transportation improvement program fy 2016/17 – 2020/21 - martin mpo… · 2019-12-16 · m a r t...

110
Transportation Improvement Program FY 2016/17 – 2020/21

Upload: others

Post on 10-Feb-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Transportation Improvement Program FY 2016/17 – 2020/21

Page 2: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

M A R T I N

FY 2016/17 - 2020/21

Transportation Improvement Program

Adopted by the Martin MPO Board on June 20, 2016

Troy McDonald MPO Board Chairman

The Transportation Improvement Program of the Martin Metropolitan Planning Organization has been developed consistent with Federal regulations 23 U.S.C. I 34(h)

and CFR 450 and Florida Statute 339.175(8) in cooperation with the Florida Department of Transportation , and the local member agencies and pu blic transit operators in the

Martin MPO Planning Area.

i || P a g e

Page 3: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

MARTIN MPO BOARD

CITY OF STUART MARTIN COUNTY

Commissioner Troy McDonald, Chair Commissioner Ed Fielding, Vice Chair Commissioner Eula R. Clarke Commissioner John Haddox

Commissioner Anne Scott Commissioner Doug Smith

SEWALL’S POINT

Commissioner Vinny Barile

REPORT DOCUMENTATION

TITLE REPORT DATE Martin MPO June 2016 FY 2016/17 - 2020/21 Transportation Improvement Program

AUTHORS ORGANIZATION NAME, ADDRESS MPO Staff AND TELEPHONE NUMBER

Martin MPO 2401 SE Monterey Road Stuart, FL 34996 772-221-1498 www.martinmpo.com

ACKNOWLEDGEMENTS

The preparation of this report has been funded in part through grants from the Federal Highway Administration and Federal Transit Administration, U. S. Department of Transportation (USDOT), under the Metropolitan Planning Program of the U.S. Code (Title 23, Section 104(f)). The contents of this report do not necessarily reflect the official views or policy of the USDOT.

Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons with questions or concerns about nondiscrimination, or who require special accommodations under the American with Disabilities Act or language translation services (free of charge) should contact Mr. Bolivar Gomez, Planner II (Title VI/Non- discrimination Contact) at (772) 288-5412 or [email protected]. Hearing impaired individuals are requested to telephone the Florida Relay System at #711.

ii | P a g e

Page 4: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

iii | P a g e

CERTIFICATION

FHWA/FTACERTIFICATION

Federal Law requires the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) to jointly certify the transportation planning processes of Transportation Management Areas (TMAs) at least every four years (a TMA is an urbanized area, as defined by the US Census, with a population over 200,000).1

Pursuant to 23 CFR 450.328(a), the FHWA/FTA must jointly find that each metropolitan TIP is based on a “3-C” (continuing, comprehensive, and cooperative) planning process by the MPO, State Department of Transportation, and transit service provider(s). In Florida, this finding primarily has been based on the annual MPO/FDOT joint certification statements on the respective metropolitan planning processes.2

The most recent Federal Certification Review was completed in December 2012.

1 Federal Highway Administration Florida Division & Federal Transit Administration Region 4. Certification Report: Port St. Lucie Transportation Management Area – St. Lucie Transportation Planning Organization & Martin Metropolitan Planning Organization. March 2009. 2 Federal Highway Administration Florida Division & Federal Transit Administration Region 4. 2009 Florida Statewide Annual Assessment. September 2009.

Page 5: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin
Page 6: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

v | P a g e

GLOSSARY OF TERMS

ABBREVIATIONSANDACRONYMS

ADM Administration

BPAC Bicycle & Pedestrian Advisory Committee

CAC Citizens Advisory Committee

CEI Construction, Engineering, and Inspection

CIP Capital Improvement Program/Plan

CLV Culvert

CMS Congestion Management System

CMP Congestion Management Process

COA Council on Aging

CTC Community Transportation Coordinator

DCA Department of Community Affairs DEP

Department of Environmental Protection (FL)

E/D Engineering/Design

EMO Environmental Management Office

EPA (U.S.) Environmental Protection Agency

ETDM Efficient Transportation Decision Making

FAA Federal Aviation Administration

FDOT Florida Department of Transportation

FHWA Federal Highway Administration

FTA Federal Transit Administration

FY Fiscal Year

FEDERALANDSTATEFUNDCODES

ACIM Advance Construction (IM)

ACNH Advance Construction (NH)

ACSA Advance Construction (SA)

BA Donor Bonus - any area Federal

BL Donor Bonus - areas <200K population(federal)

BNCA Bonds - controlled access road (state)

BNDS Bonds - state roads (state)

BRP State Bridge Replacement

BRRP State Bridge Replacement and Repair

BRT Federal Bridge Replacement - on federal system

LCB-TD Local Coordinating Board for the Transportation Disadvantaged

LRTP Long Range Transportation Plan

MIT Mitigation

MPO Metropolitan Planning Organization

MSC Miscellaneous

PIP Public Involvement Process or Plan

PTO Public Transportation Office

RELOC Relocation

RLRTP Regional Long Range Transportation Plan

RRX Railroad Crossing

RTA Regional Transit Authority

SAFETEA-LU Safe, Accountable, Efficient, Transportation Equity Act—A Legacy for Users

TAC Technical Advisory Committee

TD Transportation Disadvantaged

TDP Transit Development Plan

TEA-21 Transportation Efficiency Act for the 21st Century

TIP Transportation Improvement Program

TPO Transportation Planning Organization

UMTA Urban Mass Transportation Administration

UTIL Utilities

BRTZ Federal Bridge Replacement - off federal system

CIGP County Incentive Grant Program

CM Congestion Mitigation

D Unrestricted state primary funds

DDR District Dedicated Revenue (state)

DFTA Federal Pass Through Dollars from FTA

DIH State in-house product support

DIM State intermodal development

DOH State primary overhead

DPTO State PTO

Page 7: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

vi | P a g e

DS State primary highways and public transit

DSL Local Government Cooperative Assistance Program

DU State primary funds/federal reimbursement

EB Equity Bonus

FAA Federal Aviation Administration

FCO State-fixed capital outlay

FHPP Federal High Priority Projects

FRA Federal Railroad Administration

FTA Federal Transit Administration

FTAT FHWA Transfer to FTA

GMR General Revenue for SIS

GRSC General Revenue for SCOP

HSP Highway Safety Program

MABP Minimum Allocation - Bridges (non- BRT)

MGBP Minimum Allocation - Bridges Supplement

ML Minimum allocation - areas < 200K population (federal)

NH National Highway (federal)

NHAC NH (AC/ Regular)

NHIR FIHS from NH Federal Funds

NHS National Highway Safety (federal)

NHTS National Highway Traffic Safety (federal)

PORT Seaport Trust Fund

PKCA Turnpike - controlled access

PKYR Turnpike Rehabilitation

PKYI Turnpike Improvement

PL Metropolitan Planning

P01A Turnpike Bond Construction

HPR Highway Planning Research (federal)

IM Interstate maintenance

LF or LFF Local funds

LFR Local funds - reimbursement from FDOT

MA Minimum allocation - any area (federal) SA Surface Transportation Program (STP) -

any area (federal)

SABR STP, Bridges

SCOP Small County Outreach Program

SE STP - enhancement (federal)

SH STP - hazard elimination (federal)

SL STP - areas less than 200K population

SN STP - mandatory non-urban (federal)

SP STP - RR protective devices (federal)

SR STP - RR hazard elimination (federal)

SS STP - Safety (federal)

STP Surface Transportation Program

SU STP, Urban Areas greater than 200K

TDD Transportation Disadvantaged Discretionary

TDTF Transportation Disadvantaged Trust Fund

Umxx Minimum allocation funds

XA STP (consolidated BA, MA, and SA funds)

XL STP (consolidated BL, ML, and SL funds)

XU STP (consolidated BU, MU, and SU funds)

PHASEOFCONSTRUCTIONANDCOSTALLOCATIONCODES

ADM Administration Other Agency

PDE Project Development & Environment

PE Preliminary Engineering

PLN Planning

ROW Right of Way Support

RELOC Right of Way Relocation

ROW LND Right of Way Land

UTIL Utility Coordination

CAP Capital Grant

R/R CST Railroad construction

CST Construction, CEI (Construction, engineering, inspection), Post Design

INC Construction Incentive

MNT Maintenance

RRU Railroad/Utilities Construction

ENV Environmental

OPS Operations/Grant Services

LAR Local Agency Reimbursement

DSB Design Build

MSC Miscellaneous

Page 8: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

_____________________________________________________________________________________ vii | P a g e

FY 2016/17 - 2020/21 TIP

TABLE OF CONTENTS

ENDORSEMENT .............................................................................................................................i

MARTIN MPO BOARD ...................................................................................................................ii

REPORT DOCUMENTATION ........................................................................................................iii

CERTIFICATION .............................................................................................................................iii

FHWA/ FTA CERTIFICATION ....................................................................................................iii

JOINT CERTIFICATION ..............................................................................................................iv

GLOSSARY OF TERMS ..................................................................................................................v

ABBREVIATIONS AND ACRONYMS ..........................................................................................v

FEDERAL AND STATE FUND CODES ........................................................................................v

PHASE OF CONSTRUCTION AND COST ALLOCATION CODES ...........................................vi

TABLE OF CONTENTS ...................................................................................................................vii

1.0 INTRODUCTION .......................................................................................................................1

1.1 MPO OVERVIEW....................................................................................................................1

1.2 TIP PURPOSE ..........................................................................................................................1

1.3 ORGANIZATION ....................................................................................................................1

1.4 FULL PROJECT COSTS .........................................................................................................2

1.5 TIP AMENDMENTS AND MODIFICATIONS .....................................................................2

1.6 MAJOR PROJECT DESCRIPTIONS ......................................................................................3

1.7 IMPLEMENTED PROJECTS ..................................................................................................3

2.0 PROGRAM CONSIDERATIONS ..............................................................................................4

2.1 FINANCIAL PLAN..................................................................................................................4

2.2 PROJECT SELECTION PROCESS.........................................................................................7

2.3 PROJECT PRIORITY STATEMENT .....................................................................................7

2.4 CHANGES TO PROJECT PRIORITIES .................................................................................7

2.5 LIST OF PROJECT PRIORITIES ...........................................................................................8

2.6 MPO 2040 LRTP GOALS ........................................................................................................12

2.7 CONSISTENCY WITH REGIONAL AND LOCAL PLANS ................................................12

2.8 CONGESTION MANAGEMENT PROCESS .........................................................................12

3.0 PUBLIC INVOLVEMENT .........................................................................................................14

3.1 CONSISTENCY WITH PUBLIC INVOLVEMENT PLAN ...................................................14

3.2 TIMELINE OF EFFORTS .......................................................................................................14

3.3 PUBLIC COMMENTS & RESPONSE ...................................................................................14

4.0 5-YEAR SUMMARY OF FUNDING SOURCES......................................................................16

Page 9: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

_____________________________________________________________________________________ viii | P a g e

LIST OF TABLES Table 1. List of Project Priorities ...................................................................................................9

Table 2. List of Transportation Alternative Program (TAP) Priorities ...........................................10

Table 3. List of Transit Priorities ...................................................................................................11

Table 4. Timeline of Public Involvement Efforts ...........................................................................15

APPENDICES LOCAL CAPITAL IMPROVEMENT PLANS ...............................................................................21

FEDERALLY OBLIGATED PROJECTS ...............................................................................................................................................26PLANNING AREA MAP ................................................................................................................... 28PROJECT INDEX BY NUMBER .................................................................................................29

PROJECT SHEETS ........................................................................................................................33A - Highway ...............................................................................................................................33B - Transit ..................................................................................................................................79

C - Aviation ................................................................................................................................85G - Districtwide ..........................................................................................................................91

PROJECT INDEX BY NAME ......................................................................................................98

Page 10: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Page 1

1.0 INTRODUCTION

1.1 MPO OVERVIEW

Established in 1993, the Martin MPO is governed by a Policy Board and serves the residents of Martin County. Planning tasks of the Martin MPO include regional coordination, bicycle and pedestrian planning, mobility management, demographic research, air quality planning, and PIP processes and updates. As an agency, the Martin MPO also serves its primary function as the coordinator for multi-modal transportation project planning and funding in and through the county with various state agencies responsible for transportation and land use plans as well as adjacent MPOs. On specific regional issues, the Martin MPO partners with the St. Lucie TPO, the Indian River County MPO, and the Palm Beach MPO.

1.2 TIP PURPOSE

The purpose of this Transportation Improvement Program (TIP) is to provide a comprehensive and prioritized listing of transportation projects for FY 2016/17 – 20/21 that is consistent with the 2040 Long-Range Transportation Plan (LRTP). It contains all federally funded and regionally significant transportation projects planned for the upcoming five years and is updated annually with funding priority given to the highest ranked projects from the LRTP Cost Feasible Plan.

The TIP is based on funding data contained within the FDOT Tentative Work Program (also known as the Citizen’s Report), which is developed annually and made public by FDOT prior to the development of the TIP. This report is the result of FDOT working with local agencies to establish priorities for scheduling improvements to the Strategic Intermodal System (SIS), including freight and Intelligent Transportation System (ITS) strategies, Federal interstate highway system, local roadways and MPO priorities concerning transit, pedestrian and bicycle- friendly environments and transportation demand management programs.

1.3 ORGANIZATION

Section 1.0 contains a brief overview of the MPO and the purpose of the TIP. It also contains a list of major projects that are considered top priorities. Section 2.0 contains specific items that were considered in the development of this TIP. These include (among other sections) the Financial Plan, List of Project Priorities, and the MPO’s overall goals as described within the 2040 LRTP.

Section 3.0 contains a list of efforts the MPO plans to make in order to obtain public input for the development and approval of the TIP. It will also contain a brief summary of the public comments received and the MPO’s response to them.

The Appendix contains a list of projects by funding category, the project sheets programmed in Martin County, the Local Capital Improvement Plans and FY 15 Federal Obligated Projects. The detailed project sections are based on the FDOT District 4 Tentative Work Program as imported

Page 11: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Page 2

on April 1, 2016. Depending on many factors, these lists of projects may potentially change prior to July 1, 2016. Once the MPO receives a final Work Program from FDOT District 4, this section may be modified.

Because the project portion of the TIP is generated through the Interactive TIP Tool, there can be several variations of the project report. For efficiency and reduction of printed pages, the adopted version shows project detail with maps for only the Highway projects. Sections for transit, aviation, rail and districtwide list are summarized with project details without location maps. All project details include a summary of costs and revenues by funding source. Because only funded projects and phases are listed in the FDOT District 4 Work Program, the costs and revenues are assumed to be equal, demonstrating financial constraint.

1.4 FULL PROJECT COSTS

The normal project production sequence is to have a Project Development and Environment (PD&E) phase, a Design (PE) phase, a Right of Way (ROW) phase and a Construction (CST) phase. Some projects may not have a ROW phase, if land is not needed to complete the project. Costs on the TIP pages for projects both on and off the SIS will have historical costs and five years of the current TIP, which may or may not be the total project cost. In addition, SIS projects will also have costs for five years beyond the current TIP. If there is no CST phase on the TIP page, then the entry will probably not be reflective of the total project cost. For some projects, such as resurfacing, safety or operational project, there may not be a total cost provided but rather additional details on that program.

The SIS is a network of high priority transportation facilities which includes the state’s largest and most significant commercial service airports, spaceport, deep water seaports, freight rail terminals, passenger rail and intercity bus terminals, rail corridors, waterways and highways.

For costs beyond the ten year window, access to the Long Range Transportation Plan (LRTP) is provided. The LRTP reference on the TIP page provides the information necessary to locate the full project costs and/or additional details regarding the project in the LRTP. If there is no LRTP reference in the TIP, full project costs are provided in the TIP. The link to the Martin LRTP is https://www.martinmpo.com/wp-content/uploads/2016/03/Martin-2040-LRTP_final- report_v3.pdf.

1.5 TIP AMENDMENTS AND MODIFICATIONS

Once the TIP is adopted, there are times that it must be modified or amended because the MPO does not have direct control of funding resources. This can be accomplished by amendment or administrative modification. Amendments are revisions that involve a major change, including an added or deleted project, a significant change to project cost (increase of 20% and greater than $2 million), or major change to a project scope. Administrative modifications are revisions that include minor changes to project costs, funding sources, and project initiation dates. Amendments require a review period to gather public comments. During this review and comment period, the TIP will be brought before the MPO Advisory Committees for review and

Page 12: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

approval. Modifications are not required for public review but staff will present them to the Advisory Committees whenever feasible. Modifications require MPO Policy Board approval.

The Martin MPO coordinates all TIP Amendments and Administrative Modifications with FDOT District 4.

1.6 MAJOR PROJECT DESCRIPTIONS

FM# 435431 - High Meadow Ave: Resurfacing of High Meadow Avenue from Martin Highway to Murphy Road. (Project was updated to include the addition of sidewalks and extension of project limits). Preliminary Engineering funds are programmed for FY 16/17 and Construction funds have been programed for FY 2018/19.

FM# 4364251 - Murphy Road Bridge: Construction and CEI for the replacement of the existing bridge.

FM# 4368701 - SR-714 Widening: PD&E/PE (Divided 2-4 Lanes) Widening of SR 714 from Citrus Blvd to SW Martin Downs Blvd.

1.7 IMPLEMENTED PROJECTS

The following major projects from the last TIP were implemented in FY 2016/17:

FM# 2309782 - CR 714/Indian Street: Widening and reconstruction of CR 714 from the Turnpike to West of Mapp Road.

FM # 4316061 - Pratt Whitney: Resurfacing CR 711/ Pratt Whitney from Martin/Palm Beach C/L to SR 76.

FM# 4315201 - Citrus Boulevard: Resurfacing of SW Citrus Blvd from SW Hemmingway Terrace to SR 714.

FM# 4331701 - Baker Road: Sidewalk; Includes NE Cardinal Ave from NE Savannah Rd to NE Baker Rd.

FM# 4348381 - Martin Highway: SCOP (Small County Outreach Program) JPA with Martin County includes SW Allapattah Rd. from CR-714 to Martin/St Lucie CL

Page 3

Page 13: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Page 4

2.0 PROGRAM CONSIDERATIONS

2.1 FINANCIAL PLAN

In accordance with Federal Legislations [23 C.F.R. 450.324(i)], the MPO must demonstrate that the TIP is financially constrained. This means that the estimated expenses (or project costs) are consistent with the anticipated revenues for each funding source. Only those projects for which a revenue source has been identified are shown in the TIP to ensure a balance between the costs and revenues.

The TIP must include a financial plan that demonstrates how the approved TIP can be implemented, indicates resources from public and private sources that are reasonably expected to be made available to carry out the TIP, and recommends any additional financing strategies for needed projects and programs. However, because the MPO does not have direct control of funding resources, Administrative Modifications or Amendments may have to be made to the TIP during the fiscal year.

The Transportation Improvement Plan (TIP) is financially constrained for each year. Federally funded projects identified in the TIP can be implemented using current proposed revenue sources based on the Florida Department of Transportation (FDOT) Tentative Work Program and locally dedicated transportation revenues. All projects funded by FDOT with Federal or non-Federal dollars are included in a balanced 36-month forecast of cash and expenditures and a five-year finance plan supporting the FDOT Work Program. All local government projects (non-Federally funded) that are included in the TIP are part of member local government's capital improvement programs. The following table provides a summary of total project costs by Federal, State and local funding codes by fiscal year. Note that all project costs are shown in Year of Expenditure (YOE) dollars, meaning the costs reflect the adjusted value of the work at the time the funds will be expended on the project.

Allocation of Project Costs by Funding Source and Year

Funding Source

2016/17 2017/18 2018/19 2019/20 2020/21 Total

Federal 55,914,038 3,601,171 16,968,007 6,966,061 2,632,455 86,081,732

Local 1,400,853 1,472,749 1,353,763 796,755 565,422 5,589,542

State 16,522,623 7,313,296 17,283,879 4,229,926 8,060,294 53,410,018

State 100% 7,145 581,542 0 260,646 0 849,333

Toll/Turnpike 0 5,752,545 0 0 0 5,752,545

Total 73,844,659 18,721,303 35,605,649 12,253,388 11,258,171 151,683,170

Page 14: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Page 5

 

 

Summary by Funding Sources and Year   

   

   

          

$55,914,038

$1,400,853

$16,522,623

2016/17

Federal

Local

State

$3,601,171

$1,472,749

$7,313,296

$581,542

$5,752,545

2017/18

Federal

Local

State

State 100%

Toll/Turnpike

$16,968,007

$1,353,763

$17,283,879

2018/19

Federal

Local

State

Page 15: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Page 6

 

 

Summary by Funding Sources and Year   

   

      

$6,966,061

$796,755

$4,229,926

$260,646

2019/20

Federal

Local

State

State 100%

$2,632,455

$565,422

$8,060,294

2020/21

Federal

Local

State

Page 16: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Page 7

2.2 PROJECT SELECTION PROCESS

In accordance with 23 CFR 450.330(a), federally funded projects are selected by the MPO in conjunction with the development of the FDOT Tentative Work Program and through the cooperation of the public transit operator.

In addition, the 2040 LRTP plays a major role in identifying projects for selection. Contained within the LRTP is an evaluation of existing conditions, an evaluation of projected conditions, the identification of policy and project needs, and a determination of the cost feasibility of implementing these projects.

Both the FDOT Tentative Work Program and the 2040 LRTP provide the basis for establishing project priorities consistent with the planning factors considered in their annual selection, and subsequent development of the TIP pursuant to the requirements set forth in Federal legislation.

2.3 PROJECT PRIORITY STATEMENT

As required under 339.175 (8) (b) F.S., the annual list of project priorities was developed based on criteria that included the:

Approved 2040 Long Range Transportation Plan (LRTP); Strategic Intermodal System Plan (SIS); Results of the transportation management systems; and MPO’s public involvement procedures.

MPO and FDOT Staff meet annually to discuss project priorities. During this process, priorities are identified based on those of the previous year and the priorities listed in the Cost Feasible Plan of the current LRTP. This new list of priorities is discussed with the MPO Advisory Committees and then approved by the MPO Board. These priorities are then submitted to FDOT and used to program projects accordingly.

2.4 CHANGES TO PROJECT PRIORITIES

In accordance with 23 CFR 450.324(l) (1), MPOs are required to explain any changes in priorities from previous TIPs.

The Number 3 ranked priority CR 609 Guardrail came about during discussions with Martin County Engineering. In addition, Numbers 2, 8 and 9 are resurfacing projects. Savannah Road, Indian Street and St. Lucie Blvd. are on the Federal Aid system and serve as important roadways in the Martin transportation system that were deteriorating, yet eligible projects.

Safety improvements along US 1 (longer left turn storage area southbound on Joan Jefferson Way and buffered bicycle lanes on the Roosevelt Bridge) are the Number 4 ranked priority, recommended in FDOT’s Baseline Assessment of the US 1 Corridor. Number 7 ranked priority is pedestrian improvements along State roadways, Monterey Road and East Ocean Blvd.

The Transportation Alternatives and Transit Priorities have been updated to reflect recent Transportation Alternatives Program applications, as well as previously funded projects.

Page 17: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Page 8

2.5 LIST OF PROJECT PRIORITIES

The projects in the tables below have been formally reviewed by the MPO Technical and Citizens’ Advisory Committees and were approved by the MPO Board at its meeting on October 19, 2015.

FY 2016/17 Surface Transportation Program (STP) Priorities

The Surface Transportation Program (STP) provides flexible funding that may be used by States and localities for projects to preserve and improve the conditions and performance on any Federal-aid highway, bridge and tunnel projects on any public road, pedestrian and bicycle infrastructure, and transit capital projects, including intercity bus terminals.

Page 18: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Table 1

MARTIN MPO

FY17/18-FY21/22 Federal Attributable UNFUNDED Project Priorities

Facility

Segment Limits

Project Description

2040 RLRTP Page #

FY 2015/16 Priority Ranking

FY 2016/17

Proposed Priority Ranking From To

Traffic Signal Modification

US 1/North of NW Britt Rd. (Construction)

Traffic Signal Reconfiguration

68, App. D (p.8) 1 1

CR 609 .51 miles north of Minute Maid

Rd.

3.2 miles north of

Minute Maid Rd. (at the S

curve)

Guardrail (updated estimate)

68, App. D (p.8)

3 2

US 1 Corridor Retrofit

Roosevelt Bridge: southbound left turn lane onto Joan Jefferson

Way and Bicycle Safety

Longer left turn storage area; buffer bicycle traffic from motor vehicles

68, 69 4 3

SR 714 Widening

Citrus Blvd. SW Martin

Downs Blvd. Add 2 Lanes 67-69 5 4

Monterey Rd - E Ocean Blvd (CMP-Tier 2 Traffic Study

Kingswood Terrace

St. Lucie Blvd.

Mid-block pedestrian crosswalks

65, 68 7 5

Jensen Beach Blvd.

Intersection at US 1 and Jensen Beach Blvd.

Signal Rehabilitation

68, App. D (p.8)

6

Bridge Road Pratt Whitney

Road US 1 Resurfacing

68, App. D (p.8) 7

Jensen Beach Causeway

Bicycle Safety Buffer Bicycle traffic from motor vehicles

68, App. D (p.8)

8

Indian Street Intersection at US 1 and Dixie

Highway Resurfacing

68, App. D (p.8) 9

CR 714 Realignment

Okeechobee County/CR 15 B Connection

PD&E (District 1 SR 710)

68, App. D (p.8)

10 10

Page 19: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Table 2

MARTIN MPO

Transportation Alternatives Program (Enhancement)

Project Description 2018 2019 2020 2021 2022 Comments

Stuart CRA Kindred Street & Johnson Avenue Improvements

$791,138 Funded

SE Bridge Road Sidewalk

$400,563 Funded

NW Dixie Highway Sidewalk (north of drawbridge)

$358,092 Funded

Page 20: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Table 3.

MARTIN MPO

2017 Public Transit Priorities

Facility / Equipment

Project Location/

Description

Estimated Amount

Funding Source

2035 RLRTP or TDP Page #

Project Status/Notes

Bus Replacement / Expansion

Rolling Stock $80,707 5339 page 6 & 78

Bus Replacement

Rolling Stock $420,000 5307 page 87

Amount of funds programmed is

based on anticipated procurements and estimated costs and

will change from year to year.

Operating Operating $456,372 5307 page 88

Amount of funds programmed is

based on anticipated project(s) needs and

will change from year to year.

Transit Improvements

1% Transit Enhancement

$8,943 5307 page 87

Safety / Security

1% Safety / Security

$8,943 5307 page 70

Page 21: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Page 12

 

 

2.6 MPO 2040 LRTP GOALS

The 2040 Long-Range Transportation Plan (LRTP) for the Martin MPO is an analysis of the current and projected conditions in the region that will impact the transportation network. It contains an evaluated list of transportation improvements that will be necessary to maintain an adequate level of mobility and to accommodate anticipated population growth. The goals contained in the LRTP guide the transportation planning process in the MPO Planning Area and help to establish project priorities for the TIP.

2040 LRTP Goal 1: An efficient multimodal transportation system that supports the

local economy and maintains the quality of life.

2040 LRTP Goal 2: A safe multimodal transportation system.

2040 LRTP Goal 3: Protect the existing transportation system and the natural environment, minimizing adverse community impacts.

2040 LRTP Goal 4: A transportation system that addresses the needs and concerns of

the public.

2.7 CONSISTENCY WITH REGIONAL AND LOCAL PLANS

The 2040 LRTP was adopted by the MPO on December 14, 2016 after a duly advertised public hearing. The transportation goals found within Martin County’s Comprehensive Growth Management Plan and the City of Stuart’s Comprehensive Plan are consistent with the goals, objectives, and policies in the 2040 LRTP as well as the 2060 Florida Transportation Plan.

To the maximum extent feasible, the TIP is consistent with the Treasure Coast Strategic Regional Policy Plan, the Witham Field Master Plan, the Martin County Transportation Disadvantaged Service Plan, the Transit Development Plan, and the approved Comprehensive Plans of Martin County, the City of Stuart, the Town of Sewall’s Point, the Town of Jupiter Island, and the Town of Ocean Breeze.

2.8 CONGESTION MANAGEMENT PROCESS

Maintenance of a Congestion Management Process (CMP) or System is a requirement for all MPOs under Florida law and for MPOs in Transportation Management Areas under Federal law. A CMP is a tool that provides information needed to evaluate and improve traffic flows. The CMP is intended to help relieve congestion and enhance mobility by establishing methods to monitor and evaluate performance, identifying alternative actions, assessing and implementing cost-effective actions, and evaluating the effectiveness of implemented actions.

Candidate road sections are selected in a three tier selection process. The first tier identifies road segments in the annual Level of Service report for which the current traffic volume is at least 90 percent of the road’s adopted service volume.

Page 22: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Page 13

 

 

The second tier eliminates projects for which an improvement is currently programmed within the Work Program, either to the facility itself or to a parallel facility that will, when improved, provide relief to the candidate road section.

The third tier sorts the remaining projects by the timeframe in which a major capacity improvement was deemed financially feasible in the LRTP. The segment for which the expected funding is furthest in the future is then examined to identify low cost improvements that will reduce congestion.

Once the set of possible improvements are identified and preliminary cost estimates developed, a benefit/cost analysis is done to establish the relationship of the improvement costs to the value of the time saved by the improvements’ implementation.

In 2014 the selection process (described above) identified the East Ocean Boulevard/Southeast Monterey Road Corridor. The analysis of the segment yielded recommendations for low cost improvements. The design phases for two of these recommendations are funded in this TIP.

Page 23: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Page 14

3.0 PUBLIC INVOLVEMENT 

 

3.1 CONSISTENCY WITH PUBLIC INVOLVEMENT PLAN

The TIP was developed in accordance with the adopted MPO Public Involvement Plan (PIP). Once the Draft TIP is completed, a notice will be advertised announcing that it is available for a 45 day public review period. During the public review process, the Draft TIP will be made available on the MPO website, in the County Administration Building, and in local libraries. It will also be presented at public meetings in conjunction with the Citizen Advisory Committee (CAC), the Technical Advisory Committee (TAC), the Bicycle and Pedestrian Advisory Committee (BPAC) and the MPO Board. After the 45 day review period, the Draft TIP will be brought before the MPO Board for a public hearing and final approval. This process fulfills the public involvement requirements for the Martin County Public Transit (MCPT) Program of Projects (POP) under Section 5307.

As described above, TIP Amendments and Administrative Modifications will also be advertised and made available for public review and comment prior to being brought before the MPO Board for final review and approval. Comments received during the review period will be summarized by category and addressed through documented modifications to the TIP.

3.2 TIMELINE OF EFFORTS

See Table 4 below for the Martin MPO timeline of Public Involvement efforts for this TIP.

3.3 PUBLIC COMMENTS & RESPONSE

Martin County does not have any Tribes or Federal Lands. Thus these federal requirements to coordinate with these entities do not apply to Martin MPO. No public comments related to the TIP have been received.

Page 24: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Page 15

Table 4. Timeline of Public Involvement Efforts 

 

TASK DATE

Post Draft TIP on MPO Website 20-Apr-16

Reference Draft TIP in CAC/ TAC Agenda Packets 20-Apr-16

Publish Notice of Public Meeting for MPO Policy Board 23-Apr-16

Reference Draft TIP in BPAC Agenda Packets 25-Apr-16

Review Draft TIP @ CAC/ TAC Meetings 27-Apr-16

Begin 45 Day Public Review Period 1-May-16

Place Draft in Local Libraries and County Administration Building 1-May-16

Send Draft TIP to FHWA and FDOT for preliminary review 1-May-16

Review Draft TIP @ BPAC Meeting 2-May-16

Reference Draft TIP in MPO Board Agenda Packet 2-May-16

Review Draft TIP @ MPO Board Meeting 9-May-16

Reference Final Draft TIP in CAC Agenda Packets 25-May-16

Reference Final Draft TIP in TAC Agenda Packets 27-May-16

Review Revised Draft TIP @ CAC Meeting 1-Jun-16

Review Revised Draft TIP @ TAC Meeting 6-Jun-16

Reference Final Draft TIP in BPAC Agenda Packets 6-Jun-16

Review Revised Draft TIP @ BPAC Meeting 13-Jun-16

Reference Revised Final Draft TIP in MPO Board Agenda Packet 13-Jun-16

Review and Approve Final TIP @ MPO Board Meeting / Public Hearing 20-Jun-16

Page 25: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

5-Year Summary of Funding Source

TIP 2016/17-2020/21

Funding Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

Federal 55,914,038 3,601,171 16,968,007 6,966,061 2,632,455 86,081,732

Local 1,400,853 1,472,749 1,353,763 796,755 565,422 5,589,542

State 16,522,623 7,313,296 17,283,879 4,229,926 8,060,294 53,410,018

State 100% 7,145 581,542 0 260,646 0 849,333

Toll/Turnpike 0 5,752,545 0 0 0 5,752,545

Total 73,844,659 18,721,303 35,605,649 12,253,388 11,258,171 151,683,170

Page 16

Page 26: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

5-Year Summary of Funding Source by Codes

TIP 2016/17-2020/21

Project # Fund Code TotalFederalACNP ADVANCE CONSTRUCTION NHPP 52,304,560 0 0 0 0 52,304,560CM CONGESTION MITIGATION - AQ 0 0 1,249,819 0 0 1,249,819DU STATE PRIMARY/FEDERAL REIMB 160,777 172,222 176,354 148,857 148,750 806,960FAA FEDERAL AVIATION ADMIN 0 900,000 900,000 0 0 1,800,000FTA FEDERAL TRANSIT ADMINISTRATION 1,027,000 1,027,000 1,027,000 1,027,000 949,000 5,057,000NHRE NAT HWY PERFORM - RESURFACING 0 0 2,799,597 0 0 2,799,597PL METRO PLAN (85% FA; 15% OTHER) 421,630 421,630 421,630 421,630 421,630 2,108,150PLH PUBLIC LANDS HIGHWAY 551,000 0 0 0 0 551,000SA STP, ANY AREA 940,546 22,000 5,996,707 1,309,337 0 8,268,590SU STP, URBAN AREAS > 200K 251,525 704,415 4,067,934 4,059,237 1,113,075 10,196,186TALT TRANSPORTATION ALTS- ANY AREA 113,308 353,904 164,871 0 0 632,083TALU TRANSPORTATION ALTS- >200K 143,692 0 164,095 0 0 307,787Total 55,914,038 3,601,171 16,968,007 6,966,061 2,632,455 86,081,732LocalLF LOCAL FUNDS 1,379,753 1,472,749 1,291,195 796,755 565,422 5,505,874LFP LOCAL FUNDS FOR PARTICIPATING 21,100 0 62,568 0 0 83,668Total 1,400,853 1,472,749 1,353,763 796,755 565,422 5,589,542StateD UNRESTRICTED STATE PRIMARY 1,295,000 870,000 1,065,000 1,170,000 300,000 4,700,000DDR DISTRICT DEDICATED REVENUE 9,429,488 4,214,714 9,773,349 1,055,007 6,656,693 31,129,251DIH STATE IN-HOUSE PRODUCT SUPPORT 180,622 21,060 200,815 0 28,450 430,947DITS STATEWIDE ITS - STATE 100%. 197,264 202,196 207,250 212,432 217,743 1,036,885DPTO STATE - PTO 1,127,659 1,600,286 2,647,905 292,552 412,552 6,080,954DS STATE PRIMARY HIGHWAYS & PTO 3,285,619 0 2,823,133 61,992 12,937 6,183,681

Page 17

Page 27: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

5-Year Summary of Funding Source by Codes

TIP 2016/17-2020/21

Project # Fund Code TotalStateGRSC GROWTH MANAGEMENT FOR SCOP 216,342 299,406 566,427 890,916 0 1,973,091SCED 2012 SB1998-SMALL CO OUTREACH 540,541 98,066 0 54,054 0 692,661SCOP SMALL COUNTY OUTREACH PROGRAM 250,088 7,568 0 492,973 431,919 1,182,548Total 16,522,623 7,313,296 17,283,879 4,229,926 8,060,294 53,410,018State 100%SCWR 2015 SB2514A-SMALL CO OUTREACH 7,145 581,542 0 260,646 0 849,333Total 7,145 581,542 0 260,646 0 849,333Toll/TurnpikePKYI TURNPIKE IMPROVEMENT 0 5,752,545 0 0 0 5,752,545Total 0 5,752,545 0 0 0 5,752,545

Page 18

Page 28: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

5-Year Summary of Funding Source by Codes

TIP 2016/17-2020/21

Project # Fund Code TotalFederalACNP ADVANCE CONSTRUCTION NHPP 52,304,560 0 0 0 0 52,304,560CM CONGESTION MITIGATION - AQ 0 0 1,249,819 0 0 1,249,819DU STATE PRIMARY/FEDERAL REIMB 160,777 172,222 176,354 148,857 148,750 806,960FAA FEDERAL AVIATION ADMIN 0 900,000 900,000 0 0 1,800,000FTA FEDERAL TRANSIT ADMINISTRATION 1,027,000 1,027,000 1,027,000 1,027,000 949,000 5,057,000NHRE NAT HWY PERFORM - RESURFACING 0 0 2,799,597 0 0 2,799,597PL METRO PLAN (85% FA; 15% OTHER) 421,630 421,630 421,630 421,630 421,630 2,108,150PLH PUBLIC LANDS HIGHWAY 551,000 0 0 0 0 551,000SA STP, ANY AREA 940,546 22,000 5,996,707 1,309,337 0 8,268,590SU STP, URBAN AREAS > 200K 251,525 704,415 4,067,934 4,059,237 1,113,075 10,196,186TALT TRANSPORTATION ALTS- ANY AREA 113,308 353,904 164,871 0 0 632,083TALU TRANSPORTATION ALTS- >200K 143,692 0 164,095 0 0 307,787Total 55,914,038 3,601,171 16,968,007 6,966,061 2,632,455 86,081,732LocalLF LOCAL FUNDS 1,379,753 1,472,749 1,291,195 796,755 565,422 5,505,874LFP LOCAL FUNDS FOR PARTICIPATING 21,100 0 62,568 0 0 83,668Total 1,400,853 1,472,749 1,353,763 796,755 565,422 5,589,542StateD UNRESTRICTED STATE PRIMARY 1,295,000 870,000 1,065,000 1,170,000 300,000 4,700,000DDR DISTRICT DEDICATED REVENUE 9,429,488 4,214,714 9,773,349 1,055,007 6,656,693 31,129,251DIH STATE IN-HOUSE PRODUCT SUPPORT 180,622 21,060 200,815 0 28,450 430,947DITS STATEWIDE ITS - STATE 100%. 197,264 202,196 207,250 212,432 217,743 1,036,885DPTO STATE - PTO 1,127,659 1,600,286 2,647,905 292,552 412,552 6,080,954DS STATE PRIMARY HIGHWAYS & PTO 3,285,619 0 2,823,133 61,992 12,937 6,183,681

Page 19

Page 29: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

5-Year Summary of Funding Source by Codes

TIP 2016/17-2020/21

Project # Fund Code TotalStateGRSC GROWTH MANAGEMENT FOR SCOP 216,342 299,406 566,427 890,916 0 1,973,091SCED 2012 SB1998-SMALL CO OUTREACH 540,541 98,066 0 54,054 0 692,661SCOP SMALL COUNTY OUTREACH PROGRAM 250,088 7,568 0 492,973 431,919 1,182,548Total 16,522,623 7,313,296 17,283,879 4,229,926 8,060,294 53,410,018State 100%SCWR 2015 SB2514A-SMALL CO OUTREACH 7,145 581,542 0 260,646 0 849,333Total 7,145 581,542 0 260,646 0 849,333Toll/TurnpikePKYI TURNPIKE IMPROVEMENT 0 5,752,545 0 0 0 5,752,545Total 0 5,752,545 0 0 0 5,752,545

Page 20

Page 30: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Project C or N Priority Total To Date Unfunded FY2016 FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 FY2025Resurfacing, Drainage, Striping & Maintenance (1017) N 1 119,454,000 0 106,781,000 1,016,000 837,000 847,000 1,284,000 1,454,000 22,803,200 22,803,200 22,803,200 22,803,200 22,803,200CR-714 (SW Martin Hwy) / CR-609 (SW Allapattah Rd) - Resurfacing (101710) N 1 1,948,452.5 5,958 0 1,942,495 0 0 0 0 0 0 0 0 0CR-726 (Citrus Blvd) - Resurfacing & Bike Lanes (101701) N 1 3,556,152 11,390 0 3,544,762 0 0 0 0 0 0 0 0 0CR-708 (Bridge Rd) - Resurfacing & Bike Lanes (101706) N 1 958,569.0 5,520 0 953,049 0 0 0 0 0 0 0 0 0CR711 (Pratt Whitney Rd) - Resurfacing & Bike Lanes (101707) N 1 3,343,896 57,053 0 3,286,843 0 0 0 0 0 0 0 0 0SE Cove Road - Resurfacing (101712) N 1 1,497,776.0 0 0 0 60,000 10,000 0 1,427,776 0 0 0 0 0Signal & Intersection Improvements (1016) N 1, 2, 4 4,233,717 0 0 375,000 630,000 375,000 390,000 588,717 375,000 375,000 375,000 375,000 375,000Streetlights - Dixie Hwy (1121) N 1, 2, 4 530,000.0 175,000 215,000 140,000 0 0 0 0 215,000 0 0 0 0Annual Commitments (1019) N 8 3,755,218.0 0 0 605,218 350,000 350,000 350,000 350,000 350,000 350,000 350,000 350,000 350,000Multi-Modal Pathways (1011) N 1 200,000 0 0 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000Baker Road Improvements (1011H) N 1 370,400.0 0 0 370,400 0 0 0 0 0 0 0 0 0SE Seabranch Blvd - Resurfacing (101709) N 2 1,016,217 0 0 60,000 10,000 0 946,217 0 0 0 0 0 0SW High Meadow Ave - Resurfacing & Bike Lanes (101711) N 2 1,399,115.0 0 0 65,000 10,000 0 1,324,115 0 0 0 0 0 0SW Mapp Road - Resurfacing (101714) N 2 1,256,688 0 0 60,000 10,000 1,186,688 0 0 0 0 0 0 0SW Murphy Road Resurfacing (101715) N 2 1,009,139.0 0 0 60,000 10,000 0 939,139 0 0 0 0 0 0Parkwood Subdivision Resurfacing (101717) N 2 1,401,000.0 0 0 1,401,000 0 0 0 0 0 0 0 0 0Palm City Farms Resurfacing (101718) N 2 935,000.0 0 0 935,000 0 0 0 0 0 0 0 0 0Skyline/Highland/Pitchford Resurfacing (101719) N 2 526,000.0 0 0 526,000 0 0 0 0 0 0 0 0 0Pinecrest Lakes Resurfacing (101720) N 2 769,000.0 0 0 769,000 0 0 0 0 0 0 0 0 0Poinciana Gardens Resurfacing (101721) N 2 556,000.0 0 0 556,000 0 0 0 0 0 0 0 0 096th Street/Greenridge Resurfacing (101722) N 2 255,000.0 0 0 255,000 0 0 0 0 0 0 0 0 0Heritage Ridge Resurfacing (101723) N 2 935,000.0 0 0 935,000 0 0 0 0 0 0 0 0 0Murphy Rd (over C-23) - Bridge Replacement (105303) N 2 3,532,215 170,000 0 25,000 25,000 25,000 25,000 3,262,215 0 0 0 0 0Bridge Replacements/Renovations (1053) N 2 21,391,740.0 0 18,030,480 124,000 157,250 157,250 157,250 157,250 4,127,748 4,127,748 4,127,748 4,127,748 4,127,748Britt Rd Bridge - Bridge Replacement (105301) N 2 1,733,000 233,000 1,500,000 0 0 0 0 0 1,500,000 0 0 0 0Heavy Equipment Replacement (4957) N 2 9,964,899.6 0 5,214,121 700,779 450,000 450,000 450,000 450,000 1,492,824 1,492,824 1,492,824 1,492,824 1,492,824Engineering Field Ops and Traffic Building Replacement N 2 1,352,000 0 1,352,000 0 0 0 0 0 1,352,000 0 0 0 0South Beach Road Resurfacing (1019) N 2 5,111,918 0 0 475,000 0 4,636,918 0 0 0 0 0 0Hutchinson Island Beautification (2028A) N 10 1,386,450 319,950 0 106,650 106,650 106,650 106,650 106,650 106,650 106,650 106,650 106,650 106,650

SR-76 (S Kanner Hwy) - Interchange (1074A) C 3 7,011,133.0 2,965,133 0 4,046,000 0 0 0 0 0 0 0 0 0SR-714 (Martin Hwy) - Widening (1123A) C 3 2,345,000.0 0 0 510,000 1,835,000 0 0 0 0 0 0 0 0SR-76 (S Kanner Hwy) - Widening (1074) C 7 29,027,551 28,369,336 0 154,000 504,215 0 0 0 0 0 0 0 0SE Willoughby Blvd - Extension (1031) C 5 5,920,000 1,915,000 3,024,688 837,000 0 0 0 0 3,168,000 0 0 0 0SR710 (SW Warfield Blvd) - Widening (1066) C 5 2,225,000.0 0 1,908,574 0 0 0 0 257,000 1,968,000 0 0 0 0Expenditure Totals 240,907,246 34,227,340 138,025,863 24,379,196 5,490,115 3,527,588 10,629,289 8,073,608 37,478,422 29,275,422 29,275,422 29,275,422 29,275,422

Revenue Total To Date Carryover FY2016 FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 FY2025Ad Valorem 5,377,000 0 0 5,377,000 0 0 0 0 0 0 0 0 0City Funds 556,000 250,000 306,000 0 0 0 0 0 0 0 0 0 0Gas Tax 21,741,329 1,270,163 3,181,166 1,729,000 1,729,000 1,729,000 1,729,000 1,729,000 1,729,000 1,729,000 1,729,000 1,729,000 1,729,000Grant 25,212,351 2,560,061 2,347,500 7,846,277 475,000 806,688 7,126,834 4,049,991 0 0 0 0 0Hutchinson Island MSTU 1,386,450 319,950 0 106,650 106,650 106,650 106,650 106,650 106,650 106,650 106,650 106,650 106,650Impact Fee 1,707,715 695,872 811,843 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000LLC Contribution 1,600,000 756,000 844,000 0 0 0 0 0 0 0 0 0 0Prop Share 316,426 0 0 0 0 0 316,426 0 0 0 0 0 0Road MSTU 13,205,796 5,958 1,199,838 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000State Funds 31,781,268 28,369,336 0 664,000 2,594,215 0 0 153,717 0 0 0 0 0Revenue Total 102,884,335 34,227,340 8,690,347 16,942,927 6,124,865 3,862,338 10,498,910 7,259,358 3,055,650 3,055,650 3,055,650 3,055,650 3,055,650

Total Unfunded 138,025,863

FY 2016MARTIN COUNTY CAPITAL IMPROVEMENT PLAN (CIP)

ROADS EXPENDITURE SUMMARY

ROADS REVENUE SUMMARY

Page 21

Page 31: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Page 22

Page 32: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Page 23

Page 33: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Town of Sewall's Point 2016

CAPITAL IMPROVEMENT PLAN 2016 2017 2018 2019 2020 5-YEAR TOTAL

Streets & Bridges 90,000 350,000 350,000 345,000 345,000 1,480,000

Storm Water System 72,500 72,500 72,500 35,000 35,000 287,500

Vehicles 0 90,000 0 60,000 0 150,000

Parks & Landscaping 30,000 17,000 20,000 17,000 20,000 104,000

Town Hall 10,000 20,000 20,000 15,000 10,000 75,000

Pedway 0 25,000 85,000 0 0 110,000

Annual Expenditures 202,500 574,500 547,500 472,000 410,000 2,206,500

Page 24

Page 34: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Page 25

Page 35: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

MARTIN COUNTY TRANSPORTATION IMPROVEMENT PROGRAMFY15 FEDERAL OBLIGATED

ITEM NO PROJECT NAME FUND WORK MIX PHASE 2015 FUNDING

230978 1 INDIAN STREET BRIDGE FROM W. OF MAPP ROAD TO E. OF KANNER HIGHWAY EB NEW BRIDGE CONSTRUCTION CONSTRUCTION ‐1,971,029

230978 1 INDIAN STREET BRIDGE FROM W. OF MAPP ROAD TO E. OF KANNER HIGHWAY SA NEW BRIDGE CONSTRUCTION CONSTRUCTION ‐83,375

230978 1 INDIAN STREET BRIDGE FROM W. OF MAPP ROAD TO E. OF KANNER HIGHWAY EB NEW BRIDGE CONSTRUCTION GRANTS AND MISCELLANEOUS ‐7,754

230978 1 INDIAN STREET BRIDGE FROM W. OF MAPP ROAD TO E. OF KANNER HIGHWAY EB NEW BRIDGE CONSTRUCTION RIGHT OF WAY ‐1,412,028

230978 1 INDIAN STREET BRIDGE FROM W. OF MAPP ROAD TO E. OF KANNER HIGHWAY HPP NEW BRIDGE CONSTRUCTION RIGHT OF WAY ‐553

230978 1 INDIAN STREET BRIDGE FROM W. OF MAPP ROAD TO E. OF KANNER HIGHWAY SA NEW BRIDGE CONSTRUCTION RIGHT OF WAY ‐416,375

230978 2 CR‐714/INDIAN ST FROM TPK/MARTIN DOWNS BV TO W. OF MAPP ROAD EB ADD LANES & RECONSTRUCT CONSTRUCTION 9,000

230978 2 CR‐714/INDIAN ST FROM TPK/MARTIN DOWNS BV TO W. OF MAPP ROAD SA ADD LANES & RECONSTRUCT CONSTRUCTION 976,276

230978 2 CR‐714/INDIAN ST FROM TPK/MARTIN DOWNS BV TO W. OF MAPP ROAD SU ADD LANES & RECONSTRUCT GRANTS AND MISCELLANEOUS ‐17,694

230978 2 CR‐714/INDIAN ST FROM TPK/MARTIN DOWNS BV TO W. OF MAPP ROAD EB ADD LANES & RECONSTRUCT PRELIMINARY ENGINEERING ‐426

230978 2 CR‐714/INDIAN ST FROM TPK/MARTIN DOWNS BV TO W. OF MAPP ROAD SA ADD LANES & RECONSTRUCT PRELIMINARY ENGINEERING ‐151

230978 2 CR‐714/INDIAN ST FROM TPK/MARTIN DOWNS BV TO W. OF MAPP ROAD EB ADD LANES & RECONSTRUCT RIGHT OF WAY 6,860

230978 2 CR‐714/INDIAN ST FROM TPK/MARTIN DOWNS BV TO W. OF MAPP ROAD SA ADD LANES & RECONSTRUCT RIGHT OF WAY 10,646

230978 4 INDIAN STREET BRIDGE FROM W. OF MAPP ROAD TO E. OF KANNER HIGHWAY SU ENVIRONMENTAL MITIGATION CONSTRUCTION 2,931

230978 4 INDIAN STREET BRIDGE FROM W. OF MAPP ROAD TO E. OF KANNER HIGHWAY SU ENVIRONMENTAL MITIGATION GRANTS AND MISCELLANEOUS 500,000

413254 1 SR‐9/I‐95 F. S OF CR‐708/BRIDGE RD. TO HIGH MEADOW NHPP PD&E/EMO STUDY PRELIMINARY ENGINEERING 23,403

419250 2 SR‐710 BRIDGE #890016, BRIDGE REPLACEMENT NH BRIDGE‐REPLACE AND ADD LANES CONSTRUCTION ‐1,749,908

419250 2 SR‐710 BRIDGE #890016, BRIDGE REPLACEMENT SA BRIDGE‐REPLACE AND ADD LANES CONSTRUCTION 75,930

419250 4 SR‐710/WARFIELD BLVD FROM SW TRAIL DRIVE TO ENTRANCE RAMP TO SR‐76 SU LIGHTING CONSTRUCTION 2,931

427023 1 SR‐5/US‐1 FROM PBC/MARTIN CO LINE TO MP 5.03 NHRE RESURFACING CONSTRUCTION ‐70,184

427023 1 SR‐5/US‐1 FROM PBC/MARTIN CO LINE TO MP 5.03 SA RESURFACING CONSTRUCTION ‐64,147

427664 1 PALM CITY CRA SIDEWALKS EB SIDEWALK CONSTRUCTION ‐696

427664 1 PALM CITY CRA SIDEWALKS TALU SIDEWALK CONSTRUCTION 14,067

427664 1 PALM CITY CRA SIDEWALKS TALU SIDEWALK CONSTRUCTION 7,153

429737 1 SR‐9/I‐95 FROM N OF CR‐708 TO S OF HIGH MEADOW RD HSP LIGHTING CONSTRUCTION 27,432

429737 1 SR‐9/I‐95 FROM N OF CR‐708 TO S OF HIGH MEADOW RD EB LIGHTING GRANTS AND MISCELLANEOUS ‐524

429737 1 SR‐9/I‐95 FROM N OF CR‐708 TO S OF HIGH MEADOW RD NHPP LIGHTING PRELIMINARY ENGINEERING 16,441

429745 1 SR‐5/US‐1 @ SE POINCIANA LANE HSP LIGHTING CONSTRUCTION ‐55,067

431606 1 CR‐711/PRATT/WHITNEY FROM MARTIN/PALM BEACH CL TO SR‐76/KANNER HIGHWAY SA RESURFACING CONSTRUCTION 89,038

431606 1 CR‐711/PRATT/WHITNEY FROM MARTIN/PALM BEACH CL TO SR‐76/KANNER HIGHWAY SU RESURFACING CONSTRUCTION 2,961,935

431606 1 CR‐711/PRATT/WHITNEY FROM MARTIN/PALM BEACH CL TO SR‐76/KANNER HIGHWAY SU RESURFACING CONSTRUCTION 105,000

431646 1 CR‐707/DIXIE HWY FR. SOUTH OF FLORIDA ST. TO NORTH OF SE 5TH ST. TALT BIKE LANE/SIDEWALK CONSTRUCTION 5,000

431646 1 CR‐707/DIXIE HWY FR. SOUTH OF FLORIDA ST. TO NORTH OF SE 5TH ST. TALU BIKE LANE/SIDEWALK CONSTRUCTION 50

431649 1 CR‐A1A/SE DIXIE HWY. FROM US‐1 TO SATURN STREET TALT BIKE LANE/SIDEWALK CONSTRUCTION ‐113

431730 1 INDIANTOWN CONNECTOR SIDEWALKS TALT SIDEWALK CONSTRUCTION 830,034

431730 1 INDIANTOWN CONNECTOR SIDEWALKS TALT SIDEWALK CONSTRUCTION 27,233

433170 1 BAKER RD IMPROVEMENTS FROM NW GREEN RIVER PARKWAY TO SE BRAILLE PLACE TALU SIDEWALK CONSTRUCTION 43,400

433170 1 BAKER RD IMPROVEMENTS FROM NW GREEN RIVER PARKWAY TO SE BRAILLE PLACE TALU SIDEWALK CONSTRUCTION 13,000

433170 1 BAKER RD IMPROVEMENTS FROM NW GREEN RIVER PARKWAY TO SE BRAILLE PLACE EB SIDEWALK PRELIMINARY ENGINEERING 7,000

Page 26

Page 36: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

MARTIN COUNTY TRANSPORTATION IMPROVEMENT PROGRAMFY15 FEDERAL OBLIGATED

433170 1 BAKER RD IMPROVEMENTS FROM NW GREEN RIVER PARKWAY TO SE BRAILLE PLACE TALT SIDEWALK PRELIMINARY ENGINEERING 300

434008 1 SW CITRIS BLVD. EMBANKMENT SLOPE EROSION MARTIN COUNTY (EMERGENCY) ER13 EMERGENCY OPERATIONS GRANTS AND MISCELLANEOUS 600

434273 1 I‐95/SR‐9 FR PALM BEACH COUNTYLINE TO N OF CR‐708/SE BRIDGE ROAD NHPP RESURFACING PRELIMINARY ENGINEERING ‐188,991

435353 1 SR‐76/ SW KANNER HWY @SCFE R/R XING #272274‐B R\R MP; K 40.14 RHH RAIL SAFETY PROJECT RAILROAD AND UTILITIES 47,734

435423 1 SR‐714/SW MARTIN HWY @ SCFE CROSSING 272270Y RHH RAIL SAFETY PROJECT RAILROAD AND UTILITIES 36,607

436735 1 JONATHAN DICKINSON STATE PARK‐FLAP GRANT FOR TRAIL & US‐1 SIGNALIZATN PLH MISCELLANEOUS CONSTRUCTION PRELIMINARY ENGINEERING 100,000

427829 1 MARTIN UPWP FY 2012/2013 & 2013/2014 PL TRANSPORTATION PLANNING PRELIMINARY ENGINEERING ‐574,224

427830 1 MARTIN UPWP FY 2014/2015 & 2015/2016 PL TRANSPORTATION PLANNING PRELIMINARY ENGINEERING 838,079

Page 27

Page 37: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

434273.4

434273.1

435139.1

432705.1

437701.1 437838.1

434275.1

432348.1

436096.1

438040.1

436869.1

434733.1

433349.1

10

10

10

Witham Field

Indiantown Airport HobeSound

NorthForkStLucieRiver

LoxahatcheeRiver

SouthForkStLucieRiver

LAKE OKEECHOBEE

INDIAN RIVER

ATLANTIC OCEAN

ST716

ST714

ST710

STA1A

ST732

ST707

ST5

ST91

ST76

£¤1

£¤1

£¤98

§̈¦95

§̈¦95

State of FloridaDepartment of Transportation

0 2 4Miles®

Deepwater Seaportín¤ Passenger Intermodal Station

Bus Stationn£

Freight Intermodal Station#

Major US or State HighwayOther US or State HighwayCounty Highway

Major Airporto

Interstate Highway

Public Airportp

Transportation Facilities

Railway

Florida at WorkTransportation Improvements

MARTIN COUNTY

FY 2017-2021 TentativeWork Program

FDOT Construction Only

Overview Map:Area of Interest

20172018201920202021

Projects by First Yearof Construction

Page 38: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

Project Index (by Number)

FM # TIP # Project Name Page

4130805 . . . . . . . . . . . . . . . . . . . . . . . . . . . TREASURE COAST - MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-4

4130806 . . . . . . . . . . . . . . . . . . . . . . . . . . . PRIMARY RETRO-REFLECTIVE PAVEMENT MARKERS (RPM'S) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-4

4130807 . . . . . . . . . . . . . . . . . . . . . . . . . . . PRIMARY RETRO-REFLECTIVE PAVEMENT MARKERS (RPM'S) ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-4

4134931 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO TRANSIT CAPITAL - 5307 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-3

4137332 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN MPO TRANSIT PLANNING - 5303 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-3

4192522 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-710/WARFIELD BLVD FROM MARTIN POWER PLANT TO CR609/SW ALLAPATTAH RD . . . . . . . A-3

4226413 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-76/KANNER HWY - FROM LOST RIVER ROAD to MONTEREY RD. . . . . . . . . . . . . . . . . . . . . . . . . A-44241336 . . . . . . . . . . . . . . . . . . . . . . . . . . . TREASURE COAST STRIPING PRIMARY ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-5

4241337 . . . . . . . . . . . . . . . . . . . . . . . . . . . TREASURE COAST STRIPING PRIMARY ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-5

4259772 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY TRANSIT OPERATING - 5311 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-4

4259773 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY SECTION 5311, OPERATING RURAL FUNDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-4

4278033 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY JPA SIGNAL MAINTENANCE & OPS ON SHS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-54278302 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN MPO PL FY 16/17 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-64278303 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN UPWP FY 18-19/19-20 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-74278304 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY UPWP FY 2020/2021 - 2021/2022 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-8

2309782 . . . . . . . . . . . . . . . . . . . . . . . . . . . CR-714/INDIAN ST - MARTIN DOWNS TO MAPP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-2

2337031 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO STATE HWY SYS ROADWAY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-2

2337032 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO STATE HWY SYS BRIDGES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-22339565 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO - MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-2

2339567 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO-PRIMARY MOWING & LITTER CONTRACT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-3

2342651 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO - MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-3

2342652 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO INTERSTATE BRIDGES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-3

4071892 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO TRANSIT OPERATING - STATE GRANT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-24071893 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY BLOCK GRANT OPERATING ASSISTANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-2

(April 1, 2016) Page 29

Page 39: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

Project Index (by Number)

FM # TIP # Project Name Page

4293105 . . . . . . . . . . . . . . . . . . . . . . . . . . . TREASURE COAST HERBICIDE APPLICATION PRIMARY ROADS ... . . . . . . . . . . . . . . . . . . . . . . . . . . . G-5

4297744 . . . . . . . . . . . . . . . . . . . . . . . . . . . TREASURE COAST PRIMARY ASPHALT REPAIR ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-64310351 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD - TAXIWAY A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-2

4315151 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD - TAXIWAY D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-2

4323481 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-732/JENSEN BCH BL FROM SR-5/US-1 TO SAVANAH RD. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-9

4327051 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-710/BEELINE HWY FROM E. OF SR-76 TO PALM BEACH/MARTIN CL . . . . . . . . . . . . . . . . . . . . . . A-10

4330691 . . . . . . . . . . . . . . . . . . . . . . . . . . . CR-708/SW BRIDGE RD FROM SR-76/SW KANNER HWY TO SW PRATT-WHITNEY RD . . . . . . . . . . A-11

4331591 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN AIRPORT MASTER & ECONOMIC DEVELOP PLAN UPDATE . . . . . . . . . . . . . . . . . . . . . . . . . C-3

4333491 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-A1A AT SEWALL'S POINT ROAD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-124342731 . . . . . . . . . . . . . . . . . . . . . . . . . . . I-95/SR-9 FR PALM BEACH COUNTYLINE TO N OF CR-807/SE BRDG RD . . . . . . . . . . . . . . . . . . . . . . A-134342734 . . . . . . . . . . . . . . . . . . . . . . . . . . . I-95/SR-9 FROM PALM BEACH/MARTIN CO LINE TO CR-708 INTERCHANGE . . . . . . . . . . . . . . . . . . . A-144342751 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-76 KANNER HIGHWAY PORT MAYACA AREA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-154346201 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD MILL & RESURFACE TAXIWAY A, (PHASE 1 DESIGN) . . . . . . . . . . . . . . . . . . . . . . . . C-34346241 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD CONSTRUCT AIRPORT INTERCONNECT RD.(PHASE 2) . . . . . . . . . . . . . . . . . . . . . . C-44346371 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD MILL & RESURFACE TAXIWAY A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-44346601 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY TRANSIT CORRIDOR TREASURE COAST EXPRESS . . . . . . . . . . . . . . . . . . . . . . . B-54346611 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY SEC 5339 CAPITAL FOR BUS & BUS FACILITIES . . . . . . . . . . . . . . . . . . . . . . B-54347331 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-9/I-95 @ SR-714 INTERCHANGE - LANDSCAPING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-16

(April 1, 2016)Page 30

Page 40: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

Project Index (by Number)

FM # TIP # Project Name Page

4348381 . . . . . . . . . . . . . . . . . . . . . . . . . . . CR-714/SW MARTIN HWY FR. SW FOX BROWN RD TO WEST OF SR-9/I-95 . . . . . . . . . . . . . . . . . . . . A-174349761 . . . . . . . . . . . . . . . . . . . . . . . . . . . S.E. SEABRANCH BLVD. FROM S.E. RETREAT DR. TO SR-5/US-1 . . . . . . . . . . . . . . . . . . . . . . . . . . . A-184351391 . . . . . . . . . . . . . . . . . . . . . . . . . . . CR-707/SE BEACH ROAD FROM PALM BEACH/MARTIN CL TO CR-708/SE BRIDGE ROAD . . . . . . . A-194354131 . . . . . . . . . . . . . . . . . . . . . . . . . . . MAPP RD. FROM SW MARTIN DOWNS BLVD TO SW MARTIN HIGHWAY . . . . . . . . . . . . . . . . . . . . . . A-204354531 . . . . . . . . . . . . . . . . . . . . . . . . . . . HIGH MEADOW AVE FROM MARTIN HWY TO SR-714/MARTIN DOWNS BVLD . . . . . . . . . . . . . . . . . . A-214360961 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-5/US-1 FROM NORTH OF SALERNO RD. TO NORTH OF CENTRAL PARKWAY . . . . . . . . . . . . . . A-224363771 . . . . . . . . . . . . . . . . . . . . . . . . . . . SW MAPP RD.FROM SR-714/SW MARTIN DOWNS BLVD TO SW BRIDGEWAY ST. . . . . . . . . . . . . . . A-234363781 . . . . . . . . . . . . . . . . . . . . . . . . . . . SW MURPHY RD. FROM SW MAPP RD/SW MATHESON AVE TO MARTIN/ST. LUCIE CL . . . . . . . . . A-244364001 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD RUNWAY PROTECTION ZONE CLEARING AND IMPROVEMENTS . . . . . . . . . . . . . . C-54364011 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD REHAB OF MC NON-MOVEMENT AREAS PHASE III (DESIGN & CST) . . . . . . . . . . . . C-54364251 . . . . . . . . . . . . . . . . . . . . . . . . . . . MURPHY ROAD BRIDGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-254367351 . . . . . . . . . . . . . . . . . . . . . . . . . . . JONATHAN DICKINSON STATE PARK-FLAP GRANT FOR TRAIL & US-1 SIGNALIZTION . . . . . . . . . . A-264368511 . . . . . . . . . . . . . . . . . . . . . . . . . . . SE COVE ROAD FROM SR-76/SW KANNER HWY TO US-1/SR-5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-274368611 . . . . . . . . . . . . . . . . . . . . . . . . . . . SE KINDRED STREET/SE JOHNSON AVE FROM SOUTH COLORADO TO SR-5/US-1 . . . . . . . . . . . . A-284368691 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-A1A FROM EAST OF LYONS BRIDGE TO SR-732/JENSEN BEACH BLVD. . . . . . . . . . . . . . . . . . . . A-294368701 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-714/SW MARTIN HWY FROM CITRUS BLVD. TO SW MARTIN DOWNS BLVD. . . . . . . . . . . . . . . . A-304369671 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-5/US-1 NORTH OF NW BRITT ROAD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-314377011 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-9/I-95 FROM S OF REST AREA TO S OF SR-714/MARTIN HWY . . . . . . . . . . . . . . . . . . . . . . . . . . . A-324378381 . . . . . . . . . . . . . . . . . . . . . . . . . . . US-1/SR-5 FROM SOUTHEAST HERITAGE BLVD. TO NORTH OF SALERNO RD. . . . . . . . . . . . . . . . . A-334379631 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD, AIRPORT SECURITY FENCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-54379641 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD, WILDLIFE FENCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-64379711 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD, AIRPORT ADMIN AREA BUILDING REMOVAL & SITE PREPARATION . . . . . . . . . . . . C-64379801 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD RWY 25 BLAST PAD AND TWY A HOLDING BAY (DESIGN & CST) . . . . . . . . . . . . . . . C-64379921 . . . . . . . . . . . . . . . . . . . . . . . . . . . RESURFACE TPK MAINLINE IN MARTIN CNTY, MP 117.843 - 138.037 ... . . . . . . . . . . . . . . . . . . . . . . . . G-64379922 . . . . . . . . . . . . . . . . . . . . . . . . . . . THERMOPLASTIC FOR MARTIN CNTY RESURFACING, MP 117.843 - 138.037 ... . . . . . . . . . . . . . . . . . G-64379923 . . . . . . . . . . . . . . . . . . . . . . . . . . . ROADSIDE IMPROVEMENTS IN MARTIN CNTY, MP 117.843 - 138.037 ... . . . . . . . . . . . . . . . . . . . . . . . G-74380401 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-9/I-95 INTERCHANGE WITH SR-76/KANNER HWY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-34

(April 1, 2016)Page 31

Page 41: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

Project Index (by Number)

FM # TIP # Project Name Page

4380711 . . . . . . . . . . . . . . . . . . . . . . . . . . . SE INDIAN ST FR US-1/FEDERAL HWY TO S OF RAILROAD CROSSING . . . . . . . . . . . . . . . . . . . . . . A-354380721 . . . . . . . . . . . . . . . . . . . . . . . . . . . SE DIXIE HWY/CR-A1A FR SE JEFFERSON ST TO SE INDIAN ST . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-364381251 . . . . . . . . . . . . . . . . . . . . . . . . . . . CR-708/SE BRIDGE ROAD FROM SE FLORA AVE TO SE PLANDOME DRIVE . . . . . . . . . . . . . . . . . . . A-374383421 . . . . . . . . . . . . . . . . . . . . . . . . . . . SAVANNAH ROAD FROM NE CARDINAL AVENUE TO JENSEN BEACH BOULEVARD . . . . . . . . . . . . A-384383431 . . . . . . . . . . . . . . . . . . . . . . . . . . . CR-609 FROM .51 MILES N. OF MINUTE MAID RD TO 3.2 MILES AT THE S CURVE . . . . . . . . . . . . . . A-394383441 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-714/SW MARTIN HWY FROM CITRUS BLV TO SW MARTIN DOWNS BLV - RESERVE . . . . . . . . . A-404383451 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-5/US-1 ROOSEVELT BRIDGE RESTRIPING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-414383452 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-5/US-1 SB LEFT TURN LANE ONTO JOAN JEFFERSON WAY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-424383461 . . . . . . . . . . . . . . . . . . . . . . . . . . . MONTEREY ROAD FROM KINGSWOOD TERRACE TO ST. LUCIE BLVD . . . . . . . . . . . . . . . . . . . . . . . A-434383471 . . . . . . . . . . . . . . . . . . . . . . . . . . . INDIAN STREET FROM DIXIE HIGHWAY TO ST. LUCIE BLVD. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-444383481 . . . . . . . . . . . . . . . . . . . . . . . . . . . ST. LUCIE BLVD FROM INDIAN ST TO E. OCEAN BLVD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-454385221 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY SERVICE DEVELOPMENT- STUART TRAM IMPROVEMENTS . . . . . . . . . . . . . . . . . B-64385241 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY SERVICE DEVELOPMENT STUART- TRAM PURCHASE . . . . . . . . . . . . . . . . . . . . . . B-64385661 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-5/US-1 NORTH OF NW BRITT ROAD - RESERVE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-46

(April 1, 2016)Page 32

Page 42: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

Section A - Highway

(April 1, 2016) Page 33A - 1

Page 43: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

2309782 CR-714/INDIAN ST - MARTIN DOWNS TO MAPP RD Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

Widening and reconstruction of CR 714 from the Turnpike to W of MappRoad.

ADD LANES &RECONSTRUCT

FDOT

TPK/MARTIN DOWNS BV

W. OF MAPP ROAD

1.879 mi

21,794,930021,879,575p.42 - Table 7-4, Fig 7-1

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

ROW SU 230 84,415 0 0 0 84,645

Total 230 84,415 0 0 0 84,645

(April 1, 2016) Page 34A - 2

Page 44: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4192522 SR-710/WARFIELD BLVD FROM MARTIN POWER PLANT TO CR 609/ SW ALLAPATAH RD

SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

PD&E 419344-1

ADD LANES &RECONSTRUCT

FDOT

MP 9.771

MP 14.967

5.174 mi

2,126,37245,162,68855,545,867p. 37

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

ROW DDR 0 1,035,466 3,077,172 827,617 0 4,940,255ROW DS 0 0 2,715,360 61,992 0 2,777,352ROW DIH 0 0 9,048 0 0 9,048ROW SA 0 0 510,071 20,081 0 530,152

Total 0 1,035,466 6,311,651 909,690 0 8,256,807

(April 1, 2016) Page 35A - 3

Page 45: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4226413 SR-76/ KANNER HWY - FROM LOST RIVER ROAD TO MONTEREY RD Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

Right of way acquisition for the widening and reconstruction of SR 76 fromLost River Road to Monterey Rd.

ADD LANES &RECONSTRUCT

FDOT

LOST RIVER ROAD

MONTEREY ROAD

5.608 mi

32,674,573035,535,273p. 42, Table 7-4, Fig 7-1

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

ROW DDR 2,860,700 0 0 0 0 2,860,700

Total 2,860,700 0 0 0 0 2,860,700

(April 1, 2016) Page 36A - 4

Page 46: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4278033 MARTIN COUNTY JPA SIGNAL MAINTENANCE & OPS ON SHS Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

TRAFFIC CONTROLDEVICES/SYSTEM

Managed by MARTINCOUNTY BOARD OF

.000

228,45601,842,959p. 10, Table 3-1

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

OPS DITS 197,264 202,196 207,250 212,432 217,743 1,036,885OPS DDR 136,599 141,683 146,946 152,390 0 577,618

Total 333,863 343,879 354,196 364,822 217,743 1,614,503

(April 1, 2016) Page 37A - 5

Page 47: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4278302 MARTIN MPO PL FY 16/17 Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

TRANSPORTATION PLANNING FUNDS; UPWP 2016/2017 & 2017/2018

TRANSPORTATIONPLANNING

FDOT

FY 2016/2017

2017/2018

00843,260p. 10, Table 3-1

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

PLN (12) PL 421,630 0 0 0 0 421,630PLN PL 0 421,630 0 0 0 421,630

Total 421,630 421,630 0 0 0 843,260

(April 1, 2016) Page 38A - 6

Page 48: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4278303 MARTIN UPWP FY 18-19/19-20 Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

FUNDING FOR TRANSPORTATION PLANNING; MARTIN UPWP FPR FY18-19/19-20

TRANSPORTATIONPLANNING

FDOT .000

00843,260p. 10, Table 3-1

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

PLN PL 0 0 421,630 421,630 0 843,260

Total 0 0 421,630 421,630 0 843,260

(April 1, 2016) Page 39A - 7

Page 49: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4278304 MARTIN COUNTY UPWP FY 2020/2021 - 2021/2022 Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

TRANSPORTATION PLANNING FUNDS; MARTIN UPWP

TRANSPORTATIONPLANNING

FDOT .000

00421,630p. 10, Table 3-1

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

PLN PL 0 0 0 0 421,630 421,630

Total 0 0 0 0 421,630 421,630

(April 1, 2016) Page 40A - 8

Page 50: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4323481 SR-732/ JENSEN BEACH BLVD FROM SR-5/US-1 TO SAVANNA RD Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

RESURFACING

Managed by FDOT

SR-5/ US-1

Savannah Road

2.210

002,480,471p. 12, Appendix D

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

PE DDR 207,761 0 0 0 0 207,761PE DIH 10,000 0 0 0 0 10,000

CST SA 0 0 1,926,766 0 0 1,926,766CST DIH 0 0 65,566 0 0 65,566CST DDR 0 0 270,378 0 0 270,378

Total 217,761 0 2,262,710 0 0 2,480,471

(April 1, 2016) Page 41A - 9

Page 51: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4327051 SR-710/ BEELINE HWY FROM E OF SR-76 TO PALM BEACH/MARTIN SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

Reconstruction of the existing 2 lanes; expanded to 4 lanes divided ruralroadway; open drainage with swales.

ADD LANES &RECONSTRUCT

Managed by FDOT

EAST OF SR-76

WEST OF INDIANTOWN RD

5.598 MI

2,423,542040,523,583p.42, Table 7-4, Fig 7-1

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

CST SA 387,381 0 0 0 0 387,381CST ACNP 36,971,525 0 0 0 0 36,971,525CST DDR 221,923 0 0 0 0 221,923CST DS 519,212 0 0 0 0 519,212

Total 38,100,041 0 0 0 0 38,100,041

(April 1, 2016) Page 42A - 10

Page 52: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4330691 CR-708/ SW BRIDGE RD FROM SR-76/ SW KANNER HWY TO SW PRATT-WHITNEY RD

Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

Resurfacing; SCOP (Small County Outreach Program);

RESURFACING

Martin County

SR-76

SW Pratt-Whitney Road

2.676 MI

00803,904p. 12, Appendix D, p. 8

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

CST SCED 540,541 0 0 0 0 540,541CST GRSC 62,387 0 0 0 0 62,387CST LF 200,976 0 0 0 0 200,976

Total 803,904 0 0 0 0 803,904

(April 1, 2016) Page 43A - 11

Page 53: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4333491 SR-A1A AT SEWALL'S POINT ROAD Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

Upgrade traffic signals to mast arms at A1A Sewalls Point Road

TRAFFIC SIGNALUPDATE

Managed by FDOT .010 MI

36,1920535,169p. 17

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

CST DIH 28,747 0 0 0 0 28,747CST DDR 364,568 0 0 0 0 364,568CST LF 6,000 0 0 0 0 6,000CST DS 99,662 0 0 0 0 99,662

Total 498,977 0 0 0 0 498,977

(April 1, 2016) Page 44A - 12

Page 54: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4342731 I-95/SR-9 FROM PALM BEACH COUNTYLINE TO N OF CR-807/SE BRIDGE RD SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

NEW INTERSTATE RRR CANDIDATE

RESURFACING

Managed by FDOT

PALM BEACH COUNTYLINE

N OF C-807/SE BRDGE ROAD

7.849 MI

394,331016,126,826p. 7, Appendix B

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

CST SA 324,460 0 0 0 0 324,460CST ACNP 15,333,035 0 0 0 0 15,333,035INC SA 0 0 75,000 0 0 75,000

Total 15,657,495 0 75,000 0 0 15,732,495

(April 1, 2016) Page 45A - 13

Page 55: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4342734 I-95/SR-9 FROM PALM BEACH/MARTIN CO LINE TO CR-708 SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

ANTICIPATED SAFETY PROJECT

SAFETY PROJECT

Managed by FDOT 8.000

006,292,331p. 7, Appendix B

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

PE HSP 0 926,042 0 0 0 926,042CST HSP 0 0 0 5,366,289 0 5,366,289

Total 0 926,042 0 5,366,289 0 6,292,331

(April 1, 2016) Page 46A - 14

Page 56: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4342751 SR-76 KANNER HIGHWAY PORT MAYACA AREA Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

THIS SEGMENT IS OUT BY THE LAKE IN THE PORT MAYACA AREACHANGE TRANSPORT SYSTEM 05 TO 03 2013-07-13 CHANGE

RESURFACING

Managed by FDOT 1.810 MI

350,87102,172,954p. 12, Appendix D

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

CST DIH 25,625 0 0 0 0 25,625CST DDR 1,750,015 0 0 0 0 1,750,015CST DS 46,443 0 0 0 0 46,443

Total 1,822,083 0 0 0 0 1,822,083

(April 1, 2016) Page 47A - 15

Page 57: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4347331 SR-9/I-95 @ SR-714 INTERCHANGE - LANDSCAPING SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

STAND ALONE LANDSCAPING PROJECT

LANDSCAPING

Managed by FDOT .500 MI

200,61101,815,134p. 7, Appendix B

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

CST DIH 0 0 0 0 28,450 28,450CST DDR 0 0 0 0 1,573,136 1,573,136CST DS 0 0 0 0 12,937 12,937

Total 0 0 0 0 1,614,523 1,614,523

(April 1, 2016) Page 48A - 16

Page 58: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4348381 CR-714/SW MARTIN HWY FR. SW FOX BROWN RD TO WEST OF SR-9/ I-95

Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

SCOP (Small County Outreach Program) JPA with Martin County includesSW Allapattah Rd. from CR-714 to Martin/St Lucie CL

RESURFACING

Martin County

Sw Fox Brown Rd

W of SR-9/I-95

12.792 MI

1,740,29702,044,293p. 12, Appendix D

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

CST SCWR 7,145 0 0 0 0 7,145CST SCOP 242,520 0 0 0 0 242,520CST GRSC 54,331 0 0 0 0 54,331

Total 303,996 0 0 0 0 303,996

(April 1, 2016) Page 49A - 17

Page 59: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4349761 SE SEABRANCH BLVD FROM SE RETREAT DR TO SR-5/US-1 Non-SIS

Project Description:

Work Summary:

Lead Agency:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

Martin County

SCOP (Small County Outreach Program) JPA with Martin County, 75/25 MatchRESURFACING From: SE Retreat Dr

SR-5/US-1

2.560 MI

00856,883p. 12, Appendix D

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

CST SCOP 7,568 7,568 0 0 0 15,136CST GRSC 99,624 273,785 0 0 0 373,409CST LF 214,221 0 0 0 0 214,221CST SCWR 0 156,051 0 0 0 156,051CST SCED 0 98,066 0 0 0 98,066

Total 321,413 535,470 0 0 0 856,883

(April 1, 2016) Page 50A - 18

Page 60: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4351391 CR-707/SE BEACH ROAD FROM PALM BEACH/MARTIN CL TO CR-708/SE BRIDGE RD

Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

RESURFACING S.E. BEACH ROAD FROM PB/MARTIN COUNTY LINE TO S.E. BRIDGE ROAD

RESURFACING

Managed by FDOT 7.052 MI

007,130,197p. 42, Table 7-4, Fig 7-1

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

PE SU 251,295 0 0 0 0 251,295PE SA 223,705 0 0 0 0 223,705

CST SA 0 0 3,384,079 0 0 3,384,079CST SU 0 0 3,271,118 0 0 3,271,118

Total 475,000 0 6,655,197 0 0 7,130,197

(April 1, 2016) Page 51A - 19

Page 61: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4354131 MAPP RD FROM SW MARTIN DOWNS BLVD TO SW MARTIN HWY Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

Bike lane/Sidewalk; LAP with Martin County; MPO 2013 Priority #2

BIKE LANE/SIDEWALK

Martin County

SW Martin Downs Blvd

SW Martin Hwy

.771 MI

4,3810275,481p. 17

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

CST TALT 113,308 0 0 0 0 113,308CST LFP 21,100 0 0 0 0 21,100CST TALU 136,692 0 0 0 0 136,692

Total 271,100 0 0 0 0 271,100

(April 1, 2016) Page 52A - 20

Page 62: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4354531 HIGH MEADOW AVE FROM MARTIN HWY TO SR-714/ MARTIN DOWNS BLVD

Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

Resurfacing

RESURFACING

Martin County

Martin Hwy

SR-714/Martin Downs Blvd

.796 MI

001,355,610p. 42, Table 7-4, Fig 7-1

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

PE SA 5,000 0 0 0 0 5,000CST CM 0 0 1,249,819 0 0 1,249,819CST SA 0 0 100,791 0 0 100,791

Total 5,000 0 1,350,610 0 0 1,355,610

(April 1, 2016) Page 53A - 21

Page 63: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4360961 SR-5/US-1 FROM N OF SALERNO RD TO N OF CENTRAL PKWY Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

RESURFACING

Managed by FDOT 1.580

482,30802,715,933p. 12, Appendix D

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

CST DIH 0 21,060 0 0 0 21,060CST DDR 0 2,212,565 0 0 0 2,212,565

Total 0 2,233,625 0 0 0 2,233,625

(April 1, 2016) Page 54A - 22

Page 64: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

(April 1, 2016)

4363771 SW MAPP RD FROM SR-714/SW MARTIN DOWNS BLVD TO SW BRIDGEWAY ST

Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

SCOP JPA W/MARTIN COUNTY

RESURFACING

Martin County 2.805

001,089,349p. 12, Appendix D

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

CST SCWR 0 425,491 0 0 0 425,491CST GRSC 0 25,621 365,900 0 0 391,521CST LF 0 272,337 0 0 0 272,337

Total 0 723,449 365,900 0 0 1,089,349

Page 55A - 23

Page 65: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

(April 1, 2016)

4363781 SW MURPHY RD FROM SW MAPP RD/SW MATHESON AVE TO MARTIN/ST LUCIE CL

Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

SCOP JPA W/ MARTIN COUNTY MILE POINT EXCEPTION FROM 3.46TO 3.48

RESURFACING

Martin County 2.660

00877,129p. 12, Appendix D

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

CST GRSC 0 0 200,527 457,320 0 657,847CST LF 0 0 219,282 0 0 219,282

Total 0 0 419,809 457,320 0 877,129

Page 56A - 24

Page 66: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4364251 MURPHY ROAD BRIDGE Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

LAP CRITICAL PROJECT W/ MARTIN COUNTY; MPO 2014 PRIORITY #2

BRIDGE REPLACEMENT

Managed by FDOT .020

003,258,239P. 31, Appendix B

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

PE SA 0 7,000 0 0 0 7,000CST SA 0 0 0 1,289,256 0 1,289,256CST SU 0 0 0 1,961,983 0 1,961,983

Total 0 7,000 0 3,251,239 0 3,258,239

(April 1, 2016) Page 57A - 25

Page 67: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4367351 JONATHAN DICKINSON STATE PARK-FLAP GRANT FOR TRAIL Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

JONATHAN DICKINSON STATE PARK-FLAP GRANT FOR TRAIL & US-1 SIGNALIZATION

MISCELLANEOUSCONSTRUCTION

FDOT

130,00001,200,000p. 56, Fig. 7-3

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

CST PLH 551,000 0 0 0 0 551,000CST DIH 5,000 0 0 0 0 5,000CST DS 514,000 0 0 0 0 514,000

Total 1,070,000 0 0 0 0 1,070,000

(April 1, 2016) Page 58A - 26

Page 68: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4368511 SE COVE ROAD FROM SR-76/SW KANNER HWY TO US-1/SR-5 Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

SMALL COUNTY OUTREACH PROGRAM JPA WITH MARTIN COUNTY.

RESURFACING

Martin County 4.340

001,345,657p. 12, Appendix D

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

CST SCWR 0 0 0 260,646 0 260,646CST SCED 0 0 0 54,054 0 54,054CST SCOP 0 0 0 260,947 0 260,947CST GRSC 0 0 0 433,596 0 433,596CST LF 0 0 0 336,414 0 336,414

Total 0 0 0 1,345,657 0 1,345,657

(April 1, 2016) Page 59A - 27

Page 69: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4368611 SE KINDRED STREET/SE JOHNSON AVE FROM S COLORADO TO SR-5/ US-1 Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

2014 MPO TAP PRIORITY #1 LAP PROJECT WITH MARTIN COUNTY

SIDEWALK

Managed by FDOT .381

5,0000730,218p. 15-16

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

CST TALT 0 353,904 0 0 0 353,904CST LF 0 371,314 0 0 0 371,314

Total 0 725,218 0 0 0 725,218

(April 1, 2016) Page 60A - 28

Page 70: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4368691 SR-A1A FROM EAST OF LYONS BRIDGE TO SR-732/JENSEN BEACH BLVD Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

2016 MPO PRIORITY #6; LF FOR DECORATIVE LIGHTINGDIFFERENTIAL; 2014 MPO PRIORITY #4

LIGHTING

Managed by FDOT 3.700

001,865,817p. 31, Appendix B

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

PE DDR 200,000 0 0 0 0 200,000PE DIH 5,000 0 0 0 0 5,000

CST DDR 0 0 776,228 0 0 776,228CST SU 0 0 776,816 0 0 776,816CST DS 0 0 107,773 0 0 107,773

Total 205,000 0 1,660,817 0 0 1,865,817

(April 1, 2016) Page 61A - 29

Page 71: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4368701 SR-714/SW MARTIN HWY FROM CITRUS BLVD TO SW MARTIN DOWNS BLVD Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

2016 MPO PRIORITY #5; STATE FUNDS ONLY; 2014 MPO PRIORITY #5

PD&E/EMO STUDY

Managed by FDOT 1.120

583,14902,428,149p. 31, Appendix B

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

PE DDR 800,000 0 0 0 0 800,000PDE DDR 1,000,000 0 0 0 0 1,000,000PDE DIH 30,000 0 0 0 0 30,000PE DIH 15,000 0 0 0 0 15,000

Total 1,845,000 0 0 0 0 1,845,000

(April 1, 2016) Page 62A - 30

Page 72: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4369671 SR-5/US-1 NORTH OF NW BRITT ROAD Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

2016 MPO PRIORITY #1; MASTARM RELOCATION NORTHEASTQUADRANT OF NW MALL ENTRY SOUTH; 2014 MPO PRIORITY #3

TRAFFIC SIGNALS

Managed by FDOT .020

00408,717p. 31, Appendix B

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

PE DDR 250,000 0 0 0 0 250,000PE DIH 5,000 0 0 0 0 5,000

ROW DDR 0 0 135,717 0 0 135,717ROW DIH 0 0 18,000 0 0 18,000

Total 255,000 0 153,717 0 0 408,717

(April 1, 2016) Page 63A - 31

Page 73: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4377011 SR-9/I-95 FROM S OF REST AREA TO S OF SR-714/MARTIN HWY SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

LIGHTING

Managed by FDOT 4.876

004,181,116p. 7, Appendix B

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

PE HSP 601,842 0 0 0 0 601,842CST HSP 0 0 3,579,274 0 0 3,579,274

Total 601,842 0 3,579,274 0 0 4,181,116

(April 1, 2016) Page 64A - 32

Page 74: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4378381 US-1/SR-5 FROM SE HERITAGE BLVD TO NORTH OF SALERNO RD Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

ADJACENT TO FM#436096.1

RESURFACING

Managed by FDOT 3.560

008,843,533p. 12, Appendix D

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

PE DDR 819,891 0 0 0 0 819,891PE DIH 5,000 0 0 0 0 5,000

CST DIH 0 0 108,201 0 0 108,201CST NHRE 0 0 2,799,597 0 0 2,799,597CST DDR 0 0 5,110,844 0 0 5,110,844

Total 824,891 0 8,018,642 0 0 8,843,533

(April 1, 2016) Page 65A - 33

Page 75: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4380401 SR-9/I-95 INTERCHANGE WITH SR-76/KANNER HWY SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

STAND ALONE LANDSCAPING

LANDSCAPING

Managed by FDOT 1.400

195,34901,895,932p. 7, Appendix B

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

CST DIH 51,250 0 0 0 0 51,250CST DDR 192,700 0 0 0 0 192,700CST DS 1,456,633 0 0 0 0 1,456,633

Total 1,700,583 0 0 0 0 1,700,583

(April 1, 2016) Page 66A - 34

Page 76: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4380711 SE INDIAN ST FROM US-1/FEDERAL HWY TO S OF RAILROAD CROSSING

Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

RESURFACING

Managed by MARTINCOUNTY BOARD OF

.260

00309,368p. 12, Appendix D

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

CST SCOP 0 0 0 232,026 0 232,026CST LF 0 0 0 77,342 0 77,342

Total 0 0 0 309,368 0 309,368

(April 1, 2016) Page 67A - 35

Page 77: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4380721 SE DIXIE HWY/CR-A1A FROM SE JEFFERSON ST TO SE INDIAN ST Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

RESURFACING

Martin County .590

00575,892p. 12, Appendix D

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

CST SCOP 0 0 0 0 431,919 431,919CST LF 0 0 0 0 143,973 143,973

Total 0 0 0 0 575,892 575,892

(April 1, 2016) Page 68A - 36

Page 78: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4381251 CR-708/SE BRIDGE ROAD FROM SE FLORA AVE TO SE PLANDOME DR Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

LAP W/MARTIN COUNTY - MARTIN MPO RANKING #1 - TAP FY 2015SIDEWALK ON SOUTH SIDE ONLY, INSTALL DRAINAGE, PEDESTRIAN

SIDEWALK

Managed by FDOT .373

00398,534p. 13-14

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

PE TALU 7,000 0 0 0 0 7,000CST TALT 0 0 164,871 0 0 164,871CST LFP 0 0 62,568 0 0 62,568CST TALU 0 0 164,095 0 0 164,095

Total 7,000 0 391,534 0 0 398,534

(April 1, 2016) Page 69A - 37

Page 79: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4383421 SAVANNAH ROAD FROM NE CARDINAL AVENUE TO JENSEN BEACH BLVD

Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

2016 MPO PRIORITY #2;LAP W/ MARTIN COUNTY; 2015 MPO #2

RESURFACING

Managed by FDOT 2.085

001,125,963p. 12, Appendix D

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

PE SA 0 5,000 0 0 0 5,000CST SU 0 0 0 1,120,963 0 1,120,963

Total 0 5,000 0 1,120,963 0 1,125,963

(April 1, 2016) Page 70A - 38

Page 80: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4383431 CR-609 FROM 0.51 MILES N OF MINUTE MAID RD TO 3.2 MILES AT THE S CURVE Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

2016 MPO PRIORITY #3; LAP W/ MARTIN COUNTY; 2015 MPOPRIORITY #3

GUARDRAIL

Managed by FDOT 3.336

00783,291p. 8, Appendix D

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

PE SA 0 10,000 0 0 0 10,000CST SU 0 0 0 773,291 0 773,291

Total 0 10,000 0 773,291 0 783,291

(April 1, 2016) Page 71A - 39

Page 81: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4383441 SR-714/SW MARTIN HWY FROM CITRUS BLVD TO SW MARTIN DOWNS BLVD - RESERVE

Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

2016 MPO PRIORITY #5; R/W RESERVE FOR 436870-1 SWATPROJECT-STATE FUNDS ONLY; 2015 MPO PRIORITY #5

FUNDING ACTION

Managed by FDOT .000

004,000,000p. 31, Appendix B

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

ROW DDR 0 0 0 0 4,000,000 4,000,000

Total 0 0 0 0 4,000,000 4,000,000

(April 1, 2016) Page 72A - 40

Page 82: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4383451 SR-5/US-1 ROOSEVELT BRIDGE RESTRIPING Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

2016 MPO PRIORITY #4;PROVIDE BUFFERED SHOULDERS/BIKE LANE;2015 MPO PRIORITY #4

PRELIMINARYENGINEERING

Managed by FDOT .650

00310,000p. 13-14

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

PE SU 0 310,000 0 0 0 310,000

Total 0 310,000 0 0 0 310,000

(April 1, 2016) Page 73A - 41

Page 83: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4383452 SR-5/US-1 SB LEFT TURN LANE ONTO JOAN JEFFERSON WAY Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

2016 MPO PRIORITY #4; OPERATIONAL ANALYSIS TO DETERMINE IFLEFT TURN LANE STORAGE CAN BE INCREASED; 2015 MPO

TRAFFIC ENGINEERINGSTUDY

Managed by FDOT .057

00310,000p. 8, Appendix D

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

PE SU 0 310,000 0 0 0 310,000

Total 0 310,000 0 0 0 310,000

(April 1, 2016) Page 74A - 42

Page 84: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4383461 MONTEREY ROAD FROM KINGSWOOD TERRACE TO ST LUCIE BLVD Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

2016 MPO PRIORITY #7; MID-BLOCK PEDESTRIAN CROSSWALKSALSO INCLUDES OCEAN BLVD FROM MONTEREY RD TO ST. LUCIE

TRAFFIC ENGINEERINGSTUDY

Managed by FDOT .000

00203,000p. 13-14

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

PE SU 0 0 0 203,000 0 203,000

Total 0 0 0 203,000 0 203,000

(April 1, 2016) Page 75A - 43

Page 85: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4383471 INDIAN STREET FROM DIXIE HIGHWAY TO ST LUCIE BLVD Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

2016 MPO PRIORITY #8; 2015 MPO PRIORITY #8

RESURFACING

Managed by FDOT .762

00339,158p. 12, Appendix D

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

PE SU 0 0 10,000 0 0 10,000CST SU 0 0 0 0 329,158 329,158

Total 0 0 10,000 0 329,158 339,158

(April 1, 2016) Page 76A - 44

Page 86: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4383481 ST LUCIE BLVD FROM INDIAN ST TO E OCEAN BLVD Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

2016 MPO PRIORITY #9; LAP W/ MARTIN COUNTY; 2015 MPOPRIORITY #9

RESURFACING

Managed by FDOT 2.437

00793,917p. 12, Appendix D

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

PE SU 0 0 10,000 0 0 10,000CST SU 0 0 0 0 783,917 783,917

Total 0 0 10,000 0 783,917 793,917

(April 1, 2016) Page 77A - 45

Page 87: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

4385661 SR-5/US-1 NORTH OF NW BRITT ROAD - RESERVE Non-SIS

Project Description:

Work Summary:

Lead Agency:

From:

To:

Length:

Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:

2016 MPO PRIORITY #1; CONSTRUCTION RESERVE FOR 436967-1;2015 MPO PRIORITY #1

FUNDING ACTION

Managed by FDOT .000

001,000,000p. 31, Appendix B

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

CST DDR 0 0 0 0 1,000,000 1,000,000

Total 0 0 0 0 1,000,000 1,000,000

(April 1, 2016) Page 78A - 46

Page 88: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

Section B - Transit

(April 1, 2016) Page 79B - 1

Page 89: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

FM# 4071892 (TIP# ) MARTIN CO TRANSIT OPERATING - STATE GRANT FROM BLOCK GRANT TO *Non-SIS*Type of Work: OPERATING/ADMIN. ASSISTANCE Lead Agency: Martin County

LRTP#: p. 29, Appendix BAdditional 75,000 programmed to supplement Block Grant change

OPS DPTO 256,358 262,985 271,668 0 0 791,011OPS DDR 75,000 75,000 75,000 0 0 225,000OPS LF 256,358 262,985 271,668 0 0 791,011

Total 587,716 600,970 618,336 0 0 1,807,022

Prior Years Cost 1,172,626 Future Years Cost 0 Total Project Cost 2,979,648

FM# 4071893 (TIP# ) MARTIN COUNTY BLOCK GRANT OPERATING ASSISTANCE *Non-SIS*Length: .000Type of Work: OPERATING/ADMIN. ASSISTANCE Lead Agency: MANAGED BY MARTIN

LRTP#: p. 29, Appendix BOPS DPTO 0 0 0 285,251 285,251 570,502OPS DDR 0 0 0 75,000 83,557 158,557OPS LF 0 0 0 285,251 293,808 579,059

Total 0 0 0 645,502 662,616 1,308,118

Prior Years Cost 0 Future Years Cost 0 Total Project Cost 1,308,118

(April 1, 2016) Page 80B - 2

Page 90: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

FM# 4134931 (TIP# ) MARTIN CO TRANSIT CAPITAL - 5307 AT FTA SECTION 5307 *Non-SIS*Type of Work: CAPITAL FOR FIXED ROUTE Lead Agency: Martin County

LRTP#: p. 29, Appendix BTransit funding for fixed route.

OPS FTA 719,000 719,000 719,000 719,000 719,000 3,595,000CAP FTA 230,000 230,000 230,000 230,000 230,000 1,150,000

Total 949,000 949,000 949,000 949,000 949,000 4,745,000

Prior Years Cost 4,690,824 Future Years Cost 0 Total Project Cost 9,435,824

FM# 4137332 (TIP# ) MARTIN MPO TRANSIT PLANNING - 5303 FROM SECTION 5303 TO TRANSIT *Non-SIS*Type of Work: PTO STUDIES Lead Agency: Martin MPO

LRTP#: p. 29, Appendix BPublic Transit Planning Studies

PLN DU 58,410 0 0 0 0 58,410PLN LF 7,301 0 0 0 0 7,301

PLN (1NA) DPTO 7,301 7,301 7,301 7,301 7,301 36,505PLN (1NA) LF 0 7,301 7,301 7,301 7,301 29,204PLN (1NA) DU 0 58,410 58,410 58,410 58,410 233,640

Total 73,012 73,012 73,012 73,012 73,012 365,060

Prior Years Cost 169,092 Future Years Cost 0 Total Project Cost 534,152

(April 1, 2016) Page 81B - 3

Page 91: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

FM# 4259772 (TIP# ) MARTIN COUNTY TRANSIT OPERATING - 5311 FROM SECTION 5311, TO SMALL *Non-SIS*Type of Work: OPERATING/ADMIN. ASSISTANCE Lead Agency: Martin County

LRTP#: p. 29, Appendix BTransit operations funding

OPS DU 102,367 113,812 117,944 0 0 334,123OPS LF 100,897 113,812 117,944 0 0 332,653

Total 203,264 227,624 235,888 0 0 666,776

Prior Years Cost 426,380 Future Years Cost 0 Total Project Cost 1,093,156

FM# 4259773 (TIP# ) MARTIN COUNTY SECTION 5311, OPERATING RURAL FUNDS *Non-SIS*Length: .000Type of Work: OPERATING/ADMIN. ASSISTANCE Lead Agency: MANAGED BY MARTIN

LRTP#: p. 29, Appendix BOPS DU 0 0 0 90,447 90,340 180,787OPS LF 0 0 0 90,447 90,340 180,787

Total 0 0 0 180,894 180,680 361,574

Prior Years Cost 0 Future Years Cost 0 Total Project Cost 361,574

(April 1, 2016) Page 82B - 4

Page 92: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

FM# 4346601 (TIP# ) MARTIN COUNTY TRANSIT CORRIDOR TREASURE COAST EXPRESS *Non-SIS*Length: .000Type of Work: OPERATING FOR FIXED ROUTE Lead Agency: Martin County

LRTP#: p. 29, Appendix BOPERATING FOR FIXED ROUTE; MARTIN COUNTY TRANSIT CORRIDOR

OPS DPTO 450,000 0 0 0 0 450,000OPS DDR 0 450,000 0 0 0 450,000

Total 450,000 450,000 0 0 0 900,000

Prior Years Cost 396,880 Future Years Cost 0 Total Project Cost 1,296,880

FM# 4346611 (TIP# ) MARTIN COUNTY SEC 5339 CAPITAL FOR BUS & BUS FACILITIES *Non-SIS*Length: .000Type of Work: CAPITAL FOR FIXED ROUTE Lead Agency: Martin County

LRTP#: p. 29, Appendix BCAPITAL FOR BUS AND BUS FACILITIES

CAP FTA 78,000 78,000 78,000 78,000 0 312,000Total 78,000 78,000 78,000 78,000 0 312,000

Prior Years Cost 273,145 Future Years Cost 0 Total Project Cost 585,145

(April 1, 2016) Page 83B - 5

Page 93: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

FM# 4385221 (TIP# ) MARTIN COUNTY SERVICE DEVELOPMENT- STUART TRAM IMPROVEMENTS *Non-SIS*Length: .000Type of Work: OPERATING FOR FIXED ROUTE Lead Agency: MANAGED BY CITY OF

LRTP#: p. 29, Appendix BProject Type: ImportedNOTE: Stuart Tram improvements

OPS DPTO 220,000 0 0 0 0 220,000OPS LF 220,000 0 0 0 0 220,000

Total 440,000 0 0 0 0 440,000

Prior Years Cost 0 Future Years Cost 0 Total Project Cost 440,000

FM# 4385241 (TIP# ) MARTIN COUNTY SERVICE DEVELOPMENT STUART- TRAM PURCHASE *Non-SIS*Length: .000Type of Work: CAPITAL FOR FIXED ROUTE Lead Agency: MANAGED BY CITY OF

LRTP#: p. 29, Appendix BProject Type: ImportedNOTE: Stuart Tram

CAP DPTO 34,000 0 0 0 0 34,000CAP LF 34,000 0 0 0 0 34,000

Total 68,000 0 0 0 0 68,000

Prior Years Cost 0 Future Years Cost 0 Total Project Cost 68,000

(April 1, 2016) Page 84B - 6

Page 94: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

Section C - Aviation

(April 1, 2016) Page 85C - 1

Page 95: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

FM# 4310351 (TIP# ) WITHAM FIELD - TAXIWAY A AT TAXIWAY A IMPROVEMENTS *Non-SIS*Type of Work: AVIATION PRESERVATION PROJECT Lead Agency: FDOT

LRTP#: p. 8, Appendix DImprovements to Taxiway A

CAP DS 649,669 0 0 0 0 649,669CAP DDR 550,331 0 0 0 0 550,331CAP LF 300,000 0 0 0 0 300,000

Total 1,500,000 0 0 0 0 1,500,000

Prior Years Cost 0 Future Years Cost 0 Total Project Cost 1,500,000

FM# 4315151 (TIP# ) WITHAM FIELD - TAXIWAY D AT TAXIWAY D IMPROVEMENTS *Non-SIS*Type of Work: AVIATION PRESERVATION PROJECT Lead Agency: FDOT

LRTP#: p. 8, Appendix DImprovements to Taxiway D

CAP DDR 0 300,000 181,064 0 0 481,064CAP LF 0 75,000 75,000 0 0 150,000CAP DPTO 0 0 118,936 0 0 118,936

Total 0 375,000 375,000 0 0 750,000

Prior Years Cost 0 Future Years Cost 0 Total Project Cost 750,000

(April 1, 2016) Page 86C - 2

Page 96: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

FM# 4331591 (TIP# ) MARTIN AIRPORT MASTER & ECONOMIC DEVELOP PLAN UPDATE *Non-SIS*Length: .000Type of Work: AVIATION REVENUE/OPERATIONAL Lead Agency: FDOT

LRTP#: p. 8, Appendix DCAP DPTO 0 0 25,000 0 0 25,000CAP FAA 0 0 450,000 0 0 450,000CAP LF 0 0 25,000 0 0 25,000

Total 0 0 500,000 0 0 500,000

Prior Years Cost 0 Future Years Cost 0 Total Project Cost 500,000

FM# 4346201 (TIP# ) WITHAM FIELD MILL & RESURFACE TAXIWAY A, (PHASE 1 DESIGN) *Non-SIS*Length: .000Type of Work: AVIATION PRESERVATION PROJECT Lead Agency: FDOT

LRTP#: p. 8, Appendix DAVIATION PRESERVATION PROJECT TAXIWAY A (PHASE 1 DESIGN)

CAP DPTO 0 0 0 0 120,000 120,000CAP LF 0 0 0 0 30,000 30,000

Total 0 0 0 0 150,000 150,000

Prior Years Cost 0 Future Years Cost 0 Total Project Cost 150,000

(April 1, 2016) Page 87C - 3

Page 97: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

FM# 4364001 (TIP# ) WITHAM FIELD RUNWAY PROTECTION ZONE CLEARING AND IMPROVEMENTS *Non-SIS*Length: .000

Type of Work: AVIATION PRESERVATION PROJECT Lead Agency:

LRTP#: p. 8, Appendix D

CAP DPTO 0 0 25,000 0 0 25,000

CAP FAA 0 0 450,000 0 0 450,000

CAP LF 0 0 25,000 0 0 25,000

Total 0 0 500,000 0 0 500,000

Prior Years Cost 0 Future Years Cost 0 Total Project Cost 500,000

FM# 4364011 (TIP# ) WITHAM FIELD REHAB OF MC NON-MOVEMENT AREAS PHASE III (DESIGN & CST) *Non-SIS*Length: .000

Type of Work: AVIATION CAPACITY PROJECT Lead Agency:

LRTP#: p. 8, Appendix D

CAP DPTO 0 0 800,000 0 0 800,000

CAP LF 0 0 200,000 0 0 200,000

Total 0 0 1,000,000 0 0 1,000,000

Prior Years Cost 0 Future Years Cost 0 Total Project Cost 1,000,000

FM# 4379631 (TIP# ) WITHAM FIELD, AIRPORT SECURITY FENCE *Non-SIS*Length: .000

Type of Work: AVIATION SECURITY PROJECT Lead Agency:

LRTP#: p. 8, Appendix DProject Type: Imported

CAP DPTO 0 800,000 0 0 0 800,000

CAP LF 0 200,000 0 0 0 200,000

Total 0 1,000,000 0 0 0 1,000,000

Prior Years Cost 0 Future Years Cost 0 Total Project Cost 1,000,000

Page 89C - 5

Page 98: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

FM# 4379641 (TIP# ) WITHAM FIELD, WILDLIFE FENCE *Non-SIS*Length: .000

Type of Work: AVIATION SAFETY PROJECT Lead Agency:

LRTP#: p. 8, Appendix DProject Type: Imported

CAP DPTO 0 50,000 0 0 0 50,000

CAP FAA 0 900,000 0 0 0 900,000

CAP LF 0 50,000 0 0 0 50,000

Total 0 1,000,000 0 0 0 1,000,000

Prior Years Cost 0 Future Years Cost 0 Total Project Cost 1,000,000

FM# 4379711 (TIP# ) WITHAM FIELD, AIRPORT ADMIN AREA BUILDING REMOVAL & SITE *Non-SIS*Length: .000

Type of Work: AVIATION REVENUE/OPERATIONAL Lead Agency:

LRTP#: p. 8, Appendix DProject Type: Imported

CAP DPTO 0 0 200,000 0 0 200,000

CAP LF 0 0 50,000 0 0 50,000

Total 0 0 250,000 0 0 250,000

Prior Years Cost 0 Future Years Cost 0 Total Project Cost 250,000

FM# 4379801 (TIP# ) WITHAM FIELD RWY 25 BLAST PAD AND TWY A HOLDING BAY (DESIGN & CST.) *Non-SIS*Length: .000

Type of Work: AVIATION CAPACITY PROJECT Lead Agency:

LRTP#: p. 8, Appendix DProject Type: Imported

CAP DPTO 160,000 0 0 0 0 160,000

CAP LF 40,000 0 0 0 0 40,000

Total 200,000 0 0 0 0 200,000

Prior Years Cost 0 Future Years Cost 0 Total Project Cost 200,000

Page 90C - 6

Page 99: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

FM# 4346241 (TIP# ) WITHAM FIELD CONSTRUCT AIRPORT INTERCONNECT RD.(PHASE 2) *Non-SIS*Length: .000Type of Work: AVIATION PRESERVATION PROJECT Lead Agency: FDOT

LRTP#: p. 8, Appendix DAVIATION PRESERVATION; INTERCONNECT ROAD (PHASE 2)

CAP DPTO 0 480,000 0 0 0 480,000CAP LF 0 120,000 0 0 0 120,000

Total 0 600,000 0 0 0 600,000

Prior Years Cost 0 Future Years Cost 0 Total Project Cost 600,000

FM# 4346371 (TIP# ) WITHAM FIELD MILL & RESURFACE TAXIWAY A *Non-SIS*Length: .000Type of Work: AVIATION PRESERVATION PROJECT Lead Agency: FDOT

LRTP#: p. 8, Appendix DTAXIWAY A AVIATION PRESERVATION

MSC LF 0 0 300,000 0 0 300,000MSC DPTO 0 0 1,200,000 0 0 1,200,000

Total 0 0 1,500,000 0 0 1,500,000

Prior Years Cost 0 Future Years Cost 0 Total Project Cost 1,500,000

(April 1, 2016) Page 88C - 4

Page 100: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

Section G - Districtwide

(April 1, 2016) Page 91G - 1

Page 101: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

FM# 2337031 (TIP# ) MARTIN CO STATE HWY SYS ROADWAY *Non-SIS*Length: .000Type of Work: ROUTINE MAINTENANCE Lead Agency: Managed by FDOT

LRTP#: p. 8, Appendix DMNT D 550,000 550,000 550,000 550,000 0 2,200,000

Total 550,000 550,000 550,000 550,000 0 2,200,000

Prior Years Cost 10,010,492 Future Years Cost 0 Total Project Cost 12,210,492

FM# 2337032 (TIP# ) MARTIN CO STATE HWY SYS BRIDGES *Non-SIS*Length: .000Type of Work: ROUTINE MAINTENANCE Lead Agency: Managed by FDOT

LRTP#: p. 8, Appendix DMNT D 45,000 45,000 45,000 45,000 0 180,000

Total 45,000 45,000 45,000 45,000 0 180,000

Prior Years Cost 1,158,883 Future Years Cost 0 Total Project Cost 1,338,883

FM# 2339565 (TIP# ) MARTIN CO - MAINTENANCE AT MOWING & LITTER CONTRACT *Non-SIS*Type of Work: ROUTINE MAINTENANCE Lead Agency: FDOT

LRTP#: p. 8, Appendix DMNT D 120,000 0 0 0 0 120,000

Total 120,000 0 0 0 0 120,000

Prior Years Cost 65,862 Future Years Cost 0 Total Project Cost 185,862

(April 1, 2016) Page 92G - 2

Page 102: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

FM# 2339567 (TIP# ) MARTIN CO-PRIMARY MOWING & LITTER CONTRACT *Non-SIS*Length: .000Type of Work: ROUTINE MAINTENANCE Lead Agency: Managed by FDOT

LRTP#: p. 8, Appendix DProject Type: ImportedMNT D 0 0 0 0 150,000 150,000

Total 0 0 0 0 150,000 150,000

Prior Years Cost 0 Future Years Cost 0 Total Project Cost 150,000

FM# 2342651 (TIP# ) MARTIN CO - MAINTENANCE FROM INTERSTATE TO ROADWAY *SIS*Type of Work: ROUTINE MAINTENANCE Lead Agency: FDOT

LRTP#: p. 8, Appendix DMNT D 500,000 200,000 200,000 200,000 0 1,100,000

Total 500,000 200,000 200,000 200,000 0 1,100,000

Prior Years Cost 5,738,110 Future Years Cost 0 Total Project Cost 6,838,110

FM# 2342652 (TIP# ) MARTIN CO INTERSTATE BRIDGES *SIS*Length: .000Type of Work: ROUTINE MAINTENANCE Lead Agency: Managed by FDOT

LRTP#: p. 8, Appendix DMNT D 70,000 20,000 20,000 20,000 0 130,000

Total 70,000 20,000 20,000 20,000 0 130,000

Prior Years Cost 437,461 Future Years Cost 0 Total Project Cost 567,461

(April 1, 2016) Page 93G - 3

Page 103: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

FM# 4130805 (TIP# ) TREASURE COAST - MAINTENANCE FROM PAVEMENT MARKERS TO PRIMARY *Non-SIS*Type of Work: ROUTINE MAINTENANCE Lead Agency: FDOT

LRTP#: p. 8, Appendix DMNT D 10,000 0 0 0 0 10,000

Total 10,000 0 0 0 0 10,000

Prior Years Cost 50,000 Future Years Cost 0 Total Project Cost 60,000

FM# 4130806 (TIP# ) PRIMARY RETRO-REFLECTIVE PAVEMENT MARKERS (RPM'S) *Non-SIS*Length: .000Type of Work: ROUTINE MAINTENANCE Lead Agency: Managed by FDOT

LRTP#: p. 8, Appendix DMNT D 0 55,000 0 0 0 55,000

Total 0 55,000 0 0 0 55,000

Prior Years Cost 0 Future Years Cost 0 Total Project Cost 55,000

FM# 4130807 (TIP# ) PRIMARY RETRO-REFLECTIVE PAVEMENT MARKERS (RPM'S) *Non-SIS*Length: .000Type of Work: ROUTINE MAINTENANCE Lead Agency: Managed by FDOT

LRTP#: p. 8, Appendix DMNT D 0 0 0 55,000 0 55,000

Total 0 0 0 55,000 0 55,000

Prior Years Cost 0 Future Years Cost 0 Total Project Cost 55,000

(April 1, 2016) Page 94G - 4

Page 104: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

FM# 4241336 (TIP# ) TREASURE COAST STRIPING PRIMARY *Non-SIS*Length: .000Type of Work: ROUTINE MAINTENANCE Lead Agency: Managed by FDOT

LRTP#: p. 8, Appendix DMNT D 0 0 150,000 0 0 150,000

Total 0 0 150,000 0 0 150,000

Prior Years Cost 0 Future Years Cost 0 Total Project Cost 150,000

FM# 4241337 (TIP# ) TREASURE COAST STRIPING PRIMARY *Non-SIS*Length: .000Type of Work: ROUTINE MAINTENANCE Lead Agency: Managed by FDOT

LRTP#: p. 8, Appendix DProject Type: ImportedMNT D 0 0 0 0 150,000 150,000

Total 0 0 0 0 150,000 150,000

Prior Years Cost 0 Future Years Cost 0 Total Project Cost 150,000

FM# 4293105 (TIP# ) TREASURE COAST HERBICIDE APPLICATION PRIMARY ROADS *Non-SIS*Length: .000Type of Work: ROUTINE MAINTENANCE Lead Agency: Managed by FDOT

LRTP#: p. 8, Appendix DROUTINE MAINTENANCE; HERBICIDE APPLCIATION

MSC D 0 0 100,000 0 0 100,000Total 0 0 100,000 0 0 100,000

Prior Years Cost 0 Future Years Cost 0 Total Project Cost 100,000

(April 1, 2016) Page 95G - 5

Page 105: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

FM# 4297744 (TIP# ) TREASURE COAST PRIMARY ASPHALT REPAIR *Non-SIS*Length: .000Type of Work: ROUTINE MAINTENANCE Lead Agency: Managed by FDOT

LRTP#: p. 8, Appendix DMNT D 0 0 0 300,000 0 300,000

Total 0 0 0 300,000 0 300,000

Prior Years Cost 0 Future Years Cost 0 Total Project Cost 300,000

FM# 4379921 (TIP# ) RESURFACE TPK MAINLINE IN MARTIN CNTY, MP 117.843 - 138.037 *SIS*Length: 20.194Type of Work: RESURFACING Lead Agency: Managed by FDOT

LRTP#: p. 8, Appendix DProject Type: ImportedPE (PENA) PKYR 1,577,000 0 0 0 0 1,577,000

CST PKYR 0 23,351,903 0 0 0 23,351,903Total 1,577,000 23,351,903 0 0 0 24,928,903

Prior Years Cost 72,827 Future Years Cost 0 Total Project Cost 25,001,730

FM# 4379922 (TIP# ) THERMOPLASTIC FOR MARTIN CNTY RESURFACING, MP 117.843 - 138.037 *SIS*Length: 20.194Type of Work: SIGNING/PAVEMENT MARKINGS Lead Agency: Managed by FDOT

LRTP#: p. 8, Appendix DProject Type: ImportedCST PKYR 0 0 889,980 0 0 889,980

Total 0 0 889,980 0 0 889,980

Prior Years Cost 0 Future Years Cost 0 Total Project Cost 889,980

(April 1, 2016) Page 96G - 6

Page 106: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

PhaseFund

Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total

FM# 4379923 (TIP# ) ROADSIDE IMPROVEMENTS IN MARTIN CNTY, MP 117.843 - 138.037 *SIS*Length: 20.194Type of Work: GUARDRAIL Lead Agency: Managed by FDOT

LRTP#: p. 8, Appendix DProject Type: ImportedCST PKYI 0 5,752,545 0 0 0 5,752,545

Total 0 5,752,545 0 0 0 5,752,545

Prior Years Cost 329,608 Future Years Cost 0 Total Project Cost 6,082,153

(April 1, 2016) Page 97G - 7

Page 107: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

Project Index (by Name)

FM # TIP # Project Name Page

4383431 . . . . . . . . . . . . . . . . . . . . . . . . . . . CR-609 FROM .51 MILES N. OF MINUTE MAID RD TO 3.2 MILES AT THE S CURVE . . . . . . . . . . . . . . A-394351391 . . . . . . . . . . . . . . . . . . . . . . . . . . . CR-707/SE BEACH ROAD FROM PALM BEACH/MARTIN CL TO CR-708/SE BRIDGE ROAD . . . . . . . A-194381251 . . . . . . . . . . . . . . . . . . . . . . . . . . . CR-708/SE BRIDGE ROAD FROM SE FLORA AVE TO SE PLANDOME DRIVE . . . . . . . . . . . . . . . . . . . A-374330691 . . . . . . . . . . . . . . . . . . . . . . . . . . . CR-708/SW BRIDGE RD FROM SR-76/SW KANNER HWY TO SW PRATT-WHITNEY RD . . . . . . . . . . A-11

2309782 . . . . . . . . . . . . . . . . . . . . . . . . . . . CR-714/INDIAN ST - MARTIN DOWNS TO MAPP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-2

4348381 . . . . . . . . . . . . . . . . . . . . . . . . . . . CR-714/SW MARTIN HWY FR. SW FOX BROWN RD TO WEST OF SR-9/I-95 . . . . . . . . . . . . . . . . . . . . A-17

4354531 . . . . . . . . . . . . . . . . . . . . . . . . . . . HIGH MEADOW AVE FROM MARTIN HWY TO SR-714/MARTIN DOWNS BVLD . . . . . . . . . . . . . . . . . . A-21

4342731 . . . . . . . . . . . . . . . . . . . . . . . . . . . I-95/SR-9 FR PALM BEACH COUNTYLINE TO N OF CR-807/SE BRDG RD . . . . . . . . . . . . . . . . . . . . . . A-134342734 . . . . . . . . . . . . . . . . . . . . . . . . . . . I-95/SR-9 FROM PALM BEACH/MARTIN CO LINE TO CR-708 INTERCHANGE . . . . . . . . . . . . . . . . . . . A-14

4383471 . . . . . . . . . . . . . . . . . . . . . . . . . . . INDIAN STREET FROM DIXIE HIGHWAY TO ST. LUCIE BLVD. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-44

4367351 . . . . . . . . . . . . . . . . . . . . . . . . . . . JONATHAN DICKINSON STATE PARK-FLAP GRANT FOR TRAIL & US-1 SIGNALIZTION . . . . . . . . . . A-264354131 . . . . . . . . . . . . . . . . . . . . . . . . . . . MAPP RD. FROM SW MARTIN DOWNS BLVD TO SW MARTIN HIGHWAY . . . . . . . . . . . . . . . . . . . . . . A-204331591 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN AIRPORT MASTER & ECONOMIC DEVELOP PLAN UPDATE . . . . . . . . . . . . . . . . . . . . . . . . . C-42339565 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO - MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-22342651 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO - MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-32342652 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO INTERSTATE BRIDGES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-32337032 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO STATE HWY SYS BRIDGES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-22337031 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO STATE HWY SYS ROADWAY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-24134931 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO TRANSIT CAPITAL - 5307 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-34071892 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO TRANSIT OPERATING - STATE GRANT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-22339567 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO-PRIMARY MOWING & LITTER CONTRACT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-34071893 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY BLOCK GRANT OPERATING ASSISTANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-24278033 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY JPA SIGNAL MAINTENANCE & OPS ON SHS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-5

(April 1, 2016) Page 98

Page 108: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

Project Index (by Name)

FM # TIP # Project Name Page

4346611 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY SECTION 5339, CAPITAL FOR BUS & BUS FACILITIES . . . . . . . . . . . . . . . . . . . . . .. . B-5

4259773 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY SECTION 5311, OPERATING RURAL FUNDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-44385241 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY SERVICE DEVELOPMENT STUART- TRAM PURCHASE ... . . . . . . . . . . . . . . . . . . . . B-64385221 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY SERVICE DEVELOPMENT- STUART TRAM IMPROVEMENTS ... . . . . . . . . . . . . . . . B-64346601 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY TRANSIT CORRIDOR TREASURE COAST EXPRESS . . . . . . . . . . . . . . . . . . . . . . . B-54259772 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY TRANSIT OPERATING - 5311 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-44278304 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY UPWP FY 2020/2021 - 2021/2022 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-84278302 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN MPO PL FY 16/17 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-64137332 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN MPO TRANSIT PLANNING - 5303 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-54278303 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN UPWP FY 18-19/19-20 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-74383461 . . . . . . . . . . . . . . . . . . . . . . . . . . . MONTEREY ROAD FROM KINGSWOOD TERRACE TO ST. LUCIE BLVD . . . . . . . . . . . . . . . . . . . . . . . A-434364251 . . . . . . . . . . . . . . . . . . . . . . . . . . . MURPHY ROAD BRIDGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-254130806 . . . . . . . . . . . . . . . . . . . . . . . . . . . PRIMARY RETRO-REFLECTIVE PAVEMENT MARKERS (RPM'S) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-44130807 . . . . . . . . . . . . . . . . . . . . . . . . . . . PRIMARY RETRO-REFLECTIVE PAVEMENT MARKERS (RPM'S) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-44379921 . . . . . . . . . . . . . . . . . . . . . . . . . . . RESURFACE TPK MAINLINE IN MARTIN CNTY, MP 117.843 - 138.037 . . . . . . . . . . . . . . . . . . . . . . . . . . G-64379923 . . . . . . . . . . . . . . . . . . . . . . . . . . . ROADSIDE IMPROVEMENTS IN MARTIN CNTY, MP 117.843 - 138.037 . . . . . . . . . . . . . . . . . . . . . . . . . G-64349761 . . . . . . . . . . . . . . . . . . . . . . . . . . . S.E. SEABRANCH BLVD. FROM S.E. RETREAT DR. TO SR-5/US-1 . . . . . . . . . . . . . . . . . . . . . . . . . . . A-184383421 . . . . . . . . . . . . . . . . . . . . . . . . . . . SAVANNAH ROAD FROM NE CARDINAL AVENUE TO JENSEN BEACH BOULEVARD . . . . . . . . . . . . A-384368511 . . . . . . . . . . . . . . . . . . . . . . . . . . . SE COVE ROAD FROM SR-76/SW KANNER HWY TO US-1/SR-5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-274380721 . . . . . . . . . . . . . . . . . . . . . . . . . . . SE DIXIE HWY/CR-A1A FR SE JEFFERSON ST TO SE INDIAN ST . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-364380711 . . . . . . . . . . . . . . . . . . . . . . . . . . . SE INDIAN ST FR US-1/FEDERAL HWY TO S OF RAILROAD CROSSING . . . . . . . . . . . . . . . . . . . . . . A-354368611 . . . . . . . . . . . . . . . . . . . . . . . . . . . SE KINDRED STREET/SE JOHNSON AVE FROM SOUTH COLORADO TO SR-5/US-1 . . . . . . . . . . . . A-284360961 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-5/US-1 FROM NORTH OF SALERNO RD. TO NORTH OF CENTRAL PARKWAY . . . . . . . . . . . . . . A-224369671 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-5/US-1 NORTH OF NW BRITT ROAD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-314385661 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-5/US-1 NORTH OF NW BRITT ROAD - RESERVE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-464383451 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-5/US-1 ROOSEVELT BRIDGE RESTRIPING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-41

(April 1, 2016) Page 99

Page 109: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

Project Index (by Name)

FM # TIP # Project Name Page

4383452 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-5/US-1 SB LEFT TURN LANE ONTO JOAN JEFFERSON WAY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-424327051 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-710/BEELINE HWY FROM E. OF SR-76 TO PALM BEACH/MARTIN CL . . . . . . . . . . . . . . . . . . . . . . A-104192522 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-710/WARFIELD BLVD FROM MARTIN POWER PLANT TO CR609/SW ALLAPATTAH RD . . . . . . . A-34383441 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-714/SW MARTIN HWY FROM CITRUS BLV TO SW MARTIN DOWNS BLV - RESERVE . . . . . . . . . A-404368701 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-714/SW MARTIN HWY FROM CITRUS BLVD. TO SW MARTIN DOWNS BLVD. . . . . . . . . . . . . . . . A-304323481 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-732/JENSEN BCH BL FROM SR-5/US-1 TO SAVANAH RD. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-94342751 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-76 KANNER HIGHWAY PORT MAYACA AREA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-154226413 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-76/KANNER HWY - from LOST RIVER ROAD to MONTEREY RD. . . . . . . . . . . . . . . . . . . . . . . . . . . A-44347331 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-9/I-95 @ SR-714 INTERCHANGE - LANDSCAPING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-164377011 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-9/I-95 FROM S OF REST AREA TO S OF SR-714/MARTIN HWY . . . . . . . . . . . . . . . . . . . . . . . . . . . A-324380401 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-9/I-95 INTERCHANGE WITH SR-76/KANNER HWY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-344333491 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-A1A AT SEWALL'S POINT ROAD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-124368691 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-A1A FROM EAST OF LYONS BRIDGE TO SR-732/JENSEN BEACH BLVD. . . . . . . . . . . . . . . . . . . . A-294383481 . . . . . . . . . . . . . . . . . . . . . . . . . . . ST. LUCIE BLVD FROM INDIAN ST TO E. OCEAN BLVD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-454363771 . . . . . . . . . . . . . . . . . . . . . . . . . . . SW MAPP RD.FROM SR-714/SW MARTIN DOWNS BLVD TO SW BRIDGEWAY ST. . . . . . . . . . . . . . . A-234363781 . . . . . . . . . . . . . . . . . . . . . . . . . . . SW MURPHY RD. FROM SW MAPP RD/SW MATHESON AVE TO MARTIN/ST. LUCIE CL . . . . . . . . . A-244379922 . . . . . . . . . . . . . . . . . . . . . . . . . . . THERMOPLASTIC FOR MARTIN CNTY RESURFACING, MP 117.843 - 138.037 . . . . . . . . . . . . . . . . . . . G-64130805 . . . . . . . . . . . . . . . . . . . . . . . . . . . TREASURE COAST - MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-84293105 . . . . . . . . . . . . . . . . . . . . . . . . . . . TREASURE COAST HERBICIDE APPLICATION PRIMARY ROADS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-54297744 . . . . . . . . . . . . . . . . . . . . . . . . . . . TREASURE COAST PRIMARY ASPHALT REPAIR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-64241336 . . . . . . . . . . . . . . . . . . . . . . . . . . . TREASURE COAST STRIPING PRIMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-5

(April 1, 2016) Page 100

Page 110: Transportation Improvement Program FY 2016/17 – 2020/21 - Martin MPO… · 2019-12-16 · M A R T I N FY 2016/17 - 2020/21 Transportation Improvement Program Adopted by the Martin

Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21

Project Index (by Name)

FM # TIP # Project Name Page

4241337 . . . . . . . . . . . . . . . . . . . . . . . . . . . TREASURE COAST STRIPING PRIMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-54378381 . . . . . . . . . . . . . . . . . . . . . . . . . . . US-1/SR-5 FROM SOUTHEAST HERITAGE BLVD. TO NORTH OF SALERNO RD. . . . . . . . . . . . . . . . . A-334310351 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD - TAXIWAY A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-24315151 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD - TAXIWAY D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-34346241 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD CONSTRUCT AIRPORT INTERCONNECT RD.(PHASE 2) . . . . . . . . . . . . . . . . . . . . . . C-64346371 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD MILL & RESURFACE TAXIWAY A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-74346201 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD MILL & RESURFACE TAXIWAY A, (PHASE 1 DESIGN) . . . . . . . . . . . . . . . . . . . . . . . . C-54364011 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD REHAB OF MC NON-MOVEMENT AREAS PHASE III (DESIGN & CST) . . . . . . . . . . . . C-94364001 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD RUNWAY PROTECTION ZONE CLEARING AND IMPROVEMENTS . . . . . . . . . . . . . . C-84379801 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD RWY 25 BLAST PAD AND TWY A HOLDING BAY (DESIGN & CST.) . . . . . . . . . . . . . . C-134379711 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD, AIRPORT ADMIN AREA BUILDING REMOVAL & SITE PREPARATION . . . . . . . . . . . C-124379631 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD, AIRPORT SECURITY FENCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-104379641 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD, WILDLIFE FENCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-11

(April 1, 2016) Page 101