transportation improvement program fy 2016/17 – 2020/21 - martin mpo… · 2019-12-16 · m a r t...
TRANSCRIPT
Transportation Improvement Program FY 2016/17 – 2020/21
M A R T I N
FY 2016/17 - 2020/21
Transportation Improvement Program
Adopted by the Martin MPO Board on June 20, 2016
Troy McDonald MPO Board Chairman
The Transportation Improvement Program of the Martin Metropolitan Planning Organization has been developed consistent with Federal regulations 23 U.S.C. I 34(h)
and CFR 450 and Florida Statute 339.175(8) in cooperation with the Florida Department of Transportation , and the local member agencies and pu blic transit operators in the
Martin MPO Planning Area.
i || P a g e
MARTIN MPO BOARD
CITY OF STUART MARTIN COUNTY
Commissioner Troy McDonald, Chair Commissioner Ed Fielding, Vice Chair Commissioner Eula R. Clarke Commissioner John Haddox
Commissioner Anne Scott Commissioner Doug Smith
SEWALL’S POINT
Commissioner Vinny Barile
REPORT DOCUMENTATION
TITLE REPORT DATE Martin MPO June 2016 FY 2016/17 - 2020/21 Transportation Improvement Program
AUTHORS ORGANIZATION NAME, ADDRESS MPO Staff AND TELEPHONE NUMBER
Martin MPO 2401 SE Monterey Road Stuart, FL 34996 772-221-1498 www.martinmpo.com
ACKNOWLEDGEMENTS
The preparation of this report has been funded in part through grants from the Federal Highway Administration and Federal Transit Administration, U. S. Department of Transportation (USDOT), under the Metropolitan Planning Program of the U.S. Code (Title 23, Section 104(f)). The contents of this report do not necessarily reflect the official views or policy of the USDOT.
Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons with questions or concerns about nondiscrimination, or who require special accommodations under the American with Disabilities Act or language translation services (free of charge) should contact Mr. Bolivar Gomez, Planner II (Title VI/Non- discrimination Contact) at (772) 288-5412 or [email protected]. Hearing impaired individuals are requested to telephone the Florida Relay System at #711.
ii | P a g e
iii | P a g e
CERTIFICATION
FHWA/FTACERTIFICATION
Federal Law requires the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) to jointly certify the transportation planning processes of Transportation Management Areas (TMAs) at least every four years (a TMA is an urbanized area, as defined by the US Census, with a population over 200,000).1
Pursuant to 23 CFR 450.328(a), the FHWA/FTA must jointly find that each metropolitan TIP is based on a “3-C” (continuing, comprehensive, and cooperative) planning process by the MPO, State Department of Transportation, and transit service provider(s). In Florida, this finding primarily has been based on the annual MPO/FDOT joint certification statements on the respective metropolitan planning processes.2
The most recent Federal Certification Review was completed in December 2012.
1 Federal Highway Administration Florida Division & Federal Transit Administration Region 4. Certification Report: Port St. Lucie Transportation Management Area – St. Lucie Transportation Planning Organization & Martin Metropolitan Planning Organization. March 2009. 2 Federal Highway Administration Florida Division & Federal Transit Administration Region 4. 2009 Florida Statewide Annual Assessment. September 2009.
v | P a g e
GLOSSARY OF TERMS
ABBREVIATIONSANDACRONYMS
ADM Administration
BPAC Bicycle & Pedestrian Advisory Committee
CAC Citizens Advisory Committee
CEI Construction, Engineering, and Inspection
CIP Capital Improvement Program/Plan
CLV Culvert
CMS Congestion Management System
CMP Congestion Management Process
COA Council on Aging
CTC Community Transportation Coordinator
DCA Department of Community Affairs DEP
Department of Environmental Protection (FL)
E/D Engineering/Design
EMO Environmental Management Office
EPA (U.S.) Environmental Protection Agency
ETDM Efficient Transportation Decision Making
FAA Federal Aviation Administration
FDOT Florida Department of Transportation
FHWA Federal Highway Administration
FTA Federal Transit Administration
FY Fiscal Year
FEDERALANDSTATEFUNDCODES
ACIM Advance Construction (IM)
ACNH Advance Construction (NH)
ACSA Advance Construction (SA)
BA Donor Bonus - any area Federal
BL Donor Bonus - areas <200K population(federal)
BNCA Bonds - controlled access road (state)
BNDS Bonds - state roads (state)
BRP State Bridge Replacement
BRRP State Bridge Replacement and Repair
BRT Federal Bridge Replacement - on federal system
LCB-TD Local Coordinating Board for the Transportation Disadvantaged
LRTP Long Range Transportation Plan
MIT Mitigation
MPO Metropolitan Planning Organization
MSC Miscellaneous
PIP Public Involvement Process or Plan
PTO Public Transportation Office
RELOC Relocation
RLRTP Regional Long Range Transportation Plan
RRX Railroad Crossing
RTA Regional Transit Authority
SAFETEA-LU Safe, Accountable, Efficient, Transportation Equity Act—A Legacy for Users
TAC Technical Advisory Committee
TD Transportation Disadvantaged
TDP Transit Development Plan
TEA-21 Transportation Efficiency Act for the 21st Century
TIP Transportation Improvement Program
TPO Transportation Planning Organization
UMTA Urban Mass Transportation Administration
UTIL Utilities
BRTZ Federal Bridge Replacement - off federal system
CIGP County Incentive Grant Program
CM Congestion Mitigation
D Unrestricted state primary funds
DDR District Dedicated Revenue (state)
DFTA Federal Pass Through Dollars from FTA
DIH State in-house product support
DIM State intermodal development
DOH State primary overhead
DPTO State PTO
vi | P a g e
DS State primary highways and public transit
DSL Local Government Cooperative Assistance Program
DU State primary funds/federal reimbursement
EB Equity Bonus
FAA Federal Aviation Administration
FCO State-fixed capital outlay
FHPP Federal High Priority Projects
FRA Federal Railroad Administration
FTA Federal Transit Administration
FTAT FHWA Transfer to FTA
GMR General Revenue for SIS
GRSC General Revenue for SCOP
HSP Highway Safety Program
MABP Minimum Allocation - Bridges (non- BRT)
MGBP Minimum Allocation - Bridges Supplement
ML Minimum allocation - areas < 200K population (federal)
NH National Highway (federal)
NHAC NH (AC/ Regular)
NHIR FIHS from NH Federal Funds
NHS National Highway Safety (federal)
NHTS National Highway Traffic Safety (federal)
PORT Seaport Trust Fund
PKCA Turnpike - controlled access
PKYR Turnpike Rehabilitation
PKYI Turnpike Improvement
PL Metropolitan Planning
P01A Turnpike Bond Construction
HPR Highway Planning Research (federal)
IM Interstate maintenance
LF or LFF Local funds
LFR Local funds - reimbursement from FDOT
MA Minimum allocation - any area (federal) SA Surface Transportation Program (STP) -
any area (federal)
SABR STP, Bridges
SCOP Small County Outreach Program
SE STP - enhancement (federal)
SH STP - hazard elimination (federal)
SL STP - areas less than 200K population
SN STP - mandatory non-urban (federal)
SP STP - RR protective devices (federal)
SR STP - RR hazard elimination (federal)
SS STP - Safety (federal)
STP Surface Transportation Program
SU STP, Urban Areas greater than 200K
TDD Transportation Disadvantaged Discretionary
TDTF Transportation Disadvantaged Trust Fund
Umxx Minimum allocation funds
XA STP (consolidated BA, MA, and SA funds)
XL STP (consolidated BL, ML, and SL funds)
XU STP (consolidated BU, MU, and SU funds)
PHASEOFCONSTRUCTIONANDCOSTALLOCATIONCODES
ADM Administration Other Agency
PDE Project Development & Environment
PE Preliminary Engineering
PLN Planning
ROW Right of Way Support
RELOC Right of Way Relocation
ROW LND Right of Way Land
UTIL Utility Coordination
CAP Capital Grant
R/R CST Railroad construction
CST Construction, CEI (Construction, engineering, inspection), Post Design
INC Construction Incentive
MNT Maintenance
RRU Railroad/Utilities Construction
ENV Environmental
OPS Operations/Grant Services
LAR Local Agency Reimbursement
DSB Design Build
MSC Miscellaneous
_____________________________________________________________________________________ vii | P a g e
FY 2016/17 - 2020/21 TIP
TABLE OF CONTENTS
ENDORSEMENT .............................................................................................................................i
MARTIN MPO BOARD ...................................................................................................................ii
REPORT DOCUMENTATION ........................................................................................................iii
CERTIFICATION .............................................................................................................................iii
FHWA/ FTA CERTIFICATION ....................................................................................................iii
JOINT CERTIFICATION ..............................................................................................................iv
GLOSSARY OF TERMS ..................................................................................................................v
ABBREVIATIONS AND ACRONYMS ..........................................................................................v
FEDERAL AND STATE FUND CODES ........................................................................................v
PHASE OF CONSTRUCTION AND COST ALLOCATION CODES ...........................................vi
TABLE OF CONTENTS ...................................................................................................................vii
1.0 INTRODUCTION .......................................................................................................................1
1.1 MPO OVERVIEW....................................................................................................................1
1.2 TIP PURPOSE ..........................................................................................................................1
1.3 ORGANIZATION ....................................................................................................................1
1.4 FULL PROJECT COSTS .........................................................................................................2
1.5 TIP AMENDMENTS AND MODIFICATIONS .....................................................................2
1.6 MAJOR PROJECT DESCRIPTIONS ......................................................................................3
1.7 IMPLEMENTED PROJECTS ..................................................................................................3
2.0 PROGRAM CONSIDERATIONS ..............................................................................................4
2.1 FINANCIAL PLAN..................................................................................................................4
2.2 PROJECT SELECTION PROCESS.........................................................................................7
2.3 PROJECT PRIORITY STATEMENT .....................................................................................7
2.4 CHANGES TO PROJECT PRIORITIES .................................................................................7
2.5 LIST OF PROJECT PRIORITIES ...........................................................................................8
2.6 MPO 2040 LRTP GOALS ........................................................................................................12
2.7 CONSISTENCY WITH REGIONAL AND LOCAL PLANS ................................................12
2.8 CONGESTION MANAGEMENT PROCESS .........................................................................12
3.0 PUBLIC INVOLVEMENT .........................................................................................................14
3.1 CONSISTENCY WITH PUBLIC INVOLVEMENT PLAN ...................................................14
3.2 TIMELINE OF EFFORTS .......................................................................................................14
3.3 PUBLIC COMMENTS & RESPONSE ...................................................................................14
4.0 5-YEAR SUMMARY OF FUNDING SOURCES......................................................................16
_____________________________________________________________________________________ viii | P a g e
LIST OF TABLES Table 1. List of Project Priorities ...................................................................................................9
Table 2. List of Transportation Alternative Program (TAP) Priorities ...........................................10
Table 3. List of Transit Priorities ...................................................................................................11
Table 4. Timeline of Public Involvement Efforts ...........................................................................15
APPENDICES LOCAL CAPITAL IMPROVEMENT PLANS ...............................................................................21
FEDERALLY OBLIGATED PROJECTS ...............................................................................................................................................26PLANNING AREA MAP ................................................................................................................... 28PROJECT INDEX BY NUMBER .................................................................................................29
PROJECT SHEETS ........................................................................................................................33A - Highway ...............................................................................................................................33B - Transit ..................................................................................................................................79
C - Aviation ................................................................................................................................85G - Districtwide ..........................................................................................................................91
PROJECT INDEX BY NAME ......................................................................................................98
Page 1
1.0 INTRODUCTION
1.1 MPO OVERVIEW
Established in 1993, the Martin MPO is governed by a Policy Board and serves the residents of Martin County. Planning tasks of the Martin MPO include regional coordination, bicycle and pedestrian planning, mobility management, demographic research, air quality planning, and PIP processes and updates. As an agency, the Martin MPO also serves its primary function as the coordinator for multi-modal transportation project planning and funding in and through the county with various state agencies responsible for transportation and land use plans as well as adjacent MPOs. On specific regional issues, the Martin MPO partners with the St. Lucie TPO, the Indian River County MPO, and the Palm Beach MPO.
1.2 TIP PURPOSE
The purpose of this Transportation Improvement Program (TIP) is to provide a comprehensive and prioritized listing of transportation projects for FY 2016/17 – 20/21 that is consistent with the 2040 Long-Range Transportation Plan (LRTP). It contains all federally funded and regionally significant transportation projects planned for the upcoming five years and is updated annually with funding priority given to the highest ranked projects from the LRTP Cost Feasible Plan.
The TIP is based on funding data contained within the FDOT Tentative Work Program (also known as the Citizen’s Report), which is developed annually and made public by FDOT prior to the development of the TIP. This report is the result of FDOT working with local agencies to establish priorities for scheduling improvements to the Strategic Intermodal System (SIS), including freight and Intelligent Transportation System (ITS) strategies, Federal interstate highway system, local roadways and MPO priorities concerning transit, pedestrian and bicycle- friendly environments and transportation demand management programs.
1.3 ORGANIZATION
Section 1.0 contains a brief overview of the MPO and the purpose of the TIP. It also contains a list of major projects that are considered top priorities. Section 2.0 contains specific items that were considered in the development of this TIP. These include (among other sections) the Financial Plan, List of Project Priorities, and the MPO’s overall goals as described within the 2040 LRTP.
Section 3.0 contains a list of efforts the MPO plans to make in order to obtain public input for the development and approval of the TIP. It will also contain a brief summary of the public comments received and the MPO’s response to them.
The Appendix contains a list of projects by funding category, the project sheets programmed in Martin County, the Local Capital Improvement Plans and FY 15 Federal Obligated Projects. The detailed project sections are based on the FDOT District 4 Tentative Work Program as imported
Page 2
on April 1, 2016. Depending on many factors, these lists of projects may potentially change prior to July 1, 2016. Once the MPO receives a final Work Program from FDOT District 4, this section may be modified.
Because the project portion of the TIP is generated through the Interactive TIP Tool, there can be several variations of the project report. For efficiency and reduction of printed pages, the adopted version shows project detail with maps for only the Highway projects. Sections for transit, aviation, rail and districtwide list are summarized with project details without location maps. All project details include a summary of costs and revenues by funding source. Because only funded projects and phases are listed in the FDOT District 4 Work Program, the costs and revenues are assumed to be equal, demonstrating financial constraint.
1.4 FULL PROJECT COSTS
The normal project production sequence is to have a Project Development and Environment (PD&E) phase, a Design (PE) phase, a Right of Way (ROW) phase and a Construction (CST) phase. Some projects may not have a ROW phase, if land is not needed to complete the project. Costs on the TIP pages for projects both on and off the SIS will have historical costs and five years of the current TIP, which may or may not be the total project cost. In addition, SIS projects will also have costs for five years beyond the current TIP. If there is no CST phase on the TIP page, then the entry will probably not be reflective of the total project cost. For some projects, such as resurfacing, safety or operational project, there may not be a total cost provided but rather additional details on that program.
The SIS is a network of high priority transportation facilities which includes the state’s largest and most significant commercial service airports, spaceport, deep water seaports, freight rail terminals, passenger rail and intercity bus terminals, rail corridors, waterways and highways.
For costs beyond the ten year window, access to the Long Range Transportation Plan (LRTP) is provided. The LRTP reference on the TIP page provides the information necessary to locate the full project costs and/or additional details regarding the project in the LRTP. If there is no LRTP reference in the TIP, full project costs are provided in the TIP. The link to the Martin LRTP is https://www.martinmpo.com/wp-content/uploads/2016/03/Martin-2040-LRTP_final- report_v3.pdf.
1.5 TIP AMENDMENTS AND MODIFICATIONS
Once the TIP is adopted, there are times that it must be modified or amended because the MPO does not have direct control of funding resources. This can be accomplished by amendment or administrative modification. Amendments are revisions that involve a major change, including an added or deleted project, a significant change to project cost (increase of 20% and greater than $2 million), or major change to a project scope. Administrative modifications are revisions that include minor changes to project costs, funding sources, and project initiation dates. Amendments require a review period to gather public comments. During this review and comment period, the TIP will be brought before the MPO Advisory Committees for review and
approval. Modifications are not required for public review but staff will present them to the Advisory Committees whenever feasible. Modifications require MPO Policy Board approval.
The Martin MPO coordinates all TIP Amendments and Administrative Modifications with FDOT District 4.
1.6 MAJOR PROJECT DESCRIPTIONS
FM# 435431 - High Meadow Ave: Resurfacing of High Meadow Avenue from Martin Highway to Murphy Road. (Project was updated to include the addition of sidewalks and extension of project limits). Preliminary Engineering funds are programmed for FY 16/17 and Construction funds have been programed for FY 2018/19.
FM# 4364251 - Murphy Road Bridge: Construction and CEI for the replacement of the existing bridge.
FM# 4368701 - SR-714 Widening: PD&E/PE (Divided 2-4 Lanes) Widening of SR 714 from Citrus Blvd to SW Martin Downs Blvd.
1.7 IMPLEMENTED PROJECTS
The following major projects from the last TIP were implemented in FY 2016/17:
FM# 2309782 - CR 714/Indian Street: Widening and reconstruction of CR 714 from the Turnpike to West of Mapp Road.
FM # 4316061 - Pratt Whitney: Resurfacing CR 711/ Pratt Whitney from Martin/Palm Beach C/L to SR 76.
FM# 4315201 - Citrus Boulevard: Resurfacing of SW Citrus Blvd from SW Hemmingway Terrace to SR 714.
FM# 4331701 - Baker Road: Sidewalk; Includes NE Cardinal Ave from NE Savannah Rd to NE Baker Rd.
FM# 4348381 - Martin Highway: SCOP (Small County Outreach Program) JPA with Martin County includes SW Allapattah Rd. from CR-714 to Martin/St Lucie CL
Page 3
Page 4
2.0 PROGRAM CONSIDERATIONS
2.1 FINANCIAL PLAN
In accordance with Federal Legislations [23 C.F.R. 450.324(i)], the MPO must demonstrate that the TIP is financially constrained. This means that the estimated expenses (or project costs) are consistent with the anticipated revenues for each funding source. Only those projects for which a revenue source has been identified are shown in the TIP to ensure a balance between the costs and revenues.
The TIP must include a financial plan that demonstrates how the approved TIP can be implemented, indicates resources from public and private sources that are reasonably expected to be made available to carry out the TIP, and recommends any additional financing strategies for needed projects and programs. However, because the MPO does not have direct control of funding resources, Administrative Modifications or Amendments may have to be made to the TIP during the fiscal year.
The Transportation Improvement Plan (TIP) is financially constrained for each year. Federally funded projects identified in the TIP can be implemented using current proposed revenue sources based on the Florida Department of Transportation (FDOT) Tentative Work Program and locally dedicated transportation revenues. All projects funded by FDOT with Federal or non-Federal dollars are included in a balanced 36-month forecast of cash and expenditures and a five-year finance plan supporting the FDOT Work Program. All local government projects (non-Federally funded) that are included in the TIP are part of member local government's capital improvement programs. The following table provides a summary of total project costs by Federal, State and local funding codes by fiscal year. Note that all project costs are shown in Year of Expenditure (YOE) dollars, meaning the costs reflect the adjusted value of the work at the time the funds will be expended on the project.
Allocation of Project Costs by Funding Source and Year
Funding Source
2016/17 2017/18 2018/19 2019/20 2020/21 Total
Federal 55,914,038 3,601,171 16,968,007 6,966,061 2,632,455 86,081,732
Local 1,400,853 1,472,749 1,353,763 796,755 565,422 5,589,542
State 16,522,623 7,313,296 17,283,879 4,229,926 8,060,294 53,410,018
State 100% 7,145 581,542 0 260,646 0 849,333
Toll/Turnpike 0 5,752,545 0 0 0 5,752,545
Total 73,844,659 18,721,303 35,605,649 12,253,388 11,258,171 151,683,170
Page 5
Summary by Funding Sources and Year
$55,914,038
$1,400,853
$16,522,623
2016/17
Federal
Local
State
$3,601,171
$1,472,749
$7,313,296
$581,542
$5,752,545
2017/18
Federal
Local
State
State 100%
Toll/Turnpike
$16,968,007
$1,353,763
$17,283,879
2018/19
Federal
Local
State
Page 6
Summary by Funding Sources and Year
$6,966,061
$796,755
$4,229,926
$260,646
2019/20
Federal
Local
State
State 100%
$2,632,455
$565,422
$8,060,294
2020/21
Federal
Local
State
Page 7
2.2 PROJECT SELECTION PROCESS
In accordance with 23 CFR 450.330(a), federally funded projects are selected by the MPO in conjunction with the development of the FDOT Tentative Work Program and through the cooperation of the public transit operator.
In addition, the 2040 LRTP plays a major role in identifying projects for selection. Contained within the LRTP is an evaluation of existing conditions, an evaluation of projected conditions, the identification of policy and project needs, and a determination of the cost feasibility of implementing these projects.
Both the FDOT Tentative Work Program and the 2040 LRTP provide the basis for establishing project priorities consistent with the planning factors considered in their annual selection, and subsequent development of the TIP pursuant to the requirements set forth in Federal legislation.
2.3 PROJECT PRIORITY STATEMENT
As required under 339.175 (8) (b) F.S., the annual list of project priorities was developed based on criteria that included the:
Approved 2040 Long Range Transportation Plan (LRTP); Strategic Intermodal System Plan (SIS); Results of the transportation management systems; and MPO’s public involvement procedures.
MPO and FDOT Staff meet annually to discuss project priorities. During this process, priorities are identified based on those of the previous year and the priorities listed in the Cost Feasible Plan of the current LRTP. This new list of priorities is discussed with the MPO Advisory Committees and then approved by the MPO Board. These priorities are then submitted to FDOT and used to program projects accordingly.
2.4 CHANGES TO PROJECT PRIORITIES
In accordance with 23 CFR 450.324(l) (1), MPOs are required to explain any changes in priorities from previous TIPs.
The Number 3 ranked priority CR 609 Guardrail came about during discussions with Martin County Engineering. In addition, Numbers 2, 8 and 9 are resurfacing projects. Savannah Road, Indian Street and St. Lucie Blvd. are on the Federal Aid system and serve as important roadways in the Martin transportation system that were deteriorating, yet eligible projects.
Safety improvements along US 1 (longer left turn storage area southbound on Joan Jefferson Way and buffered bicycle lanes on the Roosevelt Bridge) are the Number 4 ranked priority, recommended in FDOT’s Baseline Assessment of the US 1 Corridor. Number 7 ranked priority is pedestrian improvements along State roadways, Monterey Road and East Ocean Blvd.
The Transportation Alternatives and Transit Priorities have been updated to reflect recent Transportation Alternatives Program applications, as well as previously funded projects.
Page 8
2.5 LIST OF PROJECT PRIORITIES
The projects in the tables below have been formally reviewed by the MPO Technical and Citizens’ Advisory Committees and were approved by the MPO Board at its meeting on October 19, 2015.
FY 2016/17 Surface Transportation Program (STP) Priorities
The Surface Transportation Program (STP) provides flexible funding that may be used by States and localities for projects to preserve and improve the conditions and performance on any Federal-aid highway, bridge and tunnel projects on any public road, pedestrian and bicycle infrastructure, and transit capital projects, including intercity bus terminals.
Table 1
MARTIN MPO
FY17/18-FY21/22 Federal Attributable UNFUNDED Project Priorities
Facility
Segment Limits
Project Description
2040 RLRTP Page #
FY 2015/16 Priority Ranking
FY 2016/17
Proposed Priority Ranking From To
Traffic Signal Modification
US 1/North of NW Britt Rd. (Construction)
Traffic Signal Reconfiguration
68, App. D (p.8) 1 1
CR 609 .51 miles north of Minute Maid
Rd.
3.2 miles north of
Minute Maid Rd. (at the S
curve)
Guardrail (updated estimate)
68, App. D (p.8)
3 2
US 1 Corridor Retrofit
Roosevelt Bridge: southbound left turn lane onto Joan Jefferson
Way and Bicycle Safety
Longer left turn storage area; buffer bicycle traffic from motor vehicles
68, 69 4 3
SR 714 Widening
Citrus Blvd. SW Martin
Downs Blvd. Add 2 Lanes 67-69 5 4
Monterey Rd - E Ocean Blvd (CMP-Tier 2 Traffic Study
Kingswood Terrace
St. Lucie Blvd.
Mid-block pedestrian crosswalks
65, 68 7 5
Jensen Beach Blvd.
Intersection at US 1 and Jensen Beach Blvd.
Signal Rehabilitation
68, App. D (p.8)
6
Bridge Road Pratt Whitney
Road US 1 Resurfacing
68, App. D (p.8) 7
Jensen Beach Causeway
Bicycle Safety Buffer Bicycle traffic from motor vehicles
68, App. D (p.8)
8
Indian Street Intersection at US 1 and Dixie
Highway Resurfacing
68, App. D (p.8) 9
CR 714 Realignment
Okeechobee County/CR 15 B Connection
PD&E (District 1 SR 710)
68, App. D (p.8)
10 10
Table 2
MARTIN MPO
Transportation Alternatives Program (Enhancement)
Project Description 2018 2019 2020 2021 2022 Comments
Stuart CRA Kindred Street & Johnson Avenue Improvements
$791,138 Funded
SE Bridge Road Sidewalk
$400,563 Funded
NW Dixie Highway Sidewalk (north of drawbridge)
$358,092 Funded
Table 3.
MARTIN MPO
2017 Public Transit Priorities
Facility / Equipment
Project Location/
Description
Estimated Amount
Funding Source
2035 RLRTP or TDP Page #
Project Status/Notes
Bus Replacement / Expansion
Rolling Stock $80,707 5339 page 6 & 78
Bus Replacement
Rolling Stock $420,000 5307 page 87
Amount of funds programmed is
based on anticipated procurements and estimated costs and
will change from year to year.
Operating Operating $456,372 5307 page 88
Amount of funds programmed is
based on anticipated project(s) needs and
will change from year to year.
Transit Improvements
1% Transit Enhancement
$8,943 5307 page 87
Safety / Security
1% Safety / Security
$8,943 5307 page 70
Page 12
2.6 MPO 2040 LRTP GOALS
The 2040 Long-Range Transportation Plan (LRTP) for the Martin MPO is an analysis of the current and projected conditions in the region that will impact the transportation network. It contains an evaluated list of transportation improvements that will be necessary to maintain an adequate level of mobility and to accommodate anticipated population growth. The goals contained in the LRTP guide the transportation planning process in the MPO Planning Area and help to establish project priorities for the TIP.
2040 LRTP Goal 1: An efficient multimodal transportation system that supports the
local economy and maintains the quality of life.
2040 LRTP Goal 2: A safe multimodal transportation system.
2040 LRTP Goal 3: Protect the existing transportation system and the natural environment, minimizing adverse community impacts.
2040 LRTP Goal 4: A transportation system that addresses the needs and concerns of
the public.
2.7 CONSISTENCY WITH REGIONAL AND LOCAL PLANS
The 2040 LRTP was adopted by the MPO on December 14, 2016 after a duly advertised public hearing. The transportation goals found within Martin County’s Comprehensive Growth Management Plan and the City of Stuart’s Comprehensive Plan are consistent with the goals, objectives, and policies in the 2040 LRTP as well as the 2060 Florida Transportation Plan.
To the maximum extent feasible, the TIP is consistent with the Treasure Coast Strategic Regional Policy Plan, the Witham Field Master Plan, the Martin County Transportation Disadvantaged Service Plan, the Transit Development Plan, and the approved Comprehensive Plans of Martin County, the City of Stuart, the Town of Sewall’s Point, the Town of Jupiter Island, and the Town of Ocean Breeze.
2.8 CONGESTION MANAGEMENT PROCESS
Maintenance of a Congestion Management Process (CMP) or System is a requirement for all MPOs under Florida law and for MPOs in Transportation Management Areas under Federal law. A CMP is a tool that provides information needed to evaluate and improve traffic flows. The CMP is intended to help relieve congestion and enhance mobility by establishing methods to monitor and evaluate performance, identifying alternative actions, assessing and implementing cost-effective actions, and evaluating the effectiveness of implemented actions.
Candidate road sections are selected in a three tier selection process. The first tier identifies road segments in the annual Level of Service report for which the current traffic volume is at least 90 percent of the road’s adopted service volume.
Page 13
The second tier eliminates projects for which an improvement is currently programmed within the Work Program, either to the facility itself or to a parallel facility that will, when improved, provide relief to the candidate road section.
The third tier sorts the remaining projects by the timeframe in which a major capacity improvement was deemed financially feasible in the LRTP. The segment for which the expected funding is furthest in the future is then examined to identify low cost improvements that will reduce congestion.
Once the set of possible improvements are identified and preliminary cost estimates developed, a benefit/cost analysis is done to establish the relationship of the improvement costs to the value of the time saved by the improvements’ implementation.
In 2014 the selection process (described above) identified the East Ocean Boulevard/Southeast Monterey Road Corridor. The analysis of the segment yielded recommendations for low cost improvements. The design phases for two of these recommendations are funded in this TIP.
Page 14
3.0 PUBLIC INVOLVEMENT
3.1 CONSISTENCY WITH PUBLIC INVOLVEMENT PLAN
The TIP was developed in accordance with the adopted MPO Public Involvement Plan (PIP). Once the Draft TIP is completed, a notice will be advertised announcing that it is available for a 45 day public review period. During the public review process, the Draft TIP will be made available on the MPO website, in the County Administration Building, and in local libraries. It will also be presented at public meetings in conjunction with the Citizen Advisory Committee (CAC), the Technical Advisory Committee (TAC), the Bicycle and Pedestrian Advisory Committee (BPAC) and the MPO Board. After the 45 day review period, the Draft TIP will be brought before the MPO Board for a public hearing and final approval. This process fulfills the public involvement requirements for the Martin County Public Transit (MCPT) Program of Projects (POP) under Section 5307.
As described above, TIP Amendments and Administrative Modifications will also be advertised and made available for public review and comment prior to being brought before the MPO Board for final review and approval. Comments received during the review period will be summarized by category and addressed through documented modifications to the TIP.
3.2 TIMELINE OF EFFORTS
See Table 4 below for the Martin MPO timeline of Public Involvement efforts for this TIP.
3.3 PUBLIC COMMENTS & RESPONSE
Martin County does not have any Tribes or Federal Lands. Thus these federal requirements to coordinate with these entities do not apply to Martin MPO. No public comments related to the TIP have been received.
Page 15
Table 4. Timeline of Public Involvement Efforts
TASK DATE
Post Draft TIP on MPO Website 20-Apr-16
Reference Draft TIP in CAC/ TAC Agenda Packets 20-Apr-16
Publish Notice of Public Meeting for MPO Policy Board 23-Apr-16
Reference Draft TIP in BPAC Agenda Packets 25-Apr-16
Review Draft TIP @ CAC/ TAC Meetings 27-Apr-16
Begin 45 Day Public Review Period 1-May-16
Place Draft in Local Libraries and County Administration Building 1-May-16
Send Draft TIP to FHWA and FDOT for preliminary review 1-May-16
Review Draft TIP @ BPAC Meeting 2-May-16
Reference Draft TIP in MPO Board Agenda Packet 2-May-16
Review Draft TIP @ MPO Board Meeting 9-May-16
Reference Final Draft TIP in CAC Agenda Packets 25-May-16
Reference Final Draft TIP in TAC Agenda Packets 27-May-16
Review Revised Draft TIP @ CAC Meeting 1-Jun-16
Review Revised Draft TIP @ TAC Meeting 6-Jun-16
Reference Final Draft TIP in BPAC Agenda Packets 6-Jun-16
Review Revised Draft TIP @ BPAC Meeting 13-Jun-16
Reference Revised Final Draft TIP in MPO Board Agenda Packet 13-Jun-16
Review and Approve Final TIP @ MPO Board Meeting / Public Hearing 20-Jun-16
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
5-Year Summary of Funding Source
TIP 2016/17-2020/21
Funding Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
Federal 55,914,038 3,601,171 16,968,007 6,966,061 2,632,455 86,081,732
Local 1,400,853 1,472,749 1,353,763 796,755 565,422 5,589,542
State 16,522,623 7,313,296 17,283,879 4,229,926 8,060,294 53,410,018
State 100% 7,145 581,542 0 260,646 0 849,333
Toll/Turnpike 0 5,752,545 0 0 0 5,752,545
Total 73,844,659 18,721,303 35,605,649 12,253,388 11,258,171 151,683,170
Page 16
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
5-Year Summary of Funding Source by Codes
TIP 2016/17-2020/21
Project # Fund Code TotalFederalACNP ADVANCE CONSTRUCTION NHPP 52,304,560 0 0 0 0 52,304,560CM CONGESTION MITIGATION - AQ 0 0 1,249,819 0 0 1,249,819DU STATE PRIMARY/FEDERAL REIMB 160,777 172,222 176,354 148,857 148,750 806,960FAA FEDERAL AVIATION ADMIN 0 900,000 900,000 0 0 1,800,000FTA FEDERAL TRANSIT ADMINISTRATION 1,027,000 1,027,000 1,027,000 1,027,000 949,000 5,057,000NHRE NAT HWY PERFORM - RESURFACING 0 0 2,799,597 0 0 2,799,597PL METRO PLAN (85% FA; 15% OTHER) 421,630 421,630 421,630 421,630 421,630 2,108,150PLH PUBLIC LANDS HIGHWAY 551,000 0 0 0 0 551,000SA STP, ANY AREA 940,546 22,000 5,996,707 1,309,337 0 8,268,590SU STP, URBAN AREAS > 200K 251,525 704,415 4,067,934 4,059,237 1,113,075 10,196,186TALT TRANSPORTATION ALTS- ANY AREA 113,308 353,904 164,871 0 0 632,083TALU TRANSPORTATION ALTS- >200K 143,692 0 164,095 0 0 307,787Total 55,914,038 3,601,171 16,968,007 6,966,061 2,632,455 86,081,732LocalLF LOCAL FUNDS 1,379,753 1,472,749 1,291,195 796,755 565,422 5,505,874LFP LOCAL FUNDS FOR PARTICIPATING 21,100 0 62,568 0 0 83,668Total 1,400,853 1,472,749 1,353,763 796,755 565,422 5,589,542StateD UNRESTRICTED STATE PRIMARY 1,295,000 870,000 1,065,000 1,170,000 300,000 4,700,000DDR DISTRICT DEDICATED REVENUE 9,429,488 4,214,714 9,773,349 1,055,007 6,656,693 31,129,251DIH STATE IN-HOUSE PRODUCT SUPPORT 180,622 21,060 200,815 0 28,450 430,947DITS STATEWIDE ITS - STATE 100%. 197,264 202,196 207,250 212,432 217,743 1,036,885DPTO STATE - PTO 1,127,659 1,600,286 2,647,905 292,552 412,552 6,080,954DS STATE PRIMARY HIGHWAYS & PTO 3,285,619 0 2,823,133 61,992 12,937 6,183,681
Page 17
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
5-Year Summary of Funding Source by Codes
TIP 2016/17-2020/21
Project # Fund Code TotalStateGRSC GROWTH MANAGEMENT FOR SCOP 216,342 299,406 566,427 890,916 0 1,973,091SCED 2012 SB1998-SMALL CO OUTREACH 540,541 98,066 0 54,054 0 692,661SCOP SMALL COUNTY OUTREACH PROGRAM 250,088 7,568 0 492,973 431,919 1,182,548Total 16,522,623 7,313,296 17,283,879 4,229,926 8,060,294 53,410,018State 100%SCWR 2015 SB2514A-SMALL CO OUTREACH 7,145 581,542 0 260,646 0 849,333Total 7,145 581,542 0 260,646 0 849,333Toll/TurnpikePKYI TURNPIKE IMPROVEMENT 0 5,752,545 0 0 0 5,752,545Total 0 5,752,545 0 0 0 5,752,545
Page 18
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
5-Year Summary of Funding Source by Codes
TIP 2016/17-2020/21
Project # Fund Code TotalFederalACNP ADVANCE CONSTRUCTION NHPP 52,304,560 0 0 0 0 52,304,560CM CONGESTION MITIGATION - AQ 0 0 1,249,819 0 0 1,249,819DU STATE PRIMARY/FEDERAL REIMB 160,777 172,222 176,354 148,857 148,750 806,960FAA FEDERAL AVIATION ADMIN 0 900,000 900,000 0 0 1,800,000FTA FEDERAL TRANSIT ADMINISTRATION 1,027,000 1,027,000 1,027,000 1,027,000 949,000 5,057,000NHRE NAT HWY PERFORM - RESURFACING 0 0 2,799,597 0 0 2,799,597PL METRO PLAN (85% FA; 15% OTHER) 421,630 421,630 421,630 421,630 421,630 2,108,150PLH PUBLIC LANDS HIGHWAY 551,000 0 0 0 0 551,000SA STP, ANY AREA 940,546 22,000 5,996,707 1,309,337 0 8,268,590SU STP, URBAN AREAS > 200K 251,525 704,415 4,067,934 4,059,237 1,113,075 10,196,186TALT TRANSPORTATION ALTS- ANY AREA 113,308 353,904 164,871 0 0 632,083TALU TRANSPORTATION ALTS- >200K 143,692 0 164,095 0 0 307,787Total 55,914,038 3,601,171 16,968,007 6,966,061 2,632,455 86,081,732LocalLF LOCAL FUNDS 1,379,753 1,472,749 1,291,195 796,755 565,422 5,505,874LFP LOCAL FUNDS FOR PARTICIPATING 21,100 0 62,568 0 0 83,668Total 1,400,853 1,472,749 1,353,763 796,755 565,422 5,589,542StateD UNRESTRICTED STATE PRIMARY 1,295,000 870,000 1,065,000 1,170,000 300,000 4,700,000DDR DISTRICT DEDICATED REVENUE 9,429,488 4,214,714 9,773,349 1,055,007 6,656,693 31,129,251DIH STATE IN-HOUSE PRODUCT SUPPORT 180,622 21,060 200,815 0 28,450 430,947DITS STATEWIDE ITS - STATE 100%. 197,264 202,196 207,250 212,432 217,743 1,036,885DPTO STATE - PTO 1,127,659 1,600,286 2,647,905 292,552 412,552 6,080,954DS STATE PRIMARY HIGHWAYS & PTO 3,285,619 0 2,823,133 61,992 12,937 6,183,681
Page 19
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
5-Year Summary of Funding Source by Codes
TIP 2016/17-2020/21
Project # Fund Code TotalStateGRSC GROWTH MANAGEMENT FOR SCOP 216,342 299,406 566,427 890,916 0 1,973,091SCED 2012 SB1998-SMALL CO OUTREACH 540,541 98,066 0 54,054 0 692,661SCOP SMALL COUNTY OUTREACH PROGRAM 250,088 7,568 0 492,973 431,919 1,182,548Total 16,522,623 7,313,296 17,283,879 4,229,926 8,060,294 53,410,018State 100%SCWR 2015 SB2514A-SMALL CO OUTREACH 7,145 581,542 0 260,646 0 849,333Total 7,145 581,542 0 260,646 0 849,333Toll/TurnpikePKYI TURNPIKE IMPROVEMENT 0 5,752,545 0 0 0 5,752,545Total 0 5,752,545 0 0 0 5,752,545
Page 20
Project C or N Priority Total To Date Unfunded FY2016 FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 FY2025Resurfacing, Drainage, Striping & Maintenance (1017) N 1 119,454,000 0 106,781,000 1,016,000 837,000 847,000 1,284,000 1,454,000 22,803,200 22,803,200 22,803,200 22,803,200 22,803,200CR-714 (SW Martin Hwy) / CR-609 (SW Allapattah Rd) - Resurfacing (101710) N 1 1,948,452.5 5,958 0 1,942,495 0 0 0 0 0 0 0 0 0CR-726 (Citrus Blvd) - Resurfacing & Bike Lanes (101701) N 1 3,556,152 11,390 0 3,544,762 0 0 0 0 0 0 0 0 0CR-708 (Bridge Rd) - Resurfacing & Bike Lanes (101706) N 1 958,569.0 5,520 0 953,049 0 0 0 0 0 0 0 0 0CR711 (Pratt Whitney Rd) - Resurfacing & Bike Lanes (101707) N 1 3,343,896 57,053 0 3,286,843 0 0 0 0 0 0 0 0 0SE Cove Road - Resurfacing (101712) N 1 1,497,776.0 0 0 0 60,000 10,000 0 1,427,776 0 0 0 0 0Signal & Intersection Improvements (1016) N 1, 2, 4 4,233,717 0 0 375,000 630,000 375,000 390,000 588,717 375,000 375,000 375,000 375,000 375,000Streetlights - Dixie Hwy (1121) N 1, 2, 4 530,000.0 175,000 215,000 140,000 0 0 0 0 215,000 0 0 0 0Annual Commitments (1019) N 8 3,755,218.0 0 0 605,218 350,000 350,000 350,000 350,000 350,000 350,000 350,000 350,000 350,000Multi-Modal Pathways (1011) N 1 200,000 0 0 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000Baker Road Improvements (1011H) N 1 370,400.0 0 0 370,400 0 0 0 0 0 0 0 0 0SE Seabranch Blvd - Resurfacing (101709) N 2 1,016,217 0 0 60,000 10,000 0 946,217 0 0 0 0 0 0SW High Meadow Ave - Resurfacing & Bike Lanes (101711) N 2 1,399,115.0 0 0 65,000 10,000 0 1,324,115 0 0 0 0 0 0SW Mapp Road - Resurfacing (101714) N 2 1,256,688 0 0 60,000 10,000 1,186,688 0 0 0 0 0 0 0SW Murphy Road Resurfacing (101715) N 2 1,009,139.0 0 0 60,000 10,000 0 939,139 0 0 0 0 0 0Parkwood Subdivision Resurfacing (101717) N 2 1,401,000.0 0 0 1,401,000 0 0 0 0 0 0 0 0 0Palm City Farms Resurfacing (101718) N 2 935,000.0 0 0 935,000 0 0 0 0 0 0 0 0 0Skyline/Highland/Pitchford Resurfacing (101719) N 2 526,000.0 0 0 526,000 0 0 0 0 0 0 0 0 0Pinecrest Lakes Resurfacing (101720) N 2 769,000.0 0 0 769,000 0 0 0 0 0 0 0 0 0Poinciana Gardens Resurfacing (101721) N 2 556,000.0 0 0 556,000 0 0 0 0 0 0 0 0 096th Street/Greenridge Resurfacing (101722) N 2 255,000.0 0 0 255,000 0 0 0 0 0 0 0 0 0Heritage Ridge Resurfacing (101723) N 2 935,000.0 0 0 935,000 0 0 0 0 0 0 0 0 0Murphy Rd (over C-23) - Bridge Replacement (105303) N 2 3,532,215 170,000 0 25,000 25,000 25,000 25,000 3,262,215 0 0 0 0 0Bridge Replacements/Renovations (1053) N 2 21,391,740.0 0 18,030,480 124,000 157,250 157,250 157,250 157,250 4,127,748 4,127,748 4,127,748 4,127,748 4,127,748Britt Rd Bridge - Bridge Replacement (105301) N 2 1,733,000 233,000 1,500,000 0 0 0 0 0 1,500,000 0 0 0 0Heavy Equipment Replacement (4957) N 2 9,964,899.6 0 5,214,121 700,779 450,000 450,000 450,000 450,000 1,492,824 1,492,824 1,492,824 1,492,824 1,492,824Engineering Field Ops and Traffic Building Replacement N 2 1,352,000 0 1,352,000 0 0 0 0 0 1,352,000 0 0 0 0South Beach Road Resurfacing (1019) N 2 5,111,918 0 0 475,000 0 4,636,918 0 0 0 0 0 0Hutchinson Island Beautification (2028A) N 10 1,386,450 319,950 0 106,650 106,650 106,650 106,650 106,650 106,650 106,650 106,650 106,650 106,650
SR-76 (S Kanner Hwy) - Interchange (1074A) C 3 7,011,133.0 2,965,133 0 4,046,000 0 0 0 0 0 0 0 0 0SR-714 (Martin Hwy) - Widening (1123A) C 3 2,345,000.0 0 0 510,000 1,835,000 0 0 0 0 0 0 0 0SR-76 (S Kanner Hwy) - Widening (1074) C 7 29,027,551 28,369,336 0 154,000 504,215 0 0 0 0 0 0 0 0SE Willoughby Blvd - Extension (1031) C 5 5,920,000 1,915,000 3,024,688 837,000 0 0 0 0 3,168,000 0 0 0 0SR710 (SW Warfield Blvd) - Widening (1066) C 5 2,225,000.0 0 1,908,574 0 0 0 0 257,000 1,968,000 0 0 0 0Expenditure Totals 240,907,246 34,227,340 138,025,863 24,379,196 5,490,115 3,527,588 10,629,289 8,073,608 37,478,422 29,275,422 29,275,422 29,275,422 29,275,422
Revenue Total To Date Carryover FY2016 FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 FY2025Ad Valorem 5,377,000 0 0 5,377,000 0 0 0 0 0 0 0 0 0City Funds 556,000 250,000 306,000 0 0 0 0 0 0 0 0 0 0Gas Tax 21,741,329 1,270,163 3,181,166 1,729,000 1,729,000 1,729,000 1,729,000 1,729,000 1,729,000 1,729,000 1,729,000 1,729,000 1,729,000Grant 25,212,351 2,560,061 2,347,500 7,846,277 475,000 806,688 7,126,834 4,049,991 0 0 0 0 0Hutchinson Island MSTU 1,386,450 319,950 0 106,650 106,650 106,650 106,650 106,650 106,650 106,650 106,650 106,650 106,650Impact Fee 1,707,715 695,872 811,843 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000LLC Contribution 1,600,000 756,000 844,000 0 0 0 0 0 0 0 0 0 0Prop Share 316,426 0 0 0 0 0 316,426 0 0 0 0 0 0Road MSTU 13,205,796 5,958 1,199,838 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000State Funds 31,781,268 28,369,336 0 664,000 2,594,215 0 0 153,717 0 0 0 0 0Revenue Total 102,884,335 34,227,340 8,690,347 16,942,927 6,124,865 3,862,338 10,498,910 7,259,358 3,055,650 3,055,650 3,055,650 3,055,650 3,055,650
Total Unfunded 138,025,863
FY 2016MARTIN COUNTY CAPITAL IMPROVEMENT PLAN (CIP)
ROADS EXPENDITURE SUMMARY
ROADS REVENUE SUMMARY
Page 21
Page 22
Page 23
Town of Sewall's Point 2016
CAPITAL IMPROVEMENT PLAN 2016 2017 2018 2019 2020 5-YEAR TOTAL
Streets & Bridges 90,000 350,000 350,000 345,000 345,000 1,480,000
Storm Water System 72,500 72,500 72,500 35,000 35,000 287,500
Vehicles 0 90,000 0 60,000 0 150,000
Parks & Landscaping 30,000 17,000 20,000 17,000 20,000 104,000
Town Hall 10,000 20,000 20,000 15,000 10,000 75,000
Pedway 0 25,000 85,000 0 0 110,000
Annual Expenditures 202,500 574,500 547,500 472,000 410,000 2,206,500
Page 24
Page 25
MARTIN COUNTY TRANSPORTATION IMPROVEMENT PROGRAMFY15 FEDERAL OBLIGATED
ITEM NO PROJECT NAME FUND WORK MIX PHASE 2015 FUNDING
230978 1 INDIAN STREET BRIDGE FROM W. OF MAPP ROAD TO E. OF KANNER HIGHWAY EB NEW BRIDGE CONSTRUCTION CONSTRUCTION ‐1,971,029
230978 1 INDIAN STREET BRIDGE FROM W. OF MAPP ROAD TO E. OF KANNER HIGHWAY SA NEW BRIDGE CONSTRUCTION CONSTRUCTION ‐83,375
230978 1 INDIAN STREET BRIDGE FROM W. OF MAPP ROAD TO E. OF KANNER HIGHWAY EB NEW BRIDGE CONSTRUCTION GRANTS AND MISCELLANEOUS ‐7,754
230978 1 INDIAN STREET BRIDGE FROM W. OF MAPP ROAD TO E. OF KANNER HIGHWAY EB NEW BRIDGE CONSTRUCTION RIGHT OF WAY ‐1,412,028
230978 1 INDIAN STREET BRIDGE FROM W. OF MAPP ROAD TO E. OF KANNER HIGHWAY HPP NEW BRIDGE CONSTRUCTION RIGHT OF WAY ‐553
230978 1 INDIAN STREET BRIDGE FROM W. OF MAPP ROAD TO E. OF KANNER HIGHWAY SA NEW BRIDGE CONSTRUCTION RIGHT OF WAY ‐416,375
230978 2 CR‐714/INDIAN ST FROM TPK/MARTIN DOWNS BV TO W. OF MAPP ROAD EB ADD LANES & RECONSTRUCT CONSTRUCTION 9,000
230978 2 CR‐714/INDIAN ST FROM TPK/MARTIN DOWNS BV TO W. OF MAPP ROAD SA ADD LANES & RECONSTRUCT CONSTRUCTION 976,276
230978 2 CR‐714/INDIAN ST FROM TPK/MARTIN DOWNS BV TO W. OF MAPP ROAD SU ADD LANES & RECONSTRUCT GRANTS AND MISCELLANEOUS ‐17,694
230978 2 CR‐714/INDIAN ST FROM TPK/MARTIN DOWNS BV TO W. OF MAPP ROAD EB ADD LANES & RECONSTRUCT PRELIMINARY ENGINEERING ‐426
230978 2 CR‐714/INDIAN ST FROM TPK/MARTIN DOWNS BV TO W. OF MAPP ROAD SA ADD LANES & RECONSTRUCT PRELIMINARY ENGINEERING ‐151
230978 2 CR‐714/INDIAN ST FROM TPK/MARTIN DOWNS BV TO W. OF MAPP ROAD EB ADD LANES & RECONSTRUCT RIGHT OF WAY 6,860
230978 2 CR‐714/INDIAN ST FROM TPK/MARTIN DOWNS BV TO W. OF MAPP ROAD SA ADD LANES & RECONSTRUCT RIGHT OF WAY 10,646
230978 4 INDIAN STREET BRIDGE FROM W. OF MAPP ROAD TO E. OF KANNER HIGHWAY SU ENVIRONMENTAL MITIGATION CONSTRUCTION 2,931
230978 4 INDIAN STREET BRIDGE FROM W. OF MAPP ROAD TO E. OF KANNER HIGHWAY SU ENVIRONMENTAL MITIGATION GRANTS AND MISCELLANEOUS 500,000
413254 1 SR‐9/I‐95 F. S OF CR‐708/BRIDGE RD. TO HIGH MEADOW NHPP PD&E/EMO STUDY PRELIMINARY ENGINEERING 23,403
419250 2 SR‐710 BRIDGE #890016, BRIDGE REPLACEMENT NH BRIDGE‐REPLACE AND ADD LANES CONSTRUCTION ‐1,749,908
419250 2 SR‐710 BRIDGE #890016, BRIDGE REPLACEMENT SA BRIDGE‐REPLACE AND ADD LANES CONSTRUCTION 75,930
419250 4 SR‐710/WARFIELD BLVD FROM SW TRAIL DRIVE TO ENTRANCE RAMP TO SR‐76 SU LIGHTING CONSTRUCTION 2,931
427023 1 SR‐5/US‐1 FROM PBC/MARTIN CO LINE TO MP 5.03 NHRE RESURFACING CONSTRUCTION ‐70,184
427023 1 SR‐5/US‐1 FROM PBC/MARTIN CO LINE TO MP 5.03 SA RESURFACING CONSTRUCTION ‐64,147
427664 1 PALM CITY CRA SIDEWALKS EB SIDEWALK CONSTRUCTION ‐696
427664 1 PALM CITY CRA SIDEWALKS TALU SIDEWALK CONSTRUCTION 14,067
427664 1 PALM CITY CRA SIDEWALKS TALU SIDEWALK CONSTRUCTION 7,153
429737 1 SR‐9/I‐95 FROM N OF CR‐708 TO S OF HIGH MEADOW RD HSP LIGHTING CONSTRUCTION 27,432
429737 1 SR‐9/I‐95 FROM N OF CR‐708 TO S OF HIGH MEADOW RD EB LIGHTING GRANTS AND MISCELLANEOUS ‐524
429737 1 SR‐9/I‐95 FROM N OF CR‐708 TO S OF HIGH MEADOW RD NHPP LIGHTING PRELIMINARY ENGINEERING 16,441
429745 1 SR‐5/US‐1 @ SE POINCIANA LANE HSP LIGHTING CONSTRUCTION ‐55,067
431606 1 CR‐711/PRATT/WHITNEY FROM MARTIN/PALM BEACH CL TO SR‐76/KANNER HIGHWAY SA RESURFACING CONSTRUCTION 89,038
431606 1 CR‐711/PRATT/WHITNEY FROM MARTIN/PALM BEACH CL TO SR‐76/KANNER HIGHWAY SU RESURFACING CONSTRUCTION 2,961,935
431606 1 CR‐711/PRATT/WHITNEY FROM MARTIN/PALM BEACH CL TO SR‐76/KANNER HIGHWAY SU RESURFACING CONSTRUCTION 105,000
431646 1 CR‐707/DIXIE HWY FR. SOUTH OF FLORIDA ST. TO NORTH OF SE 5TH ST. TALT BIKE LANE/SIDEWALK CONSTRUCTION 5,000
431646 1 CR‐707/DIXIE HWY FR. SOUTH OF FLORIDA ST. TO NORTH OF SE 5TH ST. TALU BIKE LANE/SIDEWALK CONSTRUCTION 50
431649 1 CR‐A1A/SE DIXIE HWY. FROM US‐1 TO SATURN STREET TALT BIKE LANE/SIDEWALK CONSTRUCTION ‐113
431730 1 INDIANTOWN CONNECTOR SIDEWALKS TALT SIDEWALK CONSTRUCTION 830,034
431730 1 INDIANTOWN CONNECTOR SIDEWALKS TALT SIDEWALK CONSTRUCTION 27,233
433170 1 BAKER RD IMPROVEMENTS FROM NW GREEN RIVER PARKWAY TO SE BRAILLE PLACE TALU SIDEWALK CONSTRUCTION 43,400
433170 1 BAKER RD IMPROVEMENTS FROM NW GREEN RIVER PARKWAY TO SE BRAILLE PLACE TALU SIDEWALK CONSTRUCTION 13,000
433170 1 BAKER RD IMPROVEMENTS FROM NW GREEN RIVER PARKWAY TO SE BRAILLE PLACE EB SIDEWALK PRELIMINARY ENGINEERING 7,000
Page 26
MARTIN COUNTY TRANSPORTATION IMPROVEMENT PROGRAMFY15 FEDERAL OBLIGATED
433170 1 BAKER RD IMPROVEMENTS FROM NW GREEN RIVER PARKWAY TO SE BRAILLE PLACE TALT SIDEWALK PRELIMINARY ENGINEERING 300
434008 1 SW CITRIS BLVD. EMBANKMENT SLOPE EROSION MARTIN COUNTY (EMERGENCY) ER13 EMERGENCY OPERATIONS GRANTS AND MISCELLANEOUS 600
434273 1 I‐95/SR‐9 FR PALM BEACH COUNTYLINE TO N OF CR‐708/SE BRIDGE ROAD NHPP RESURFACING PRELIMINARY ENGINEERING ‐188,991
435353 1 SR‐76/ SW KANNER HWY @SCFE R/R XING #272274‐B R\R MP; K 40.14 RHH RAIL SAFETY PROJECT RAILROAD AND UTILITIES 47,734
435423 1 SR‐714/SW MARTIN HWY @ SCFE CROSSING 272270Y RHH RAIL SAFETY PROJECT RAILROAD AND UTILITIES 36,607
436735 1 JONATHAN DICKINSON STATE PARK‐FLAP GRANT FOR TRAIL & US‐1 SIGNALIZATN PLH MISCELLANEOUS CONSTRUCTION PRELIMINARY ENGINEERING 100,000
427829 1 MARTIN UPWP FY 2012/2013 & 2013/2014 PL TRANSPORTATION PLANNING PRELIMINARY ENGINEERING ‐574,224
427830 1 MARTIN UPWP FY 2014/2015 & 2015/2016 PL TRANSPORTATION PLANNING PRELIMINARY ENGINEERING 838,079
Page 27
434273.4
434273.1
435139.1
432705.1
437701.1 437838.1
434275.1
432348.1
436096.1
438040.1
436869.1
434733.1
433349.1
10
10
10
Witham Field
Indiantown Airport HobeSound
NorthForkStLucieRiver
LoxahatcheeRiver
SouthForkStLucieRiver
LAKE OKEECHOBEE
INDIAN RIVER
ATLANTIC OCEAN
ST716
ST714
ST710
STA1A
ST732
ST707
ST5
ST91
ST76
£¤1
£¤1
£¤98
§̈¦95
§̈¦95
State of FloridaDepartment of Transportation
0 2 4Miles®
Deepwater Seaportín¤ Passenger Intermodal Station
Bus Stationn£
Freight Intermodal Station#
Major US or State HighwayOther US or State HighwayCounty Highway
Major Airporto
Interstate Highway
Public Airportp
Transportation Facilities
Railway
Florida at WorkTransportation Improvements
MARTIN COUNTY
FY 2017-2021 TentativeWork Program
FDOT Construction Only
Overview Map:Area of Interest
20172018201920202021
Projects by First Yearof Construction
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
Project Index (by Number)
FM # TIP # Project Name Page
4130805 . . . . . . . . . . . . . . . . . . . . . . . . . . . TREASURE COAST - MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-4
4130806 . . . . . . . . . . . . . . . . . . . . . . . . . . . PRIMARY RETRO-REFLECTIVE PAVEMENT MARKERS (RPM'S) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-4
4130807 . . . . . . . . . . . . . . . . . . . . . . . . . . . PRIMARY RETRO-REFLECTIVE PAVEMENT MARKERS (RPM'S) ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-4
4134931 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO TRANSIT CAPITAL - 5307 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-3
4137332 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN MPO TRANSIT PLANNING - 5303 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-3
4192522 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-710/WARFIELD BLVD FROM MARTIN POWER PLANT TO CR609/SW ALLAPATTAH RD . . . . . . . A-3
4226413 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-76/KANNER HWY - FROM LOST RIVER ROAD to MONTEREY RD. . . . . . . . . . . . . . . . . . . . . . . . . A-44241336 . . . . . . . . . . . . . . . . . . . . . . . . . . . TREASURE COAST STRIPING PRIMARY ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-5
4241337 . . . . . . . . . . . . . . . . . . . . . . . . . . . TREASURE COAST STRIPING PRIMARY ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-5
4259772 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY TRANSIT OPERATING - 5311 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-4
4259773 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY SECTION 5311, OPERATING RURAL FUNDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-4
4278033 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY JPA SIGNAL MAINTENANCE & OPS ON SHS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-54278302 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN MPO PL FY 16/17 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-64278303 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN UPWP FY 18-19/19-20 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-74278304 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY UPWP FY 2020/2021 - 2021/2022 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-8
2309782 . . . . . . . . . . . . . . . . . . . . . . . . . . . CR-714/INDIAN ST - MARTIN DOWNS TO MAPP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-2
2337031 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO STATE HWY SYS ROADWAY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-2
2337032 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO STATE HWY SYS BRIDGES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-22339565 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO - MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-2
2339567 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO-PRIMARY MOWING & LITTER CONTRACT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-3
2342651 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO - MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-3
2342652 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO INTERSTATE BRIDGES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-3
4071892 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO TRANSIT OPERATING - STATE GRANT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-24071893 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY BLOCK GRANT OPERATING ASSISTANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-2
(April 1, 2016) Page 29
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
Project Index (by Number)
FM # TIP # Project Name Page
4293105 . . . . . . . . . . . . . . . . . . . . . . . . . . . TREASURE COAST HERBICIDE APPLICATION PRIMARY ROADS ... . . . . . . . . . . . . . . . . . . . . . . . . . . . G-5
4297744 . . . . . . . . . . . . . . . . . . . . . . . . . . . TREASURE COAST PRIMARY ASPHALT REPAIR ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-64310351 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD - TAXIWAY A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-2
4315151 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD - TAXIWAY D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-2
4323481 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-732/JENSEN BCH BL FROM SR-5/US-1 TO SAVANAH RD. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-9
4327051 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-710/BEELINE HWY FROM E. OF SR-76 TO PALM BEACH/MARTIN CL . . . . . . . . . . . . . . . . . . . . . . A-10
4330691 . . . . . . . . . . . . . . . . . . . . . . . . . . . CR-708/SW BRIDGE RD FROM SR-76/SW KANNER HWY TO SW PRATT-WHITNEY RD . . . . . . . . . . A-11
4331591 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN AIRPORT MASTER & ECONOMIC DEVELOP PLAN UPDATE . . . . . . . . . . . . . . . . . . . . . . . . . C-3
4333491 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-A1A AT SEWALL'S POINT ROAD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-124342731 . . . . . . . . . . . . . . . . . . . . . . . . . . . I-95/SR-9 FR PALM BEACH COUNTYLINE TO N OF CR-807/SE BRDG RD . . . . . . . . . . . . . . . . . . . . . . A-134342734 . . . . . . . . . . . . . . . . . . . . . . . . . . . I-95/SR-9 FROM PALM BEACH/MARTIN CO LINE TO CR-708 INTERCHANGE . . . . . . . . . . . . . . . . . . . A-144342751 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-76 KANNER HIGHWAY PORT MAYACA AREA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-154346201 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD MILL & RESURFACE TAXIWAY A, (PHASE 1 DESIGN) . . . . . . . . . . . . . . . . . . . . . . . . C-34346241 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD CONSTRUCT AIRPORT INTERCONNECT RD.(PHASE 2) . . . . . . . . . . . . . . . . . . . . . . C-44346371 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD MILL & RESURFACE TAXIWAY A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-44346601 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY TRANSIT CORRIDOR TREASURE COAST EXPRESS . . . . . . . . . . . . . . . . . . . . . . . B-54346611 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY SEC 5339 CAPITAL FOR BUS & BUS FACILITIES . . . . . . . . . . . . . . . . . . . . . . B-54347331 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-9/I-95 @ SR-714 INTERCHANGE - LANDSCAPING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-16
(April 1, 2016)Page 30
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
Project Index (by Number)
FM # TIP # Project Name Page
4348381 . . . . . . . . . . . . . . . . . . . . . . . . . . . CR-714/SW MARTIN HWY FR. SW FOX BROWN RD TO WEST OF SR-9/I-95 . . . . . . . . . . . . . . . . . . . . A-174349761 . . . . . . . . . . . . . . . . . . . . . . . . . . . S.E. SEABRANCH BLVD. FROM S.E. RETREAT DR. TO SR-5/US-1 . . . . . . . . . . . . . . . . . . . . . . . . . . . A-184351391 . . . . . . . . . . . . . . . . . . . . . . . . . . . CR-707/SE BEACH ROAD FROM PALM BEACH/MARTIN CL TO CR-708/SE BRIDGE ROAD . . . . . . . A-194354131 . . . . . . . . . . . . . . . . . . . . . . . . . . . MAPP RD. FROM SW MARTIN DOWNS BLVD TO SW MARTIN HIGHWAY . . . . . . . . . . . . . . . . . . . . . . A-204354531 . . . . . . . . . . . . . . . . . . . . . . . . . . . HIGH MEADOW AVE FROM MARTIN HWY TO SR-714/MARTIN DOWNS BVLD . . . . . . . . . . . . . . . . . . A-214360961 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-5/US-1 FROM NORTH OF SALERNO RD. TO NORTH OF CENTRAL PARKWAY . . . . . . . . . . . . . . A-224363771 . . . . . . . . . . . . . . . . . . . . . . . . . . . SW MAPP RD.FROM SR-714/SW MARTIN DOWNS BLVD TO SW BRIDGEWAY ST. . . . . . . . . . . . . . . A-234363781 . . . . . . . . . . . . . . . . . . . . . . . . . . . SW MURPHY RD. FROM SW MAPP RD/SW MATHESON AVE TO MARTIN/ST. LUCIE CL . . . . . . . . . A-244364001 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD RUNWAY PROTECTION ZONE CLEARING AND IMPROVEMENTS . . . . . . . . . . . . . . C-54364011 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD REHAB OF MC NON-MOVEMENT AREAS PHASE III (DESIGN & CST) . . . . . . . . . . . . C-54364251 . . . . . . . . . . . . . . . . . . . . . . . . . . . MURPHY ROAD BRIDGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-254367351 . . . . . . . . . . . . . . . . . . . . . . . . . . . JONATHAN DICKINSON STATE PARK-FLAP GRANT FOR TRAIL & US-1 SIGNALIZTION . . . . . . . . . . A-264368511 . . . . . . . . . . . . . . . . . . . . . . . . . . . SE COVE ROAD FROM SR-76/SW KANNER HWY TO US-1/SR-5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-274368611 . . . . . . . . . . . . . . . . . . . . . . . . . . . SE KINDRED STREET/SE JOHNSON AVE FROM SOUTH COLORADO TO SR-5/US-1 . . . . . . . . . . . . A-284368691 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-A1A FROM EAST OF LYONS BRIDGE TO SR-732/JENSEN BEACH BLVD. . . . . . . . . . . . . . . . . . . . A-294368701 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-714/SW MARTIN HWY FROM CITRUS BLVD. TO SW MARTIN DOWNS BLVD. . . . . . . . . . . . . . . . A-304369671 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-5/US-1 NORTH OF NW BRITT ROAD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-314377011 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-9/I-95 FROM S OF REST AREA TO S OF SR-714/MARTIN HWY . . . . . . . . . . . . . . . . . . . . . . . . . . . A-324378381 . . . . . . . . . . . . . . . . . . . . . . . . . . . US-1/SR-5 FROM SOUTHEAST HERITAGE BLVD. TO NORTH OF SALERNO RD. . . . . . . . . . . . . . . . . A-334379631 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD, AIRPORT SECURITY FENCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-54379641 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD, WILDLIFE FENCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-64379711 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD, AIRPORT ADMIN AREA BUILDING REMOVAL & SITE PREPARATION . . . . . . . . . . . . C-64379801 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD RWY 25 BLAST PAD AND TWY A HOLDING BAY (DESIGN & CST) . . . . . . . . . . . . . . . C-64379921 . . . . . . . . . . . . . . . . . . . . . . . . . . . RESURFACE TPK MAINLINE IN MARTIN CNTY, MP 117.843 - 138.037 ... . . . . . . . . . . . . . . . . . . . . . . . . G-64379922 . . . . . . . . . . . . . . . . . . . . . . . . . . . THERMOPLASTIC FOR MARTIN CNTY RESURFACING, MP 117.843 - 138.037 ... . . . . . . . . . . . . . . . . . G-64379923 . . . . . . . . . . . . . . . . . . . . . . . . . . . ROADSIDE IMPROVEMENTS IN MARTIN CNTY, MP 117.843 - 138.037 ... . . . . . . . . . . . . . . . . . . . . . . . G-74380401 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-9/I-95 INTERCHANGE WITH SR-76/KANNER HWY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-34
(April 1, 2016)Page 31
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
Project Index (by Number)
FM # TIP # Project Name Page
4380711 . . . . . . . . . . . . . . . . . . . . . . . . . . . SE INDIAN ST FR US-1/FEDERAL HWY TO S OF RAILROAD CROSSING . . . . . . . . . . . . . . . . . . . . . . A-354380721 . . . . . . . . . . . . . . . . . . . . . . . . . . . SE DIXIE HWY/CR-A1A FR SE JEFFERSON ST TO SE INDIAN ST . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-364381251 . . . . . . . . . . . . . . . . . . . . . . . . . . . CR-708/SE BRIDGE ROAD FROM SE FLORA AVE TO SE PLANDOME DRIVE . . . . . . . . . . . . . . . . . . . A-374383421 . . . . . . . . . . . . . . . . . . . . . . . . . . . SAVANNAH ROAD FROM NE CARDINAL AVENUE TO JENSEN BEACH BOULEVARD . . . . . . . . . . . . A-384383431 . . . . . . . . . . . . . . . . . . . . . . . . . . . CR-609 FROM .51 MILES N. OF MINUTE MAID RD TO 3.2 MILES AT THE S CURVE . . . . . . . . . . . . . . A-394383441 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-714/SW MARTIN HWY FROM CITRUS BLV TO SW MARTIN DOWNS BLV - RESERVE . . . . . . . . . A-404383451 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-5/US-1 ROOSEVELT BRIDGE RESTRIPING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-414383452 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-5/US-1 SB LEFT TURN LANE ONTO JOAN JEFFERSON WAY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-424383461 . . . . . . . . . . . . . . . . . . . . . . . . . . . MONTEREY ROAD FROM KINGSWOOD TERRACE TO ST. LUCIE BLVD . . . . . . . . . . . . . . . . . . . . . . . A-434383471 . . . . . . . . . . . . . . . . . . . . . . . . . . . INDIAN STREET FROM DIXIE HIGHWAY TO ST. LUCIE BLVD. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-444383481 . . . . . . . . . . . . . . . . . . . . . . . . . . . ST. LUCIE BLVD FROM INDIAN ST TO E. OCEAN BLVD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-454385221 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY SERVICE DEVELOPMENT- STUART TRAM IMPROVEMENTS . . . . . . . . . . . . . . . . . B-64385241 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY SERVICE DEVELOPMENT STUART- TRAM PURCHASE . . . . . . . . . . . . . . . . . . . . . . B-64385661 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-5/US-1 NORTH OF NW BRITT ROAD - RESERVE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-46
(April 1, 2016)Page 32
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
Section A - Highway
(April 1, 2016) Page 33A - 1
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
2309782 CR-714/INDIAN ST - MARTIN DOWNS TO MAPP RD Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
Widening and reconstruction of CR 714 from the Turnpike to W of MappRoad.
ADD LANES &RECONSTRUCT
FDOT
TPK/MARTIN DOWNS BV
W. OF MAPP ROAD
1.879 mi
21,794,930021,879,575p.42 - Table 7-4, Fig 7-1
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
ROW SU 230 84,415 0 0 0 84,645
Total 230 84,415 0 0 0 84,645
(April 1, 2016) Page 34A - 2
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4192522 SR-710/WARFIELD BLVD FROM MARTIN POWER PLANT TO CR 609/ SW ALLAPATAH RD
SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
PD&E 419344-1
ADD LANES &RECONSTRUCT
FDOT
MP 9.771
MP 14.967
5.174 mi
2,126,37245,162,68855,545,867p. 37
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
ROW DDR 0 1,035,466 3,077,172 827,617 0 4,940,255ROW DS 0 0 2,715,360 61,992 0 2,777,352ROW DIH 0 0 9,048 0 0 9,048ROW SA 0 0 510,071 20,081 0 530,152
Total 0 1,035,466 6,311,651 909,690 0 8,256,807
(April 1, 2016) Page 35A - 3
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4226413 SR-76/ KANNER HWY - FROM LOST RIVER ROAD TO MONTEREY RD Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
Right of way acquisition for the widening and reconstruction of SR 76 fromLost River Road to Monterey Rd.
ADD LANES &RECONSTRUCT
FDOT
LOST RIVER ROAD
MONTEREY ROAD
5.608 mi
32,674,573035,535,273p. 42, Table 7-4, Fig 7-1
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
ROW DDR 2,860,700 0 0 0 0 2,860,700
Total 2,860,700 0 0 0 0 2,860,700
(April 1, 2016) Page 36A - 4
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4278033 MARTIN COUNTY JPA SIGNAL MAINTENANCE & OPS ON SHS Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
TRAFFIC CONTROLDEVICES/SYSTEM
Managed by MARTINCOUNTY BOARD OF
.000
228,45601,842,959p. 10, Table 3-1
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
OPS DITS 197,264 202,196 207,250 212,432 217,743 1,036,885OPS DDR 136,599 141,683 146,946 152,390 0 577,618
Total 333,863 343,879 354,196 364,822 217,743 1,614,503
(April 1, 2016) Page 37A - 5
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4278302 MARTIN MPO PL FY 16/17 Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
TRANSPORTATION PLANNING FUNDS; UPWP 2016/2017 & 2017/2018
TRANSPORTATIONPLANNING
FDOT
FY 2016/2017
2017/2018
00843,260p. 10, Table 3-1
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
PLN (12) PL 421,630 0 0 0 0 421,630PLN PL 0 421,630 0 0 0 421,630
Total 421,630 421,630 0 0 0 843,260
(April 1, 2016) Page 38A - 6
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4278303 MARTIN UPWP FY 18-19/19-20 Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
FUNDING FOR TRANSPORTATION PLANNING; MARTIN UPWP FPR FY18-19/19-20
TRANSPORTATIONPLANNING
FDOT .000
00843,260p. 10, Table 3-1
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
PLN PL 0 0 421,630 421,630 0 843,260
Total 0 0 421,630 421,630 0 843,260
(April 1, 2016) Page 39A - 7
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4278304 MARTIN COUNTY UPWP FY 2020/2021 - 2021/2022 Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
TRANSPORTATION PLANNING FUNDS; MARTIN UPWP
TRANSPORTATIONPLANNING
FDOT .000
00421,630p. 10, Table 3-1
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
PLN PL 0 0 0 0 421,630 421,630
Total 0 0 0 0 421,630 421,630
(April 1, 2016) Page 40A - 8
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4323481 SR-732/ JENSEN BEACH BLVD FROM SR-5/US-1 TO SAVANNA RD Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
RESURFACING
Managed by FDOT
SR-5/ US-1
Savannah Road
2.210
002,480,471p. 12, Appendix D
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
PE DDR 207,761 0 0 0 0 207,761PE DIH 10,000 0 0 0 0 10,000
CST SA 0 0 1,926,766 0 0 1,926,766CST DIH 0 0 65,566 0 0 65,566CST DDR 0 0 270,378 0 0 270,378
Total 217,761 0 2,262,710 0 0 2,480,471
(April 1, 2016) Page 41A - 9
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4327051 SR-710/ BEELINE HWY FROM E OF SR-76 TO PALM BEACH/MARTIN SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
Reconstruction of the existing 2 lanes; expanded to 4 lanes divided ruralroadway; open drainage with swales.
ADD LANES &RECONSTRUCT
Managed by FDOT
EAST OF SR-76
WEST OF INDIANTOWN RD
5.598 MI
2,423,542040,523,583p.42, Table 7-4, Fig 7-1
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
CST SA 387,381 0 0 0 0 387,381CST ACNP 36,971,525 0 0 0 0 36,971,525CST DDR 221,923 0 0 0 0 221,923CST DS 519,212 0 0 0 0 519,212
Total 38,100,041 0 0 0 0 38,100,041
(April 1, 2016) Page 42A - 10
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4330691 CR-708/ SW BRIDGE RD FROM SR-76/ SW KANNER HWY TO SW PRATT-WHITNEY RD
Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
Resurfacing; SCOP (Small County Outreach Program);
RESURFACING
Martin County
SR-76
SW Pratt-Whitney Road
2.676 MI
00803,904p. 12, Appendix D, p. 8
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
CST SCED 540,541 0 0 0 0 540,541CST GRSC 62,387 0 0 0 0 62,387CST LF 200,976 0 0 0 0 200,976
Total 803,904 0 0 0 0 803,904
(April 1, 2016) Page 43A - 11
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4333491 SR-A1A AT SEWALL'S POINT ROAD Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
Upgrade traffic signals to mast arms at A1A Sewalls Point Road
TRAFFIC SIGNALUPDATE
Managed by FDOT .010 MI
36,1920535,169p. 17
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
CST DIH 28,747 0 0 0 0 28,747CST DDR 364,568 0 0 0 0 364,568CST LF 6,000 0 0 0 0 6,000CST DS 99,662 0 0 0 0 99,662
Total 498,977 0 0 0 0 498,977
(April 1, 2016) Page 44A - 12
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4342731 I-95/SR-9 FROM PALM BEACH COUNTYLINE TO N OF CR-807/SE BRIDGE RD SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
NEW INTERSTATE RRR CANDIDATE
RESURFACING
Managed by FDOT
PALM BEACH COUNTYLINE
N OF C-807/SE BRDGE ROAD
7.849 MI
394,331016,126,826p. 7, Appendix B
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
CST SA 324,460 0 0 0 0 324,460CST ACNP 15,333,035 0 0 0 0 15,333,035INC SA 0 0 75,000 0 0 75,000
Total 15,657,495 0 75,000 0 0 15,732,495
(April 1, 2016) Page 45A - 13
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4342734 I-95/SR-9 FROM PALM BEACH/MARTIN CO LINE TO CR-708 SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
ANTICIPATED SAFETY PROJECT
SAFETY PROJECT
Managed by FDOT 8.000
006,292,331p. 7, Appendix B
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
PE HSP 0 926,042 0 0 0 926,042CST HSP 0 0 0 5,366,289 0 5,366,289
Total 0 926,042 0 5,366,289 0 6,292,331
(April 1, 2016) Page 46A - 14
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4342751 SR-76 KANNER HIGHWAY PORT MAYACA AREA Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
THIS SEGMENT IS OUT BY THE LAKE IN THE PORT MAYACA AREACHANGE TRANSPORT SYSTEM 05 TO 03 2013-07-13 CHANGE
RESURFACING
Managed by FDOT 1.810 MI
350,87102,172,954p. 12, Appendix D
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
CST DIH 25,625 0 0 0 0 25,625CST DDR 1,750,015 0 0 0 0 1,750,015CST DS 46,443 0 0 0 0 46,443
Total 1,822,083 0 0 0 0 1,822,083
(April 1, 2016) Page 47A - 15
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4347331 SR-9/I-95 @ SR-714 INTERCHANGE - LANDSCAPING SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
STAND ALONE LANDSCAPING PROJECT
LANDSCAPING
Managed by FDOT .500 MI
200,61101,815,134p. 7, Appendix B
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
CST DIH 0 0 0 0 28,450 28,450CST DDR 0 0 0 0 1,573,136 1,573,136CST DS 0 0 0 0 12,937 12,937
Total 0 0 0 0 1,614,523 1,614,523
(April 1, 2016) Page 48A - 16
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4348381 CR-714/SW MARTIN HWY FR. SW FOX BROWN RD TO WEST OF SR-9/ I-95
Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
SCOP (Small County Outreach Program) JPA with Martin County includesSW Allapattah Rd. from CR-714 to Martin/St Lucie CL
RESURFACING
Martin County
Sw Fox Brown Rd
W of SR-9/I-95
12.792 MI
1,740,29702,044,293p. 12, Appendix D
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
CST SCWR 7,145 0 0 0 0 7,145CST SCOP 242,520 0 0 0 0 242,520CST GRSC 54,331 0 0 0 0 54,331
Total 303,996 0 0 0 0 303,996
(April 1, 2016) Page 49A - 17
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4349761 SE SEABRANCH BLVD FROM SE RETREAT DR TO SR-5/US-1 Non-SIS
Project Description:
Work Summary:
Lead Agency:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
Martin County
SCOP (Small County Outreach Program) JPA with Martin County, 75/25 MatchRESURFACING From: SE Retreat Dr
SR-5/US-1
2.560 MI
00856,883p. 12, Appendix D
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
CST SCOP 7,568 7,568 0 0 0 15,136CST GRSC 99,624 273,785 0 0 0 373,409CST LF 214,221 0 0 0 0 214,221CST SCWR 0 156,051 0 0 0 156,051CST SCED 0 98,066 0 0 0 98,066
Total 321,413 535,470 0 0 0 856,883
(April 1, 2016) Page 50A - 18
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4351391 CR-707/SE BEACH ROAD FROM PALM BEACH/MARTIN CL TO CR-708/SE BRIDGE RD
Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
RESURFACING S.E. BEACH ROAD FROM PB/MARTIN COUNTY LINE TO S.E. BRIDGE ROAD
RESURFACING
Managed by FDOT 7.052 MI
007,130,197p. 42, Table 7-4, Fig 7-1
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
PE SU 251,295 0 0 0 0 251,295PE SA 223,705 0 0 0 0 223,705
CST SA 0 0 3,384,079 0 0 3,384,079CST SU 0 0 3,271,118 0 0 3,271,118
Total 475,000 0 6,655,197 0 0 7,130,197
(April 1, 2016) Page 51A - 19
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4354131 MAPP RD FROM SW MARTIN DOWNS BLVD TO SW MARTIN HWY Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
Bike lane/Sidewalk; LAP with Martin County; MPO 2013 Priority #2
BIKE LANE/SIDEWALK
Martin County
SW Martin Downs Blvd
SW Martin Hwy
.771 MI
4,3810275,481p. 17
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
CST TALT 113,308 0 0 0 0 113,308CST LFP 21,100 0 0 0 0 21,100CST TALU 136,692 0 0 0 0 136,692
Total 271,100 0 0 0 0 271,100
(April 1, 2016) Page 52A - 20
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4354531 HIGH MEADOW AVE FROM MARTIN HWY TO SR-714/ MARTIN DOWNS BLVD
Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
Resurfacing
RESURFACING
Martin County
Martin Hwy
SR-714/Martin Downs Blvd
.796 MI
001,355,610p. 42, Table 7-4, Fig 7-1
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
PE SA 5,000 0 0 0 0 5,000CST CM 0 0 1,249,819 0 0 1,249,819CST SA 0 0 100,791 0 0 100,791
Total 5,000 0 1,350,610 0 0 1,355,610
(April 1, 2016) Page 53A - 21
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4360961 SR-5/US-1 FROM N OF SALERNO RD TO N OF CENTRAL PKWY Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
RESURFACING
Managed by FDOT 1.580
482,30802,715,933p. 12, Appendix D
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
CST DIH 0 21,060 0 0 0 21,060CST DDR 0 2,212,565 0 0 0 2,212,565
Total 0 2,233,625 0 0 0 2,233,625
(April 1, 2016) Page 54A - 22
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
(April 1, 2016)
4363771 SW MAPP RD FROM SR-714/SW MARTIN DOWNS BLVD TO SW BRIDGEWAY ST
Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
SCOP JPA W/MARTIN COUNTY
RESURFACING
Martin County 2.805
001,089,349p. 12, Appendix D
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
CST SCWR 0 425,491 0 0 0 425,491CST GRSC 0 25,621 365,900 0 0 391,521CST LF 0 272,337 0 0 0 272,337
Total 0 723,449 365,900 0 0 1,089,349
Page 55A - 23
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
(April 1, 2016)
4363781 SW MURPHY RD FROM SW MAPP RD/SW MATHESON AVE TO MARTIN/ST LUCIE CL
Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
SCOP JPA W/ MARTIN COUNTY MILE POINT EXCEPTION FROM 3.46TO 3.48
RESURFACING
Martin County 2.660
00877,129p. 12, Appendix D
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
CST GRSC 0 0 200,527 457,320 0 657,847CST LF 0 0 219,282 0 0 219,282
Total 0 0 419,809 457,320 0 877,129
Page 56A - 24
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4364251 MURPHY ROAD BRIDGE Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
LAP CRITICAL PROJECT W/ MARTIN COUNTY; MPO 2014 PRIORITY #2
BRIDGE REPLACEMENT
Managed by FDOT .020
003,258,239P. 31, Appendix B
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
PE SA 0 7,000 0 0 0 7,000CST SA 0 0 0 1,289,256 0 1,289,256CST SU 0 0 0 1,961,983 0 1,961,983
Total 0 7,000 0 3,251,239 0 3,258,239
(April 1, 2016) Page 57A - 25
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4367351 JONATHAN DICKINSON STATE PARK-FLAP GRANT FOR TRAIL Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
JONATHAN DICKINSON STATE PARK-FLAP GRANT FOR TRAIL & US-1 SIGNALIZATION
MISCELLANEOUSCONSTRUCTION
FDOT
130,00001,200,000p. 56, Fig. 7-3
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
CST PLH 551,000 0 0 0 0 551,000CST DIH 5,000 0 0 0 0 5,000CST DS 514,000 0 0 0 0 514,000
Total 1,070,000 0 0 0 0 1,070,000
(April 1, 2016) Page 58A - 26
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4368511 SE COVE ROAD FROM SR-76/SW KANNER HWY TO US-1/SR-5 Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
SMALL COUNTY OUTREACH PROGRAM JPA WITH MARTIN COUNTY.
RESURFACING
Martin County 4.340
001,345,657p. 12, Appendix D
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
CST SCWR 0 0 0 260,646 0 260,646CST SCED 0 0 0 54,054 0 54,054CST SCOP 0 0 0 260,947 0 260,947CST GRSC 0 0 0 433,596 0 433,596CST LF 0 0 0 336,414 0 336,414
Total 0 0 0 1,345,657 0 1,345,657
(April 1, 2016) Page 59A - 27
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4368611 SE KINDRED STREET/SE JOHNSON AVE FROM S COLORADO TO SR-5/ US-1 Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
2014 MPO TAP PRIORITY #1 LAP PROJECT WITH MARTIN COUNTY
SIDEWALK
Managed by FDOT .381
5,0000730,218p. 15-16
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
CST TALT 0 353,904 0 0 0 353,904CST LF 0 371,314 0 0 0 371,314
Total 0 725,218 0 0 0 725,218
(April 1, 2016) Page 60A - 28
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4368691 SR-A1A FROM EAST OF LYONS BRIDGE TO SR-732/JENSEN BEACH BLVD Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
2016 MPO PRIORITY #6; LF FOR DECORATIVE LIGHTINGDIFFERENTIAL; 2014 MPO PRIORITY #4
LIGHTING
Managed by FDOT 3.700
001,865,817p. 31, Appendix B
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
PE DDR 200,000 0 0 0 0 200,000PE DIH 5,000 0 0 0 0 5,000
CST DDR 0 0 776,228 0 0 776,228CST SU 0 0 776,816 0 0 776,816CST DS 0 0 107,773 0 0 107,773
Total 205,000 0 1,660,817 0 0 1,865,817
(April 1, 2016) Page 61A - 29
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4368701 SR-714/SW MARTIN HWY FROM CITRUS BLVD TO SW MARTIN DOWNS BLVD Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
2016 MPO PRIORITY #5; STATE FUNDS ONLY; 2014 MPO PRIORITY #5
PD&E/EMO STUDY
Managed by FDOT 1.120
583,14902,428,149p. 31, Appendix B
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
PE DDR 800,000 0 0 0 0 800,000PDE DDR 1,000,000 0 0 0 0 1,000,000PDE DIH 30,000 0 0 0 0 30,000PE DIH 15,000 0 0 0 0 15,000
Total 1,845,000 0 0 0 0 1,845,000
(April 1, 2016) Page 62A - 30
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4369671 SR-5/US-1 NORTH OF NW BRITT ROAD Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
2016 MPO PRIORITY #1; MASTARM RELOCATION NORTHEASTQUADRANT OF NW MALL ENTRY SOUTH; 2014 MPO PRIORITY #3
TRAFFIC SIGNALS
Managed by FDOT .020
00408,717p. 31, Appendix B
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
PE DDR 250,000 0 0 0 0 250,000PE DIH 5,000 0 0 0 0 5,000
ROW DDR 0 0 135,717 0 0 135,717ROW DIH 0 0 18,000 0 0 18,000
Total 255,000 0 153,717 0 0 408,717
(April 1, 2016) Page 63A - 31
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4377011 SR-9/I-95 FROM S OF REST AREA TO S OF SR-714/MARTIN HWY SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
LIGHTING
Managed by FDOT 4.876
004,181,116p. 7, Appendix B
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
PE HSP 601,842 0 0 0 0 601,842CST HSP 0 0 3,579,274 0 0 3,579,274
Total 601,842 0 3,579,274 0 0 4,181,116
(April 1, 2016) Page 64A - 32
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4378381 US-1/SR-5 FROM SE HERITAGE BLVD TO NORTH OF SALERNO RD Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
ADJACENT TO FM#436096.1
RESURFACING
Managed by FDOT 3.560
008,843,533p. 12, Appendix D
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
PE DDR 819,891 0 0 0 0 819,891PE DIH 5,000 0 0 0 0 5,000
CST DIH 0 0 108,201 0 0 108,201CST NHRE 0 0 2,799,597 0 0 2,799,597CST DDR 0 0 5,110,844 0 0 5,110,844
Total 824,891 0 8,018,642 0 0 8,843,533
(April 1, 2016) Page 65A - 33
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4380401 SR-9/I-95 INTERCHANGE WITH SR-76/KANNER HWY SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
STAND ALONE LANDSCAPING
LANDSCAPING
Managed by FDOT 1.400
195,34901,895,932p. 7, Appendix B
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
CST DIH 51,250 0 0 0 0 51,250CST DDR 192,700 0 0 0 0 192,700CST DS 1,456,633 0 0 0 0 1,456,633
Total 1,700,583 0 0 0 0 1,700,583
(April 1, 2016) Page 66A - 34
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4380711 SE INDIAN ST FROM US-1/FEDERAL HWY TO S OF RAILROAD CROSSING
Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
RESURFACING
Managed by MARTINCOUNTY BOARD OF
.260
00309,368p. 12, Appendix D
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
CST SCOP 0 0 0 232,026 0 232,026CST LF 0 0 0 77,342 0 77,342
Total 0 0 0 309,368 0 309,368
(April 1, 2016) Page 67A - 35
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4380721 SE DIXIE HWY/CR-A1A FROM SE JEFFERSON ST TO SE INDIAN ST Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
RESURFACING
Martin County .590
00575,892p. 12, Appendix D
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
CST SCOP 0 0 0 0 431,919 431,919CST LF 0 0 0 0 143,973 143,973
Total 0 0 0 0 575,892 575,892
(April 1, 2016) Page 68A - 36
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4381251 CR-708/SE BRIDGE ROAD FROM SE FLORA AVE TO SE PLANDOME DR Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
LAP W/MARTIN COUNTY - MARTIN MPO RANKING #1 - TAP FY 2015SIDEWALK ON SOUTH SIDE ONLY, INSTALL DRAINAGE, PEDESTRIAN
SIDEWALK
Managed by FDOT .373
00398,534p. 13-14
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
PE TALU 7,000 0 0 0 0 7,000CST TALT 0 0 164,871 0 0 164,871CST LFP 0 0 62,568 0 0 62,568CST TALU 0 0 164,095 0 0 164,095
Total 7,000 0 391,534 0 0 398,534
(April 1, 2016) Page 69A - 37
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4383421 SAVANNAH ROAD FROM NE CARDINAL AVENUE TO JENSEN BEACH BLVD
Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
2016 MPO PRIORITY #2;LAP W/ MARTIN COUNTY; 2015 MPO #2
RESURFACING
Managed by FDOT 2.085
001,125,963p. 12, Appendix D
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
PE SA 0 5,000 0 0 0 5,000CST SU 0 0 0 1,120,963 0 1,120,963
Total 0 5,000 0 1,120,963 0 1,125,963
(April 1, 2016) Page 70A - 38
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4383431 CR-609 FROM 0.51 MILES N OF MINUTE MAID RD TO 3.2 MILES AT THE S CURVE Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
2016 MPO PRIORITY #3; LAP W/ MARTIN COUNTY; 2015 MPOPRIORITY #3
GUARDRAIL
Managed by FDOT 3.336
00783,291p. 8, Appendix D
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
PE SA 0 10,000 0 0 0 10,000CST SU 0 0 0 773,291 0 773,291
Total 0 10,000 0 773,291 0 783,291
(April 1, 2016) Page 71A - 39
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4383441 SR-714/SW MARTIN HWY FROM CITRUS BLVD TO SW MARTIN DOWNS BLVD - RESERVE
Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
2016 MPO PRIORITY #5; R/W RESERVE FOR 436870-1 SWATPROJECT-STATE FUNDS ONLY; 2015 MPO PRIORITY #5
FUNDING ACTION
Managed by FDOT .000
004,000,000p. 31, Appendix B
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
ROW DDR 0 0 0 0 4,000,000 4,000,000
Total 0 0 0 0 4,000,000 4,000,000
(April 1, 2016) Page 72A - 40
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4383451 SR-5/US-1 ROOSEVELT BRIDGE RESTRIPING Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
2016 MPO PRIORITY #4;PROVIDE BUFFERED SHOULDERS/BIKE LANE;2015 MPO PRIORITY #4
PRELIMINARYENGINEERING
Managed by FDOT .650
00310,000p. 13-14
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
PE SU 0 310,000 0 0 0 310,000
Total 0 310,000 0 0 0 310,000
(April 1, 2016) Page 73A - 41
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4383452 SR-5/US-1 SB LEFT TURN LANE ONTO JOAN JEFFERSON WAY Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
2016 MPO PRIORITY #4; OPERATIONAL ANALYSIS TO DETERMINE IFLEFT TURN LANE STORAGE CAN BE INCREASED; 2015 MPO
TRAFFIC ENGINEERINGSTUDY
Managed by FDOT .057
00310,000p. 8, Appendix D
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
PE SU 0 310,000 0 0 0 310,000
Total 0 310,000 0 0 0 310,000
(April 1, 2016) Page 74A - 42
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4383461 MONTEREY ROAD FROM KINGSWOOD TERRACE TO ST LUCIE BLVD Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
2016 MPO PRIORITY #7; MID-BLOCK PEDESTRIAN CROSSWALKSALSO INCLUDES OCEAN BLVD FROM MONTEREY RD TO ST. LUCIE
TRAFFIC ENGINEERINGSTUDY
Managed by FDOT .000
00203,000p. 13-14
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
PE SU 0 0 0 203,000 0 203,000
Total 0 0 0 203,000 0 203,000
(April 1, 2016) Page 75A - 43
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4383471 INDIAN STREET FROM DIXIE HIGHWAY TO ST LUCIE BLVD Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
2016 MPO PRIORITY #8; 2015 MPO PRIORITY #8
RESURFACING
Managed by FDOT .762
00339,158p. 12, Appendix D
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
PE SU 0 0 10,000 0 0 10,000CST SU 0 0 0 0 329,158 329,158
Total 0 0 10,000 0 329,158 339,158
(April 1, 2016) Page 76A - 44
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4383481 ST LUCIE BLVD FROM INDIAN ST TO E OCEAN BLVD Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
2016 MPO PRIORITY #9; LAP W/ MARTIN COUNTY; 2015 MPOPRIORITY #9
RESURFACING
Managed by FDOT 2.437
00793,917p. 12, Appendix D
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
PE SU 0 0 10,000 0 0 10,000CST SU 0 0 0 0 783,917 783,917
Total 0 0 10,000 0 783,917 793,917
(April 1, 2016) Page 77A - 45
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
4385661 SR-5/US-1 NORTH OF NW BRITT ROAD - RESERVE Non-SIS
Project Description:
Work Summary:
Lead Agency:
From:
To:
Length:
Prior Year Cost:Future Year Cost:Total Project Cost:LRTP:
2016 MPO PRIORITY #1; CONSTRUCTION RESERVE FOR 436967-1;2015 MPO PRIORITY #1
FUNDING ACTION
Managed by FDOT .000
001,000,000p. 31, Appendix B
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
CST DDR 0 0 0 0 1,000,000 1,000,000
Total 0 0 0 0 1,000,000 1,000,000
(April 1, 2016) Page 78A - 46
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
Section B - Transit
(April 1, 2016) Page 79B - 1
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
FM# 4071892 (TIP# ) MARTIN CO TRANSIT OPERATING - STATE GRANT FROM BLOCK GRANT TO *Non-SIS*Type of Work: OPERATING/ADMIN. ASSISTANCE Lead Agency: Martin County
LRTP#: p. 29, Appendix BAdditional 75,000 programmed to supplement Block Grant change
OPS DPTO 256,358 262,985 271,668 0 0 791,011OPS DDR 75,000 75,000 75,000 0 0 225,000OPS LF 256,358 262,985 271,668 0 0 791,011
Total 587,716 600,970 618,336 0 0 1,807,022
Prior Years Cost 1,172,626 Future Years Cost 0 Total Project Cost 2,979,648
FM# 4071893 (TIP# ) MARTIN COUNTY BLOCK GRANT OPERATING ASSISTANCE *Non-SIS*Length: .000Type of Work: OPERATING/ADMIN. ASSISTANCE Lead Agency: MANAGED BY MARTIN
LRTP#: p. 29, Appendix BOPS DPTO 0 0 0 285,251 285,251 570,502OPS DDR 0 0 0 75,000 83,557 158,557OPS LF 0 0 0 285,251 293,808 579,059
Total 0 0 0 645,502 662,616 1,308,118
Prior Years Cost 0 Future Years Cost 0 Total Project Cost 1,308,118
(April 1, 2016) Page 80B - 2
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
FM# 4134931 (TIP# ) MARTIN CO TRANSIT CAPITAL - 5307 AT FTA SECTION 5307 *Non-SIS*Type of Work: CAPITAL FOR FIXED ROUTE Lead Agency: Martin County
LRTP#: p. 29, Appendix BTransit funding for fixed route.
OPS FTA 719,000 719,000 719,000 719,000 719,000 3,595,000CAP FTA 230,000 230,000 230,000 230,000 230,000 1,150,000
Total 949,000 949,000 949,000 949,000 949,000 4,745,000
Prior Years Cost 4,690,824 Future Years Cost 0 Total Project Cost 9,435,824
FM# 4137332 (TIP# ) MARTIN MPO TRANSIT PLANNING - 5303 FROM SECTION 5303 TO TRANSIT *Non-SIS*Type of Work: PTO STUDIES Lead Agency: Martin MPO
LRTP#: p. 29, Appendix BPublic Transit Planning Studies
PLN DU 58,410 0 0 0 0 58,410PLN LF 7,301 0 0 0 0 7,301
PLN (1NA) DPTO 7,301 7,301 7,301 7,301 7,301 36,505PLN (1NA) LF 0 7,301 7,301 7,301 7,301 29,204PLN (1NA) DU 0 58,410 58,410 58,410 58,410 233,640
Total 73,012 73,012 73,012 73,012 73,012 365,060
Prior Years Cost 169,092 Future Years Cost 0 Total Project Cost 534,152
(April 1, 2016) Page 81B - 3
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
FM# 4259772 (TIP# ) MARTIN COUNTY TRANSIT OPERATING - 5311 FROM SECTION 5311, TO SMALL *Non-SIS*Type of Work: OPERATING/ADMIN. ASSISTANCE Lead Agency: Martin County
LRTP#: p. 29, Appendix BTransit operations funding
OPS DU 102,367 113,812 117,944 0 0 334,123OPS LF 100,897 113,812 117,944 0 0 332,653
Total 203,264 227,624 235,888 0 0 666,776
Prior Years Cost 426,380 Future Years Cost 0 Total Project Cost 1,093,156
FM# 4259773 (TIP# ) MARTIN COUNTY SECTION 5311, OPERATING RURAL FUNDS *Non-SIS*Length: .000Type of Work: OPERATING/ADMIN. ASSISTANCE Lead Agency: MANAGED BY MARTIN
LRTP#: p. 29, Appendix BOPS DU 0 0 0 90,447 90,340 180,787OPS LF 0 0 0 90,447 90,340 180,787
Total 0 0 0 180,894 180,680 361,574
Prior Years Cost 0 Future Years Cost 0 Total Project Cost 361,574
(April 1, 2016) Page 82B - 4
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
FM# 4346601 (TIP# ) MARTIN COUNTY TRANSIT CORRIDOR TREASURE COAST EXPRESS *Non-SIS*Length: .000Type of Work: OPERATING FOR FIXED ROUTE Lead Agency: Martin County
LRTP#: p. 29, Appendix BOPERATING FOR FIXED ROUTE; MARTIN COUNTY TRANSIT CORRIDOR
OPS DPTO 450,000 0 0 0 0 450,000OPS DDR 0 450,000 0 0 0 450,000
Total 450,000 450,000 0 0 0 900,000
Prior Years Cost 396,880 Future Years Cost 0 Total Project Cost 1,296,880
FM# 4346611 (TIP# ) MARTIN COUNTY SEC 5339 CAPITAL FOR BUS & BUS FACILITIES *Non-SIS*Length: .000Type of Work: CAPITAL FOR FIXED ROUTE Lead Agency: Martin County
LRTP#: p. 29, Appendix BCAPITAL FOR BUS AND BUS FACILITIES
CAP FTA 78,000 78,000 78,000 78,000 0 312,000Total 78,000 78,000 78,000 78,000 0 312,000
Prior Years Cost 273,145 Future Years Cost 0 Total Project Cost 585,145
(April 1, 2016) Page 83B - 5
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
FM# 4385221 (TIP# ) MARTIN COUNTY SERVICE DEVELOPMENT- STUART TRAM IMPROVEMENTS *Non-SIS*Length: .000Type of Work: OPERATING FOR FIXED ROUTE Lead Agency: MANAGED BY CITY OF
LRTP#: p. 29, Appendix BProject Type: ImportedNOTE: Stuart Tram improvements
OPS DPTO 220,000 0 0 0 0 220,000OPS LF 220,000 0 0 0 0 220,000
Total 440,000 0 0 0 0 440,000
Prior Years Cost 0 Future Years Cost 0 Total Project Cost 440,000
FM# 4385241 (TIP# ) MARTIN COUNTY SERVICE DEVELOPMENT STUART- TRAM PURCHASE *Non-SIS*Length: .000Type of Work: CAPITAL FOR FIXED ROUTE Lead Agency: MANAGED BY CITY OF
LRTP#: p. 29, Appendix BProject Type: ImportedNOTE: Stuart Tram
CAP DPTO 34,000 0 0 0 0 34,000CAP LF 34,000 0 0 0 0 34,000
Total 68,000 0 0 0 0 68,000
Prior Years Cost 0 Future Years Cost 0 Total Project Cost 68,000
(April 1, 2016) Page 84B - 6
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
Section C - Aviation
(April 1, 2016) Page 85C - 1
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
FM# 4310351 (TIP# ) WITHAM FIELD - TAXIWAY A AT TAXIWAY A IMPROVEMENTS *Non-SIS*Type of Work: AVIATION PRESERVATION PROJECT Lead Agency: FDOT
LRTP#: p. 8, Appendix DImprovements to Taxiway A
CAP DS 649,669 0 0 0 0 649,669CAP DDR 550,331 0 0 0 0 550,331CAP LF 300,000 0 0 0 0 300,000
Total 1,500,000 0 0 0 0 1,500,000
Prior Years Cost 0 Future Years Cost 0 Total Project Cost 1,500,000
FM# 4315151 (TIP# ) WITHAM FIELD - TAXIWAY D AT TAXIWAY D IMPROVEMENTS *Non-SIS*Type of Work: AVIATION PRESERVATION PROJECT Lead Agency: FDOT
LRTP#: p. 8, Appendix DImprovements to Taxiway D
CAP DDR 0 300,000 181,064 0 0 481,064CAP LF 0 75,000 75,000 0 0 150,000CAP DPTO 0 0 118,936 0 0 118,936
Total 0 375,000 375,000 0 0 750,000
Prior Years Cost 0 Future Years Cost 0 Total Project Cost 750,000
(April 1, 2016) Page 86C - 2
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
FM# 4331591 (TIP# ) MARTIN AIRPORT MASTER & ECONOMIC DEVELOP PLAN UPDATE *Non-SIS*Length: .000Type of Work: AVIATION REVENUE/OPERATIONAL Lead Agency: FDOT
LRTP#: p. 8, Appendix DCAP DPTO 0 0 25,000 0 0 25,000CAP FAA 0 0 450,000 0 0 450,000CAP LF 0 0 25,000 0 0 25,000
Total 0 0 500,000 0 0 500,000
Prior Years Cost 0 Future Years Cost 0 Total Project Cost 500,000
FM# 4346201 (TIP# ) WITHAM FIELD MILL & RESURFACE TAXIWAY A, (PHASE 1 DESIGN) *Non-SIS*Length: .000Type of Work: AVIATION PRESERVATION PROJECT Lead Agency: FDOT
LRTP#: p. 8, Appendix DAVIATION PRESERVATION PROJECT TAXIWAY A (PHASE 1 DESIGN)
CAP DPTO 0 0 0 0 120,000 120,000CAP LF 0 0 0 0 30,000 30,000
Total 0 0 0 0 150,000 150,000
Prior Years Cost 0 Future Years Cost 0 Total Project Cost 150,000
(April 1, 2016) Page 87C - 3
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
FM# 4364001 (TIP# ) WITHAM FIELD RUNWAY PROTECTION ZONE CLEARING AND IMPROVEMENTS *Non-SIS*Length: .000
Type of Work: AVIATION PRESERVATION PROJECT Lead Agency:
LRTP#: p. 8, Appendix D
CAP DPTO 0 0 25,000 0 0 25,000
CAP FAA 0 0 450,000 0 0 450,000
CAP LF 0 0 25,000 0 0 25,000
Total 0 0 500,000 0 0 500,000
Prior Years Cost 0 Future Years Cost 0 Total Project Cost 500,000
FM# 4364011 (TIP# ) WITHAM FIELD REHAB OF MC NON-MOVEMENT AREAS PHASE III (DESIGN & CST) *Non-SIS*Length: .000
Type of Work: AVIATION CAPACITY PROJECT Lead Agency:
LRTP#: p. 8, Appendix D
CAP DPTO 0 0 800,000 0 0 800,000
CAP LF 0 0 200,000 0 0 200,000
Total 0 0 1,000,000 0 0 1,000,000
Prior Years Cost 0 Future Years Cost 0 Total Project Cost 1,000,000
FM# 4379631 (TIP# ) WITHAM FIELD, AIRPORT SECURITY FENCE *Non-SIS*Length: .000
Type of Work: AVIATION SECURITY PROJECT Lead Agency:
LRTP#: p. 8, Appendix DProject Type: Imported
CAP DPTO 0 800,000 0 0 0 800,000
CAP LF 0 200,000 0 0 0 200,000
Total 0 1,000,000 0 0 0 1,000,000
Prior Years Cost 0 Future Years Cost 0 Total Project Cost 1,000,000
Page 89C - 5
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
FM# 4379641 (TIP# ) WITHAM FIELD, WILDLIFE FENCE *Non-SIS*Length: .000
Type of Work: AVIATION SAFETY PROJECT Lead Agency:
LRTP#: p. 8, Appendix DProject Type: Imported
CAP DPTO 0 50,000 0 0 0 50,000
CAP FAA 0 900,000 0 0 0 900,000
CAP LF 0 50,000 0 0 0 50,000
Total 0 1,000,000 0 0 0 1,000,000
Prior Years Cost 0 Future Years Cost 0 Total Project Cost 1,000,000
FM# 4379711 (TIP# ) WITHAM FIELD, AIRPORT ADMIN AREA BUILDING REMOVAL & SITE *Non-SIS*Length: .000
Type of Work: AVIATION REVENUE/OPERATIONAL Lead Agency:
LRTP#: p. 8, Appendix DProject Type: Imported
CAP DPTO 0 0 200,000 0 0 200,000
CAP LF 0 0 50,000 0 0 50,000
Total 0 0 250,000 0 0 250,000
Prior Years Cost 0 Future Years Cost 0 Total Project Cost 250,000
FM# 4379801 (TIP# ) WITHAM FIELD RWY 25 BLAST PAD AND TWY A HOLDING BAY (DESIGN & CST.) *Non-SIS*Length: .000
Type of Work: AVIATION CAPACITY PROJECT Lead Agency:
LRTP#: p. 8, Appendix DProject Type: Imported
CAP DPTO 160,000 0 0 0 0 160,000
CAP LF 40,000 0 0 0 0 40,000
Total 200,000 0 0 0 0 200,000
Prior Years Cost 0 Future Years Cost 0 Total Project Cost 200,000
Page 90C - 6
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
FM# 4346241 (TIP# ) WITHAM FIELD CONSTRUCT AIRPORT INTERCONNECT RD.(PHASE 2) *Non-SIS*Length: .000Type of Work: AVIATION PRESERVATION PROJECT Lead Agency: FDOT
LRTP#: p. 8, Appendix DAVIATION PRESERVATION; INTERCONNECT ROAD (PHASE 2)
CAP DPTO 0 480,000 0 0 0 480,000CAP LF 0 120,000 0 0 0 120,000
Total 0 600,000 0 0 0 600,000
Prior Years Cost 0 Future Years Cost 0 Total Project Cost 600,000
FM# 4346371 (TIP# ) WITHAM FIELD MILL & RESURFACE TAXIWAY A *Non-SIS*Length: .000Type of Work: AVIATION PRESERVATION PROJECT Lead Agency: FDOT
LRTP#: p. 8, Appendix DTAXIWAY A AVIATION PRESERVATION
MSC LF 0 0 300,000 0 0 300,000MSC DPTO 0 0 1,200,000 0 0 1,200,000
Total 0 0 1,500,000 0 0 1,500,000
Prior Years Cost 0 Future Years Cost 0 Total Project Cost 1,500,000
(April 1, 2016) Page 88C - 4
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
Section G - Districtwide
(April 1, 2016) Page 91G - 1
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
FM# 2337031 (TIP# ) MARTIN CO STATE HWY SYS ROADWAY *Non-SIS*Length: .000Type of Work: ROUTINE MAINTENANCE Lead Agency: Managed by FDOT
LRTP#: p. 8, Appendix DMNT D 550,000 550,000 550,000 550,000 0 2,200,000
Total 550,000 550,000 550,000 550,000 0 2,200,000
Prior Years Cost 10,010,492 Future Years Cost 0 Total Project Cost 12,210,492
FM# 2337032 (TIP# ) MARTIN CO STATE HWY SYS BRIDGES *Non-SIS*Length: .000Type of Work: ROUTINE MAINTENANCE Lead Agency: Managed by FDOT
LRTP#: p. 8, Appendix DMNT D 45,000 45,000 45,000 45,000 0 180,000
Total 45,000 45,000 45,000 45,000 0 180,000
Prior Years Cost 1,158,883 Future Years Cost 0 Total Project Cost 1,338,883
FM# 2339565 (TIP# ) MARTIN CO - MAINTENANCE AT MOWING & LITTER CONTRACT *Non-SIS*Type of Work: ROUTINE MAINTENANCE Lead Agency: FDOT
LRTP#: p. 8, Appendix DMNT D 120,000 0 0 0 0 120,000
Total 120,000 0 0 0 0 120,000
Prior Years Cost 65,862 Future Years Cost 0 Total Project Cost 185,862
(April 1, 2016) Page 92G - 2
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
FM# 2339567 (TIP# ) MARTIN CO-PRIMARY MOWING & LITTER CONTRACT *Non-SIS*Length: .000Type of Work: ROUTINE MAINTENANCE Lead Agency: Managed by FDOT
LRTP#: p. 8, Appendix DProject Type: ImportedMNT D 0 0 0 0 150,000 150,000
Total 0 0 0 0 150,000 150,000
Prior Years Cost 0 Future Years Cost 0 Total Project Cost 150,000
FM# 2342651 (TIP# ) MARTIN CO - MAINTENANCE FROM INTERSTATE TO ROADWAY *SIS*Type of Work: ROUTINE MAINTENANCE Lead Agency: FDOT
LRTP#: p. 8, Appendix DMNT D 500,000 200,000 200,000 200,000 0 1,100,000
Total 500,000 200,000 200,000 200,000 0 1,100,000
Prior Years Cost 5,738,110 Future Years Cost 0 Total Project Cost 6,838,110
FM# 2342652 (TIP# ) MARTIN CO INTERSTATE BRIDGES *SIS*Length: .000Type of Work: ROUTINE MAINTENANCE Lead Agency: Managed by FDOT
LRTP#: p. 8, Appendix DMNT D 70,000 20,000 20,000 20,000 0 130,000
Total 70,000 20,000 20,000 20,000 0 130,000
Prior Years Cost 437,461 Future Years Cost 0 Total Project Cost 567,461
(April 1, 2016) Page 93G - 3
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
FM# 4130805 (TIP# ) TREASURE COAST - MAINTENANCE FROM PAVEMENT MARKERS TO PRIMARY *Non-SIS*Type of Work: ROUTINE MAINTENANCE Lead Agency: FDOT
LRTP#: p. 8, Appendix DMNT D 10,000 0 0 0 0 10,000
Total 10,000 0 0 0 0 10,000
Prior Years Cost 50,000 Future Years Cost 0 Total Project Cost 60,000
FM# 4130806 (TIP# ) PRIMARY RETRO-REFLECTIVE PAVEMENT MARKERS (RPM'S) *Non-SIS*Length: .000Type of Work: ROUTINE MAINTENANCE Lead Agency: Managed by FDOT
LRTP#: p. 8, Appendix DMNT D 0 55,000 0 0 0 55,000
Total 0 55,000 0 0 0 55,000
Prior Years Cost 0 Future Years Cost 0 Total Project Cost 55,000
FM# 4130807 (TIP# ) PRIMARY RETRO-REFLECTIVE PAVEMENT MARKERS (RPM'S) *Non-SIS*Length: .000Type of Work: ROUTINE MAINTENANCE Lead Agency: Managed by FDOT
LRTP#: p. 8, Appendix DMNT D 0 0 0 55,000 0 55,000
Total 0 0 0 55,000 0 55,000
Prior Years Cost 0 Future Years Cost 0 Total Project Cost 55,000
(April 1, 2016) Page 94G - 4
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
FM# 4241336 (TIP# ) TREASURE COAST STRIPING PRIMARY *Non-SIS*Length: .000Type of Work: ROUTINE MAINTENANCE Lead Agency: Managed by FDOT
LRTP#: p. 8, Appendix DMNT D 0 0 150,000 0 0 150,000
Total 0 0 150,000 0 0 150,000
Prior Years Cost 0 Future Years Cost 0 Total Project Cost 150,000
FM# 4241337 (TIP# ) TREASURE COAST STRIPING PRIMARY *Non-SIS*Length: .000Type of Work: ROUTINE MAINTENANCE Lead Agency: Managed by FDOT
LRTP#: p. 8, Appendix DProject Type: ImportedMNT D 0 0 0 0 150,000 150,000
Total 0 0 0 0 150,000 150,000
Prior Years Cost 0 Future Years Cost 0 Total Project Cost 150,000
FM# 4293105 (TIP# ) TREASURE COAST HERBICIDE APPLICATION PRIMARY ROADS *Non-SIS*Length: .000Type of Work: ROUTINE MAINTENANCE Lead Agency: Managed by FDOT
LRTP#: p. 8, Appendix DROUTINE MAINTENANCE; HERBICIDE APPLCIATION
MSC D 0 0 100,000 0 0 100,000Total 0 0 100,000 0 0 100,000
Prior Years Cost 0 Future Years Cost 0 Total Project Cost 100,000
(April 1, 2016) Page 95G - 5
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
FM# 4297744 (TIP# ) TREASURE COAST PRIMARY ASPHALT REPAIR *Non-SIS*Length: .000Type of Work: ROUTINE MAINTENANCE Lead Agency: Managed by FDOT
LRTP#: p. 8, Appendix DMNT D 0 0 0 300,000 0 300,000
Total 0 0 0 300,000 0 300,000
Prior Years Cost 0 Future Years Cost 0 Total Project Cost 300,000
FM# 4379921 (TIP# ) RESURFACE TPK MAINLINE IN MARTIN CNTY, MP 117.843 - 138.037 *SIS*Length: 20.194Type of Work: RESURFACING Lead Agency: Managed by FDOT
LRTP#: p. 8, Appendix DProject Type: ImportedPE (PENA) PKYR 1,577,000 0 0 0 0 1,577,000
CST PKYR 0 23,351,903 0 0 0 23,351,903Total 1,577,000 23,351,903 0 0 0 24,928,903
Prior Years Cost 72,827 Future Years Cost 0 Total Project Cost 25,001,730
FM# 4379922 (TIP# ) THERMOPLASTIC FOR MARTIN CNTY RESURFACING, MP 117.843 - 138.037 *SIS*Length: 20.194Type of Work: SIGNING/PAVEMENT MARKINGS Lead Agency: Managed by FDOT
LRTP#: p. 8, Appendix DProject Type: ImportedCST PKYR 0 0 889,980 0 0 889,980
Total 0 0 889,980 0 0 889,980
Prior Years Cost 0 Future Years Cost 0 Total Project Cost 889,980
(April 1, 2016) Page 96G - 6
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
PhaseFund
Source 2016/17 2017/18 2018/19 2019/20 2020/21 Total
FM# 4379923 (TIP# ) ROADSIDE IMPROVEMENTS IN MARTIN CNTY, MP 117.843 - 138.037 *SIS*Length: 20.194Type of Work: GUARDRAIL Lead Agency: Managed by FDOT
LRTP#: p. 8, Appendix DProject Type: ImportedCST PKYI 0 5,752,545 0 0 0 5,752,545
Total 0 5,752,545 0 0 0 5,752,545
Prior Years Cost 329,608 Future Years Cost 0 Total Project Cost 6,082,153
(April 1, 2016) Page 97G - 7
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
Project Index (by Name)
FM # TIP # Project Name Page
4383431 . . . . . . . . . . . . . . . . . . . . . . . . . . . CR-609 FROM .51 MILES N. OF MINUTE MAID RD TO 3.2 MILES AT THE S CURVE . . . . . . . . . . . . . . A-394351391 . . . . . . . . . . . . . . . . . . . . . . . . . . . CR-707/SE BEACH ROAD FROM PALM BEACH/MARTIN CL TO CR-708/SE BRIDGE ROAD . . . . . . . A-194381251 . . . . . . . . . . . . . . . . . . . . . . . . . . . CR-708/SE BRIDGE ROAD FROM SE FLORA AVE TO SE PLANDOME DRIVE . . . . . . . . . . . . . . . . . . . A-374330691 . . . . . . . . . . . . . . . . . . . . . . . . . . . CR-708/SW BRIDGE RD FROM SR-76/SW KANNER HWY TO SW PRATT-WHITNEY RD . . . . . . . . . . A-11
2309782 . . . . . . . . . . . . . . . . . . . . . . . . . . . CR-714/INDIAN ST - MARTIN DOWNS TO MAPP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-2
4348381 . . . . . . . . . . . . . . . . . . . . . . . . . . . CR-714/SW MARTIN HWY FR. SW FOX BROWN RD TO WEST OF SR-9/I-95 . . . . . . . . . . . . . . . . . . . . A-17
4354531 . . . . . . . . . . . . . . . . . . . . . . . . . . . HIGH MEADOW AVE FROM MARTIN HWY TO SR-714/MARTIN DOWNS BVLD . . . . . . . . . . . . . . . . . . A-21
4342731 . . . . . . . . . . . . . . . . . . . . . . . . . . . I-95/SR-9 FR PALM BEACH COUNTYLINE TO N OF CR-807/SE BRDG RD . . . . . . . . . . . . . . . . . . . . . . A-134342734 . . . . . . . . . . . . . . . . . . . . . . . . . . . I-95/SR-9 FROM PALM BEACH/MARTIN CO LINE TO CR-708 INTERCHANGE . . . . . . . . . . . . . . . . . . . A-14
4383471 . . . . . . . . . . . . . . . . . . . . . . . . . . . INDIAN STREET FROM DIXIE HIGHWAY TO ST. LUCIE BLVD. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-44
4367351 . . . . . . . . . . . . . . . . . . . . . . . . . . . JONATHAN DICKINSON STATE PARK-FLAP GRANT FOR TRAIL & US-1 SIGNALIZTION . . . . . . . . . . A-264354131 . . . . . . . . . . . . . . . . . . . . . . . . . . . MAPP RD. FROM SW MARTIN DOWNS BLVD TO SW MARTIN HIGHWAY . . . . . . . . . . . . . . . . . . . . . . A-204331591 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN AIRPORT MASTER & ECONOMIC DEVELOP PLAN UPDATE . . . . . . . . . . . . . . . . . . . . . . . . . C-42339565 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO - MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-22342651 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO - MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-32342652 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO INTERSTATE BRIDGES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-32337032 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO STATE HWY SYS BRIDGES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-22337031 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO STATE HWY SYS ROADWAY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-24134931 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO TRANSIT CAPITAL - 5307 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-34071892 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO TRANSIT OPERATING - STATE GRANT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-22339567 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN CO-PRIMARY MOWING & LITTER CONTRACT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-34071893 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY BLOCK GRANT OPERATING ASSISTANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-24278033 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY JPA SIGNAL MAINTENANCE & OPS ON SHS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-5
(April 1, 2016) Page 98
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
Project Index (by Name)
FM # TIP # Project Name Page
4346611 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY SECTION 5339, CAPITAL FOR BUS & BUS FACILITIES . . . . . . . . . . . . . . . . . . . . . .. . B-5
4259773 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY SECTION 5311, OPERATING RURAL FUNDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-44385241 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY SERVICE DEVELOPMENT STUART- TRAM PURCHASE ... . . . . . . . . . . . . . . . . . . . . B-64385221 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY SERVICE DEVELOPMENT- STUART TRAM IMPROVEMENTS ... . . . . . . . . . . . . . . . B-64346601 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY TRANSIT CORRIDOR TREASURE COAST EXPRESS . . . . . . . . . . . . . . . . . . . . . . . B-54259772 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY TRANSIT OPERATING - 5311 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-44278304 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN COUNTY UPWP FY 2020/2021 - 2021/2022 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-84278302 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN MPO PL FY 16/17 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-64137332 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN MPO TRANSIT PLANNING - 5303 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-54278303 . . . . . . . . . . . . . . . . . . . . . . . . . . . MARTIN UPWP FY 18-19/19-20 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-74383461 . . . . . . . . . . . . . . . . . . . . . . . . . . . MONTEREY ROAD FROM KINGSWOOD TERRACE TO ST. LUCIE BLVD . . . . . . . . . . . . . . . . . . . . . . . A-434364251 . . . . . . . . . . . . . . . . . . . . . . . . . . . MURPHY ROAD BRIDGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-254130806 . . . . . . . . . . . . . . . . . . . . . . . . . . . PRIMARY RETRO-REFLECTIVE PAVEMENT MARKERS (RPM'S) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-44130807 . . . . . . . . . . . . . . . . . . . . . . . . . . . PRIMARY RETRO-REFLECTIVE PAVEMENT MARKERS (RPM'S) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-44379921 . . . . . . . . . . . . . . . . . . . . . . . . . . . RESURFACE TPK MAINLINE IN MARTIN CNTY, MP 117.843 - 138.037 . . . . . . . . . . . . . . . . . . . . . . . . . . G-64379923 . . . . . . . . . . . . . . . . . . . . . . . . . . . ROADSIDE IMPROVEMENTS IN MARTIN CNTY, MP 117.843 - 138.037 . . . . . . . . . . . . . . . . . . . . . . . . . G-64349761 . . . . . . . . . . . . . . . . . . . . . . . . . . . S.E. SEABRANCH BLVD. FROM S.E. RETREAT DR. TO SR-5/US-1 . . . . . . . . . . . . . . . . . . . . . . . . . . . A-184383421 . . . . . . . . . . . . . . . . . . . . . . . . . . . SAVANNAH ROAD FROM NE CARDINAL AVENUE TO JENSEN BEACH BOULEVARD . . . . . . . . . . . . A-384368511 . . . . . . . . . . . . . . . . . . . . . . . . . . . SE COVE ROAD FROM SR-76/SW KANNER HWY TO US-1/SR-5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-274380721 . . . . . . . . . . . . . . . . . . . . . . . . . . . SE DIXIE HWY/CR-A1A FR SE JEFFERSON ST TO SE INDIAN ST . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-364380711 . . . . . . . . . . . . . . . . . . . . . . . . . . . SE INDIAN ST FR US-1/FEDERAL HWY TO S OF RAILROAD CROSSING . . . . . . . . . . . . . . . . . . . . . . A-354368611 . . . . . . . . . . . . . . . . . . . . . . . . . . . SE KINDRED STREET/SE JOHNSON AVE FROM SOUTH COLORADO TO SR-5/US-1 . . . . . . . . . . . . A-284360961 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-5/US-1 FROM NORTH OF SALERNO RD. TO NORTH OF CENTRAL PARKWAY . . . . . . . . . . . . . . A-224369671 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-5/US-1 NORTH OF NW BRITT ROAD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-314385661 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-5/US-1 NORTH OF NW BRITT ROAD - RESERVE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-464383451 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-5/US-1 ROOSEVELT BRIDGE RESTRIPING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-41
(April 1, 2016) Page 99
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
Project Index (by Name)
FM # TIP # Project Name Page
4383452 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-5/US-1 SB LEFT TURN LANE ONTO JOAN JEFFERSON WAY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-424327051 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-710/BEELINE HWY FROM E. OF SR-76 TO PALM BEACH/MARTIN CL . . . . . . . . . . . . . . . . . . . . . . A-104192522 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-710/WARFIELD BLVD FROM MARTIN POWER PLANT TO CR609/SW ALLAPATTAH RD . . . . . . . A-34383441 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-714/SW MARTIN HWY FROM CITRUS BLV TO SW MARTIN DOWNS BLV - RESERVE . . . . . . . . . A-404368701 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-714/SW MARTIN HWY FROM CITRUS BLVD. TO SW MARTIN DOWNS BLVD. . . . . . . . . . . . . . . . A-304323481 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-732/JENSEN BCH BL FROM SR-5/US-1 TO SAVANAH RD. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-94342751 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-76 KANNER HIGHWAY PORT MAYACA AREA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-154226413 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-76/KANNER HWY - from LOST RIVER ROAD to MONTEREY RD. . . . . . . . . . . . . . . . . . . . . . . . . . . A-44347331 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-9/I-95 @ SR-714 INTERCHANGE - LANDSCAPING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-164377011 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-9/I-95 FROM S OF REST AREA TO S OF SR-714/MARTIN HWY . . . . . . . . . . . . . . . . . . . . . . . . . . . A-324380401 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-9/I-95 INTERCHANGE WITH SR-76/KANNER HWY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-344333491 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-A1A AT SEWALL'S POINT ROAD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-124368691 . . . . . . . . . . . . . . . . . . . . . . . . . . . SR-A1A FROM EAST OF LYONS BRIDGE TO SR-732/JENSEN BEACH BLVD. . . . . . . . . . . . . . . . . . . . A-294383481 . . . . . . . . . . . . . . . . . . . . . . . . . . . ST. LUCIE BLVD FROM INDIAN ST TO E. OCEAN BLVD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-454363771 . . . . . . . . . . . . . . . . . . . . . . . . . . . SW MAPP RD.FROM SR-714/SW MARTIN DOWNS BLVD TO SW BRIDGEWAY ST. . . . . . . . . . . . . . . A-234363781 . . . . . . . . . . . . . . . . . . . . . . . . . . . SW MURPHY RD. FROM SW MAPP RD/SW MATHESON AVE TO MARTIN/ST. LUCIE CL . . . . . . . . . A-244379922 . . . . . . . . . . . . . . . . . . . . . . . . . . . THERMOPLASTIC FOR MARTIN CNTY RESURFACING, MP 117.843 - 138.037 . . . . . . . . . . . . . . . . . . . G-64130805 . . . . . . . . . . . . . . . . . . . . . . . . . . . TREASURE COAST - MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-84293105 . . . . . . . . . . . . . . . . . . . . . . . . . . . TREASURE COAST HERBICIDE APPLICATION PRIMARY ROADS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-54297744 . . . . . . . . . . . . . . . . . . . . . . . . . . . TREASURE COAST PRIMARY ASPHALT REPAIR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-64241336 . . . . . . . . . . . . . . . . . . . . . . . . . . . TREASURE COAST STRIPING PRIMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-5
(April 1, 2016) Page 100
Martin MPO Transportation Improvement Program - FY 2016/17 - 2020/21
Project Index (by Name)
FM # TIP # Project Name Page
4241337 . . . . . . . . . . . . . . . . . . . . . . . . . . . TREASURE COAST STRIPING PRIMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-54378381 . . . . . . . . . . . . . . . . . . . . . . . . . . . US-1/SR-5 FROM SOUTHEAST HERITAGE BLVD. TO NORTH OF SALERNO RD. . . . . . . . . . . . . . . . . A-334310351 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD - TAXIWAY A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-24315151 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD - TAXIWAY D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-34346241 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD CONSTRUCT AIRPORT INTERCONNECT RD.(PHASE 2) . . . . . . . . . . . . . . . . . . . . . . C-64346371 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD MILL & RESURFACE TAXIWAY A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-74346201 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD MILL & RESURFACE TAXIWAY A, (PHASE 1 DESIGN) . . . . . . . . . . . . . . . . . . . . . . . . C-54364011 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD REHAB OF MC NON-MOVEMENT AREAS PHASE III (DESIGN & CST) . . . . . . . . . . . . C-94364001 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD RUNWAY PROTECTION ZONE CLEARING AND IMPROVEMENTS . . . . . . . . . . . . . . C-84379801 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD RWY 25 BLAST PAD AND TWY A HOLDING BAY (DESIGN & CST.) . . . . . . . . . . . . . . C-134379711 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD, AIRPORT ADMIN AREA BUILDING REMOVAL & SITE PREPARATION . . . . . . . . . . . C-124379631 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD, AIRPORT SECURITY FENCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-104379641 . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHAM FIELD, WILDLIFE FENCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-11
(April 1, 2016) Page 101