.
2 Federation Four current Area Partnerships currently funded by £400k from WAG
and CCBC. Intended to add strategic governance group for each
partnership. Current funding ceases 2010/11. New annual funding
stream required.
3 Single sixth form
centre in
Rhymney/Caerphilly
Basin – Full Tertiary
in Islwyn
Current two partnership arrangements mean that the seven schools
involved retain their 6th forms and Learners move between schools
and the College at Ystrad Mynach. In this proposal individual 6th
forms would be closed and an existing school shut and re-designated
as a mixed 6th Form Centre. Staff would remain on the payroll of their
existing schools and travel to the 6th form, the college would retain its
current role. Staff move rather than learners.
Possible minor reductions in running costs of other schools. Capital
of £1–2m required for refurbishment and equipment. Additional staff
travel costs will be incurred but this option saves surplus places.
An alternative may be a new build 6th Form Centre on the college
site.
Version: 1.5 DE Page 57 of 62
Date: 09/11/10
4 Full Tertiary -
Maximum
The move to a full tertiary system will mean closing all 6th forms with
consequent costs of staff redeployment. Without 6th forms it will be
necessary to rationalise 11-16 provision which may see the closure
and disposal of 3 or 4 school sites.
6th form learners would have to be accommodated at expanded FE
colleges. Potentially a 1,000 extra at Ystrad Mynach and 200 extra at
Coleg Gwent. Both colleges would require additional new build
capacity to accommodate these students.
Version: 1.5 DE Page 58 of 62
Date: 09/11/10
6.0 The Management Case
6.1 Introduction
This section of the SOC addresses the ‘achievability’ of the scheme. Its purpose is to set out
the actions that will be required to ensure the successful delivery of the scheme in
accordance with best practice.
6.2 Programme management arrangements
The scheme is an integral part of the Caerphilly 14-19 Learning Partnership programme. The
diagram below shows the structure of the partnership and how decisions are made.
In the context of the Transition Programme this group is a strategy setting, co-ordinating and
advisory body. For structures and terms of reference for the future please see Appendix C.
Version: 1.5 DE Page 59 of 62
Date: 09/11/10
6.3 Project management arrangements
Tba
Table 18: Milestones
Milestone activity Date / Month / Year
i.
ii.
iii.
iv.
v.
vi.
vii.
viii.
ix.
x.
xi.
xii.
xiii.
Version: 1.5 DE Page 60 of 62
Date: 09/11/10
Annex A – Current Members of the Caerphilly LAN/Learning Partnership
1. David Eynon Head of 14-19 Development (Chair)
2. Cllr Phil Bevan Cabinet Member for Education and Leisure
3. Dr Chris Howard Upper Rhymney Valley Partnership
4. Chris David Islwyn Partnership
5. Owain ap Dafydd Welsh Medium Partnership
6. David Finch The College, Ystrad Mynach
7. Martin Jones The College, Ystrad Mynach
8. Bill Mason Crosskeys Campus, Coleg Gwent
9. Dot Powell Quality Champion
10. Guy Brewer Gwent Visual Impairment Service
11. Howard Jones Trinity Fields Special School
12. Arlene Pryce UWIC
13. Melanie Aitchison University of Glamorgan
14. Tom Croke University of Wales, Newport
15. Phil Bowden Careers Wales Gwent
16. Mark Owen Careers Wales Mid Glamorgan
17. Steve Mason Adult Education
18. Alex Hicks WBL representative(Educ8)
19. Dave Brunton Voluntary Sector
Version: 1.5 DE Page 61 of 62
Date: 09/11/10
ANNEX B - Approximate distances and travel times between institutions
(to be inserted from relevant prospectus)
Version: 1.5 DE Page 62 of 62
Date: 09/11/10
ANNEX C
THE CAERPHILLY* LEARNING PARTNERSHIP FEDERATION
TERMS OF REFERENCE
(currently under separate consultation in each partnership group)
* Replace with Upper Rhymney Valley/Caerphilly Basin/Islwyn as appropriate